Five Year Capital Requirements Committee
Thursday, May 27, 2010 at 2:00 p.m.
Delchamps Room, 161 North Section Street
AGENDA
1. Discuss Goals of the Committee
2. Develop future work session plan ... meetings with Department Heads etc
3. Seek consensus on future meeting dates
4 . Roundtable overview of submitted General Fund and Utilities plans ... your
observations and perspectives are important
STATE OF ALABAMA
COUNTY OF BALDWIN
)(
)(
The Five Year Capital Requirements Committee met at 2:00 p.m.,
City Hall , Delchamps Room, 161 North Section Street,
Fairhope, Alabama 36532, on Thursday, 27 May 2010.
Present were:
Stan Grubin , Chairman
Members: Lonnie Mixon, Dan Stankoski, John Gutknecht
Mac McCawley and Mayor Kant were absent.
Stan Grubin called the meeting to order at 2:05 p.m. He announced that Mayor Kant
would not be attending the meeting, but wanted the following points mentioned:
1) We need some feel for available cash in order to set priorities on capital spending
proposed.
2) We need to impress on Department Heads that their list is unrealistically large
3) The cumulative Sales Tax Reserve should be about 20% -safe limit $4 million .
Gregg Mims stated there was no effort to slice and dice the 5-year plan . This process will
reduce and show some that may have been missed .
Lonnie Mixon stated we have no idea how much we can spend. And, we need at least $5
million to $6 million in reserves. This committee's job is to prioritize the capital
requirement needs of the City.
Dan Stankoski said the residents of the City do not pay for themselves and we can't
finance based from their revenue. We could balance our budget if we draw from our
Utilities.
Develop future work session plan . . . meetings with Department Heads and Seeking
consensus on future meeting dates was discussed next. Mr. Grubin said we need to set
the next meeting dates and suggest preparation for the meetings. Department Heads
should rank order for importance of the City.
John Gutknecht discussed the Strategic Plan and the SWOT Analysis. Some of the main
needs were a new computer system, fleet management/maintenance, and infrastructure
improvements. This is a checklist for priorities .
James Gillespie stated that the Five Year Plan was developed as a wish list and the
Strategic Plan is a list of priorities.
Five Year Capital Requirements Committee
Thursday, 27 May 2010
Page-2-
Dan Stankoski said to give Department Heads both plans, have them prioritize based on
the two, and bring back to Committee.
Gregg Mims mentioned the Public Works 5-year plan may change drastically based on
the Bids and RFQs that are being prepared.
Lonnie Mixon told Gregg Mims to make sure Department Heads know they will not have
to think about money, just prioritize the needs of the City.
Dan Stankoski said whatever we do it is not in stone. Of the priorities , which ones are
critical?
Stan Grubin mentioned we are going to go line by line for each capital requirement.
John Gutknecht stated the Committee needs to supplement the Strategic Plan information
with the Five Year Capital Requirements Plan.
There being no further business to come before the Five Year Capital Requirements
Committee, the meeting was duly adjourned at 2:45 p.m.
~~
• Stan Grubin, Chairman
.J.
STATE OF ALABAMA )(
COUNTY OF BALDWIN )(
The Five Year Capital Requirements Committee met at 2:00 p.m.,
City Hall , Delchamps Room, 161 North Section Street,
Fairhope, Alabama 36532, on Thursday, 27 May 2010.
Present were:
Stan Grubin, Chairman
Members: Lonnie Mixon, Dan Stankoski, John Gutknecht
Mac McCawley and Mayor Kant were absent.
Stan Grubin called the meeting to order at 2 :05 p.m. He announced that Mayor Kant
would not be attending the meeting, but wanted the following points mentioned:
1) We need some feel for available cash in order to set priorities on capital spending
proposed.
2) We need to impress on Department Heads that their list is unrealistically large
3) ~cem1e Stteam is ti:om cun:eHt revefttle , aottds ,-and""™es t&.-safe limit $4 millio~
Tl-Ji? 9-Vt::Ufl.Jc;, SA~£.j' TA>-RJ-.5 6-JZVtr J/.ld U:0 I/Gr-Alfotrr zo ~ ,) n: r~ v tt L.Jt.
