HomeMy WebLinkAbout02-13-1995 Regular MeetingThe Airport Board of the City of Fairhope met Monday, February 13, 1995
at the City Administration Building, 161 N. Section Street at 8:00 AM
Present: Chairman Sue Mason; members Robert Coiling, Mike Baugh,
Jeanette Puckett, Bill Payne
Sue talked about the Teledyne project. She said we have not signed
the lease yet, Thompson Engineering is doing tests on the soil around
the tanks. She told of the meeting that she, Mayor Nix and Teledyne
representatives had. That everything is going as it should, we are just
going through the hoops. That as of now we have a projection of possibly
April 1 for them opening at the airport. She talked about the proposal
that we have received from BP. That we are still buying from Exxon
but Teledyne will have to work out their own arrangements. That we
will probably install tanks above ground, or have a truck, but if we
install above ground need to move fueling area across the road, not
put back where they are now.
Sue mentioned that with the extension of the road at the airport she
has had a couple of inquiries about corporate hangars.
There was an update discussion on the ongoing lawsuit.
Tut Wynne had submitted a bill for November/December work.
A motion was made by Bill Payne, seconded by Buzz Coiling to pay.
Motion carried unanimously. Mike Baugh asked if we could get Tut
to come to the next meeting to discuss with us further the Clark case.
There being no further business, meeting was duly adjourned.