Loading...
HomeMy WebLinkAbout10-02-2023 Planning Commission Agenda PacketSeptember 7, 2023 Planning Commission Minutes 1 The Planning Commission met Monday, September 7, 2023, at 5:00 PM at the City Municipal Complex, 161 N. Section Street in the Council Chambers. Present: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar; Hunter Simmons, Planning and Zoning Director; Mike Jeffries, Development Services Manager; Michelle Melton, City Planner; Chris Williams, City Attorney; and Cindy Beaudreau, Planning Clerk. Absent: Jack Burrell, Clarice Hall-Black, Erik Cortines Chairman Turner called the meeting to order at 5:10 PM. Approval of the Minutes August 15, 2023: Jon Worsham made a motion to approve the minutes from the August 15, 2023. Rebecca Bryant seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar NAY: None. Chris Williams reminded the Planning Commission that they have a 5-person quorum a vote of 4 is required to take any action. A vote of 3-2 would not pass. Old/New Business: John Worsham made a motion to confirm the annual public participation forum for the October 2, 2023, meeting. Hollie MacKellar seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar NAY: None. Consideration of Agenda Items: UR 23.08 Request of Mediacom for an 11.52.11 Utility Review and approval of the proposed installation of approximately 3,078 LF of coaxial cable in the City ROW in the Tracery subdivision. Summary: Hunter Simmons, Planning and Zoning Director, presented all three cases at one time: Riverhorse, Tracery and Trentino. Mr. Simmons showed the pedestals for the cable and stated that staff does recommend approval, but staff has not received the revised plans. Mr. Simmons stated that an action must be taken during this meeting and listed the actions of recommend complete approval, denial, or to table the request. If the Planning Commission recommends approval, Mr. Simmons asked that the approval is conditioned on staff receiving revised plans before releasing construction permits. Brandon Johanson, Mediacom, 1613 Nantahala Beach Road, Gulf Breeze, FL explained that there was a misunderstanding about staff needing revised plans. Mr. Johanson stated that he would provide revised plans to staff this month. Chairman Turner suggested that Mediacom allow the Planning Commission to approve the request subject to receipt of revised plans. September 7, 2023 Planning Commission Minutes 2 Rebecca Bryant stated that she remembered the revised plans would include a reduction in quantity of the pedestals and that they may be able to be placed behind the houses in Trentino. Mr. Simmons agreed with Ms. Bryant’s recollection. The revised plans should include locations of pedestals, reducing the number and locations of other existing equipment from other utilities and try to locate in the same vicinity. Staff recommends approval subject to the following conditions: 1. A pre -construction meeting shall be held with the City prior to issuance of any permits. 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. 4. An additional right-of-way permit may be required for the potholing procedures. 5. Follow-up activities below required by staff and the applicant: 6. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. 7. Provide draft door hanger for approval at time of pre-construction. 8. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. 9. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 10. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 11. Utilities boxes shall be concentrated near existing boxes. 12. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, unless otherwise required by the Fairhope Building Department. Motion: Hollie MacKellar made a motion to approve UR 23.08, with staff recommendations and revised plans prior to issuance of construction permits. Harry Kohler seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar NAY: None. UR 23.11 Request of Mediacom for an 11.52.11 Utility Review and approval of the proposed installation of approximately 3,369 LF of buried coaxial cable in the City ROW in the Riverhorse Subdivision. Staff recommends approval subject to the following conditions: 1. A pre -construction meeting shall be held with the City prior to issuance of any permits. September 7, 2023 Planning Commission Minutes 3 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. 4. An additional right-of-way permit may be required for the potholing procedures. 5. Follow-up activities below required by staff and the applicant: 6. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. 7. Provide draft door hanger for approval at time of pre-construction. 8. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. 9. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 10. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 11. Utilities boxes shall be concentrated near existing boxes. 12. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, unless otherwise required by the Fairhope Building Department. Motion: Rebecca Bryant made a motion to approve UR 23.11, with staff recommendations and revised plans prior to issuance of construction permits. John Worsham seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar NAY: None. UR 23.12 Request of Mediacom for an 11.52.11 Utility Review and approval of the proposed installation of approximately 4,495 LF of buried coaxial cable in the City ROW in the Trentino Subdivision. Staff recommends approval subject to the following conditions: 1. A pre -construction meeting shall be held with the City prior to issuance of any permits. 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. 4. An additional right-of-way permit may be required for the potholing procedures. 5. Follow-up activities below required by staff and the applicant: 6. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. September 7, 2023 Planning Commission Minutes 4 7. Provide draft door hanger for approval at time of pre-construction. 8. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. 9. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 10. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 11. Utilities boxes shall be concentrated near existing boxes. 12. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, unless otherwise required by the Fairhope Building Department. Motion: John Worsham made a motion to approve UR 23.12, with staff recommendations and revised plans prior to issuance of construction permits. Harry Kohler seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar NAY: None. SD 23.17 Public hearing to consider the request of the Applicant, Dewberry Engineers, Inc., acting on behalf of the Owner, DR Horton, Inc. – Birmingham, for Final Plat approval for Laurelbrooke Phase I. The property is approximately 59.72 acres and is located on the east side of State Highway 181 and north of County Road 24. PPIN #34129 Chris Williams, City Attorney, excused himself from this discussion. Summary: Mike Jeffries, Development Services Manager, presented the request for Phase I of a 51-lot subdivision on the east side of State Highway 181 and north of County Road 24. The subject property is outside of the City of Fairhope municipal limits. Mr. Jeffries showed the zoning and aerial maps and the site plan along with some of the amenities. Mr. Jeffries shared aerials of the tree mitigation area and current photos of some of the amenities. Mr. Jeffries showed a photo of the detention area and explained that a synthetic mat had been added to help with landscaping. Mr. Jeffries shared the following Follow-Up Activities: • The construction of Phase 2 of Laurelbrooke is happening simultaneously and nearing completion. • Baldwin EMC, the electrical provider will not provide power until after Final Plat. o Aerators will be connected after Final Plat. • The Lift Station pumps did not meet required City Specifications. The new pumps have been ordered and approved by Fairhope Utilities. Once installed, the city of Fairhope Utilities will inspect and test for compliance. The expected installation date is approximately 2 weeks. • A mulch nature trail has been provided throughout the common areas as shown on the landscape plans. Additionally, the applicant has provided a detail of the train and maintenance plan for these trails which has been included in the Operations and Maintenance plan that will be recorded. o Currently trail has trees/limbs across trail path and needs vegetation removed from trail. September 7, 2023 Planning Commission Minutes 5 • Part of the city’s utility acceptance will include the lift station. The property around the lift station must be a lot that can be deeded over to the City of Fairhope. • The accidental removal of the 75” live oak that was going to be the tree house and focal point of the development was discussed at a previous Planning Commission. In short, the tree committee recommended the planting of one 10” live oak and 25 additional smaller oaks. • The site is 90% vegetated. An area of common area originally proposed to be undisturbed was inadvertently cleared. Included in the staff packed is the proposed mitigation of additional trees and shrubs planted in the common area designed to match existing vegetation. Sod was also laid for final stabilization. o Planning Commission may wish to have this work bonded similar to the bonding of the utilities and roads. • Landscaping/Screening needs to be added around the northwester retention pond. Preliminary plans showed this area as undisturbed, common area, and shown to be cleared. The Master Plan Rendering showed it to have a stream flowing through it. Now built, it is clearly a retention pond utilized during rain events. o A synthetic mat has been installed, hydroseed applied, has growth and is stabilized. • Invoices provided for: o Street lights o Exercise/Fitness/Play equipment o Fish to stock pond (will be stocked approximately 7 days after the aerator has been operational) Mr. Jeffries shared the following punch list items: • The City of Fairhope Utilities will inspect and test the lift station for compliance. • Aerators are installed but will not have power until after Final Plat. Baldwin EMC will not provide power until after Final Plat. Confirmation that they are operating will occur at that time. • Landscaping/screening added around retention pond to be approved by Planning Director. • Maintain trail per the provided Maintenance Plan. • Add General Note that there is a blanket utility and drainage easement over all common areas. • The “Lift Station Parcel” needs to be a numbered lot to be deeded to the City of Fairhope. • Confirmation from ALDOT all improvements in the ALDOT ROW are completed to their satisfaction. Staff recommends Conditional Approval of SD 23.17 – Laurelbrooke Phase I final plat with the following conditions: 1. Completion of the Punch List items listed above. 2. Completion of the Follow-Up Activities listed above. 3. Completed inspection report from the Baldwin County Building Department for structural integrity of the tree house. 4. Solution for Landscape Mitigation and Maintenance. Ms. Bryant asked if there was a format to bond the landscape. Chairman Turner suggested waiting for the engineer to address. September 7, 2023 Planning Commission Minutes 6 Justin Britt, Dewberry, 25253 Friendship Road, Daphne, responded to the concern by Chairman Turner about plans to keep the mitigated trees alive. Mr. Britt stated that there is not a format to bond the trees, but the owner may verbally agree to keep the trees alive. Ms. Bryant stated that much of the trust is gone following the contractor removing the 75” live oak. Mr. Britt stated that it was the contractor, not the owner, that removed the tree. Ms. Bryant reiterated that, most likely, it would be a contractor watering the landscaping, not the owner. Chairman Turner asked if Phase II had been brought to the Planning Commission. Mr. Simmons stated no, but they should see it soon. Mr. Britt stated it would be next month. Mr. Simmons stated that, typically, there would be ways to mitigate this, but due to jurisdictional changes, this is not in any building jurisdiction. Once this project is over, the only thing staff will have lingering is the maintenance bond for utilities. All the permits for the buildings will come from Baldwin County, so we are unable to hold up COs and we cannot tie it into the existing maintenance bond. A performance bond is not appropriate because the trees have been installed. Other places have come up with a simple warranty bond. Chairman Turner does not believe that we could write a bond now. We are at a point where we have to trust, knowing the lots will be worth more if the areas are more attractive and look nice. Mr. Simmons stated that a representative, stating publicly, committing to keep the trees alive could suffice. Ms. Bryant asked if the homeowners could go after the developer. Could the commitment be enforced by the homeowners and buyers? Mr. Simmons stated that anything stated in a public meeting should be able to be enforced by the City of Fairhope. Mr. Jeffries stated that even with a verbal commitment, a timeline should be listed. He suggests a two-year time limit. Taylor Henseler, DR Horton, 103 Spanish Fort Center, Daphne, committed to keeping the trees alive and stated that they are reinforcing the tree house. Mr. Simmons asked if Baldwin County requires permits for that type of structure. Mr. Henseler stated that he is sure that they do. Chairman Turner opened the public hearing at 5:35pm with no one present to speak, the public hearing was closed at 5:35pm. Motion: John Worsham made a motion to approve SD 23.17 with staff conditions. Hollie MacKellar seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar NAY: None. ZC 23.04 Public hearing to consider the request of Applicant, Ryan Baker, Walcott Adams Verneuille Architects, acting on behalf of the owner, Phillip Goodwyn, to rezone property from B-4, Business and Professional District to B3a, Tourist Resort Lodging District. The property is approximately 0.15 acres and is located at 491/493 Pine Avenue. PPIN #14838, #65661 Chairman Turner explained that zoning cases are different from other cases because the Planning Commission does not vote to approve zoning cases. The Planning Commission votes to recommend whatever the vote may be to the City Council. Mr. Simmons added that the zoning case will be held during two meetings of the City Council. September 7, 2023 Planning Commission Minutes 7 Summary: Michelle Melton, City Planner, presented the request of the applicant to rezone the property from B-4 to B3a. Ms. Melton shared the zoning map and a photo of the property. The owners intend to keep the structure as a duplex. Ms. Melton shared the differences between the B-4 and B3a zoning. Staff recommends approval of ZC 23.04. Chairman Turner asked if restaurants need to be approved by the Board of Adjustments. Ms. Melton agreed. Mr. Simmons added that the request was to be able to use the 2-unit duplex as a short-term rental. Any zoning request requires staff to review all other conditions. Chairman Turner stated that he likes the short-term rentals but asked if there were any setback differences between B-4 and B3a. Mr. Simmons stated there are differences in the setbacks and that there is the ability to have the B3a on the cusp of the CBD. Ms. Bryant was confused by the term of bed and breakfast. Ms. Simmons stated that is a use of the B3a. If it were a bed and breakfast, another review would be required. Hollie MacKellar stated that there had been discussions about extending the CBD and having an overlap to prepare for the growth. Mr. Simmons stated that there has not been a consensus of extending the CBD. Ryan Baker, 1 South School Street spoke that the owners want to do short term rentals. Because this is a small parcel, it would be hard to do mixed use or restaurant. The goal is to turn the duplex into short term rental when needed. Owner, Phillip Goodwyn, 497 Pine Avenue, explained that an easement is shared between the two properties. The plan is to relandscape behind it to make it more of a hideaway for someone to stay short term. The do not plan to cut any trees or tear any houses down. Chairman Turner opened the public hearing at 5:51pm. Dean Mosher, 456 Oak Avenue, spoke in support of the owners. The public hearing was closed at 5:52pm. Motion: John Worsham made a motion to recommend approval of ZC 23.04 to the City Council. Hollie MacKellar seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar NAY: None. ZC 23.05 Public hearing to consider the request of Applicant, Jade Consulting, LLC, acting on behalf of the owner, Two Hands Design