Gregg Mims stated there was no effort to slice and dice the 5-year plan. This process will
reduce and show some that may have been missed.
Lonnie Mixon stated we have no idea how much we can spend. And, we need at least $5
million to $6 million in reserves. This committee 's job is to prioritize the capital
requirement needs of the City.
Dan Stankoski said the residents of the City do not pay for themsel v es and we can't
finance based from their revenue. We could balance our budget if we draw from our
Utilities.
Develop future work session plan . . . meetings with Department Heads and Seeking
consensus on future meeting dates was discussed next. Mr. Grubin said we need to set
the next meeting dates and suggest preparation for the meetings. Department Heads
should rank order for importance of the City.
John Gutknecht discussed the Strategic Plan and the SWOT Analysis. Some of the main
needs were a new computer system, fleet management/maintenance, and infrastructure
improvements. This is a checklist for priorities.
James Gillespie stated that the Five Year Plan was developed as a wish list and the
Strategic Plan is a list of priorities.
Council President Mixon announced he wanted to appoint a Study Group for
the Five Year Capital Improvement Plan which would consist of the following
members: Stan Grubin and Mac Mccawley from the F AC , John Gutknecht, Mayor
Timothy Kant , and Councilmembers: Lonnie Mixon and Dan Stankoski .
Councilmember Quinn moved to appoint the above Study Group as presented .
Seconded by Councilmember Kingrea, motion passed unanimously by voice vote.
City of Fairhope -S Year Capital Requirements submitted by Department Heads
2011 2012 2013 2014 2015 Totals
Civic Center Dept 30 $200,000 $100,000 $10,000 $20,000 $20,000 $350,000
Volunteer Fire Dept $111,000 $104,000 $63,000 $1,553,000 $79,000 $1,910,000
QC Golf Course $52,000 $28,000 $55 ,000 $18,000 $18,000 $171,000
IT Dept 10 $2,030,000 $665,000 $540,000 $50,000 $50,000 $3,335,000
Museum Dept 30 $8 ,000 $12,000 $0 $0 $0 $20,000
Nix Center Dept 30 $45,000 $25 ,000 $40,000 $25,000 $0 $135,000
Parks & Recreation Dept 25 $191,000 $270,000 $151,000 $170,000 $67 ,000 $849,000
Planning and Building Dept 10 $20,000 $20,000 $20,000 $20,000 $20,000 $100,000
Police Dept Communications $0 $0 $100,000 $7 ,800 $0 $107,800
Police Dept Corrections $91,500 $0 $0 $0 $0 $91,500
Police Dept Crime Suppression Team $28,000 $15,000 $0 $0 $0 $43,000
Police Dept K9 Division $13,000 $13,000
Police Dept Spl Operations/Traffic $28,000 $22 ,000 $0 $0 $0 $50,000
Police Dept Station Control Division $557,050 $194,300 $1 28,750 $171 ,000 $121,500 $1,172,600
Police Dept Swat Team $10,000 $0 $0 $0 $0 $10,000
Police Dept Training/ Acreditation Unit $36,906 $36,906 $0 $0 $0 $73,812
Police Dept Administration $0 $0 $1 ,500,000 $0 $0 $1,500,000
Police Dept Animal Control Shelter $0 $10,000 $0 $0 $0 $10,000 $3,071,712 Police Total
Public Works Sanitation Dept 40 $1,505,000 $0 $560,000 $0 $710,000 $2,775,000
Public Works Streets Dept 35 $3 ,712,700 $269,000 $404,000 $1 ,665,000 $407,000 $6,457,700 $9,232,700 PW Total
Welcome Center $70,000 $75,000 $0 $0 $0 $145,000
Energy Audits 6 Buildings $0 $49,134 $0 $0 $0 $49,134
