HomeMy WebLinkAbout01-19-2010 Regular MeetingPublic Meeting Notice
Committee: Fairhope Airport Authority
Date & Time: Tuesday, January 19, 2010 at 4:30 p.m.
Place: Conference Room
161 North Section Street
Subject: See Posted Agenda
Notice must be stamped, dated and initialed before posted on
bulletin board.
POSTED
I -&-1a
SIGNATURE
Fairhope Airport Authority
Agenda -January 19, 2010
4:30 p.m. in the Mayor's Conference Room
City Hall -161 N. Section St., Fairhope, AL
• Approval of Minutes for December 15 , 2009 meeting
• Wetlands Mitigation Bank project
• Setting the date for the February meeting
• Baldwin County EMA Hurricane Expo -May 22, 2010
• Treasurer's report
• New business
Schedule Of Future Meetings
(Note: Regular meetings are on the 3 rd Tuesday of each month at 4:30 p.m. in the
Mayor's Conference Room at City Hall, 161 N. Section St., Fairhope, AL.)
• Next regular meeting: February, 2010 -date to be determined
The Fairhope Airport Authority met Tuesday, January 19, 2010, at 4 :30 PM
at the City Administration Building, 161 N. Section Street.
Present: Chuck Zunk, Members Joe McEnerney, Charlie Bassett, Dan
Stankoski, Howard Haldey. David Bagwell, Attorney, Rod Platt, Howard
Hadley; Absent: Pam Caudill and Gregg Mims. Guest: Christopher Baker.
Pandora Heathcoe , City Administrative Assistant took the minutes.
The minutes of the December 15th meeting were considered and duly
approved on motion by 1st Charlie Bassett, 2 nd by Dan Stankoski and
unanimously carried .
Next Meetini, -The next monthly meeting was scheduled for Wednesday,
February 17 at 4 :30 p.m . and duly approved on motion by 1st Howard
Hadley, 2nd by Rod Platt and unanimously carried .
Baldwin County EMA Hurricane Exp -Chuck Zunk reported he had spoken
to the EMA concerning the upcoming Hurricane Expo being held at the
Robertsdale Coliseum on May 22, 2010 . There will be Hurricane Hunters
flying into Keesler AFB but and would like to have them at the Fa i rhope
Airport for a day. The City would provide security and fire protection . T here
would only be one aircraft. This was approved on motion by 1st Howard
Hadley, 2nd by Charlie Bassett and unanimously carried .
Wetlands Mitigation Bank project -Guest, Christopher Baker brought six
d ifferent layouts and descriptions of the options for each layout. Each layout
displayed: the number of lots that could be developed , amount of
infrastructure costs per lot, range of acres per lot, proposed wetland areas,
total wetland acreage on-site, and total estimated credits in dollars . Board
members voiced that they preferred Option 5 but with all the development
kept on the West side. The Board also voiced how they believe the road
should have access to both County Road 32 and County Road 98 . They felt
that limiting the access to both roads would decrease the land value for sale .
The Board also voiced how they would like to "name the stream ." The
$SOOK stream credit is a fixed figure . Christopher Baker said he would redo
the displays and have them ready for the next meeting in February. He also
stated that the survey is complete.
Treasurer's Report -Due to the City clos i ng the year end , there are not any
financial statements for December available at th is time . There have not
been any new expenses to date. The ONO policy has been renewed . There
is also $100 ,000 in the bank that still needs to be placed in a CD .
1
165
New Business-Rod Platt stated that the URL has been renewed with
Godaddy.com for $15 .37. Charlie Zunk stated that the FFA has advised
that they will be changing the identifier code from 4R4 to KCQF.