and Development LLC, to amend Hill Top PUD – Lot 29 setback from 100’ to 20’. The property is approximately 1.14 acres and is located on the west side of Section Street and south of Petiole Dr. PPIN #389630 Summary: Hunter Simmons, Planning and Zoning Director, presented the request of the applicant to amend the Hill Top PUD – Lot 29 setback from 100’ to 20’. The property annexed in as a PUD. The approved PUD states that the setback is 100’ from the center of Section Street. That is a county regulation for a construction setback. Staff worked with the applicant and agreed that a 30’ setback from the front property line is more appropriate. Mr. Simmons shared the zoning and aerial maps and the two revised paragraphs for the Hill Top PUD Ordinance. Mr. Simmons showed the original plat with the 100’ September 7, 2023 Planning Commission Minutes 8 construction setback and the proposed aerial of the 30’ setback which would align with the homes. The 30’ setback allows a structure to be built on flatter land. Mr. Simmons explained further landscaping will be required to fill in the buffer. Staff recommends approval of ZC 23.05 to amend the front setback for Lot 29 from 100’ as measured from the centerline of Section Street to 30’ as measured from the property line; and add the two proposed paragraphs clarifying the intent of Lot 29. Mr. Simmons addressed the comments received from the residents. The preliminary plat was approved in 2019 creating Lot 29. At that time, it was unzoned. The property was final platted in August 2020 and in November 2021, the Planning Commission discussed the original PUD which confirmed the uses and went twice to the City Council in 2022. Much of this was approved prior to the sale of some of the homes. Trey Jinright, Jade Consulting, 208 Greeno Road, explained that the request is only to amend the setback from 100’ construction setback to 30’ front setback. Chairman Turner asked for the net sum difference. Mr. Jinright stated that it is close to a 20’-30’ difference. The goal is to pull it away from the waterway in the back to give flexibility to place the building along the highway. Mr. Jinright envisions this as an entryway into the downtown area as a cornerstone. When the request was originally approved, the uses were restricted to neighborhood use type facilities. With the reduction in the setback, he agreed to add some architectural standards so the structures will have a residential feel. Once the uses are established, the buffers will be included which should address some concerns of the residents. Parking will be on the side or to the rear of the structure. Chairman Turner opened the public hearing at 6:02pm. Kendall Douglass, 147 Hyacinth, explained that they put an offer on a house prior to the PUD being approved. They did not receive any notifications at that time. He was unaware of any zoning changes prior to receiving notification of this meeting. He does agree with the setback change but is concerned about the parking and is unsure if the buffer will help with noise of a gravel parking lot. He asked about moving the setback on the southern portion of Lot 29. Chairman Turner asked if this would come back for a site plan review. Mr. Simmons stated that it is unlikely unless the height on the mixed use would trigger it and explained that moving the setback is just about the placement of the building which is currently proposed approximately 80’ from the south property line. Mr. Simmons explained that there are two more public hearings through the City Council regarding this property where Mr. Douglass would be allowed to speak. Geri Cope, 151 Hyacinth, spoke. She is the middle home. She asked if the building could be placed closer to the north. She asked if ribbons could be tied around the trees so they would not be accidentally cut down. Mr. Simmons explained that the developer has taken great care with the trees in that development. Chairman Turner explained that there are tree protection ordinances. She asked if they would be informed of any future meetings. Mr. Simmons stated that the fully amended ordinance will be advertised and will be placed on two of the City Council agendas. Frank Vitello, 20040 Highway 181, is a real estate broker. He was involved in the sale. He believes the issue is with the RSA not the developer. He is concerned about the clients that will be in the building, specifically the coffee shop and exercise studio. The amount of traffic off Section Street is a concern. Mr. Vitello asked if a restriction can be placed on the volume of traffic. Chairman Turner explained that the PUD has been approved already as is. Ms. Bryant explained that the residents may have been given misinformation prior to the purchase of their home. Ms. Bryant stated that she had not considered the noise of a gravel drive, but a different pervious surface may be better. September 7, 2023 Planning Commission Minutes 9 The public hearing was closed at 6:18pm. Motion: John Worsham made a motion to recommend ZC 23.05 to the City Council to amend the front setback on Lot 29 from 100’ from the center of Section Street to 30’ from the property line and add two proposed paragraphs to the Ordinance. Hollie MacKellar seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar NAY: None. Executive Session – To discuss pending or potential litigation pursuant to Alabama Code Section 36- 25A-7(a)(3) Attorney Chris Williams made a declaration to move to Executive Session to discuss pending litigation. He does not anticipate any action needed following the Executive Session. Motion: John Worsham made a motion to close the public meeting and move to Executive Session and the motion carried unanimously with the following vote: AYE: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar NAY: None. The Commissioners left the dais at 6:20 p.m. The Commissioners returned to the dais at 7:22 p.m. Adjournment John Worsham made a motion to adjourn. AYE: Lee Turner; Rebecca Bryant; Harry Kohler; John Worsham; Hollie MacKellar NAY: None. Adjourned at 7:23pm. _______________________ ________________________ Lee Turner, Chairman Cindy Beaudreau, Secretary FAIRHOPE PLANNING COMMISSION DEADLINES 2024 AGENDA IS SUBJECT TO CHANGE BY PLANNING COMMISSION Meeting Date, 5:00 PM Submittal Deadline, 9:00 AM Thursday, January 4, 2024 *Moved due to New Year’s Day Holiday Tuesday, November 28, 2023 Monday, February 5, 2024 Tuesday, December 26, 2023 Monday, March 4, 2024 Tuesday, January 23, 2024 Monday, April 1, 2024 Tuesday, February 20, 2024 Monday, May 6, 2024 Tuesday, March 26, 2024 Monday, June 3, 2024 Tuesday, April 23, 2024 Monday, July 1, 2024 Tuesday, May 21, 2024 Monday, August 5, 2024 Tuesday, June 25, 2024 Thursday, September 5, 2024 *Moved due to Labor Day Holiday Tuesday, July 23, 2024 Monday, October 7, 2024 Tuesday, August 20, 2024 Monday, November 4, 2024 Tuesday, September 24, 2024 Monday, December 2, 2024 Tuesday, October 22, 2024 Monday, January 6, 2025 Tuesday, November 26, 2024 PLANNING COMMISSION MEETINGS ARE HELD IN THE COUNCIL CHAMBERS, FAIRHOPE MUNICIPAL COMPLEX AT 161 N. SECTION STREET. IT IS THE RESPONSIBILITY OF THE APPLICANT TO SEE THAT ALL SUBMITTALS ARE MADE IN A COMPLETE AND TIMELY SEQUENCE, AND TO HAVE THE CASE PRESENTED BEFORE THE COMMISSION AT SCHEDULED MEETINGS. **INCOMPLETE SUBMITTALS WILL NOT BE PLACED ON THE AGENDA.** This digital package has been condensed for size and some documents may not contain all the original pages. All submittals were reviewed in full by staff in preparation for the reports prepared for the Planning Commission. COUNTY RD 48NORTHWOOD STRIVERMILLDREASTWOOD AVE SOUTHWOOD STSALVADOR STBLUEBERRY LNRIVERMILLDRLAWRENCE RDBROWNINGLNWESTWOOD AVE KNOLLWOODAVE MARILYN AVE PETZ AVE GILBREATH AVE MCNIEL DAVIS LNCity of FairhopePlanning Commission October 2, 2023 ¯ COUNTY RD 48 PETZAVE NORTHWOOD STCABOT LNEASTWOOD AVE SOUTHWOOD STWESTWOOD AVE MCNIEL DAVIS LN UR 23.13 - River Station, C-Spire Legend Proposed Work Area Roads Parcels Corporate LimitsZoning Classification PUD - Planned Unit Development R-1 - Low Density Single-Family R-2 - Medium Density Single-Family R-3 - High Density Single-Family Planning Jurisdiction ^ Project Name: River Station, C-SpireSite Data: 5,688 Linear FeetProject Type: Fiber InstallationJurisdiction: Fairhope Planning JurisdictionZoning District: R-1PPIN Number: N/AGeneral Location: North side of County Road 48, East of River Mill DriveSurveyor of Record: Delta FiberEngineer of Record: Delta FiberOwner / Developer: C-SpireSchool District: Fairhope Elementary School Fairhope Middle and High Schools Recommendation: Approved w/ ConditionsPrepared by: Chris Ambron µ µ 2 UR 23.13 C-Spire – October 2, 2023 Summary of Request: Request of C-Spire for an 11.52.11 Utility Review and approval of the proposed installation of approximately 5,688 linear feet of buried fiber along routes outlined on the below location map. t -. -- i;m =--:, ____ . -~ r~~- ~ -• ~ : :_ E[E;l . ' ' ,:::a:::: ! • a.....,;;;;;;,;.a-...,..1,_,,==-tt~ _ I I 3 UR 23.13 C-Spire – October 2, 2023 1. Citizen Communication & Notification • Provide Door Hangers at preconstruction meetings which shall be approved prior to distribution and work. • Use of portable A-frame style signage at the entrance and exit of work sites. • Applicant shall dedicate a Point of Contact to answer citizens questions. 2. Permitting, Locating & Phasing • Subsurface Utility Engineering may be required for sensitive locations within the city as required by the ROW supervisor. • An additional right-of-way permit may be required for the potholing procedures needed for SUE. • A traffic control plan shall be submitted with all permits that affect the flow of traffic. • No work shall begin until a ROW permit is issued by the City of Fairhope Building Department. Permit not valid until approved and paid for on Citizen Serve online portal. • The City’s ROW inspector is to be notified 24 hours prior to any activity within the ROW. The prior notice applied to all activity within the ROW including but not limited to trenching, boring, concrete placement. • Hand holes/boxes shall not be allowed to be installed in sidewalks. The applicant shall review the sidewalk plan to determine if there are any conflicts. The applicant shall coordinate with the ROW inspector to resolve any conflicts. • The applicant shall contact Alabama One Call 811 to locate all existing utilities in the ROW (750 LF maximum daily allocation for COF utility locates per day). • A phasing plan must be submitted with the permit to alleviate confusion for locating. • A pre-construction meeting shall be held with the City prior to issuance of any permits. 3. Construction • A minimum horizontal clearance (separation) of 36” must be maintained from water, sewer, gas, stormwater, and other city utility infrastructure. • A minimum depth for all telecommunication lines shall be 30”. • Conduit shall match the 811-color code for communication, electric, gas etc. No blue/blue striped conduit is to be used for telecommunications. • The contractor responsible for *excavating inside right of way will be required to provide video documentation of the integrity of any sanitary sewer line (including laterals) within 3 feet of work being performed. This can be videoed prior to work being performed if locations, including depths, are clearly established by contractor, and said work is not within 3 ft of sewer mains or laterals within right of way. This does not apply to laterals on private property not “publicly maintained” (Private infrastructure). • Water, sewer, and gas mains/services must be potholed prior to bore/missile crossings. If street cuts are necessary please contact Right of Way inspector for restoration. • If sidewalk panels need to be removed, the subgrade must be compacted to the satisfaction of the ROW inspector. Cold patch asphalt shall be used as a temporary walking surface until the permanent repair can be done. • Sidewalk panels shall be a minimum of 4000 psi and be inspected within 24 hours of pouring concrete. Anything over one sidewalk panel shall be poured via concrete truck (no bag mix allowed). 4 UR 23.13 C-Spire – October 2, 2023 4. Horticultural • Handholes shall not be located within driplines of trees within City property, to include the right of ways, without explicit written permission from the City Horticulturalist. • Any proposed trenching shall not be within the dripline of trees. • If within tree dripline, consult the City of Fairhope Horticulturist prior to earth work. • Trees shall not be negatively impacted. • Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. • Any work done within the critical root zone shall be done to meet or exceed Internal Society Arboriculture (ISA) standards. • All roots to be removed shall be severed cleanly at the perimeter of the protected radius. • Protective barriers shall be used for all trees, barricades shall be erected a minimum of 20’ from the trunk. 5. Erosion Control • Any ROW cuts shall be stabilized (covered) at the end of each day & disturbed areas shall be re-vegetated with sod within ten (10) days of completion of the project. Sod shall be watered to ensure survival. • Any excess soil shall be removed and disposed of properly. Dumping on private property without approval will not be tolerated. • Mulch / seed shall only be acceptable as temporary cover. • Inlets shall be protected. BMPs shall be placed at all affected storm inlets. • If the site is within 100' of a critical area (wetland, etc.), red soil/clay shall not be allowed as fill material, per the City’s Red Clay/Soil Ordinance. • BMPs shall be installed at boring sites and trench locations. • Ground conditions in the ROW’s shall be returned to original preconstruction condition(s) or better. • No open trenches shall be allowed. Directional boring shall be used in sensitive areas, such as under roads, in proximity to trees, on finished lots, etc. • 6. Project Completion, Punch List Walk, & As Built • The applicant shall provide as-built drawings of all installed lines depicting depths. • Damage to any City’s infrastructure (storm, sewer, water, ditches etc. shall be the responsibility of the permittee to repair to city standards at no cost to the city. • Any damage that occurs needs to be reported to the city as soon as possible. • Pedestals shall be placed in a manner as to avoid obstructing visibility of motorists and to allow vehicles to exit the roadway during an emergency. 5 UR 23.13 C-Spire – October 2, 2023 7.Staff Recommendation •The proposed utility construction falls within the corporate limits of the City of Fairhope. Any portions of the project affecting public right-of-way (ROW) maintained by Baldwin County or the Alabama Department of Transportation (ALDOT) shall require permits through the respective agency. •This site shall comply with all State, Federal and local requirements, including, but not limited to the following City of Fairhope Ordinances: i.City of Fairhope Wetland Ordinance (#1370), which regulates activity within 20' of wetlands. ii.City of Fairhope Red Soil & Clay Ordinance (#1423), which prohibits the use of red soil / clay within 100' of critical areas. iii.City of Fairhope Erosion and Sediment Control Ordinance (#1398). iv.Chapter 19 Article VI: ROW Construction and Administration, Ordinance (1754) v.City of Fairhope Tree and Landscape Ordinance (#1444) •Staff Recommendation: Approval with Conditions of UR 23.13 S MOBILE STPADDOCKDR NELSON DR SCENICHWY98BAY POINTE CT PADDOCK DRHEARD RDMOLO K A I L N WESTONLNSAGGINOAKS CT City of FairhopePlanning Commission October 2, 2023 ¯ NELSON DR SAG G I NO AKS C T SD 23.25 - Moffett's Way Legend Roads Parcels Corporate LimitsZoning Classification B-1 - Local Shopping District R-1 - Low Density Single-Family R-3 - High Density Single-Family Planning Jurisdiction ^ Project Name: Moffett's WaySite Data: 2.58 acresProject Type: 3-Lot Minor SubdivisionJurisdiction: Fairhope Planning JurisdictionZoning District: R-1PPIN Number: 44034General Location: East of Scenic Hwy 98, North side of Nelson Dr.Surveyor of Record: Moore Surveying IncEngineer of Record: Owner / Developer: Deborah MoffettSchool District: Fairhope Elementary School Fairhope Middle and High Schools Recommendation: Prepared by: µ µ Approve with Conditions Mike Jeffries 1 SD 23.25 Moffett’s Way Minor Subdivision - October 2, 2023 Summary of Request: The owner is Deborah Moffett. Seth Moore of Moore Surveying, Inc. is the authorized agent for the project. This application is for Moffett’s Way, a 3-lot minor subdivision approximately 2.58 acres and is located at 6125 Nelson Drive. The subject property is zoned R-1 - Low Density Single-Family Residential District. There is an existing residence on proposed Lot-1. The site data table is below: General Comments: All lots are within 450 feet of a fire hydrant and each lot fronts Nelson Road and meets the minimum lot requirements. The proposed subdivision according to Fairhope’s Subdivision Regulations is a minor subdivision and has been reviewed accordingly. The proposed subdivision does not include the building of any additional infrastructure or improvements therefore a tree protection plan, landscape plan, and other criteria required for a major subdivision is not applicable. The proposed subdivision did not trigger a traffic study. Fairhope’s Subdivision Regulations Article VI Section D requires the provision of sidewalks along all streets in the Planning Jurisdiction of Fairhope. Sidewalks do not currently exist along Nelson Rd. The nearest sidewalk is over 440 feet to the west on S. Mobile St. and there are not sidewalks to the east. The applicant has provided a 15’ sidewalk easement along Nelson Rd. and requests not to be required to install the sidewalk at this time. Final plat must be recorded within 120 days of approval. Drainage Comments: The existing flow patterns are not being changed. Utility Comments: Water, sewer, and gas are provided by the City of Fairhope. Power is provided by Riviera and AT&T is the telecommunications provider. - Due to the water conservation the Water Department has suspended all fire flow testing. As a condition of approval, the Flow-Modeling shall be done and approved prior to the signing of the plat. SIT E DA TA: 1. Total Number al Lats 3, Project Size 2.583+/-Acres Smal lest Lat 36,380+/-Square Fee t Larges t Lot 39,050+/-Acres 2. The Lots are served by AT & T Commun ications (B ELLSOUTH) -Telephone, City of Fairhope Water, Gas, sewer Rivie r a -Power 3. Property lies Inside the City of Fairhope. 