Total General Fund $8,696,156 $1,908,340 $3,571,750 $3,699,800 $1,492,500 $19,368,546
Electric Department $1,880,000 $1 ,445,000 $1,655 ,000 $1,590,000 $1,770,000 $8,340,000
Gas Dept $496,848 $409,300 $591,920 $777,720 $405,416 $2,681,204
Sewer Dept $2 ,650,000 $2,685,000 $2,650,000 $679,000 $650,000 $9,314,000
Water Dept $2,998,800 $923,643 $455,000 $3 ,945,000 $1 ,610,000 $9,932,443
Total Utilities $8,025,648 $5,462,943 $5,351,920 $6,991,720 $4,435,416 $30,267,647
Fairhope Grand Total $16,721,804 $7,371,283 $8,923,670 $10,691,520 $5,927,916 $49,636,193
5/20/10-Stan Grubin 990-9113
CITY OF FAIRH)PE
DEBT -@ 4/30,10
Debt
Original Balance
Debt lnstrunent Debt Amount @4/30/2010
Bond/Warrant Cebt Service
2002 URW 6 ,720 ,000 6 ,720 ,000
2002 GOW 5 ,775 ,000 4 ,715 ,000
2005 URW 8,455 ,000 7 ,720 ,000
2007 GOW 7 ,900 ,000 7 ,530 ,000
2009 URW 1,250 ,000 1,170 ,000
Notes Payable
NIP -Hancock Bank 3,430,000 3,430 ,000
Fuel Oil Supply P'Operty 230 ,000 20 ,333
E-One Pumper 198 ,617 47 ,745
Hancock Bank -l 'brary Loan 1 ,300 ,000 1,001 ,000
RSC Bank -Utilifos LOC 0 0
T otal Debt $35 ,258,617 $32 ,354 ,079
Debt Limit , per City Council Ordinance 2/25/08
Debt Margin
5/14/2010
N.Wilson
GENERAL
FUND
4 ,505 ,654
7 ,530 ,000
3 ,368 ,260
0
47 ,745
1,001 ,000
0
$16 ,452 ,659
$18 ,500 ,000
$2 ,047 ,341
Prin .
Final Maturing Monthly
UTILITIES Maturity DatE in FY 2010 payment
6 ,720 ,000 12/1/2025 0 27 ,540
209 ,346 6/1/2025 240 ,000 37 ,685
7 ,720 ,000 12/1/2020 265 ,000 47 ,371
0 6/1/2032 195 ,000 44 ,031
1,170 ,000 12/1/2019 80 ,000 13 ,994
61 ,740 6/1/2020 210 ,000 28 ,000
20 ,333 3/7/2012 26 ,052 annual pmt-3/1 O
0 4/1/2012 22 ,1 97 annual pmt 4/10
0 4/1/2018 130 ,000 annual pmt 4/10
0 6/30/2010 0 0
$15,901,419 $1 ,744,064
Date :
To :
From :
July 21 , 2009
Fairhope City Council
Strategic Planning Steering Committee
Subject: Results to Date of the Strategic Planning Process and Identification of
Critical Issues for the City 's Strategic Plan
This memorandum with appendixes reports the results to date of the strategic planning
process by city department heads, with assistance from members of the Strategic
Planning Steering Committee and identifies the most critical issues to be addressed in a
strategic plan for the City of Fairhope.
Following recommendations by the Strategic Planning Process Committee in their final
report , dated July 28, 2008 , a Strategic Planning Steering Committee was formed to
assist the Mayor and department heads in the formation of a three year strategic plan for
the city. Steering Committee members met with the Mayor and department heads on
January 8 , 2009 , to outline the general approach to the planning process which was
modeled after the Government Finance Officers Association (GFOA) process used in the
Fai rhope Governmental Structure Committee recommendations .
The strategic planning process involves:
1. Defining the mission statement for each department.
2. Conducting a Strengths, Weaknesses, Opportunities , Threats (SWOT)
analysis to define the threats or weaknesses that will prevent the effective
implementation of each department's mission as well as what strengths and
opportunities can be exploited to facilitate the department's effectiveness.
