HomeMy WebLinkAbout08-27-1963 Regular Meeting12
AIRPORT BOARD
August 27, 1963
Present: Mr. Lacey and Mr. Byrne.
Note: Dr. Mullins came in later and concurred
with motion on material removal and replacing
with new material.
Guests: Mr. Schneider, Mr. Ack Moore, Mr. Barfield, Mr. Dejohn,
Mr. Taylor, and Mr. Thad Ingram.
BUSINESS:
The problem of a pool recently found on the Airport site in
the vicinity of station 20-21 was discussed. It was decided
that the dirt should be taken out and new material put in its
place and water source dried or drained out.
Mr. Lacey motioned, Mr. Byrne seconded, authorizing the engineer
to proceed in removing the material in question -- this to be
paid for from contingency funds. Cost to be at contract price
of 5.29 cu. yd. and Moore estimated about 3,000 yards involved.
Mr. Barfield stated that the cost for the "fill in" would be
about $1,000.00 and that FAA would pay half the cost.
✓Mr. Barfield asked if anyy thought had yet been given to the
tree removal on the South end of the field, clearance zone
area.
A Base Operator discussion followed.
The meeting was adjourn