4. Property is Zoned R-1. 5 . Minimum Build ing Setbacks FRON T 40 Feet REAR 35 Feet SIDE 10 Feet Un less Otherwise Noted Hereon . Drainage & Front Rear Side Uti lity Easemen t s 15 feet 15 feet 15 fee t or 7.5 feet Inte r ior Lot Lines 2 SD 23.25 Moffett’s Way Minor Subdivision - October 2, 2023 Connectivity: The applicant has provided a 15’ sidewalk easement across the front property line. Comments: The City of Fairhope Subdivision Regulations contain the following criteria in Article V.B.2. Approval Standards. “2. Consistency with Plans, Regulations and Laws - The Planning Commission shall not approve the subdivision of land if the Commission makes a finding that such land is not suitable for platting and development as proposed, due to any of the following: a. The proposed subdivision is not consistent with the City’s Comprehensive Plan, and/or the City’s Zoning ordinance, where applicable; • Meets b. The proposed subdivision is not consistent with the City’s Comprehensive Plan or any other plan or program for the physical development of the City including but not limited to a Master Street Plan, a Parks Plan, a Bicycle Plan, a Pedestrian Plan, or the Capital Improvements Program; • Meets c. The proposed subdivision is not consistent with these Regulations; • Meets d. The proposed subdivision is not consistent with other applicable state or federal laws and regulations; • Meets e. The proposed subdivision otherwise endangers the health, safety, welfare or property within the planning jurisdiction of the City.” • Meets With any Minor Subdivision, the Planning Commission typically approves preliminary and final plat simultaneously. Because the flow modeling is incomplete, Staff ask that the Planning Commission vote on preliminary approval and final approval separately. Should the results of the hydrant flow modeling require infrastructure improvements, this project would be a Major Subdivision that would require Planning Commission approval of a Final Plat. Recommendation 1: Staff recommends Preliminary Plat APPROVAL of SD 23. 25 Moffett’s Way Minor Subdivision. Recommendation 2: Staff recommends Final Plat APPROVAL of SD 23. 25 Moffett’s Way Minor Subdivision, with the following condition: 1.) A fire flow model is completed and approved. FAIRHOPE AVE S BANCROFT STS SECTION STS SUMMIT ST S CHURCH STN SUMMIT STATKINSON LN MAGNOLIA AVE N SCHOOLSTSAXE LN N CHURCH STN BANCROFT STN SECTION STPINE AVE EQUALITY ST BOISE LNGENEVIEVE LN OAK AVE City of FairhopePlanning Commission October 2, 2023 ¯N CHURCH STMAGNOLIA AVE SD 23.26 - Vatan Mixed Use Development Legend Roads Parcels Corporate Limits Zoning Classification B-2 - General Business District B-3b - Tourist Resort Commercial Service District B-4 - Business and Professional District P-1 - Parking R-2 - Medium Density Single-Family R-4 - Low Density Multi-Family R-5 - High Density Dwelling Residential Planning Jurisdiction ^ Project Name: Vatan Mixed Use DevelopmentSite Data: 0.52 acresProject Type: 9 Unit Mulitple Occupancy ProjectJurisdiction: Fairhope Planning JurisdictionZoning District: B-2PPIN Number: 15164General Location: Northeast corner of North Church St. and Magnolia Ave.Surveyor of Record: S.E. Civil LLCEngineer of Record: S.E. Civil LLCOwner / Developer: Mike Jeffries School District: Fairhope Elementary School Fairhope Middle and High Schools Recommendation: Prepared by: µ µ FST RW LLC Approve with Conditions □ C ----- LLC Cert of Formation - 11/2021 Page 1 of 2 STATE OF ALABAMA DOMESTIC LIMITED LIABILITY COMPANY (LLC) CERTIFICATE OF FORMATION PURPOSE: In order to form a Limited Liability Company (LLC) under Section 10A-5A-2.01 of the Code of Alabama 1975, this Certificate of Formation and the appropriate filing fees must be filed with the Office of the Secretary of State. The information required in this form is required by Title 10A. 1. The name of the limited liability company (must contain the words “Limited Liability Company” or the abbreviation “L.L.C.” or “LLC,” and comply with Code of Alabama, Section 10A-1-5.06. You may use Professional or Series before Limited Liability Company or LLC (or PLLC or SLLC) if they apply: 2.A copy of the Name Reservation Certificate from the Office of the Secretary of State must be attached. 3. The name of the registered agent (only one agent): Street (no PO Boxes) address of registered office (must be located in Alabama): *COUNTY of above address: Mailing address in Alabama of registered office (if different from street address): 4.The undersigned certify that there is at least one member of the limited liability company. (For SOS Office Use Only) RW LLC David Ryan Alabama Sec. Of State 001-044-188 DLL Date 10/12/2022 Time 11:20:00 File $100.00 County $100.00 ------- Total $200.00 71 N. Section Street, Suite B Fairhope, AL 36532 BALDWIN [] - DOMESTIC LIMITED LIABILITY COMPANY (LLC) CERTIFICATE OF FORMATION LLC Cert of Formation – 11/2021 Page 2 of 2 5.Check only if the type applies to the Limited Liability Company being formed: Series LLC complying with Title 10A, Chapter 5A, Article 11 Professional LLC complying with Title 10A, Chapter 5A, Article 8 Non-Profit LLC complying with Section 10A-5A-1.04(c) 6.The filing of the limited liability company is effective immediately on the date received by the office of the Secretary of State, Business Services Division or at the delayed filing date (cannot be prior to the filing date) specified in this filing complying with Section 10A-1-4.12 The undersigned specify / / as the effective date (must be on or after the date filed in the office of the Secretary of State, but no later than the 90th day after the date this instrument was signed) and the time of filing to be : AM or PM. (cannot be noon or midnight – 12:00) Attached are any other matters the members determine to include herein (if this item is checked there must be attachments with the filing). Date (MM/DD/YYYY) Signature as required by 10A-5A-2.04 Typed title (organizer or attorney-in-fact) *County of Registered Agent is requested in order to determine distribution of County filing fees. 10 12 2022 11 20 10 //12 2022 Member David Ryan _Q _Q _Q _O_ --® ~0-~----- Additional Details Organizers Organizer Street Address Mailing Address David Ryan 71 N. Section Street, Suite B Fairhope, AL 36532 71 N. Section Street, Suite B Fairhope, AL 36532 1 SD 23.26 Vatan Mixed Use MOP – October 2, 2023 Summary of Request: The Applicant is S.E. Civil, LLC, on behalf of the Owner FST/RW LLC. Dave Lavery with S.E. Civil is the engineer of record for the project. This application is for a 9-unit Multiple Occupancy Project (“MOP”) on approximately 0.52 acres and is located at 301 Magnolia Avenue. It is the intent of the Applicant to have a dedicated 1,200ft² retail/commercial component in each first floor of the two (2) structures facing Magnolia Avenue with one (1) residential unit occupying the second and third floor of each structure. The remaining five (5) structures will be single family dwelling units. This project was the subject of BOA Case 23.02 in which the “use” was clarified. In short, mixed use, residential, and retail/commercial are allowed by right to some degree in B-2 but having all the uses on one (1) lot with not every structure being “mixed use” per se is a different concept. This combination of use was approved in BOA Case 23.02. Figure 1: Mixed-Use Units facing Magnolia Avenue. Figure 2: Site Data Table SITE ANA l YSIS o E Ai~REiV~E [P R!lPD6i3!lJ <!1 .51 ~ [22 ,r.2:SF) FR YARD : -HlE YllfiD: AE"'".YllfiD: WJOMUIA E!UlLDING HEIGHT: i3U LLD NG [UN CEn Rco=1 1[],.4e 6F PR.CWEEO P-"PXJ NG, 1-4 E<',M:86 :Z·OhIN' 8-2 ICEOJ 41]' 2 SD 23.26 Vatan Mixed Use MOP – October 2, 2023 Figure 3: Residential Units facing Church Street. Comments: - Utilities: Water, sewer, and gas services are available through the City of Fairhope. The development will have a private trash service that will gather the rubbish from outside locations for each unit within the development. Trash receptacles will not be rolled out to any public right-of-way. o Water & Sewer plans have been reviewed and are acceptable.  Due to the water conservation the Water Department has suspended all fire flow testing. As a condition of approval, the Flow-Modeling shall be done and approved prior to the signing of the plat. o Power – Contractor is responsible for getting electricity to the take-off pole. o Communications – AT&T - Traffic Study: A traffic study was not necessary for this project. - Drainage: The terrain of the site falls from east to west with elevations ranging. Runoff flows westward across the surface of the site and enters the N. Church Street ROW where it enters City storm sewer lines through inlets located along N. Church Street. Runoff will be directed to a series of area drains and drop inlets located along N. Church Street. The underground storm pipes will carry the runoff to an existing City inlet on the east side of N. Church Street near the Magnolia Avenue intersection where it will continue through Fairhope’s storm sewer network. Retention facilities are not required for this development. An HOA will be formed that will be required to maintain any and all stormwater facilities and structures located outside of the publicly accepted ROW. Submitted plans have been approved. - Landscaping: There is an extensive landscaping plan that has been reviewed. Revised plans, if any, shall be received prior to sending the Site Plan to the City Council for final approval. (Ordinance #1444, Section 20.5-4(6)). o Elevated stairs located in the ROW are proposed to access the buildings fronting Church St. to minimize disturbance to existing heritage trees. 3 SD 23.26 Vatan Mixed Use MOP – October 2, 2023 Figure 4: Land Usage Data Table. - Greenspace: Since the subject property is within the CBD greenspace requirements are more lenient. The greenspace plan is acceptable. - Wetlands: There are no wetlands on the property. - Comprehensive Plan: Case SD 23.26 Vatan Mixed Use MOP is in compliance with the City’s Comprehensive Plan, the Fairhope Zoning Ordinance, and all other applicable regulations. Site Plan LA ND 'U SAGE 1!],.S'2A.CR£S l!lJILD ING -[UNCs;;i ROOF] !124AcRE:6 BRI/ICIJS pl( i=8'<'VIOC\!i PA'illN IJ CR/i,SS:Jl,1.A~A'il'EA ! ~---~I _________ ll , ~ W~E s 4 SD 23.26 Vatan Mixed Use MOP – October 2, 2023 ***The application is for Preliminary approval. If approved a Final approval by the Planning Commission is required to close out the project prior to vertical construction.*** Recommendation of Case SD 23.26 Vatan Mixed Use MOP: Staff recommends approval subject to the following condition(s): 1. Developer shall coordinate the installation of the sidewalks with the Public Works Department to minimize disturbance to the existing trees in the ROW’s at time of building permit. 2. Any aid to construction costs shall be paid prior to issuance of building permit. 3. A fire flow model is completed and approved. 4. Provide spot elevations for the building corners, along with building elevations, prior to any land disturbance or issuance any building permit to confirm building height. 5. Provide a Hold-Harmless agreement for staircases proposed in the ROW. ATTACHMENT TO APPLICATION FOR VATAN SITE PLAN AND MOP (FOR PROPERTY PIN_#15164) LOCATED AT THE CORNER OF MAGNOLIA AVENUE AND CHURCH STREET IN FAIRHOPE, ALABAMA (8-22-23) The proposed Project for the Property (named “Vatan”) is depicted on the attached Site Plan and MOP applications. Vatan is a mixed-use development comprised of 7 architecturally compatible and separate structures and will constitute a land condominium created and administered in accordance with the Alabama Uniform Condominium Act. The dedicated retail/commercial component of Building 1 fronting Magnolia Avenue comprises approximately 1,400 square feet on the first floor and is intended to serve one or more small scale retail/commercial tenants, and the second and third floors of Building 1 (consisting of approximately 3,000 square feet) are intended for a single residential use. The dedicated retail/commercial component of Building 2 fronting Magnolia Avenue comprises approximately 2,980 square feet on the first and second floors and is intended to serve one or more small scale retail/commercial tenants. The third floor of Building 2 (consisting of approximately 1,730 square feet) is intended for a single residential use. The remaining 5 Buildings in Vatan (facing Church Street and internal to the Property) range from approximately 3,500 square feet to approximately 2,300 square feet, and each of them is primarily intended for a single residential use. At the Board of Adjustments meeting for Vatan earlier in 2023, allowance was made for calculating the height of each Building on the basis of each Building’s individual footprint. The mixed-use Buildings facing Magnolia Avenue are 40 feet in height in accordance with the calculation methodology used by the City of Fairhope, and the remaining 5 Buildings are 35 feet or less in height in accordance with the City of Fairhope’s calculation methodology. Substantial planning has been undertaken to ensure that the Project is consistent with the applicable regulations within the zoning for the Property and the Central Business District of Fairhope. Project attributes include: a. a single entry/exit to and from the Property for vehicular traffic, promoting traffic safety; b. on-site parking that is twice the minimum number of spaces required in the CBD; c. dedicated golf cart parking for certain Buildings located on the Property; d. a site plan and design that makes every effort to preserve the trees located both on the Property and in the Magnolia Avenue and Church Street right-of-ways; e. the Project is complimentary of the residential, commercial and mixed-use developments in the immediate vicinity of the Property; and f. the Project is supportive of and promotes multiple of the objectives specifically applicable to the CBD in the Fairhope Zoning Ordinance, including: • generating high levels of pedestrian and bicycle traffic; • providing a mix of uses; • strengthening non-automotive connections to adjacent neighborhoods; • buffering surrounding neighborhoods from any adverse impacts of activities in the CBD; and • providing a small park/green space for Property occupants The Site Plan and the arrangement of structures on the Property compliment the natural topography of the Property, which ranges from 111 feet above sea level to 97 feet above sea level. The Site Plan, Project design and Project configuration are all intended to promote the highest and best use of the Property and to also further enhance the CBD and general downtown area of Fairhope. 