3. Analysis of SWOT results to determine the most critical issues to consider in
implementation of a strategic plan to improve city government effectiveness.
4 . Creation of a strategic plan encompassing action plans to establ ish priorities ,
required resources and funding , assignment of responsibilities ,
implementation timeline , etc. to effect resolution of defined critica l issues.
Steps one through three have been completed . The critical issues are presented in
Appendix A. Additional identified issues requiring resolution a re contained in Appendix
B. These issues did not meet the critical defin ition , but are important to the c ity's ability
to operate effectively and efficiently and reduce liabilities.
The Strategic Planning Process Committee's final report (July 2008) recommended the
Mayor and key department heads create a three year strategic plan , including action
plans (Step Four), utilizing the SWOT analyses .
On May 4, 2009 , the critical issues (Appendix A) were presented by the Steering
Committee to Gregg Mims, then General Superintendent, Nancy Wilson, T reasurer, and
James Gillespie, Administrative Superintendent to assist the department heads with
Step Four, the creation of a strategic plan and act ion plans . Messer's. Mims and
Gillespie and Ms . Wilson reviewed the critical issues. In June, Mr. Mimms
recommended presentation of these issues to the City Council.
1
The Steering Committee is compiling a master file of all supporting documentation for
Appendixes A and B for use and additions by the Mayor and department heads in
creating a three year strateg ic plan/action plans (Step Four), and budgetary cycles ,
beginning with fiscal year 2010.
2
APPENDIX A
Critical Issue 1 -Replacement of the AS/400
Critical Issue 2 -Condition of city fleet
Critical Issue 3 -Condition of city equipment/infrastructure
Critical Issue 4 -Human Resource Allocation , Utilization and Training
Appendix 8
3
Page4
Pages
Page 6-7
Pages 8-9
Pages 10-11
Critical Issue #1 -Replacement of AS/400:
The AS/400 is the core computer/management information system the city is supposed
to use to manage its financial, personnel, inventory, and other computerized city
operations. The inadequacy of the system is the single, most often identified
weakness in departmental SWOT analyses. Due to its technological limitations and
lack of flexibility , many departments have abandoned use of this obsolete system and
developed their own data bases and methods. This has led to a lack of systems
integration and a breakdown in inter-department communications. In addition , a third
party vendor consisting of one individual is required to add, remove or change any
custom reports that are necessary to run daily operations.
Strategic Planning Steering Committee Recommendation:
Direct the Information Technology Department to identify state of the art technology to
replace the AS/400 and define procurement and other costs and resources necessary to
implement and maintain the new system. Once identified, obtain city council approval
for procurement. A new system will eliminate the need for third party vendor services .
4
Critical Issue #2 -Condition of City Fleet:
A recurring issue in the majority of departments' SWOT analyses is the condition of city
vehicles and the need for a comprehensive fleet management program including
provisions for a formal fuel tracking and usage program and the replacement of obsolete
equipment in a timely manner. The following are the needs identified by the department
heads:
Parks and Recreation:
Public Works:
Utilities -Gas:
Utilities -Water:
Utilities -Electric:
Fire Department:
Needs to replace four vehicles.
Pass and implement a modification to the
waste management ordinance for once a week
garbage collection . The expected annual cost
savings is $250,000. Begin a staggered
replacement of worn out vehicles such as trash
trucks, transfer truck and trailer, bull dozer, leaf
vacuums , etc.
Old equipment is minimally useful or obsolete
and in need of replacement.
There is a lack of funds to replace
obsolete equipment in a timely manner.
Old equipment is minimally useful or obsolete
and in need of replacement (e.g. a 29 year old
derrick truck, old generators and truck 201 -a 1992
bucket truck , and truck 281 -a 1991 pickup.)
A new fire truck will be needed when the fourth
fire station is completed . Estimated cost is
$500,000.
Strategic Planning Steering Committee Recommendation:
Develop a city wide comprehensive fleet management program based on:
Condition
Need 1
Replacement costs
Operational costs
1 Need -Encompasses effect of equipment failure on city revenue/costs, interruption of city
services, increase of liabilities to the city, negative effect on worker efficiency, etc .
