HomeMy WebLinkAbout06-10-2010 Regular MeetingPublic Meeting Notice
Committee: Five Year Capital Requirements Committee
Date & Time: Thursday, June 10, 2010 at 4:00 p.m.
Place: Delchamps Room
161 North Section Street
Subject: Public Works
Notice must be stamped, dated and initialed before posted on
bulletin board.
POSTED
v -8 -10
DATE
(!/hdi/_a liJztzbtWUt:J
SIGNATURE
STATE OF ALABAMA
COUNTY OF BALDWIN
)(
)(
The Five Year Capital Requirements Committee met at 4:00 p.m.,
City Hall , Delchamps Room, 161 North Section Street,
Fairhope, Alabama 36532 , on Thursday, 10 June 2010.
Present were:
Stan Grubin, Chairman
Members: Lonnie Mix on , Dan Stankoski , John Gutknecht, and Mac McCaw ley
Mayor Kant was absent.
Chairman Stan Grubin called the meeting to order at 4 :05 p .m. City Administrator
Gregg Mims announced that Mayor Kant would not be attending the meeting.
Chairman Grubin announced that the first item is to approve the minutes from the
May 27, 2010 Five Year Capital Requirements Committee meeting with the correction to
Mayor Kant's statement which should read as "3) the cumulative sales tax reserve should
be about 20% -safe limit $4 million." John Gutknecht moved to approv e the minutes
from the May 27 , 2010 Five Year Capital Requirements Committee meeting as amended.
Seconded by Lonnie Mix on, motion passed unanimously by voice vote. Mr. Grubin then
announced that the June 3 , 2010 meeting did not have a quorum and minutes were taken
which need to be amended to remove the appro v al of the May 27 , 2 010 minutes. Mr.
Grubin, then stated if there are no other corrections , the minutes stand approved as
amended.
The following topics w ere discussed :
• Mr. Grubin stated he sent the revised Utilities spreadsheet to the Financial
Advisory Committee for review. The Water & Sewer Department will be the
biggest problem due to the large dollar amounts ; these may need to be spread out
over time for completion.
• Jennifer Fidler, Public Works Director, passed out a Capital E xpenditure Plan she
had prepared for this meeting. Then, began her discussion w ith the Sanitation
Department and two options which would minimally impact the customers '
routine for garbage and recycling pickup . Her suggestion to the committee was
Option #2.
• Gregg Mims reminded the committee that the bid for garbage contract was still
out and mentioned contracting out fleet maintenance like the C ity of Opelika.
Five Year Capital Requirements Committee
Thursday, 10 June 2010
Page-2-
• Ms. Fidler discussed the Street Department and the needed equipment. Mr.
Mixon stated that she needed to prioritize these items for all 5-years. In the Street
Department, Ms. Fidler stated that Items # 1, #2, #8, and #9 were at the top of this
list for priority.
• Mr. Mims mentioned that Item # 17 Automatic Gate at Warehouse would be done
in house and paid for by the 3 Utilities.
• The meeting time for the last three meetings was changed to begin at 3:00 p.m.
instead of 4 :00 p.m. to allow more time; and City Clerk Lisa Hanks was asked to
send out the public meeting notices.
Lonnie Mixon moved to adjourn the meeting. Seconded by John Gutknecht, motion
passed unanimously by voice vote.
There being no further business to come before the Five Year Capital Requirements
Committee, the meeting was duly adjourned at 5:00 p.m.
~~ ✓ Stan Grubin, Chairman
....
City of Fairhope
Public Works Department
Captial Expenditure Plan
June 10, 2010
y
Public Works Department -Sanitation -Dept. 40
2011 (Nos. 1-7 if not obtained in 2010) Option one Option two
1. White Used Tractor Autocar $55,000 $55 ,000
2. Refuse Trailer $82 ,000 $82,000
3 . International 7400 -Garbage $250,000 $250,000
4. International 7400 -Garbage $250,000 $250,000
5. International 7400 -Garbage $250,000
6.
7.
8 .
9 . 416 B CAT backhoe repair $10,000 $10,000
10. Transfer Station repairs -Sanitation $25,000 $25,000
11.
12 .
13 .
14. Trash transfer station -Trash $45,000
15 . International 4900 -Repairs $15,000 $15,000
16. International 4900 -Repairs $15,000 $15,000
17. International 4900 -Repairs $15,000
18 .
19. Recycling automated cans{4,500@ $60 .00) $270,000 $270,000
20. Leaf sucker truck body $25,000 $25 ,000
21. Garbage cans $15,000 $15,000
Total $ 1,322,000. 1,012,000.
Both options save approximately $120,000 in labor, the cost of three employees.