There being no further business and was duty approved on motion by 1st
Dan Stankoski, 2 nd by Charlie Basssett and unanimously carried ; therefore ,
meeting was duly adjourned at 5 :35 PM.
lbJ
2
Preliminary Layout Project Summary
Option 1
30 lots
5,845 LF road
•
•
•
•
•
•
•
1,753,500 infrastructure costs= 58,450 pilot
Lots range from 1.3 acres to 4.13 acres
Proposed wetland area= 35.90 acres
Total wetland on-site= 48 .3 acres
21 est. credit = $735,000
Option 2
• 5 Lots
• 2,025 LF Road
• 607,500 infrastructure costs= 121,500 pilot
• Lots range from 2.03 acres to 5.44 acres
• Proposed wetland area = 92 acres
• Total wetland on-site = 104 acres
• 46.8 est. credit= $1,638,000
Option 3
• 37 Lots
• 6,963 LF Road
• 2,076,900 infrastructure costs = 56, 132 pilot
• Lots range from 1.05 acres to 6.75 acres
• Proposed wetland area= 36 .80 acres
• Total wetland on-site = 49.22 acres
• 22 est. credit= $775,215
Option 4
• 27 Lots
• 5,917 LF Road
• 1,775,100 infrastructure costs = 65,744 pilot
• Lots range from 1.39 acres to 3.54 acres
• Proposed wetland area = 75.56 acres
• Total wetland on-site = 86.98 acres
• 39 est. credit= $1,369,935
Option 5
• 26 Lots
• 5,947 LF Road
• 1,784,100 infrastructure costs= 68,619 p/Lot
• Lots range from .94 acres to 4.67 acres
• Proposed wetland area = 82.36 acres
• Total wetland on-site= 94.78 acres
• 42 est. credit= $1,492,785
L I ;:J
Option 6
• 27 Lots
• 4,732 LF Road
• 1,416,600 infrastructure costs= 52,466 pilot
• Lots range from 1.3 to 3.8 acres
• Proposed wetland area = 85.82 acres
• Total wetland on-site= 98.24 acres
• 44.2 est. credit= $1,547,280
r--------------Htrr~ON, MOORE~ RAUCH, LLC -----
M~WIND:RIVE
E)/O l )lttu ♦Suav1vou
LAND PLAXNH,t
NOT TO SCALE
SITE DATA TABLE
W-.111'1 • ........... ft.(LILk.e..t -~ .... __,,. ....... .... 1l'IIL..,,,,.. • ...... .., ft. Cl.Ml .IIC.aJ ,...,,......,.., • ,,....,111-n.(Saaa,CJJ
10'b&, U' • ., ----l8IS -a.wt .u. ftlll;U' ............. _. ,.-u.
ffUl,U .• ,__...., • ..... U .
t .,.,
-------------HlITCHINSON, MOORE & RAUCH, LLC -----
QiJ.101-1 di EliGINEUS •Sun ■vOIS r· LAND Pu11111u
HIGHWAY32
McGOWIN Oll!VE
NOT TO SCALE
SITE DATA TABLE --. --. """............ . """ .......... . IM&U •• __.. ...... 1811 •
1lllfll.U .............. T •
....... -.n.cMIMac.a)
........ .....-&~ ........ n., .... ..c:..J ........ n., .. -.., ........ ._.,_
~ u
Cl)
,--------------HUTCHINSON.MOORE at RAUCH, LLC -----
0,J.to,I ,I E)ICJNaLas ♦S u l\'&YOlS r" "' , L•ND PL.lN.lllll
HIGHWAY32
McGOWIN DRIVE
NOT TO SCALE
Sift DATA TillB
....... • ........ n. ....... ..u, -~ .. _. ........... ....,.
""'-lmmic~ • ....... n.c.-..ac..1
""" ..... ___ ............ ,,_ (t&M c.tj
WIM.U.--.-,.iae • ~tStU.
wal.U.W...,_......, • UITLr.
I"/ I
HUTCHINSON, MooRE & RAu E11G111nu• Suavnou CH, LLC -------
LAND PLAIINBU
NOT TO SCALE
SITE DATA TABLE
McGOWIN DllIVE
l O I
HUTCHmSON M ' OORE&R ENGUl!.ns ♦S AUCH, LLC
L&)II) p Ul\'IYOll ---
LANNa&.I
NOT TO SCALE