5
Critical Issue #3 -Condition of City Equipmentllnfrastructure:
The SWOT analyses identified many issues involving the condition of city equipment and
physical infrastructure across departments. The following are the needs identified by the
department heads:
Parks and Recreation :
Quail Creek:
Nix Center:
Utilities -Gas:
Utilities -Water:
Utilities -Electric:
Library :
Police:
Purchase of two mowers at $35,000 to $40,000
each, and three at $10,000 each . Total cost-
approximately $110,000. Current equipment needs
constant repair.
There are too many trees on the course.
The fire alarm system is in need of repair. The roof
leaks and requires repair or replacement.
Approximately nine miles of cast iron pipe
needs replacement, pursuant to governmental
directive .
A number of generators are obsolete and in need of
replacement. Fifty percent of sewer lines are over
50 years old and in need of repair/replacement.
Need to bring oil management program into
compliance with Environmental Protection
Agency (EPA) regulations governing PCBs.
Ensure satisfactory physical condition of the
infrastructure (e.g . substations, overhead
wires, poles, transformers, and breakers.) Fire
retardant clothing is needed for the workers.
Maintenance and adjustment of HVAC system
needed to correct inefficiency and
uncomfortable temperatures.
A new records management/ Computer Aided
Dispatch (CAD) system (estimated cost $100,000.)
Components of this system include, but are not
limited to , linkage with the state judicial , court and
jail systems, evidence software, traffic/template,
and increased supervisory oversight of all
functions . Both ALDOT and the ACJIC beginning in
201 O will only accept electronic submission of
required reports (Traffic accidents-ALDOT &
Uniform Crime Report-ACJIC). City misses
opportunities for grant funding due to inability to pull
statistical data other than manual counting. There
is an on-going cost of approximately $3000 to
$5000 annually for maintenance and support. The
intention is to purchase this with asset forfeiture
6
funds if received . If not, it must be funded by the
city.
Qualify 43 officers twice a year requires 12,040
rounds plus an additional 25 ,800 rounds to give
each officer 50 rounds a month . Note: Both sworn
officers and reserve officers who are APOST-
certified are required to qualify. Cost $7640.
Purchase of 14 Digital Alley in-car cameras at a
cost of $63,000. The in-car cameras collect
valuable video evidence used in court proceedings ,
increasing conviction rates. Also, the cameras
document officer encounters to protect the
department and the city from unjust complaints and
reduce the city's exposure to civil liabilities.
Purchase of 30 Toughbook laptop computers at
$3 ,500 for a total of $105,000. Thirty mounts for
a total of $8 ,370. Installation of 30 mounts, is
$8,370. Total $121,740. Computers will be tied into
the new dispatch and record system . Officers will
not need to come to the office to complete or
transmit reports . Officers will be spending more
time in the field on patrol and investigations .
Strategic Planning Steering Committee Recommendation:
Identify those items that need immediate action based on:
Condition
Need 2
Replacement costs
Operational Costs
2 Need -Encompasses effect of equipment failure on city revenue/costs , interruption of city
services , increase of liabilities to the city, negative effect on worker efficiency, etc .
7
Critical Issue #4 -Human Resource Allocation, Utilization and Training:
The appropriate allocation , full utilization , and proper training of city employees is
necessary to ensure the city is operating in the most cost effective manner in providing
city services. The following are the needs identified by the department heads:
Nix Center:
Parks and Recreation :
Purchasing:
Information Technology:
Building :
Human Resources :
Planning :
Police:
Needs one more full time employee as all staff, other than
the director are part time help ages 70 to 80.
Needs full time help with mowing , etc.
Warehouse staffing is inadequate. One Warehouse Clerk
and helper are responsible for all shipping and receiving ,
unloading , inventory, paper and computer posting for all
items to and from the warehouse . The servicing of all city
departments by these two men cannot be done without
backup by the purchasing staff, who, in order to assist
must stop procurement of materials and services needed
by other departments resulting in delays and increased
costs.
