Loading...
HomeMy WebLinkAbout10-04-1993 Planning Commission AgendaTO: FAIRHOPE PLANNING COMMISSION II FROM: Meeting of: 04 OCT 1993 Planning/Zoning Officer ARBOR GABLES - A Planned Unit Development by the Knight Company. This is the Final Plan for the second and final unit of Arbor Gables which includes two buildings with 24 units and support facilities. For convenience of reference, the Final Plan combines Units One and Two for recording. The Planned Unit Development was established under the provisions of the Zoning Ordinance during a public hearing convened by the City Council at its regular meeting of 11 April 1993, as Ordinance No. 931. Developers engineer has revised stormwater calculations to include runoff from both Unit One and Unit Two and represents that, based on those calculations, more than adequate retention is provided to accommodate differential runoff. It is noted that the retention pond is design d to hold water more or less continuously, with the —(:�i� retention being provided within freeboard area above the ground water table. The application and final plan appears to be in order and final approval is recommended. THE VILLAS - Application of DoLeen Inc. for Final Approval 18 Lots lying south of Quail Creek Drive near the existing tennis courts and pool. Conditional Preliminary Approval was given this subdivision at the May meeting. Conditions appear to have been met generally. However, it is noted that the temporary turnaround constructed lies outside the limits of the dedicated right-of-way. Therefore, developer should be advised that the City Council will expressly exclude that turnaround from acceptance for public maintenance. Section 94 of the Constitution of Alabama, 1901 expressly prohibits the expenditure of public funds on privately owned property. Subject to reservation set forth above, final plat approval is recommended. UNNAMED;SITE - Request for Informal Plan Review of 7 Lots off County Road 11 south of U. S. 98 in the Barnwell Community. Lots 1-4 abut paved County Road 11. Lots 5-7 abut an unpaved, county maintained road designated as Roy Henderson Lane. All lots are in excess of 15000 square 18 SEP 93 25 SEP 93 ZOCOMM93.fpc feet and are capable of service by city water supply. Whereas the total site area is only six acres, this development will not be subject to all stormwater • provisions; however, it will be necessary to provide calculations demonstrating that post -development runoff will be equal to or less than pre -development. Health department approval will be required for installation of septic tanks and drainfields. Review is informal and requires no commission action. UNNAMED SITE - request for Informal Plan Review of 5 Lots on the west side of North Bayview Street north of Atkinson Lane. Proposal is to install a privately maintained street to access the lots. Land is zoned R-2 for Single Family. Lots 2-4 will require care in design of buildings owing the the adverse width to depth ratio. Storm water runoff must be designed so as not to create an erosion problem to city park lands abutting on the west. The fire department may require a fire hydrant to be located on the access drive for fire protection, since there is inadequate space available for a turnaround at the west end of the drive. Review is informal and requires no commission action. It is noted that an application for re -subdivision of Bay Chase was received at the deadline for submittals. The Plat contained none of the required signatures and was rejected for being incomplete, in conformity with the Commission's policy. 18 SEP 93 25 SEP 93 ZOCOMM93.fpc