HomeMy WebLinkAboutO-1804ORDINANCE NO. 1804
AN ORDINANCE TO AMEND ORDINANCE NO. 1599 ,
CODE OF ORDINANCES TO ALTER THE SCHEDULE OF FEES
FOR CONSTRUCTION AND BUILDING PERMITS.
WHEREAS T h e City of Fairhop e d es ires to en sure proper cons tru ction standards are utilize d to
provide for ad equ ate h ea lth, public safety, and we l far e of our citi zens; and ,
WHEREAS , T h e City of Fairhope des ires to b e competitive in the u ser fees charged so as to
ade qu ate l y cover the ex p en ses incurred by the City i n en forcing established constructi on
stan dards;
NOW THEREFORE, BE IT ORDAINED BY THE CITY OF FAIRHOPE ,
ALABAMA:
1. THAT, th e followin g sc h edul e of user charges ar e h ereby adopted :
New Con stru ction Pe rmi t Fees
Fees residential commercial
$6 .00 per $1000.00 of project value $6 .00 per $1000 .00 of project value
Building Pe rmit Fee (minimum of $100 .00) (minimum of $100 .00)
$1 . 00 per $1000 of project value
Electrical Permi t Fee $75 .00 (minimum of $100 .00)
Temoorarv Elect. Fee $25 .00 $25.00
$1.00 per $1000 .00 of project value
Plumbing Permi t Fee $75 .00 (minimum of $100 .00)
$1.00 per $1000.00 of project value
Mec hanical Perm it Fee $75 .00 (minimum of $100.00)
Secu rity/Stru ctured Wi re/
Fire Alarm sta nd alone $ .50 per $1000 .00 of project value
perm it $25 .00 (minimum of $50 .00)
Fire Suppression hood
(sta nd alone oroiect) N/A $1 .00 per $1000.00 of project value
Sprinkler System $50 .00 $1 .00 oer $1000 of project value
Food Truck lnsoections N/A $50.00
$5 .00 per $1000 .00 of project value ,
Generator $100 .00 (minimum of $200 .00)
Sewe r Tao Inspection Fee $25 .00 $50.00
Fee determ in ed by Gas Dept Fee determined by Gas Dept
Gas Permit Fee (Ordinance 1701) (Ordinance 1701)
$2.50 per $1000 .00 of project value
(For informal reviews , fee may be
charged as calculated using the ICC
Building Code Valuation Tab les .
$75 .00 3rd party reviews shall be either the
(For informal reviews with no cost of the review or the standard
contractor of record listed , a review charge of $2 .50/$1000 , whichever is
Plan Review Fee fee of $200 .00 mav be charged) greater)
$5.00 per $10 00 .00 of value (min $5 .00 per $1000.00 of project value
Fence Perm it Fee $25 .00) (minimum of $50 .00)
$5.00 per $1000.00 of project value
Sian Perm it Fee N/A (minimum of $50 .00)
New Construction Permit Fees
Fees residential commercial
Demolition Perm it Fee $25 .00 $50.00
$100.00 for the first reinspection , $200 .00 for the second reinspection ,
Re insoect ion Fees $300.00 fo r the third reinsoection .