9969 Windmill Rd. Fairhope, Alabama 36532 251-990-6566 July 31, 2020 Re: Vatan- MOP Dear Fairhope Resident: The City of Fairhope Resolution No. 2018-03 requires all property owners adjacent to property being considered for development approval to be notified by mail. The Baldwin County Revenue Office provided your information as a current adjacent property owner to the proposed development request described below. RW, LLC, is requesting the Vatan Project. This development will consist of 2 commercial units and 7 residential units. The property is located on the northeast corner of Magnolia Avenue and Church Street. The parcel number of the property is 05-46-03-37-0-006-036.502. S.E. Civil Engineering will hold a Community Meeting at 11:00 AM at our office at 9969 Windmill Rd, Fairhope, AL. on Tuesday, August 15th, 2023. Should you have any questions or concerns, please contact me at (251)-990-6566. Sincerely, Larry Smith, PE lsmith@secivileng.com ~ , ~giY1! Surveying VATAN MOP COF MEETING MINUTES MEETING START TIME: 11:00 DATE: 8/15/2023 No one showed up for the mee�ng. We had a call in at 11:08 am from Rebecca Bryant. - Rebecca Bryant from Watershed located at 302 Magnolia Ave. - Primary concerns were the tree protec�on plan. Dave told her that we were preserving certain trees that are considered heritage trees on the site. - 2nd concern was the run-off and where it is going. Dave informed her it would be going to Fairhopes storm drains. - Her final concern was whether we are using impervious pavers. Dae told her that they were indicated as pavers but did not know if they were impervious. Dave called mee�ng was called to a close at 11:15 with zero atendees. 1 Architectual Renderings Supplied At Community Meeting ~ . • 1 Dave Lavery From:Jamie Rollins <jamie.rollins@fairhopeal.gov> Sent:Wednesday, September 13, 2023 4:08 PM To:Richard Johnson; Dave Lavery Cc:Mike Jeffries; Michelle Melton; Hunter Simmons Subject:Re: Vatan Mixed Use Development We met on-site today. The sidewalks are a difficult one. It is obvious that many measures are being taken to preserve the trees on-site. A consulting arborist has been working with the project and I agree with his assessment that removing 12-14 inches of material in the critical root zone of the trees will be very impactful to the trees. Maybe not today but time will tell that tale. The middle tree is my biggest concern. Could we find a way to do wooden boardwalk or something less impactful there? Thanks, Jamie Get Outlook for iOS From: Richard Johnson <richard.johnson@fairhopeal.gov> Sent: Wednesday, September 13, 2023 2:57:54 PM To: Dave Lavery <dlavery@secivileng.com> Cc: Mike Jeffries <mike.jeffries@fairhopeal.gov>; Michelle Melton <michelle.melton@fairhopeal.gov>; Hunter Simmons <hunter.simmons@fairhopeal.gov>; Jamie Rollins <jamie.rollins@fairhopeal.gov> Subject: RE: Vatan Mixed Use Development Dave: I have reviewed the proposed drainage for the subject development – I have no issues or concerned. I will get you a copy of the “As Builts” for this portion of the Church Street Drainage. As discussed – sidewalks as shown are acceptable, however, I recognize that post approval and during construction we may have to make some modifications to mitigate tree impacts and/or meet ADA compliancy requirements. All approvals are conditioned on final approval by the City Horticulture Supervisor’s for compliance with the Tree & Landscape Ordinance. Thanks, RDJ Richard D. Johnson, PE Public Works Director richard.johnson@fairhopeal.gov Office: 251-929-0360 Cell: 251-423-7418 From: Dave Lavery <dlavery@secivileng.com> Sent: Tuesday, September 12, 2023 1:44 PM 2 To: Richard Johnson <richard.johnson@fairhopeal.gov> Subject: RE: Vatan Mixed Use Development Good afternoon Richard, I revised the civil plans for Vatan so that the site drainage would connect to the grate inlet to the north of our site instead of the catch basin near the corner of Magnolia and Church. Please let me know if you have any comments on the revised plan set. Thank you, Dave Lavery, PE 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 phone www.secivil.pro From: Dave Lavery Sent: Friday, September 8, 2023 12:30 PM To: richard.johnson@fairhopeal.gov Subject: RE: Vatan Mixed Use Development Good afternoon Richard, I received a comment from Wednesday’s DRC to follow up with you on sidewalk layout, drainage plan, and any potential additions/improvements. The civil plans are attached. Please let me know if you have any comments that need to be addressed. Planning has asked that I respond by Thursday morning at 9:00 so please let me know as soon as possible if you need additional information of if you have any comments that might require plan revisions. I’d be happy to come in early next week and look at the plans with you if that makes it any easier. Thank you, Dave Lavery, PE 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 phone www.secivil.pro 3 From: Dave Lavery Sent: Wednesday, August 16, 2023 2:12 PM To: richard.johnson@fairhopeal.gov Subject: Vatan Mixed Use Development Good afternoon Richard, We are working through the design for the Vatan Mixed Use Development on the northeast corner of Magnolia and Church. Attached are current versions of the site plan and grading and drainage plan. Do you have any comments on the sidewalk layout, the storm connection, or anything else you see that needs to be addressed? Or if it would be easier to go over this in person I would be happy to come by. I also had a question on the existing storm sewer on the east side of Church Street. Our survey (attached) shows a 15” CPP stubout (I think it’s actually RCP) on the north side of a catch basin near Magnolia, and further north there is a 15” CMP stubout on the south side of an inlet. Those lines are pointing towards each other, but aren’t shown connecting in our survey. With the inverts we shot, I don’t think they would be connected, but can you verify? I currently show our storm coming into the ROW near the north side of the property line and going to the inlet to the south, which is further away than the inlet to the north, but we’ll have to tear up more sidewalk, curb, and street to connect to the north inlet. Are you okay with us connecting to the south? Thank you, Dave Lavery, PE 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 phone www.secivil.pro September 5, 2023 City Council City of Fairhope 451 Pecan Ave. Ste. 200 Fairhope, AL 36532 Civil Engineering & Surveying Re: SD 23.26 & SR 23.05-Vatan Mixed Use Development Sidewalk Width Reduction Request Dear Council: I would like to request a reduced sidewalk width of 6 feet for portions of the proposed Vatan Mixed Use Development. The site is located on the northeast comer of Magnolia Avenue and Church Street and is within the Central Business District (CBD). The minimum sidewalk width within the CBD is 8 feet, but can be reduced to 6 feet with City Council Approval. Within the Church Street Right-Of-Way there are multiple heritage Live Oaks between the proposed buildings and the street. The available space from the existing curb to their trunks is between 10 and 13 feet. Reducing the sidewalk width to 6 feet in the vicinity of these trees will reduce the impact to the roots of these trees. Additionally, in the Magnolia Avenue Right-Of-Way near the intersection there is existing 5' sidewalk which is immediately adjacent to 2 heritage trees. I would like to request that this sidewalk near these trees be allowed to remain in place with no requirement to increase the sidewalk width. Please see the attached sketch depicting the proposed sidewalk widths within the Right-Of-Way Please let me know if you have any questions or comments. Sincerely, ~ ~ David Lavery, PE dlavery@secivileng.com 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 August 21, 2023 Hunter Simmons City of Fairhope 451 Pecan Ave. Ste. 200 Fairhope, AL 36532 Civil Engineering & Surveying Re: Va tan Mixed Use Development -Traffic Impact Study Note Dear Hunter: This letter is to serve as back up information as to why a Traffic Impact Study is not warranted for this project. According to the subdivision regulations a traffic impact study is required if a project will increase the average daily traffic by 1,000 trips or generate 50 trips or more during any peak hour period. The proposed project will add 7 new residential units and 2,619 square feet of office space. Per the attached chart we have an average daily traffic of 70 trips and a total of 8 peak hour trips for this development. If you have any questions, please let me know . Sincerely, ~ ~ dlavery@secivileng.com 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 Instructions:Trip Generation Rates from the 8th Edition ITE Trip Generation ReportEnter Numbers into the "Expected Units"NA: Not AvailableKSF2: Units of 1,000 square feetin the Corresponding Yellow ColumnDU: Dwelling UnitFuel Position: # of vehicles that could be fueled simultaneouslyOcc.Room: Occupied RoomDescription / ITE Code UnitsRate Weekday Daily Traffic PM Peak Period Rate% PM In% PM OutExpected Units (independent variable)Calculated Daily TripsPM Peak Trips - TotalPM In PM Out NotesWaterport/Marine Terminal 010Berths171.52NA NA NA0NA NA NACommercial Airport 021Employees13.400.80 54% 46%00NA NACommercial Airport 021Avg Flights/Day104.735.75 56% 44%00NA NACommercial Airport 021Com. Flights/Day122.216.88 54% 46%00NA NAGeneral Aviation Airport 022Employees14.241.03 45% 55%00NA NAGeneral Aviation Airport 022Avg. Flights/Day1.97NA NA NA0NA NA NAGeneral Aviation Airport 022Based Aircraft5.000.37 45% 55%00NA NATruck Terminal 030Acres81.906.55 43% 57%00NA NA Caution- Only 3 StudiesPark&Ride w/ Bus Service 090Parking Spaces4.500.62 22% 78%00NA NAPark&Ride w/ Bus Service 090Occ. Spaces9.620.81 28% 72%00NA NALight Rail Station w/ Park 093Parking Space2.511.24 58% 42%00NA NALight Rail Station w/ Park 093Occ. Spaces3.911.33 58% 42%00NA NAGeneral Light Industrial 110KSF26.970.97 12% 88%00NA NAGeneral Light Industrial 110Employees3.020.42 21% 79%00NA NAGeneral Heavy Industrial 120KSF21.500.68 NA NA00NA NA Caution-Only 3 Studies.General Heavy Industrial 120Employees0.820.88 NA NA00NA NAIndustrial Park 130KSF26.960.86 21% 79%00NA NAIndustrial Park 130Employees3.340.46 20% 80%00NA NAManufacturing 140KSF23.820.74 36% 64%00NA NAManufacturing 140Employees2.130.36 44% 56%00NA NAWarehousing 150KSF23.560.32 25% 75%00NA NAWarehousing 150Employees3.890.59 35% 65%00NA NAMini Warehouse 151KSF22.500.26 51% 49%00NA NAMini Warehouse 151Storage Units0.250.02 NA NA00NA NAMini Warehouse 151Employees61.906.04 52% 48%00NA NAHigh-Cube Warehouse 152KSF21.440.10 33% 67%00NA NAHigh-Cube Warehouse 152EmployeesNA0.66 35% 65%00NA NAUtilities 170KSF2NA0.76 45% 55%00NA NAUtilities 170EmployeesNA0.76 90% 10%00NA NASingle Family Homes 210DU9.571.01 63% 37%00NA NASingle Family Homes 210Vehicles6.020.67 66% 34%00NA NAApartment 220DU6.650.62 65% 35%00NA NAApartment 220Persons3.310.40 NA NA00NA NAApartment 220Vehicles5.100.60 NA NA00NA NALow Rise Apartment 221Occ.DU6.590.58 65% 35%00NA NAHigh Rise Apartment 222DU4.200.35 61% 39%00NA NAMid-Rise Apartment 223DUNA0.39 58% 42%00NA NARental Townhouse 224DUNA0.72 51% 49%00NA NA Caution- Only 1 Study.Resd. Condo/Townhouse 230DU5.810.52 67% 33%7.041421Resd. Condo/Townhouse 230Persons2.490.24 67% 33%00NA NALow Rise Resd. Condo 231DUNA0.78 58% 42%00NA NAHigh Rise Resd. Condo 232DU 4.180.38 62% 38%00NA NALuxury Condo/Townhouse 233Occ. DUNA0.55 63% 37%00NA NAMobile Home Park 240DU4.990.59 62% 38%00NA NAMobile Home Park 240Persons2.460.26 63% 37%00NA NARetirement Community 250DUNA0.27 56% 44%00NA NA Caution- Only 1 StudyElderly Housing-Detached 251DU3.710.27 61% 39%00NA NA Caution- Only 1 Study.Congregate Care Facility 253Occ.DU2.150.17 56% 44%00NA NA Caution- Only 2 StudiesElderly Housing- Attached 252Occ.DU3.480.16 60% 40%00NA NA Caution- Only 4 StudiesI I Recreational Homes 260DU3.160.26 41% 59%00NA NAResidential PUD 270DU7.500.62 65% 35%00NA NAHotel 310Occ. Room8.920.70 49% 51%00NA NAHotel 310Rooms8.170.59 53% 47%00NA NAHotel 310Employees14.340.80 54% 46%00NA NAAll Suites Hotel 311Occ.Room6.240.55 42% 58%00NA NA Caution- Only 4 StudiesAll Suites Hotel 311Rooms4.900.40 45% 55%00NA NABusiness Hotel 312Occ. Room7.270.62 60% 40%00NA NA Caution-Only 4 StudiesBusiness Hotel 312Employees72.677.60 60% 40%00NA NAMotel 320Occ.Room9.110.58 53% 47%00NA NAMotel 320Rooms5.630.47 54% 46%00NA NAMotel 320Employees12.810.73 54% 46%00NA NAResort Hotel 330Occ. Room13.430.49 43% 57%00NA NA Daily Rate for Saturday.Resort Hotel 330RoomsNA0.42 43% 57%00NA NACity Park 411Picinic Sites5.87NA NA NA0NA NA NACounty Park 412Acres2.280.06 41% 59%00NA NAState Park 413Picnic Sites9.950.65 43% 57%00NA NAState Park 413EmployeesNA4.67 43% 57%00NA NAWater Slide Park 414Parking Space2.27NA NA NA0NA NA NA Caution- Only 1 Study.Beach Park 415Acres29.811.30 29% 71%00NA NACampground/RV Park 416Acres74.380.39 NA NA00NA NA Caution-Only 1 Study.Regional Park 417Picnic Sites61.829.60 41% 59%00NA NA Peak Hour is PM Peak Hour.Regional Park 417Employees79.7710.26 45% 55%00NA NANational Monument 418Employees31.055.58 NA NA00NA NA Peak Hour is PM Peak Hour.Marina 420Berths2.960.19 60% 40%00NA NA Caution- Only 2 StudiesGolf Course 430Employees20.521.48 48% 52%00NA NAGolf Course 430Holes35.742.78 45% 55%00NA NAMinature Golf Course 431HolesNA0.33 33% 67%00NA NAGolf Driving Range 432TeesNA1.25 45% 55%00NA NA Caution- Only 2 Studies.Multipurpose Rec. Facility 435Acres90.385.77 NA NA00NA NA Caution- Only 1 Study.Live Theater 441SeatsNA0.02 50% 50%00NA NAMovie Theater w/o matinee 443KSF278.066.16 94% 6%00NA NA Caution- Only 1 Study.Movie Theater w/o matinee 443Movie Screens220.0024.00 41% 59%00NA NAMovie Theater w/o matinee 443Seats1.760.07 75% 25%00NA NA Peak Hour is PM Peak Hour.Movie Theater w/o matinee 443Employees53.124.20 NA NA00NA NAMovie Theater w/ matinee 444KSF2NA3.80 64% 36%00NA NA Caution- Only 1 Study.Movie Theater w/ matinee 444Movie Screens153.3320.22 40% 60%00NA NAMovie Theater w/ matinee 444SeatsNA0.14 53% 47%00NA NAHorse Track 452Employees2.60NA 50% 50%0NA NA NADog Track 454Attendees1.090.13 66% 34%00NA NAArena 460Employees10.00NA 50% 50%0NA NA NAIce Rink 465Seats1.260.12 NA NA00NA NA Caution- Only 1 Study.Casino/Video Lottery Establishment 473KSF2NA13.43 56% 44%00NA NAAmusement Park 480Employees8.330.50 61% 39%00NA NAZoo 481Acres114.88NA 50% 50%0NA NA NAZoo 481Employees23.93NA 50% 50%0NA NA NATennis Courts 490Courts31.043.88 NA NA00NA NATennis Courts 490Employees66.675.67 NA NA00NA NARacquet Club 491Courts38.703.35 NA NA00NA NARacquet Club 491KSF214.031.06 NA NA00NA NARacquet Club 491Employees45.714.95 NA NA00NA NAHealth Club 492KSF232.933.53 57% 43%00NA NA Caution- Only 1 StudyBowling Alley 494KSF233.333.54 35% 65%00NA NA Caution- Only 1 Study.Recreational Com. Center 495KSF222.881.45 37% 63%00NA NA Caution- 1 study.Recreational Com. Center 495Employees27.253.16 44% 56%00NA NAMilitary Base 501Employees1.780.39 NA NA00NA NAElementary School 520Students1.290.15 49% 51%00NA NA Peak Hour is PM Peak Hour.Elementary School 520KSF215.431.21 45% 55%00NA NAElementary School 520Employees15.711.81 49% 51%00NA NAPrivate School (K-12) 536Students2.480.17 43% 57%00NA NA Caution- Only 2 studies.Middle/ JR. High School 522Students1.620.16 49% 51%00NA NA Middle/ JR. High School 522KSF213.781.19 52% 48%00NA NAHigh School 530Students1.710.13 47% 53%00NA NAHigh School 530KSF212.890.97 54% 46%00NA NAHigh School 530Employees19.741.55 54% 46%00NA NAJunior/ Comm. College 540Students1.200.12 64% 36%00NA NAJunior/ Comm. College 540KSF227.492.54 58% 42%00NA NAJunior/ Comm. College 540Employees15.551.39 58% 42%00NA NAUniversity/College 550Students2.380.21 30% 70%00NA NAUniversity/College 550Employees9.130.88 29% 71%00NA NAChurch 560KSF29.110.55 48% 52%00NA NA For WeekdaySynagogue 561KSF210.641.69 47% 53%00NA NA Caution- Only 1 Study.Daycare Center 565KSF279.2612.46 47% 53%00NA NADaycare Center 565Students4.480.82 47% 53%00NA NADaycare Center 565Employees28.134.79 47% 53%00NA NACemetery 566Employees58.097.00 33% 67%00NA NAPrison 571KSF2NA2.91 NA NA00NA NA Peak Hour is PM Peak Hour. Caution- Only 1 Study.Prison 571EmployeesNA0.23 28% 72%00NA NALibrary 590KSF256.247.30 48% 52%00NA NALibrary 590Employees52.525.40 47% 53%00NA NALodge/Fraternal Organization 591Members0.290.03 NA NA00NA NA Caution- Only 1 Study.Lodge/Fraternal Organization 591Employees46.904.05 NA NA00NA NAHospital 610KSF216.501.14 42% 58%00NA NAHospital 610Beds11.811.31 36% 64%00NA NAHospital 610Employees5.200.33 31% 69%00NA NANursing Home 620Beds2.370.22 33% 67%00NA NANursing Home 620Employees4.03NA 26% 74%0NA NA NA Peak Hour is PM Peak Hour.Clinic 630KSF231.455.18 NA NA00NA NA Caution- Only 2 Studies.Clinic 630Employees7.751.23 41% 59%00NA NAGeneral