A one person department is inadequate to meet city
demands of over 300 employees in a dozen city-owned
buildings. This decreases response time to minor issues,
and increases the amount of time it takes to design and
implement major information technology initiatives.
A void is left by the loan of the permit clerk . Due
to the hiring freeze, departments have been shifting
employees around departments. Planning is presently
sharing a planning clerk with Building , but that leaves
Planning short handed to meet urgent needs.
A one person department is inadequate to administer the
human resources , employee benefits and payroll for
approximately 330 employees.
A full/part time civil engineer will be needed before the next
building boom begins. At least before applications and
building permits pick up again so the individual could help
conduct necessary studies to address the problems of
storm water standards, drainage systems, drainage ways ,
flood plains, etc.
Need adequate personnel to ensure adequate coverage
with anticipated growth . FHPD officers are currently
serving a large jurisdiction (88 sq . miles) using minimal
staffing (33 officers .) Due to the large jurisdiction and the
rate of population growth in this jurisdiction, the FHPD
hiring rates need to increase as well . Current jurisdictional
8
Fire :
population exceeds 36,000. Freeze on training funds
adversely impacts yearly required APOST training,
decreases the quality of service and potentially increases
city liability.
The fire department is in dire need of a full time
administrative assistant. The Fire Chief and volunteer
secretary now maintain these duties. This is a volunteer
fire department and members have full time jobs. The
completion of paperwork, including required National
Incident Fire Reporting System reports are often delayed.
Unless a department is up to date in all required reporting ,
the ability to apply for Federal Emergency Management
Agency (FEMA) grants is affected.
Strategic Planning Steering Committee Recommendation:
Ensure all city employees currently assigned to full time positions have comprehensive
job descriptions that ensure an adequate work load that eliminates both idle down time
due to insufficient assigned tasks as well as overtime due to an overload of assigned
tasks. Conduct a review to identify underutilized personnel who could be shifted to
other departments in city government in need of additional staffing before h iring any
additional employees. Lift freeze on training budgets to ensure personnel are
adequately trained and reduce potential city liability due to inadequate training .
9
.. .
APPENDIX B
SAFETY/LIABILITY ISSUES:
• There are no loading/unloading docks at the city warehouse. Forklifts operate on
uneven pavements.
• Heavy vehicle lifts and a pit are needed in the garage for worker safety.
• The city does not have a formal safety program -no trained safety professional.
• The city does not have a certification program for forklift drivers.
OVERSIGHT OF CITY EQUIPMENT AND INVENTORY CONTROL ISSUES:
• A revised work order/inventory system is needed . The city warehouse contents
are vulnerable due to a lack of security and inventory control.
FACILITIES ISSUES:
• The City landfill is nearing capacity.
• There is a need for a new recycling center. A grant has been applied for.
• Potential startup problems for the new recreation center.
• Reduction of planting costs and elimination of need for new green houses could
be achieved through the substitution of shrubs for annual flowers where deemed
appropriate.
• The Quail Creek golf course is in need of a new irrigation system . The current
system does not cover the fairways adequately.
• Warehouse hygiene issues -One restroom to service employees and visiting
vendors is insufficient.
EQUIPMENT ISSUES:
• Equipment is needed to digitize plans and blueprints to efficiently store and
retrieve documents.
10
POLICIES/PROCEDURES:
• The Information Technology Department does not have any Standard Operating
Procedures (SOP). At this time, the one person department has not been able to
address this issue due to the first priority of keeping the city computers
functioning.
• Review the E time system to record employee working hours.
• In light of a substantive capital improvement investment in new greens, adjust
golf fees and schedules for Quail Creek while reducing operating costs, as part of
budget planning to ensure a net profit in upcoming fiscal years . The golf course
should be a self sustaining enterprise and improvements made on a pay-as-you-
go basis.
• Consider internal staffing for building maintenance to replace outside contractor .
This possibly could be accomplished through reassignment of underutilized
personnel from other departments.
• Responsibility for specifications on bid document preparation should be defined
and assigned .
11