$5 .00 per $1000 .00 of project value $5 .00 per $1000 .00 of project value
Roofina Permit Fee (minimum of $25 .00) (minimum of $50 .00)
Ord inance No . 1804
Page -2-
SwimminQ Pool Fees $100 .,00 $250 .00
Remodeling Permit Fees (residential and commercial)
Project value Project Value
Fees $0.00 -$5,000.00 $5,001.00 -$20,000.00
$5 .00 per $1000 .00 of project value
(residential)
$6 .00 per $1000 .00 of project value
BuildinQ Permit Fee $25 .00 (commercial)
Electrical Permit Fee $25 .00 $35.00
T emoorarv Elect. Fee $25 .00 $25.00
Plumbin!l Permit Fee $25 .00 $35.00
Mechanical Permit Fee $25 .00 $35 .00
Sewer Tao Inspection Fee $25 .00 $25.00
Fee determined by Gas Dept Fee determined by Gas Dept
Gas Permit Fee (Ordinance 1701) (Ordinance 1701)
Fees $20,001.00 -$50,000.00 $50,001.00 -above
$5 .00 per $1000.00 of project value $5 .00 per $1000 .00 of project value
(residential) (residential)
$6 .00 per $1000 .00 of project value $6 .00 per $1000 .00 of project value
Building Permit Fee (commercial) (commercial)
Electrical Permit Fee $50 .00 new construction rates
Temporary Elect. Fee $25 .00 new construction rates
PlumbinQ Permit Fee $50 .00 new construction rates
Mechanical Permit Fee $50 .00 new construction rates
Sewer Tap Inspection Fee $25 .00 new construction rates
Fee determined by Gas Dept Fee determined by Gas Dept
Gas Permit Fee (Ordinance 1701) (Ordinance 1701)
Fee determined by Public Works Dept Fee determined by Public Works Dept
Riqht of Wav Permit Fee (Ordinance 1757) (Ordinance 1757)
Building Moving Permit Fees
Building Moving Permit $50 .00
Required Police Escort $300 .00 (minimum)
Required Utility Department
Work $120.00 per hour (minimum of 3 hours)
Requlations qoverninq the movinq of existinq buildinqs are outlined in City Ordinance 1035
A convenience fee for all credit cards charges may apply and will be assessed directly by the credit card
processing vendor .
FINES AND PENAL TIES
Where work for which a permit is required by this Code is started or proceeds prior
to obtaining a permit , the fees herein specified shall be doubled . The payment of such
double fees shall not relieve any persons from fully complying with the requirements of this
Code in the execution of the work nor from any other penalties prescribed herein .
Fine for continuing work without a1212roved ins12ections
$500 .00 fine per occurrence may be assessed to the applicant or contractor of record for beginning or
continuing work without approved permits or inspections , as determined by the Building Official. After the
2nd documented case , further permit submittals from the applicant or contractor of record may be denied
until the case has been adjudicated by the Fairhope Municipal Court.
J
-~~ ~~
.5 ~
i .r:.
..!!!
]5
::::,
D...
.~
"E
0
Ordinan ce No . 180 4
Page -3-
Fine for submitting incorrect contractors on a Qermit aQQlication
$100 .00 fine per occurrence may be assessed if an inspection is scheduled and performed with an
incorrect subcontractor listed on the permit, as determined by the Building Official. There will be
no fine or charge for contractor changes submitted to the Building Department prior to any
inspection beinQ performed .
OccUQ:l£ing a Structure without a Certificate of OccuQanc:l£ {CO}
$500 .00 fine may be assessed to the applicant or contractor of record if a structure is occupied
prior to the issuance of a CO , as determined by the Building Official. Separate fines may be
assessed for each day of occupancy without a CO . After the 2nd documented case , further permit
applications from the applicant or contractor of record may be denied until the case has been
adjudicated by the Fairhope Municipal Court.
Refund PoliC:l£
Building Permit fees of $200.00 or greater may be refunded within 180 days of the expiration of the
permit if no work has taken place. The refund policy only applies to primary building permit and
Impact Fees , and a written request to refund the fees and void the permit must be submitted by the
permit applicant. An administrative fee of $50 .00 will be deducted from the amount of the refund to
be issued .
2. SEVERABILITY CLAUSE, If any sub se c tio n, se nten ce, cl au se, or phrase of thi s
ordinance is for an y reaso n held to b e un co n stitution al or otherwi se in valid b y a co urt of
co mp e ten t jurisdicti on , su ch dec isio n sh all no t affec t th e validity of th e re m ainin g
portio n s of thi s o rdinan ce.
3. EFFECTIVE D ATE, Thi s ordinanc e shall tak e effect on Septemb er 1, 2024 up on it s du e
adoption and public ation as required by law .
ADOPTED THIS 22 ND D
Co r ey M artin , Counci l Pres id ent
ATTE ST :