Office 710 (Equation)KSF2Equation Equation17% 83%00NA NAGeneral Office 710KSF211.011.49 17% 83%2.629413Corporate Headquarters 714KSF27.981.40 10% 90%00NA NA Peak Hour is PM Peak Hour.Corporate Headquarters 714Employees7.981.40 10% 90%00NA NA Peak Hour is PM Peak Hour.Single Tenant Office Bldg 715KSF211.571.72 15% 85%00NA NA Peak Hour is PM Peak Hour.Single Tenant Office Bldg 715Employees3.620.50 15% 85%00NA NA Peak Hour is PM Peak Hour.Medical Dental Office 720KSF236.133.46 27% 73%00NA NAMedical Dental Office 720Employees8.911.06 34% 66%00NA NAGovernment Office Building 730KSF268.931.21 31% 69%00NA NA Peak Hour is PM Peak Hour. Caution- Only 1 Study.Government Office Building 730Employees11.951.91 74% 26%00NA NAState Motor Vehicles Dept. 731KSF2166.0217.09 NA NA00NA NAState Motor Vehicles Dept. 731Employees44.544.58 NA NA00NA NAUS Post Office 732KSF2108.1911.12 51% 49%00NA NAUS Post Office 732Employees28.322.84 51% 49%00NA NAGov. Office Complex 733KSF227.922.85 31% 69%00NA NA Caution- Only 1 Study.Gov. Office Complex 733Employees7.750.79 31% 69%00NA NAR&D Center 760KSF28.111.07 15% 85%00NA NA Peak Hour is PM Peak Hour.R&D Center 760Employees2.770.41 10% 90%00NA NABuilding Materials/Lumber 812KSF245.164.49 47% 53%00NA NABuilding Materials/Lumber 812Employees32.122.77 51% 49%00NA NAFree-Standing Discount Superstore 813KSF253.134.61 49% 51%00NA NAFree-Standing Discount Store 815KSF257.245.00 50% 50%00NA NAFree-Standing Discount Store 815Employees28.843.48 50% 50%00NA NAHardware/Paint Store 816KSF251.294.84 47% 53%00NA NA Caution- Only 3 StudiesHardware/Paint Store 816Employees53.215.05 NA NA00NA NANursery (Garden Center) 817KSF236.083.80 NA NA00NA NA Nursery (Garden Center) 817Employees22.131.99 NA NA00NA NANursery (Wholesale) 818KSF239.005.17 NA NA00NA NANursery (Wholesale) 818Employees23.400.47 NA NA00NA NAShopping Center 820 (Equation)KSF2Equation Equation49% 51%00NA NAShopping Center 820 RateKSF242.943.37 49% 51%00NA NAFactory Outlet Center 823KSF226.592.29 47% 53%00NA NAQuality Restaurant 931KSF289.957.49 67% 33%00NA NA Low Turnover - More than 1 hourQuality Restaurant 931Seats2.860.26 67% 33%00NA NAHigh Turnover/Sit Down Rest 932KSF2127.1511.15 59% 41%00NA NA Big variation on DailyHigh Turnover/Sit Down Rest 932Seats4.830.41 57% 43%00NA NAFast Food w/o Drive Thru 933KSF2716.0026.15 51% 49%00NA NAFast Food w/o Drive Thru 933Seats42.122.13 64% 36%00NA NAFast Food w/ Drive Thru 934KSF2496.1233.48 52% 48%00NA NAFast Food w/ Drive Thru 934Seats19.520.94 53% 47%00NA NADrive Thru Only 935KSF2NA153.85 54% 46%00NA NA Only 2 studiesDrinking Place 925KSF2NA11.34 66% 34%00NA NAQuick Lube Shop 941Service Bays40.005.19 55% 45%00NA NAAutomobile Care Center 942Service Bays12.482.17 NA NA00NA NA Daily Trips for Saturday. Caution- Only 1 Study.Automobile Care Center 942KSF215.863.38 50% 50%00NA NA Daily Trips for Saturday.New Car Sales 841 KSF233.342.59 39% 61%00NA NANew Car Sales 841 Employees21.140.96 48% 52%00NA NA Peak Hour is PM Peak Hour.Automobile Parts Sales 843KSF261.915.98 49% 51%00NA NAGasoline/Service Station 944Fuel. Position168.5613.87 50% 50%00NA NA Daily Rate from 4th Edition ITEServ.Station w/ Conven.Mkt 945Fuel Position162.7813.38 50% 50%00NA NA Have auto repair and serviceServ.Stat.w/Conv.Mkt.&Carwash 946Fuel Position152.8413.94 51% 49%00NA NASelf-Service Carwash 947Stalls108.005.54 51% 49%00NA NA Caution- Only 1 Study.Tire Store 848Service BaysNA3.54 42% 58%00NA NATire Store 848KSF224.874.15 43% 57%00NA NAWholesale Tire Store 849Service Bays30.553.17 47% 53%00NA NASupermarket 850KSF2102.2410.50 51% 49%00NA NA Daily based on small number of studies (Caution)Convenien. Mkt. (Open 24 hrs) 851KSF2737.9952.41 51% 49%00NA NAConvenien. Mkt. (Open 16 Hrs) 852KSF2NA34.57 49% 51%00NA NAConvenien. Mkt w/ Gas Pumps 853KSF2845.6059.69 50% 50%00NA NA Average size = 3,000 sqftDiscount Supermarket 854KSF296.828.90 50% 50%00NA NA Daily Trips for Saturday. Caution- Only 1 Study.Wholesale Market 860KSF26.730.88 53% 47%00NA NA Caution- Only 1 Study.Discount Club 857KSF241.804.24 50% 50%00NA NA Similar to "Sams" or "Pace"Home Improvement Store 862KSF229.802.37 48% 52%00NA NAElectronics Superstore 863KSF245.044.50 49% 51%00NA NAToy/Children's Superstore 864KSF2NA4.99 50% 50%00NA NA Peak Hour is for Saturday.Apparel Store 876KSF266.403.83 50% 50%00NA NADrugstore w/o Drive-Thru 880KSF290.068.42 50% 50%00NA NADrugstore w/ Drive-Thru 881KSF288.1610.35 50% 50%00NA NAFurniture Store 890KSF25.060.45 48% 52%00NA NAVideo Arcade 895KSF2NA56.81 52% 48%00NA NA Peak Hour is PM Peak Hour. Caution- Only 1 Study.Video Rental Store 896 KSF2NA31.54 50% 50%00NA NA Peak Hour is PM Peak Hour.Walk-in Bank 911KSF2156.4812.12 44% 56%00NA NA Daily based on 1 study & PM Peak based on 2 studies.Drive-in Bank 912Drive-in Windows139.2527.41 49% 51%00NA NADrive-in Bank 912KSF2148.1525.82 50% 50%00NA NA NA: Not AvailableKSF2: Units of 1,000 square feetDU: Dwelling UnitFuel Position: # of vehicles that could be fueled simultaneously Occ.Room: Occupied Room21-Aug-23 August 21, 2023 Hunter Simmons City of Fairhope 451 Pecan Ave. Ste. 200 Fairhope, AL 36532 Civil Engineering & Surveying Re: Vatan Mixed Use Development-Fire Flow Dear Hunter: Due to the current Emergency Water Conservation Plan, a fire flow could not be performed for this project. A fire flow test will be scheduled at a time when water conservation is in Phase I, or when the Emergency Water Conservation Plan has ended. If you have any questions, please let me know . Sincerely, ~ ~ David Lavery, PE dlavery@secivileng.com 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 ATO 2155 OLD SHELL RD Suite MOBILE, AL 36607 T: 2514718361 F: 2514710410 www.att.com ATO 2155 OLD SHELL RD Suite MOBILE, AL 36607 T: 2514718361 F: 2514710410 www.att.com January 21, 2019 Gabe Wagner S. E. Civil Engineering 1 S. School St Fairhope, Alabama 36532 Dear Mr. Wagner, This letter is in response to your request for information on the availability of AT&T service at Parcel I.D. 15164, N.E. corner of Magnolia Av. and N. Church St. Attn: Planning and Zoning RE: Service Availability This letter acknowledges that the above referenced project is located in an area served by AT&T. Any service arrangements for this location will be subject to later discussions and agreements between the developer and AT&T. Please be advised that this letter is not a commitment by AT&T to provide service to the proposed subdivision / development of Parcel I.D. 15164, located at the N. E. corner of Magnolia Av. and N. Church St., but an acknowledgement that we have service in this area. Please contact me at the phone number included in this letter if you have any questions. Thank you for contacting AT&T. Sincerely, Wade Mitchell MGR OSP Planning & Engineering Design FAIRHOPE AVE S BANCROFT STS SECTION STS SUMMIT ST S CHURCH STN SUMMIT STATKINSON LN MAGNOLIA AVE N SCHOOLSTSAXE LN N CHURCH STN BANCROFT STN SECTION STPINE AVE EQUALITY ST BOISE LNGENEVIEVE LN OAK AVE City of FairhopePlanning Commission October 2, 2023 ¯N CHURCH STMAGNOLIA AVE SR 23.05 - Vatan Mixed Use Development Legend Roads Parcels Corporate Limits Zoning Classification B-2 - General Business District B-3b - Tourist Resort Commercial Service District B-4 - Business and Professional District P-1 - Parking R-2 - Medium Density Single-Family R-4 - Low Density Multi-Family R-5 - High Density Dwelling Residential Planning Jurisdiction ^ Project Name: Vatan Mixed Use DevelopmentSite Data: 0.52 acresProject Type: Site Plan ReviewJurisdiction: Fairhope Planning JurisdictionZoning District: B-2PPIN Number: 15164General Location: Northeast corner of North Church St. and Magnolia Ave.Surveyor of Record: S.E. Civil LLCEngineer of Record: S.E. Civil LLCOwner / Developer: Approve with Conditions School District: Fairhope Elementary School Fairhope Middle and High Schools Recommendation: Prepared by: µ µ Mike Jeffries FST RW LLC □ C ----- LLC Cert of Formation - 11/2021 Page 1 of 2 STATE OF ALABAMA DOMESTIC LIMITED LIABILITY COMPANY (LLC) CERTIFICATE OF FORMATION PURPOSE: In order to form a Limited Liability Company (LLC) under Section 10A-5A-2.01 of the Code of Alabama 1975, this Certificate of Formation and the appropriate filing fees must be filed with the Office of the Secretary of State. The information required in this form is required by Title 10A. 1. The name of the limited liability company (must contain the words “Limited Liability Company” or the abbreviation “L.L.C.” or “LLC,” and comply with Code of Alabama, Section 10A-1-5.06. You may use Professional or Series before Limited Liability Company or LLC (or PLLC or SLLC) if they apply: 2.A copy of the Name Reservation Certificate from the Office of the Secretary of State must be attached. 3. The name of the registered agent (only one agent): Street (no PO Boxes) address of registered office (must be located in Alabama): *COUNTY of above address: Mailing address in Alabama of registered office (if different from street address): 4.The undersigned certify that there is at least one member of the limited liability company. (For SOS Office Use Only) RW LLC David Ryan Alabama Sec. Of State 001-044-188 DLL Date 10/12/2022 Time 11:20:00 File $100.00 County $100.00 ------- Total $200.00 71 N. Section Street, Suite B Fairhope, AL 36532 BALDWIN [] - DOMESTIC LIMITED LIABILITY COMPANY (LLC) CERTIFICATE OF FORMATION LLC Cert of Formation – 11/2021 Page 2 of 2 5.Check only if the type applies to the Limited Liability Company being formed: Series LLC complying with Title 10A, Chapter 5A, Article 11 Professional LLC complying with Title 10A, Chapter 5A, Article 8 Non-Profit LLC complying with Section 10A-5A-1.04(c) 6.The filing of the limited liability company is effective immediately on the date received by the office of the Secretary of State, Business Services Division or at the delayed filing date (cannot be prior to the filing date) specified in this filing complying with Section 10A-1-4.12 The undersigned specify / / as the effective date (must be on or after the date filed in the office of the Secretary of State, but no later than the 90th day after the date this instrument was signed) and the time of filing to be : AM or PM. (cannot be noon or midnight – 12:00) Attached are any other matters the members determine to include herein (if this item is checked there must be attachments with the filing). Date (MM/DD/YYYY) Signature as required by 10A-5A-2.04 Typed title (organizer or attorney-in-fact) *County of Registered Agent is requested in order to determine distribution of County filing fees. 10 12 2022 11 20 10 //12 2022 Member David Ryan _Q _Q _Q _O_ --® ~0-~----- Additional Details Organizers Organizer Street Address Mailing Address David Ryan 71 N. Section Street, Suite B Fairhope, AL 36532 71 N. Section Street, Suite B Fairhope, AL 36532 1 SR 23.05 Vatan Site Plan – October 2, 2023 Summary of Request: Request of Applicant, SE Civil, LLC, on behalf of owner, FST/RW LLC, for Site Plan Approval of Vatan Mixed Use Development. David Lavery, P.E., is the authorized agent and engineer for the project. The subject property is zoned B-2 General Business District and is within the Central Business District. Subject property is approximately 0.52 acres and is located at 301 Magnolia Avenue on the corner of Magnolia Avenue and Church Street. It is the intent of the Applicant to have a dedicated 1,200ft² retail/commercial component in each first floor of the two (2) structures facing Magnolia Avenue with one (1) residential unit occupying the second and third floor of each structure. The remaining five (5) structures will be single family dwelling units. In total, seven (7) residential units and two (2) commercial units are proposed on one lot with shared areas under common ownership. This project was the subject of BOA Case 23.02 in which the “use” was clarified. In short, mixed use, residential, and retail/commercial are allowed by right to some degree in B-2, but having all of the uses on one (1) lot with not every structure being “mixed use” per se is a different concept. This combination of use was approved in BOA Case 23.02. Figure 1: Site Plan i I I I I ..:-.:.... ! ! ! __ J _________ lL __ 2 SR 23.05 Vatan Site Plan – October 2, 2023 Figure 2: Site Data Tables Setbacks: B-2 only has a front setback at 20ft; however, this being located in the CBD allows for non- residential buildings to be built at the right-of-way line, unless a courtyard, plaza, or other public space is provided. Unit 2 is mixed use and has a courtyard. The rest of the units are built to the lot lines. This being a corner lot the setbacks for the front and side are the same pursuant to Article V, Section B(4)(b) of the Zoning Ordinance. Building(s): The buildings meet the height restriction of B-2. Architectural elevations are provided as attachments. Front elevations are shown in Figure 3. The buildings will be 40 ft tall pursuant to the dimension standards of the CBD. However, the subject property fluctuates in elevation from 97 ft to 111 ft above sea level. The Applicant is developing the subject property using the existing natural topography. Applicants are to use the average elevation of each condominium lot, which will result in the structures following the existing grade. “Building Height” is defined in the Zoning Ordinance as “the vertical distance measured from the average natural elevation of the lot to the mean point of the roof of the building.” Thus, the structures may appear to be different heights, but, in fact, they all will be 40 ft tall or less. Materials for the building are primarily brick, stucco, metal roof and overhangs. SITE ANAll YSIS SJiEM:RE~ IP RCPCGEDJ 8 Uru!l>""1 HEJa'ii BU ILDNJ [Ul'<□EF! RCO=! <11 .51 M:. [;?2 ,3,,2 -ll F) 4th· 10,, EF ~EENiil~. UMIT:s. ~~1~1 TN&UNITS s 2 1.NJJS S,,UNJTS =·.-..•:;;;a) PAAKINlJ FR!Wl!k-0 PA,OON G, i'SP.-.CSS (SE P l,l[l°"1.T. 1 &=-J'ICSS JURll,l)JC---rJCN ~ CITY o~ FA.."'lHOfE E!-i!fCEDJ IE) I'<~ SET1EIACIIS: REQJ.ME:t FR Y.AfUl: D FT -SDE Y!IRD: D FT' RE.-'IR Yl'IRD: Dr MAXIMUM P-U1 LDINa1 HE Kil-fi: M"JC.. E I ·XG S 11iE OOYBRJIGE: ·- LA ND USAG E ~-N ."nEA !if<, Oi' f'i'WFSU'I' A":E .. "Fl.aFSlY.-'lliEA l!IS!ACRES - ., DING -. [UNDER ROOFJ '!l24AcRBS--.1.~ IW'$\/IOIJS IF1"-'4Jll '!l.18AcREs-:!ti.,52'£ "ERVIOCIS P 'ITNIJ 111.C~ Ar:RSS l!lll.I~ Q RII.SS::0,1.A~..D-il.1DAcREI; '19.23':I. 3 SR 23.05 Vatan Site Plan – October 2, 2023 Figure 3: Elevations from Magnolia Avenue Landscaping Plan: There is an extensive landscaping plan that has been reviewed. Revised plans, if any, shall be received prior to sending the Site Plan to City Council for final approval. (Ordinance #1444, Section20.5- 4(6)). Parking: Parking meets the requirements of Zoning Ordinance. Fourteen (14) spaces are provided and only seven (7) are necessary. All parking is located mostly behind the buildings and in garages that have a direct pedestrian connection to the primary entrance off Magnolia Avenue. Units 6 & 7 have garages situated to the side. Sidewalks: This Site Plan includes an interior sidewalk for Unit 2 and the required 8’ sidewalks along Magnolia Avenue and Church Street. Applicant is tying into existing sidewalks wherever possible. Part of the sidewalk in front of Units 3 and 4 is cinched in to 6’ in order to accommodate heritage trees. There is also an existing 5’ sidewalk close to the corner of Magnolia and Church in the Magnolia ROW that the Applicant desires to keep to 5’ in order to protect two (2) heritage trees. A request to City Council for parts of the sidewalks to be less than 8’ pursuant to Article V, Section B(4)(e) Zoning Ordinance is included in the packet. Some areas of the sidewalk may be less that 6 feet to avoid critical root zones. o Elevated stairs located in the ROW are proposed to access the buildings fronting Church St. to minimize disturbance to existing heritage trees. A Hold-Harmless shall be required prior to any land disturbance or issuance of anu building permit. Locations, intensity, and heights of exterior lights: All lighting fixtures will be for each individual unit. No parking lot or driveway pole lights will be provided. All light fixtures will be installed so that no light or glare is allowed to spill onto the right of way or adjacent property. A photometric plan was not provided, however, will be required at time of building permit application. Mechanical equipment: Mechanical equipment has been finalized, reviewed, and accepted, and all appear on the Site Plan. HVAC equipment is screened. I } ~ 1 SOUTH 4 SR 23.05 Vatan Site Plan – October 2, 2023 Dumpster location and screening: Units 3-7 are strictly residential and have trash receptacles located in each garage. Units 1 and 2, which are mixed-use have a residential trash receptacle located in each garage and a screened commercial receptacle located to the rear of the units. The development will have a private trash service that will gather the garbage from outside locations for each unit within the development. Trash receptacles will not be rolled out to any public right-of-way. Fences: There is various fencing on the site. Since the underlying zoning is B-2 and non-residential then side fencing on the site shall not be mor than 12’ tall. The plan has landscape fencing at 3’ and the east side of the site has 10’ fencing made of multiple materials. Figure 4: Dumpster and HVAC Enclosures. HVAC EQUl l?i.il'rnr·--~Ml!IU:.