Loading...
HomeMy WebLinkAbout06-20-1951 Regular MeetingSTATE OF ALABAMA County of Baldwin The Waterworks and Sewer Board met in regular session at the Citk.. Hall on June 20, 1951 with the following members present: Chairman R. Roy Moyers, L. A. Berglin, Sr., Arthur Mannich, Marie Moore and City Superintendent C. B. Niemeyer. The minutes of the previous regular meeting were read and approved. On motion by Mr. Mannich seconded by Mr. Berglin the follow- ing bills were approved for payment: Standard Equipment Co. $ 270.57 Gaston Motor Co. 4.75 The California Insurance Co. 52.92 Fairhope Service Center 5.80 Chicago Pump Company 6.53 Fuel Oil Supply Company American Bitimuls Co. 120.72 Poser Printing Co. 22.98 0. Forster and Sons 60.00 W. S. Dickey Clay Co. 454.72 Motio n by Mr. Berglin seconded by Mr. Mannich that the Water and Sewer Fund increase their monthly payment to the General Fund for Clerical services to $200.00. Motion carried. Motion by Mr. Mannich seconded by Mr. Berglin that George Dyson's salary be increased 10%. Motion carried. Motion by Mr. Berglin seconded by Mr*. Mannich that Mr. Donald Mills be authorized to secure bids on cleaning out and testing old well located on the beach. Motion carried. It was duly moved and seconded that the meeting adjourn. Motion carried. Approved Chai an Attest: S c. & Treas. CONTRACT THIS AGREFI�F NT made between DONALD MILLS, Consulting Engineer, Selma, Alabama, Engineer, and the WATER WORKS BOARD, Town of Fairhope, Alabama, Client, witnesseth that whereas the Client wishes to construct Water Works Improvements hereinafter referred to as 'tthe project", and not having engaged other Engineers for the work, wishes to engage the services of the Engineer in connection there- with, the parties hereto agree as follows: 1. THE ENGINEER (a) will make the necessary tidies, investigations and preliminary surveys of the proposed improvements and prepare an engineering report and preliminary estimate of cost. (b) will then confer with the Client regarding the recommended improvements and will make such changes and additions as are requested. (c) after the Client has arranged the necessary financing for the project, will prepare complete construction plans, specificiations and contract documents cover- ing the improvements decided upon and will furnish -the client with one set bearing the approval of the State Department of Health or other authority involved. (d) will assist the Client in obtaining bids by circular- izing contractors, reporting agencies and material manufacturers in order to give the proposed construct- ion wide publicity and thus ensure keen competition and lower prices. He will furnish prospective bidders with copies of the plans, specifications and bidding documents and will be present at the bid opening to read, tabulate and check the proposals and to recommend contract awards. (e) will furnish the necessary supervision during the con- struction period and will prepare periodical estimates of the value of the work performed and a final estimate upon the completion of the project. 2. THE CLIENT will pay the engineer for his services in the following manner: (a) The sum of t100.00 upon receipt of the report and estimate set forth in 1 (a). (b) An amount equal to 4% of the contract price, less the preliminary paymenti at the time the contract is awarded, or 412% of the estimated cost, less the pre- liminary payment, when the plans and specifications are delivered, if the work is to be performed by day labor. • - s (c) An amount equal to 3% of the cost of the completed work, payment to be made monthly and to be based on the cost of the work completed each month. 3. (a) In the event that the report made by the Engineer shall result in supplying owners water needs without the construction of new facilities, it is agreed that the total fee to be paid for the services of the Engineer will be the percentage of the costs thereof as herein provided but not less than $ _ (b) It is understood and agreed that the Owner will supply the Engineer with all available data on the existing wells, including the chemical analyses of the water, or will obtain such analyses for him. IN TESTIMONY Or 1,1HIC Ii the Engineer has signed this agreement and the Client, by an appropriate resolution, moved, seconded and adopted at a legally authorized meeting of its governing body held on the, day of , 1951, has authorized this agree- ment to be executed by it Chairman and attested by its Secretary for and on its behalf. WATERWORKS BOARD, MIN OF FAT OP LABAI,IA BY _ Chairman Attest: Secr tary DONALD DII , CONSULTING ENGINES BY