Recommendation : Option 2
-
tal Reguirements for 2011 to 2015 by De12artmer -
I
Rank of
Dept. Item Descri~tion Priority 2011 2012 2013 2014 2015 Totals
Water Water line Hwy 13 & 104 to back of Rock Creek 1 2,267,800 2,267,800
Water Repaint 2 million gallon water tank 1 552,643 552,643
Water Water Tank Rock Creek 1/5 million gallons 1 3,450,000 3,450,000
Water International 4300 Heavy Construct ion Truck 1 85,000 85,000
Water Repaint 1 million gallon water tank 1 450,000 450,000
Water Water line from Hwys 104 & 13 going west to US 98 2 325,000 325,000
Water 12 inch water main Hwy 104 south to Hwy 98 2 1,200,000 1,200,000
Water Ford F-650 Heavy Construction Truck 2 85,000 85,000
Water Electronic reading Water meters 2 350,000 350,000
Water Ford F-250 Heavy Water System Truck 2 35,000 35,000
Water Ford F-250 Heavy Water System Truck 3 35,000 35,000
Water Chevy 2500 Service Truck 3 20,000 20,000
Water Chevy Kodiak C-60 Heavy Construction Truck 3 85,000 85,000
Water Back hoe trailer 3 21,000 21,000
Water Ford F-150 Service Truck 3 25,000 25,000
Water Electronic reading Water meters 4 350,000 350,000 350,000 1,050,000
Water Chevy Colorado Truck 4 25,000 25,000
Total Water Department 3,427,800 923,643 3,905,000 495,000 1,310,000 10,061,443
Sewer Upgrades to sewage treatment plant 1 2,000,000 2,000,000 2,000,000 6,000,000
Sewer Sewer line rehab 1 200,000 200,000 400,000
Sewer Sewer line rehab 2 200,000 200,000 200,000 600,000
Sewer Manhole rehab 2 100,000 100,000 200,000
Sewer Manhole rehab I 3 100,000 100,000 100,000 i 300,000
Sewer Truck 3 29,000 29,000
Sewer Generators for lift stations i 3 350,000 350,000
Sewer Generators for lift stations 4 350,000 350,000 350,000 350,000 1,400,000
Sewer /System Truck i 4 1 3s,ooo I I 35,000 I
I
! Total Sewer Department I I 2,650,000 2,Gas,000 I 2,Gso,000 I 679,ooo I Gso,ooo I 9,314,000
-
Rank of
Dept. Item Descrigtion Priorit:i£ 2011 2012 2013 2014 2015 Totals
Gas Cast Iron Replacement (Fruit & Nut section} 1 2,500 2,500 2,500 2,500 2,500 12,500
Gas Back feed southern part of system Hwy 44 & 98, 32, 98 2 90,000 140,000 66,516 296,516
Gas Back feed southern part of system Hwy 98, 24 & 34 2 85,000 85,000
Gas Back feed southern part of system Hwy 104 & 13 2 60,000 60,000
Gas Boring Machine 3 85,000 85,000
Gas Trencher Combo Tractor 3 75,000 75,000
Gas Service Truck 3 35,000 35,000 70,000
Gas
1 Welding Truck 3 60,000 60,000
Gas Pick-up Truck 4 15,000 15,000 30,000
Gas Welding Truck 4 60,000 60,000
Gas Service Truck 4 45 ,000 45,000
Gas Pick-up Truck 5 20,000 20,000
Gas Rectifier Station 6 20,000 20,000
Total Gas Department 232,500 162,500 112,500 237,500 174,016 919,016
Electric Vehicles 1 215,000 200,000 415,000
Electric New breakers for Church St Substation 1 65,000 65,000
Electric Technology Upgrades -Smart Grid 1 350,000 350,000
Electri c New transformer at Church St Substation 1 350,000 350,000
Electric Pole Replacement 2 75,000 75,000
Electric New Transformers at Volanta Ave Substation 2 300,000 300,000
Electric New regulators for Church St Substation 2 100,000 100,000
Electric Vehicles 2 250,000 250,000 500,000
Electric SCADA Upg~ade 3 100,000 100,000
Electric 46kv switch es 3 45,000 45,000
Electric Vehicles 3 200,000 200,000
Electric Volanta Ave regulators I 3 100,000 100,000
Electric Underground buri al of existing overhead lines 3 1,000,000 1,000,000
Electric 46kv switches 4 45,000 45,000
Electric Pole Replacement 4 75,000 75,000 75,000 225,000
Electric I lSkv Gang Sw itches I 5 25,000 25,000
Electric I 1skv Gang Switches i SI I 2s,ooo I I ! 25,000 '
I Rank of
I
I
I
I --I I
I
Dept. Item Des cri~t ion Priorit:l 2011 2012 2013 2014 2015 I Totals I
El ectric 46kv sw itches 5 i 4s,ooo I i i 45,000
Electr ic Underground burial of existing overhead lines 5 750,000 750,000
Electri c New Pole Yard Next to Twin Be ach Substation 6 35,000 35,000
Electric AMR Meter Purchase 6 50,000 50,000
Electric Technology Upgrades -Smart Gri d 6 500,000 500,000
Electric New 115/46kv Transformer at Tw in Beach Substation 7 600,000 I 600,000
Electric Underground burial of existing ov erhead lines 7 750,000 750,000 1,500,000
Electric AMR Meter Purchase 8 50,000 50,000
Electric Underground burial of existing ov erhead l i nes 9 750,000 750,000
Total Electric Department 1,895,000 1,445,000 1,735,000 1,525,000 1,600,000 8,200,000
Grand Total Utilities 8,205,300 5,216,143 8,402,500 2,936,500 3,734,016 28,494,459