<J SCR EEN f' I CCt ,0.4 ERC ~~ TRASH ECEP TAtl..E, SCR EEl'Jijl) GA~h flr RESI DEN n l TRAS H___!Fi I ECEF'T~J.l..E I I I f I I I I I I I I ,, I I \/ I t\l / J / f UINIT/ I ~~O 1s.:JFT ST LOOR -OOf/1 !iQ 2 1-l □ ~"L.OOR SQTT J il.P OOR / /ll4100FT ·iii.AA<,• / '119SOFl PA II O / I I ( I I \ 7 I I I I I I I l~----tf=~=----,;1---------;:::======::::;-i / ~~~~I .fT □ ~ ,, I I j I /I r r I j UN IT3 j J I I I 1 I03 SQ! 1STFLIX)FI I 1 SQ D I 421"0F1~ I 5QiHlCF11 PAT j r J I ~ j ! ' I I RESIDEN llAL m.JH !iE EPTACLE / GARAGE 5 SR 23.05 Vatan Site Plan – October 2, 2023 Figure 5: Fence and Wall Details. Storm water: The terrain of the site falls from east to west with elevations ranging. Runoff flows westward across the surface of the site and enters the N. Church Street ROW where it enters City storm sewer lines through inlets located along N. Church Street. Runoff will be directed to a series of area drains and drop inlets located along N. Church Street. The underground storm pipes will carry the runoff to an existing City inlet on the east side of N. Church Street near the Magnolia Avenue intersection where it will continue through Fairhope’s storm sewer network. Retention facilities are not required for this development. An HOA will be formed that will be required to maintain any and all stormwater facilities and structures located outside of the publicly accepted ROW. Submitted plans have been approved. Location and size of all signage: A sign plan was not provided. It is the intent to have minimal signage. A sign plan shall be in compliance with the Sign Ordinance. Erosion control: An Erosion Control plan was submitted with the application and is acceptable. Utilities: A utility plan was submitted and has been reviewed and approved by the appropriate providers. The contractor is responsible to get electricity to the take off pole. Risers for gas meters will be installed based on the locations provided by the applicant. ADA Requirements: ADA requirements have been met, but will be inspected during construction construction. --.L 4 ~9~~~~ FE NCE SECT ION i!i ' ',\'OOD SO.R EEN i'il'll../fi'ETAINlt-,1('; '"LL HEJ GHT F•OU.0 '/i'S "'li RPL DE: ON EAS T :S ID E. REF CIVI L Ai/il ~(;'S FOR 3 LI MITS Of ETAI NING 'i'l.'I..L REF 4 /A 1.0IJ r L A N DSCAPE FENCE 6 SR 23.05 Vatan Site Plan – October 2, 2023 Traffic: A traffic impact study is not warranted for this project pursuant to letter dated August 21, 2023, from S.E. Civil. Article II, Section C.2.d. (Site Plan Review Criteria) Criteria – The application shall be reviewed based on the following criteria: (1) Compliance with the Comprehensive Plan; The property is currently zoned B-2 and the uses currently proposed (residential and office) are allowed in B-2. (2) Compliance with any other approved planning documents; Will be met prior to vertical construction/applying for building permit. (3) Compliance with the standards, goals, and intent of this ordinance and applicable zoning districts; The standards of the zoning ordinance have been, or shall be by condition of approval, met. (4) Compliance with other laws and regulations of the City; Meets (5) Compliance with other applicable laws and regulations of other jurisdictions; Meets (6) Impacts on adjacent property including noise, traffic, visible intrusions, potential physical impacts, and property values; Meets (7) Impacts on the surrounding neighborhood including noise, traffic, visible intrusions, potential physical impacts, and property values; Property is zoned B-2, which allows for such things and the site does not abut conflicting uses. (8) Overall benefit to the community; No Conflicts. (9) Compliance with sound planning principles; Meets (10) Compliance with the terms and conditions of any zoning approval; Meets (11) Any other matter relating to the health, safety, and welfare of the community; Nothing noted (12) Property boundaries with dimensions and setback lines; Meets (13) Location of proposed buildings and structures indicating sizes in square feet; Meets (14) Data to show percentage of lot covered with existing and proposed buildings; Meets (15) Elevations indicating exterior materials; Front elevations were provided. (16) The locations, intensity, and height of exterior lights; Meets (17) The locations of mechanical equipment; All relevant requirements are met. (18) Outside storage and/or display; Meets (19) Drive-up window locations (must be away from residential uses/districts and not in front of building); n/a (20) Curb-cut detail and location(s); Provided. (21) Parking, loading, and maneuvering areas; Meets (22) Landscaping plan in accordance with the City Landscape Ordinance; 7 SR 23.05 Vatan Site Plan – October 2, 2023 Meets (23) Location, materials, and elevation of any and all fences and/or walls; Meets (24) Dumpster location and screening; and Meets (25) Location and size of all signage. A signage plan is underway and the plan shall conform to the Sign Ordinance. Recommendation: Staff recommends conditional approval of case SR 23.05 with the following conditions: 1.) No part of any building shall extend beyond 40’ from the natural elevation of each building pad. 2.) Signage plan shall conform to the Sign Ordinance. 3.) Provide a Hold-Harmless agreement for staircases proposed in the ROW. ATTACHMENT TO APPLICATION FOR VATAN SITE PLAN AND MOP (FOR PROPERTY PIN_#15164) LOCATED AT THE CORNER OF MAGNOLIA AVENUE AND CHURCH STREET IN FAIRHOPE, ALABAMA (8-22-23) The proposed Project for the Property (named “Vatan”) is depicted on the attached Site Plan and MOP applications. Vatan is a mixed-use development comprised of 7 architecturally compatible and separate structures and will constitute a land condominium created and administered in accordance with the Alabama Uniform Condominium Act. The dedicated retail/commercial component of Building 1 fronting Magnolia Avenue comprises approximately 1,400 square feet on the first floor and is intended to serve one or more small scale retail/commercial tenants, and the second and third floors of Building 1 (consisting of approximately 3,000 square feet) are intended for a single residential use. The dedicated retail/commercial component of Building 2 fronting Magnolia Avenue comprises approximately 2,980 square feet on the first and second floors and is intended to serve one or more small scale retail/commercial tenants. The third floor of Building 2 (consisting of approximately 1,730 square feet) is intended for a single residential use. The remaining 5 Buildings in Vatan (facing Church Street and internal to the Property) range from approximately 3,500 square feet to approximately 2,300 square feet, and each of them is primarily intended for a single residential use. At the Board of Adjustments meeting for Vatan earlier in 2023, allowance was made for calculating the height of each Building on the basis of each Building’s individual footprint. The mixed-use Buildings facing Magnolia Avenue are 40 feet in height in accordance with the calculation methodology used by the City of Fairhope, and the remaining 5 Buildings are 35 feet or less in height in accordance with the City of Fairhope’s calculation methodology. Substantial planning has been undertaken to ensure that the Project is consistent with the applicable regulations within the zoning for the Property and the Central Business District of Fairhope. Project attributes include: a. a single entry/exit to and from the Property for vehicular traffic, promoting traffic safety; b. on-site parking that is twice the minimum number of spaces required in the CBD; c. dedicated golf cart parking for certain Buildings located on the Property; d. a site plan and design that makes every effort to preserve the trees located both on the Property and in the Magnolia Avenue and Church Street right-of-ways; e. the Project is complimentary of the residential, commercial and mixed-use developments in the immediate vicinity of the Property; and f. the Project is supportive of and promotes multiple of the objectives specifically applicable to the CBD in the Fairhope Zoning Ordinance, including: • generating high levels of pedestrian and bicycle traffic; • providing a mix of uses; • strengthening non-automotive connections to adjacent neighborhoods; • buffering surrounding neighborhoods from any adverse impacts of activities in the CBD; and • providing a small park/green space for Property occupants The Site Plan and the arrangement of structures on the Property compliment the natural topography of the Property, which ranges from 111 feet above sea level to 97 feet above sea level. The Site Plan, Project design and Project configuration are all intended to promote the highest and best use of the Property and to also further enhance the CBD and general downtown area of Fairhope. . • PROPOSED TREE CARE PLAN as of June 21, 2023 I. Assignment Components A. Assess the health and structure of the live oak trees located at this site. B. Develop a basis plan of care for the trees to mediate the impact of proposed construction near these trees. C. Assess construction and site plans to recommend alternatives to reduce the impact upon the trees. D. Develop a tree protection plan using the approved plans prior to the start of construction. E. Communicate with contractors as needed to explain the tree protection plan, reevaluate the tree protection plan as needed due to changes with construction plans, and assess any contractor damage to these trees, develop remediation plans, and determine the cost of any damage and/or cost of treatment for these trees. F. Monitor the trees before, during, and after construction. G. Provide a written report for items A – D. II. Care Components A. Tree health and structure assessment for the 5 trees on the Right of Way (ROW) and 1 tree on the property. The assessment will not be a tree risk assessment but rather a basis assessment looking for defects that could require a formal tree risk assessment. B. Using the current plans, determine areas that will require air excavation to map and/or prune roots as needed. C. Collect a soil sample(s) for testing. The results will be used to determine a prescription for fertilization. D. Determine if the use of a tree growth regulator will have benefit and apply as needed. E. Using the approved plans, determine pruning needs for limb removal and/or reduction to provide clearance for the buildings and any space needed for construction purposes. F. Standard pruning to remove deadwood one-inch diameter and larger, crossing limbs, cracked or broken limbs, and hanging limbs. Reduction pruning of over-extended limbs as needed. Pruning will follow ANSI A-300 Part 1 standards. G. An application of mulch up to 12-inches deep in areas that will not be fenced off from construction and sufficient roots are present. H. The installation of a fence, to protect tree roots, outside of the building’s footprint and any over-dig construction areas where sufficient roots are present. I. Consult with contractors before, during, and after construction as needed. Review construction plans, make recommendations, and develop or review existing tree protection plans. Assess any damage, develop a remediation plan, and determine the responsible party as needed. Application for tree pruning or removal permits. 1 Dave Lavery From:Jamie Rollins <jamie.rollins@fairhopeal.gov> Sent:Wednesday, September 13, 2023 4:08 PM To:Richard Johnson; Dave Lavery Cc:Mike Jeffries; Michelle Melton; Hunter Simmons Subject:Re: Vatan Mixed Use Development We met on-site today. The sidewalks are a difficult one. It is obvious that many measures are being taken to preserve the trees on-site. A consulting arborist has been working with the project and I agree with his assessment that removing 12-14 inches of material in the critical root zone of the trees will be very impactful to the trees. Maybe not today but time will tell that tale. The middle tree is my biggest concern. Could we find a way to do wooden boardwalk or something less impactful there? Thanks, Jamie Get Outlook for iOS From: Richard Johnson <richard.johnson@fairhopeal.gov> Sent: Wednesday, September 13, 2023 2:57:54 PM To: Dave Lavery <dlavery@secivileng.com> Cc: Mike Jeffries <mike.jeffries@fairhopeal.gov>; Michelle Melton <michelle.melton@fairhopeal.gov>; Hunter Simmons <hunter.simmons@fairhopeal.gov>; Jamie Rollins <jamie.rollins@fairhopeal.gov> Subject: RE: Vatan Mixed Use Development Dave: I have reviewed the proposed drainage for the subject development – I have no issues or concerned. I will get you a copy of the “As Builts” for this portion of the Church Street Drainage. As discussed – sidewalks as shown are acceptable, however, I recognize that post approval and during construction we may have to make some modifications to mitigate tree impacts and/or meet ADA compliancy requirements. All approvals are conditioned on final approval by the City Horticulture Supervisor’s for compliance with the Tree & Landscape Ordinance. Thanks, RDJ Richard D. Johnson, PE Public Works Director richard.johnson@fairhopeal.gov Office: 251-929-0360 Cell: 251-423-7418 From: Dave Lavery <dlavery@secivileng.com> Sent: Tuesday, September 12, 2023 1:44 PM 2 To: Richard Johnson <richard.johnson@fairhopeal.gov> Subject: RE: Vatan Mixed Use Development Good afternoon Richard, I revised the civil plans for Vatan so that the site drainage would connect to the grate inlet to the north of our site instead of the catch basin near the corner of Magnolia and Church. Please let me know if you have any comments on the revised plan set. Thank you, Dave Lavery, PE 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 phone www.secivil.pro From: Dave Lavery Sent: Friday, September 8, 2023 12:30 PM To: richard.johnson@fairhopeal.gov Subject: RE: Vatan Mixed Use Development Good afternoon Richard, I received a comment from Wednesday’s DRC to follow up with you on sidewalk layout, drainage plan, and any potential additions/improvements. The civil plans are attached. Please let me know if you have any comments that need to be addressed. Planning has asked that I respond by Thursday morning at 9:00 so please let me know as soon as possible if you need additional information of if you have any comments that might require plan revisions. I’d be happy to come in early next week and look at the plans with you if that makes it any easier. Thank you, Dave Lavery, PE 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 phone www.secivil.pro 3 From: Dave Lavery Sent: Wednesday, August 16, 2023 2:12 PM To: richard.johnson@fairhopeal.gov Subject: Vatan Mixed Use Development Good afternoon Richard, We are working through the design for the Vatan Mixed Use Development on the northeast corner of Magnolia and Church. Attached are current versions of the site plan and grading and drainage plan. Do you have any comments on the sidewalk layout, the storm connection, or anything else you see that needs to be addressed? Or if it would be easier to go over this in person I would be happy to come by. I also had a question on the existing storm sewer on the east side of Church Street. Our survey (attached) shows a 15” CPP stubout (I think it’s actually RCP) on the north side of a catch basin near Magnolia, and further north there is a 15” CMP stubout on the south side of an inlet. Those lines are pointing towards each other, but aren’t shown connecting in our survey. With the inverts we shot, I don’t think they would be connected, but can you verify? I currently show our storm coming into the ROW near the north side of the property line and going to the inlet to the south, which is further away than the inlet to the north, but we’ll have to tear up more sidewalk, curb, and street to connect to the north inlet. Are you okay with us connecting to the south? Thank you, Dave Lavery, PE 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 phone www.secivil.pro September 5, 2023 City Council City of Fairhope 451 Pecan Ave. Ste. 200 Fairhope, AL 36532 Civil Engineering & Surveying Re: SD 23.26 & SR 23.05-Vatan Mixed Use Development Sidewalk Width Reduction Request Dear Council: I would like to request a reduced sidewalk width of 6 feet for portions of the proposed Vatan Mixed Use Development. The site is located on the northeast comer of Magnolia Avenue and Church Street and is within the Central Business District (CBD). The minimum sidewalk width within the CBD is 8 feet, but can be reduced to 6 feet with City Council Approval. Within the Church Street Right-Of-Way there are multiple heritage Live Oaks between the proposed buildings and the street. The available space from the existing curb to their trunks is between 10 and 13 feet. Reducing the sidewalk width to 6 feet in the vicinity of these trees will reduce the impact to the roots of these trees. Additionally, in the Magnolia Avenue Right-Of-Way near the intersection there is existing 5' sidewalk which is immediately adjacent to 2 heritage trees. I would like to request that this sidewalk near these trees be allowed to remain in place with no requirement to increase the sidewalk width. Please see the attached sketch depicting the proposed sidewalk widths within the Right-Of-Way Please let me know if you have any questions or comments. Sincerely, ~ ~ David Lavery, PE dlavery@secivileng.com 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 August 21, 2023 Hunter Simmons City of Fairhope 451 Pecan Ave. Ste. 200 Fairhope, AL 36532 Civil Engineering & Surveying Re: Va tan Mixed Use Development -Traffic Impact Study Note Dear Hunter: This letter is to serve as back up information as to why a Traffic Impact Study is not warranted for this project. According to the subdivision regulations a traffic impact study is required if a project will increase the average daily traffic by 1,000 trips or generate 50 trips or more during any peak hour period. The proposed project will add 7 new residential units and 2,619 square feet of office space. Per the attached chart we have an average daily traffic of 70 trips and a total of 8 peak hour trips for this development. If you have any questions, please let me know . Sincerely, ~ ~ dlavery@secivileng.com 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 Instructions:Trip Generation Rates from the 8th Edition ITE Trip Generation ReportEnter Numbers into the "Expected Units"NA: Not AvailableKSF2: Units of 1,000 square feetin the Corresponding Yellow ColumnDU: Dwelling UnitFuel Position: # of vehicles that could be fueled simultaneouslyOcc.Room: Occupied RoomDescription / ITE Code UnitsRate Weekday Daily Traffic PM Peak Period Rate% PM In% PM OutExpected Units (independent variable)Calculated Daily TripsPM Peak Trips - TotalPM In PM Out NotesWaterport/Marine Terminal 010Berths171.52NA NA NA0NA NA NACommercial Airport 021Employees13.400.80 54% 46%00NA NACommercial Airport 021Avg Flights/Day104.735.75 56% 44%00NA NACommercial Airport 021Com. Flights/Day122.216.88 54% 46%00NA NAGeneral Aviation Airport 022Employees14.241.03 45% 55%00NA NAGeneral Aviation Airport 022Avg. Flights/Day1.97NA NA NA0NA NA NAGeneral Aviation Airport 022Based Aircraft5.000.37 45% 55%00NA NATruck Terminal 030Acres81.906.55 43% 57%00NA NA Caution- Only 3 StudiesPark&Ride w/ Bus Service 090Parking Spaces4.500.62 22% 78%00NA NAPark&Ride w/ Bus Service 090Occ. Spaces9.620.81 28% 72%00NA NALight Rail Station w/ Park 093Parking Space2.511.24 58% 42%00NA NALight Rail Station w/ Park 093Occ. Spaces3.911.33 58% 42%00NA NAGeneral Light Industrial 110KSF26.970.97 12% 88%00NA NAGeneral Light Industrial 110Employees3.020.42 21% 79%00NA NAGeneral Heavy Industrial 120KSF21.500.68 NA NA00NA NA Caution-Only 3 Studies.General Heavy Industrial 120Employees0.820.88 NA NA00NA NAIndustrial Park 130KSF26.960.86 21% 79%00NA NAIndustrial Park 130Employees3.340.46 20% 80%00NA NAManufacturing 140KSF23.820.74 36% 64%00NA NAManufacturing 140Employees2.130.36 44% 56%00NA NAWarehousing 150KSF23.560.32 25% 75%00NA NAWarehousing 150Employees3.890.59 35% 65%00NA NAMini Warehouse 151KSF22.500.26 51% 49%00NA NAMini Warehouse 151Storage Units0.250.02 NA NA00NA NAMini Warehouse 151Employees61.906.04 52% 48%00NA NAHigh-Cube Warehouse 152KSF21.440.10 33% 67%00NA NAHigh-Cube Warehouse 152EmployeesNA0.66 35% 65%00NA NAUtilities 170KSF2NA0.76 45% 55%00NA NAUtilities 170EmployeesNA0.76 90% 10%00NA NASingle Family Homes 210DU9.571.01 63% 37%00NA NASingle Family Homes 210Vehicles6.020.67 66% 34%00NA NAApartment 220DU6.650.62 65% 35%00NA NAApartment 220Persons3.310.40 NA NA00NA NAApartment 220Vehicles5.100.60 NA NA00NA NALow Rise Apartment 221Occ.DU6.590.58 65% 35%00NA NAHigh Rise Apartment 222DU4.200.35 61% 39%00NA NAMid-Rise Apartment 223DUNA0.39 58% 42%00NA NARental Townhouse 224DUNA0.72 51% 49%00NA NA Caution- Only 1 Study.Resd. Condo/Townhouse 230DU5.810.52 67% 33%7.041421Resd. Condo/Townhouse 230Persons2.490.24 67% 33%00NA NALow Rise Resd. Condo 231DUNA0.78 58% 42%00NA NAHigh Rise Resd. Condo 232DU 4.180.38 62% 38%00NA NALuxury Condo/Townhouse 233Occ. DUNA0.55 63% 37%00NA NAMobile Home Park 240DU4.990.59 62% 38%00NA NAMobile Home Park 240Persons2.460.26 63% 37%00NA NARetirement Community 250DUNA0.27 56% 44%00NA NA Caution- Only 1 StudyElderly Housing-Detached 251DU3.710.27 61% 39%00NA NA Caution- Only 1 Study.Congregate Care Facility 253Occ.DU2.150.17 56% 44%00NA NA Caution- Only 2 StudiesElderly Housing- Attached 252Occ.DU3.480.16 60% 40%00NA NA Caution- Only 4 StudiesI I Recreational Homes 260DU3.160.26 41% 59%00NA NAResidential PUD 270DU7.500.62 65% 35%00NA NAHotel 310Occ. Room8.920.70 49% 51%00NA NAHotel 310Rooms8.170.59 53% 47%00NA NAHotel 310Employees14.340.80 54% 46%00NA NAAll Suites Hotel 311Occ.Room6.240.55 42% 58%00NA NA Caution- Only 4 StudiesAll Suites Hotel 311Rooms4.900.40 45% 55%00NA NABusiness Hotel 312Occ. Room7.270.62 60% 40%00NA NA Caution-Only 4 StudiesBusiness Hotel 312Employees72.677.60 60% 40%00NA NAMotel 320Occ.Room9.110.58 53% 47%00NA NAMotel 320Rooms5.630.47 54% 46%00NA NAMotel 320Employees12.810.73 54% 46%00NA NAResort Hotel 330Occ. Room13.430.49 43% 57%00NA NA Daily Rate for Saturday.Resort Hotel 330RoomsNA0.42 43% 57%00NA NACity Park 411Picinic Sites5.87NA NA NA0NA NA NACounty Park 412Acres2.280.06 41% 59%00NA NAState Park 413Picnic Sites9.950.65 43% 57%00NA NAState Park 413EmployeesNA4.67 43% 57%00NA NAWater Slide Park 414Parking Space2.27NA NA NA0NA NA NA Caution- Only 1 Study.Beach Park 415Acres29.811.30 29% 71%00NA NACampground/RV Park 416Acres74.380.39 NA NA00NA NA Caution-Only 1 Study.Regional Park 417Picnic Sites61.829.60 41% 59%00NA NA Peak Hour is PM Peak Hour.Regional Park 417Employees79.7710.26 45% 55%00NA NANational Monument 418Employees31.055.58 NA NA00NA NA Peak Hour is PM Peak Hour.Marina 420Berths2.960.19 60% 40%00NA NA Caution- Only 2 StudiesGolf Course 430Employees20.521.48 48% 52%00NA NAGolf Course 430Holes35.742.78 45% 55%00NA NAMinature Golf Course 431HolesNA0.33 33% 67%00NA NAGolf Driving Range 432TeesNA1.25 45% 55%00NA NA Caution- Only 2 Studies.Multipurpose Rec. Facility 435Acres90.385.77 NA NA00NA NA Caution- Only 1 Study.Live Theater 441SeatsNA0.02 50% 50%00NA NAMovie Theater w/o matinee 443KSF278.066.16 94% 6%00NA NA Caution- Only 1 Study.Movie Theater w/o matinee 443Movie Screens220.0024.00 41% 59%00NA NAMovie Theater w/o matinee 443Seats1.760.07 75% 25%00NA NA Peak Hour is PM Peak Hour.Movie Theater w/o matinee 443Employees53.124.20 NA NA00NA NAMovie Theater w/ matinee 444KSF2NA3.80 64% 36%00NA NA Caution- Only 1 Study.Movie Theater w/ matinee 444Movie Screens153.3320.22 40% 60%00NA NAMovie Theater w/ matinee 444SeatsNA0.14 53% 47%00NA NAHorse Track 452Employees2.60NA 50% 50%0NA NA NADog Track 454Attendees1.090.13 66% 34%00NA NAArena 460Employees10.00NA 50% 50%0NA NA NAIce Rink 465Seats1.260.12 NA NA00NA NA Caution- Only 1 Study.Casino/Video Lottery Establishment 473KSF2NA13.43 56% 44%00NA NAAmusement Park 480Employees8.330.50 61% 39%00NA NAZoo 481Acres114.88NA 50% 50%0NA NA NAZoo 481Employees23.93NA 50% 50%0NA NA NATennis Courts 490Courts31.043.88 NA NA00NA NATennis Courts 490Employees66.675.67 NA NA00NA NARacquet Club 491Courts38.703.35 NA NA00NA NARacquet Club 491KSF214.031.06 NA NA00NA NARacquet Club 491Employees45.714.95 NA NA00NA NAHealth Club 492KSF232.933.53 57% 43%00NA NA Caution- Only 1 StudyBowling Alley 494KSF233.333.54 35% 65%00NA NA Caution- Only 1 Study.Recreational Com. Center 495KSF222.881.45 37% 63%00NA NA Caution- 1 study.Recreational Com. Center 495Employees27.253.16 44% 56%00NA NAMilitary Base 501Employees1.780.39 NA NA00NA NAElementary School 520Students1.290.15 49% 51%00NA NA Peak Hour is PM Peak Hour.Elementary School 520KSF215.431.21 45% 55%00NA NAElementary School 520Employees15.711.81 49% 51%00NA NAPrivate School (K-12) 536Students2.480.17 43% 57%00NA NA Caution- Only 2 studies.Middle/ JR. High School 522Students1.620.16 49% 51%00NA NA Middle/ JR. High School 522KSF213.781.19 52% 48%00NA NAHigh School 530Students1.710.13 47% 53%00NA NAHigh School 530KSF212.890.97 54% 46%00NA NAHigh School 530Employees19.741.55 54% 46%00NA NAJunior/ Comm. College 540Students1.200.12 64% 36%00NA NAJunior/ Comm. College 540KSF227.492.54 58% 42%00NA NAJunior/ Comm. College 540Employees15.551.39 58% 42%00NA NAUniversity/College 550Students2.380.21 30% 70%00NA NAUniversity/College 550Employees9.130.88 29% 71%00NA NAChurch 560KSF29.110.55 48% 52%00NA NA For WeekdaySynagogue 561KSF210.641.69 47% 53%00NA NA Caution- Only 1 Study.Daycare Center 565KSF279.2612.46 47% 53%00NA NADaycare Center 565Students4.480.82 47% 53%00NA NADaycare Center 565Employees28.134.79 47% 53%00NA NACemetery 566Employees58.097.00 33% 67%00NA NAPrison 571KSF2NA2.91 NA NA00NA NA Peak Hour is PM Peak Hour. Caution- Only 1 Study.Prison 571EmployeesNA0.23 28% 72%00NA NALibrary 590KSF256.247.30 48% 52%00NA NALibrary 590Employees52.525.40 47% 53%00NA NALodge/Fraternal Organization 591Members0.290.03 NA NA00NA NA Caution- Only 1 Study.Lodge/Fraternal Organization 591Employees46.904.05 NA NA00NA NAHospital 610KSF216.501.14 42% 58%00NA NAHospital 610Beds11.811.31 36% 64%00NA NAHospital 610Employees5.200.33 31% 69%00NA NANursing Home 620Beds2.370.22 33% 67%00NA NANursing Home 620Employees4.03NA 26% 74%0NA NA NA Peak Hour is PM Peak Hour.Clinic 630KSF231.455.18 NA NA00NA NA Caution- Only 2 Studies.Clinic 630Employees7.751.23 41% 59%00NA NAGeneral Office 710 (Equation)KSF2Equation Equation17% 83%00NA NAGeneral Office 710KSF211.011.49 17% 83%2.629413Corporate Headquarters 714KSF27.981.40 10% 90%00NA NA Peak Hour is PM Peak Hour.Corporate Headquarters 714Employees7.981.40 10% 90%00NA NA Peak Hour is PM Peak Hour.Single Tenant Office Bldg 715KSF211.571.72 15% 85%00NA NA Peak Hour is PM Peak Hour.Single Tenant Office Bldg 715Employees3.620.50 15% 85%00NA NA Peak Hour is PM Peak Hour.Medical Dental Office 720KSF236.133.46 27% 73%00NA NAMedical Dental Office 720Employees8.911.06 34% 66%00NA NAGovernment Office Building 730KSF268.931.21 31% 69%00NA NA Peak Hour is PM Peak Hour. Caution- Only 1 Study.Government Office Building 730Employees11.951.91 74% 26%00NA NAState Motor Vehicles Dept. 731KSF2166.0217.09 NA NA00NA NAState Motor Vehicles Dept. 731Employees44.544.58 NA NA00NA NAUS Post Office 732KSF2108.1911.12 51% 49%00NA NAUS Post Office 732Employees28.322.84 51% 49%00NA NAGov. Office Complex 733KSF227.922.85 31% 69%00NA NA Caution- Only 1 Study.Gov. Office Complex 733Employees7.750.79 31% 69%00NA NAR&D Center 760KSF28.111.07 15% 85%00NA NA Peak Hour is PM Peak Hour.R&D Center 760Employees2.770.41 10% 90%00NA NABuilding Materials/Lumber 812KSF245.164.49 47% 53%00NA NABuilding Materials/Lumber 812Employees32.122.77 51% 49%00NA NAFree-Standing Discount Superstore 813KSF253.134.61 49% 51%00NA NAFree-Standing Discount Store 815KSF257.245.00 50% 50%00NA NAFree-Standing Discount Store 815Employees28.843.48 50% 50%00NA NAHardware/Paint Store 816KSF251.294.84 47% 53%00NA NA Caution- Only 3 StudiesHardware/Paint Store 816Employees53.215.05 NA NA00NA NANursery (Garden Center) 817KSF236.083.80 NA NA00NA NA Nursery (Garden Center) 817Employees22.131.99 NA NA00NA NANursery (Wholesale) 818KSF239.005.17 NA NA00NA NANursery (Wholesale) 818Employees23.400.47 NA NA00NA NAShopping Center 820 (Equation)KSF2Equation Equation49% 51%00NA NAShopping Center 820 RateKSF242.943.37 49% 51%00NA NAFactory Outlet Center 823KSF226.592.29 47% 53%00NA NAQuality Restaurant 931KSF289.957.49 67% 33%00NA NA Low Turnover - More than 1 hourQuality Restaurant 931Seats2.860.26 67% 33%00NA NAHigh Turnover/Sit Down Rest 932KSF2127.1511.15 59% 41%00NA NA Big variation on DailyHigh Turnover/Sit Down Rest 932Seats4.830.41 57% 43%00NA NAFast Food w/o Drive Thru 933KSF2716.0026.15 51% 49%00NA NAFast Food w/o Drive Thru 933Seats42.122.13 64% 36%00NA NAFast Food w/ Drive Thru 934KSF2496.1233.48 52% 48%00NA NAFast Food w/ Drive Thru 934Seats19.520.94 53% 47%00NA NADrive Thru Only 935KSF2NA153.85 54% 46%00NA NA Only 2 studiesDrinking Place 925KSF2NA11.34 66% 34%00NA NAQuick Lube Shop 941Service Bays40.005.19 55% 45%00NA NAAutomobile Care Center 942Service Bays12.482.17 NA NA00NA NA Daily Trips for Saturday. Caution- Only 1 Study.Automobile Care Center 942KSF215.863.38 50% 50%00NA NA Daily Trips for Saturday.New Car Sales 841 KSF233.342.59 39% 61%00NA NANew Car Sales 841 Employees21.140.96 48% 52%00NA NA Peak Hour is PM Peak Hour.Automobile Parts Sales 843KSF261.915.98 49% 51%00NA NAGasoline/Service Station 944Fuel. Position168.5613.87 50% 50%00NA NA Daily Rate from 4th Edition ITEServ.Station w/ Conven.Mkt 945Fuel Position162.7813.38 50% 50%00NA NA Have auto repair and serviceServ.Stat.w/Conv.Mkt.&Carwash 946Fuel Position152.8413.94 51% 49%00NA NASelf-Service Carwash 947Stalls108.005.54 51% 49%00NA NA Caution- Only 1 Study.Tire Store 848Service BaysNA3.54 42% 58%00NA NATire Store 848KSF224.874.15 43% 57%00NA NAWholesale Tire Store 849Service Bays30.553.17 47% 53%00NA NASupermarket 850KSF2102.2410.50 51% 49%00NA NA Daily based on small number of studies (Caution)Convenien. Mkt. (Open 24 hrs) 851KSF2737.9952.41 51% 49%00NA NAConvenien. Mkt. (Open 16 Hrs) 852KSF2NA34.57 49% 51%00NA NAConvenien. Mkt w/ Gas Pumps 853KSF2845.6059.69 50% 50%00NA NA Average size = 3,000 sqftDiscount Supermarket 854KSF296.828.90 50% 50%00NA NA Daily Trips for Saturday. Caution- Only 1 Study.Wholesale Market 860KSF26.730.88 53% 47%00NA NA Caution- Only 1 Study.Discount Club 857KSF241.804.24 50% 50%00NA NA Similar to "Sams" or "Pace"Home Improvement Store 862KSF229.802.37 48% 52%00NA NAElectronics Superstore 863KSF245.044.50 49% 51%00NA NAToy/Children's Superstore 864KSF2NA4.99 50% 50%00NA NA Peak Hour is for Saturday.Apparel Store 876KSF266.403.83 50% 50%00NA NADrugstore w/o Drive-Thru 880KSF290.068.42 50% 50%00NA NADrugstore w/ Drive-Thru 881KSF288.1610.35 50% 50%00NA NAFurniture Store 890KSF25.060.45 48% 52%00NA NAVideo Arcade 895KSF2NA56.81 52% 48%00NA NA Peak Hour is PM Peak Hour. Caution- Only 1 Study.Video Rental Store 896 KSF2NA31.54 50% 50%00NA NA Peak Hour is PM Peak Hour.Walk-in Bank 911KSF2156.4812.12 44% 56%00NA NA Daily based on 1 study & PM Peak based on 2 studies.Drive-in Bank 912Drive-in Windows139.2527.41 49% 51%00NA NADrive-in Bank 912KSF2148.1525.82 50% 50%00NA NA NA: Not AvailableKSF2: Units of 1,000 square feetDU: Dwelling UnitFuel Position: # of vehicles that could be fueled simultaneously Occ.Room: Occupied Room21-Aug-23 1 Dave Lavery From:Curtis Cooper <Curtis.Cooper@fairhopeal.gov> Sent:Tuesday, August 29, 2023 7:51 AM To:Dave Lavery Subject:Re: Magnolia & Church Fire Flow When I get back to the office I will send you something on this. Get Outlook for iOS From: Dave Lavery <dlavery@secivileng.com>  Sent: Tuesday, August 29, 2023 7:43:28 AM  To: Curtis Cooper <Curtis.Cooper@fairhopeal.gov>  Subject: RE: Magnolia & Church Fire Flow Good morning Curtis,   Sorry to pester you on this, but P&Z requested a response to the below comment by EOD. Can you provide a comment  that we can submit to satisfy this requirement?   Fire Flow Modeling (We realize that these tests were suspended due to water conservation. Please follow up with  sewer and water to schedule testing.)    Thank you,   Dave Lavery, PE 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 phone www.secivil.pro   From: Dave Lavery   Sent: Monday, August 28, 2023 10:11 AM  To: Curtis Cooper <Curtis.Cooper@fairhopeal.gov>  Subject: RE: Magnolia & Church Fire Flow Curtis,   We submitted to Planning and Zoning and noted that we are unable to perform a Fire Flow Test until we Phase 1 of  water conservation, but they commented that we need to follow up to schedule testing. Can you provide an email that  we will be scheduled for a fire flow test when water conservation reaches Phase 1.    Thank you,   Civil ngineetjng & Surv yi11g 2   Dave Lavery, PE 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 phone www.secivil.pro   From: Dave Lavery   Sent: Monday, August 21, 2023 3:16 PM  To: Curtis Cooper <Curtis.Cooper@fairhopeal.gov>  Subject: RE: Magnolia & Church Fire Flow Curtis,   Did you ever get a chance to check if there is fire flow data available in this area? Please let me know.   Thank you,   Dave Lavery, PE 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 phone www.secivil.pro   From: Curtis Cooper <Curtis.Cooper@fairhopeal.gov>   Sent: Wednesday, August 16, 2023 3:48 PM  To: Dave Lavery <dlavery@secivileng.com>  Subject: Re: Magnolia & Church Fire Flow No I didn’t today. We had we’ll issues. And yes until we get to phase 1 of water conservation Get Outlook for iOS From: Dave Lavery <dlavery@secivileng.com>  Sent: Wednesday, August 16, 2023 3:08:19 PM  To: Curtis Cooper <Curtis.Cooper@fairhopeal.gov>  Subject: RE: Magnolia & Church Fire Flow Civil ngineedng &: Surv yi:ng Civil ngineetjng &: Surv yi11g 3 Were you able to look into this?    If you don’t have data available, would we need to wait to do a fire flow test until the moratorium is ended?   Thank you,   Dave Lavery, PE 9969 Windmill Road Fairhope, Alabama 36532 251-990-6566 phone www.secivil.pro   From: Curtis Cooper <Curtis.Cooper@fairhopeal.gov>   Sent: Tuesday, August 15, 2023 4:21 PM  To: Dave Lavery <dlavery@secivileng.com>  Subject: Re: Magnolia & Church Fire Flow I will look tomorrow Get Outlook for iOS From: Dave Lavery <dlavery@secivileng.com>  Sent: Tuesday, August 15, 2023 4:13:56 PM  To: Curtis Cooper <Curtis.Cooper@fairhopeal.gov>  Subject: Magnolia & Church Fire Flow Good afternoon Curtis,     Do you have any fire flow data available near Magnolia and Church? We are working on an MOB submittal for the parcel  on the northeast corner of that intersection.     Thank you,     Dave Lavery, PE  9969 Windmill Road  Fairhope, Alabama 36532  251-990-6566 phone  www.secivil.pro      Civil Engineetino & Surv ying Civil ngineetino & Surv ying AT&T Alabama 2155 Old Shell Rd Mobile, AL 36607 www.att.com T: 251.471.8361 F: 251.471.0410 w.mitchell@att.com August 29, 2023 Dave Lavery S.E. Civil Engineering & Surveying RE: Service Availability – Vatan Mixed Use Development Dear Mr. Lavery, This letter is in response to your request for information on the availability of service at the above location by AT&T. This letter acknowledges that the above referenced property is located in an area served by AT&T. Any service arrangements for this location will be subject to later discussions and agreements between the developer and AT&T. Please be advised that this letter is not a commitment by AT&T to provide service to this location. Please contact me at the phone number included in this letter with any questions. Thank you for contacting AT&T. Sincerely, Wade Mitchell Manager, OSP Planning and Design AT&T Alabama 2155 Old Shell Rd Mobile, Alabama 36607 Gulf District/ Mobile Office ~at&t ~ Proud Sponso, ot the Lf.S, Olympic Team NBANCROFTSTNSECTIONSTNSUMMITSTBAYOU DR OAK AVE KEIFER AVE POWELLAVE OAK AVE N CHURCH STPINE AVE EQUALITY ST City of FairhopePlanning Commission October 2, 2023 ¯ OAK AVE N SECTION STNBANCROFTSTZC 23.06 - 404 Oak LLC Legend Roads Parcels Corporate LimitsZoning Classification B-2 - General Business District B-3a - Tourist Resort Lodging District B-4 - Business and Professional District R-2 - Medium Density Single-Family R-4 - Low Density Multi-Family R-5 - High Density Dwelling Residential Planning Jurisdiction ^ Project Name: 404 Oak AvenueSite Data: 0.18 acresProject Type: RezoningJurisdiction: Fairhope Planning JurisdictionZoning District: B-4PPIN Number: 14546General Location: East side of N. Section Street., South side of Oak Avenue.Surveyor of Record: N/AEngineer of Record: N/AOwner / Developer: FST AL Coastal Holdings, LLCSchool District: Fairhope Elementary School Fairhope Middle and High Schools Recommendation: Prepared by: µ µ Approval w Conditions Michelle Melton 1 ZC 23.06 Rezoning 404 Oak Avenue from B-4 to B-2 –October 2, 2023 Summary of Request: Applicant, AL Coastal Holdings LLC, requests the subject property be rezoned from B-4, Business and Professional District to B-2, General Business District. The property is located at 404 Oak Avenue and within the Central Business District (“CBD”). Applicant desires to utilize the subject property as a restaurant, which is allowed in B-2, but not in B-4. Figure 1: Map of subject and adjacent properties. Comments: The subject property was approved with conditions for a MOP in case SD 22.21 in August 2022. SD 22.21 allowed for four mixed-use units. Mixed uses are allowed in all the “B” zoning districts. Restaurants are only permitted by right in B-2 and B-3(b), and are not allowed in B-4. Pursuant to Article V, Section B(3), since the subject property is within the CBD, re-zoning approvals may be done conditionally so that some allowed uses within the rezoned district may not be allowed for a particular location. For example, an Automobile Repair Station is not a desired use for this location although an allowable use. Any future rezoning in the CBD overlay may be conditioned so that the goals and intent of the Comprehensive Plan and Article V., Section B.1. of the Zoning Ordinance are achieved. •=-=--.>-------- f- l/) z_ i= (J w 1/) z JIJU PI NE ST 0 0::: 0 z PINE ST .. ~ Z ning I B-1 -l oca l Shopp i g Distri ct B- -Ge era I B siness ·s ict I B-3a -o rist Reso edg ing is ict I B-3 . _ ouris• esort Co me rci al Se rv ice Dis ·Cl I B- -Busi es s en Profe ss;ona l is ict ... 2 ZC 23.06 Rezoning 404 Oak Avenue from B-4 to B-2 –October 2, 2023 Table 3-1 Zoning Dism cl U t es: Cat egones I d, "! ~ ~ "f Sn.ecific Us e-; 0 co 0 0 Dw-'"-- Single-f amily • • • • • Two-fam.il v • • • • Town house ) ) ) Patio Home Multiple-family I Apartment 0 0 M anu.factw-ed H ome ?-.fued -use • • • • • Acce~ory· Owe.Dint • • • • • Estate Ofli« Genera} • • • • Pro f essional • • • • Home Occupation • • • • • Retail Gr----, • • • Convenience S tore • • • General Merchandise • • • Shono in..-Center-• Automo b ile S en-ice 'Station 0 0 Outdoor S ale.:; Limited 0 Outdoor Sal e:s Lot 0 Gardffi Cenie.r 0 0 Service Convalescent or .Nursin..-Home 0 0 0 0 Clime 0 0 0 Outdoor Re.cn ation h cili---;;: 0 0 • 0 D av C are 0 0 0 0 General Personal Services • • M ornwy o r Funeral Home 0 0 Autom ob ile R en.air • Indoor Recreation • • 0 Orv C leaner f Laundrv • 0 Pen.onal St orage 0 • • Bed &. Breakfast • 0 Hotel / t\fotel 0 0 0 Boardini . House or Dormitory • • • Re.c:1-ea tion.al Ve.hid e. Park • • Resuu-ranr 0 • 0 • Bar • 0 • Ente.rtain.ment Venne • 0 Marina 0 0 Kennel or Animal Ho~ ... ital 0 0 W a1-e·bouse Junk Ya.rd or Salvag e Yard - 3 ZC 23.06 Rezoning 404 Oak Avenue from B-4 to B-2 –October 2, 2023 Figure 2: Google Street View last visited on September 11, 2023. The Zoning Ordinance defines B-4 Business and Professional District as follows: “B-4 Business and Professional District: This district is intended to provide opportunity for business establishments of a professional nature and is restricted to offices and businesses, which provide specific corporate functions or professional services to the general public.” See Art. III, Section A(14). The Zoning Ordinance defines B-2 General Business District as follows: “B-2 General Business District: This district is intended to provide opportunity for activities causing noise and heavy traffic, not considered compatible in the more restrictive business district. These uses also serve a regional as well as a local market and require location proximity to major transportation routes. Recreational vehicle parks, very light production and processing activities are included. See Art. III, Section A(11). There is an Easement Agreement recorded as Instrument#: 1962444 and included in the packet. The easement is to the benefit of the subject property as it is a 20’ easement across the southern 20’ of 406 Oak Avenue. Applicants are aware of the easement. Applicants are also aware that to use the subject property as a restaurant there may be additional parking and utility requirements. As the restaurant concept develops a Site Plan Review may be generated that will come before the Planning Commission and City Council only if the 4 ZC 23.06 Rezoning 404 Oak Avenue from B-4 to B-2 –October 2, 2023 triggers of Article 2, Section 2 within the Zoning Ordinance are initiated. Otherwise, permits may be Staff Review only. A Re-Zoning Request is considered a Zoning Map Amendment and the application is reviewed pursuant to the Criteria in Art. II, Section B(1)(e). (1) Compliance with the Comprehensive Plan; Response: The 2015 Comprehensive Plan states that downtown Fairhope is the ultimate Village Center. The subject property is within downtown and meets the form, function, and design standards because it is a source for both tourists and locals. It accomplishes this as B-4 and as B-2. (2) Compliance with the standards, goals, and intent of this ordinance; Response: Meets. Some allowable uses are not ideal for this location and use changes will be vetted accordingly. (3) The character of the surrounding property, including any pending development activity; Response: Meets. Use as a restaurant will complement the current situation and future development activity, such as a hotel, which has been approved for the property immediately adjacent. (4) Adequacy of public infrastructure to support the proposed development; Response: Meets. Already an existing structure with utilities. Applicant plans to add a larger commercial kitchen, which may require additional demands on infrastructure. Parking may also be an issue as the restaurant concept develops. (5) Impacts on natural resources, including existing conditions and ongoing post-development conditions; Response: Meets. This zoning change will not negatively impact natural resources or current/future conditions. (5) Compliance with other laws and regulations of the City; Response: Meets. Any future development is subject to all applicable laws of the City. (6) Compliance with other applicable laws and regulations of other jurisdictions; Response: Meets. Any future development is subject to all applicable laws. (7) Impacts on adjacent property including noise, traffic, visible intrusions, potential physical impacts, and property values; and Response: Staff does not anticipate any significant issues relating to this criterion currently. Staff has not supported some request to rezone property to B-2 in the general vicinity. However, those properties directly abutted the edge of the CBD or gully. The subject property abuts neither. (8) Impacts on the surrounding neighborhood including noise, traffic, visible intrusions, potential physical impacts, and property values. 5 ZC 23.06 Rezoning 404 Oak Avenue from B-4 to B-2 –October 2, 2023 Response: Staff does not anticipate any significant issues relating to this criterion currently. Recommendation: Staff recommends approval of ZC 23.06: rezoning 404 Oak Avenue from B-4 to B-2 with the following conditions: 1.) Regardless of the allowed uses in Table 3-1 of the Fairhope Zoning Ordinance, the following uses shall be prohibited on the subject property: a. Automobile Service Station b. Automobile Repair c. Personal Storage d. Boarding House or Dormitory e. Recreational Vehicle Park f. Kennel or Animal Hospital g. Convenience Store h. Clinic Metes and Bounds Description @QUNDARY DESCRIPTION: THE EAST 10 rEET or LOT ONE I 1).TH( EAST 10 0 FEET Of-THE NORTH HALF OF LOT TWO 12) THE WE5T 71 0 FEET OF THE NORTH HALF or LOT SEVCN (7) AND THE WEST 71 0 FEET OF LOT EIGHT (8) BLOCK TWO (2) DIVISION FOUR (4) L.ANOCi or THI: rAIRHOPE SINGLE TAX CORPORATION IN THE CITY OF FAIRHOPE ALABAMA BEING APPROXIMATU Y 81 Fl:[T DY 99 rEET AS RECOROEO IN MISC BOOK 1. PAGES 320-21 PJWHA Tl RECORDS l!ALDWIN COUNlY ALABAMA. FRAC L SF Cl ION 17 TOWNSHIP 6 SOUTH RANGE 2 £AST ~ND IIV CLVQIHG AN 1-ASFMENl FOR INGRESS AND EGRESS ACROSS THE 5OUTH 20 FEET OF 406 OAK AVfNUt Legal Description LOT 7-A "LOT 7-A" OF THE RE-PLAT OF PART OF LOTS 1, 2, 7, & 8 BLOCK 2, DIVISION 4 OF THE LANDS OF FAIRHOPE SINGLE TAX MISCELLANEOUS BK 1 PGS 320-321 SLIDE 2853-ELEASEIN#1999899 STATE OF ALABAMA COUNTY OF BALDWIN BALDWIN COUNTY, ALABAMA _. HARRY D'OLIVE, JR. PROBATE JUDGE c,o Filed/cert. 12:06:2021 01 :02:06 PM 0) Total: $28.00 ~ 6 Pages .,i::.. EASEMENT AGREEMENT -1>- ' This Easement Agreement is entered into on the Jp__ day of _,_JJc--"'=-~0~----~ 2021, by and between PETER F, SIKOROWSKI & LAURIE S, SIKOROWSKI, HOUSTON HOLDINGS OF FL, LLC, and the FAIRHOPE STNGLE TAX CORPORATION (hereinafter "the FSTC"). WHEREAS, PETER F. SIKOROWSKI & LAURIE S. SIKOROWSKI are the leasehold owners of certain property, commonly known as 404 Oak A venue, Fairhope, Alabama, 3653 2, and more particularly described as follows: 1be East 10 feet of Lot One(!), the East 10.0 feet of the North Half of Lot Two (2), the West 71.0 feet of the North Half of Lot Seven (7), and the West 71.0 feet of Lot Eight (8), Block Two (2), Division Four (4), lands of the Fairhope Single Tax Corporation in the City of Fairhope, Alabama, being approximately 81 feet by 99 feet, as recorded in Misc. Book I, Pages 320-21, Probate Records, Baldwin County, Alabama, Frac'l Section 17, Township 6 South, Range 2 East. 46-03-37-0-007-068.503 WHEREAS, HOUSTON HOLDINGS OF FL, LLC is the leasehold owner of certain property, commonly known as 406 Oak Avenue, Fairhope, Alabama, 36532, and more particularly described as follows: The East 61 feet of Lot Eight (8) and the East 61 feet of the North Half of Lot Seven (7), Block Two (2), Division Four ( 4), lands of the Fairhope Single Tax Corporation in the City of Fairhope, Alabama, being approximately 61 feet by 99 feet, as recorded in Misc. Book I, Pages 320-21, Probate Records, Baldwin County, Alabama, Frac'l Section 17, Township 6 South, Range 2 East. 46-03-37-0-007-068.513 NOW, THEREFORE, for and in consideration of the sum often dollars ($10.00) and other good and valuable consideration, the receipt of which is hereby acknowledged, and the covenants Page 1 of6 and agreements contained herein, PETER F. SIKOROWSKI & LAURIE S. SIKOROWSK! and HOUSTON HOLDINGS OF FL, LLC, being the leasehold owners of 404 Oak Avenue and 406 Oak Avenue, as described above, do hereby agree and bind themselves and their heirs or assigns as follows: 1. There currently exists a 20-foot Easement for ingress and egress, for the benefit of 404 Oak Avenue, across the South 20 feet of 406 Oak Avenue, the Easement more particularly described as follows: The South 20 feet of the East 61 feet of the North Half of Lot Seven (7), Block Two (2), Division Four (4), lands of the Fairhope Single Tax Corporation in the City of Fairhope, Alabama, as recorded in Misc. Book 1, Pages 32()-21, Probate Records, Baldwin County, Alabama, Frac'l Section 17, Township 6 South, Range 2 East. 2. The terms and conditions of this easement agreement may be amended, from time to time, upon the joint agreement of the owners of 404 Oak Avenue and 406 Oak Avenue. Any amendment shall be in writing and recorded in the Office of the Judge of Probate of Baldwin County, Alabama. 3. This easement agreement shall be deemed to be a covenant running with the land and any futnre leasehold owners of 404 Oak Avenue and 406 Oak A venue shall be bound by the terms and conditions of this agreement. 4. This easement agreement is subject to the terms and conditions of the 99-year ground lease issued to each leasehold owner by the FSTC and by the laws of the State of Alabama. 5. The FSTC does hereby join in this agreement for the purpose of acknowledging the terms and conditions of this agreement and no more. Page 2 of6 BARTON & SHUMER ENGINEERING, LLC 3213 MIDTOWN PARK SOUTH MOBILE, AL 36606 251.219.4942 www.bartoneng.com June 6, 2022 Mr. Richard Johnson, PE City of Fairhope 555 S. Section Street Fairhope, Alabama 36532 RE: 404 Oak Avenue MOP – Drainage Narrative Dear Mr. Johnson: A Multiple Occupancy Project is proposed at the existing residence at 404 Oak Avenue which is located in the southwest quadrant of the intersection of Oak Avenue and North Bancroft Street. The site slopes toward the northeast with existing inlets on the north side of Oak Avenue and the east side of Bancroft Street. Bancroft Street has a significant northward slope beyond Oak Avenue where any runoff will enter a natural drainage feature that drains to Mobile Bay. The existing residence is located on multiple parcels and has an existing driveway with aggregate parking. The project consists of renovating the existing residence to provide for residential and commercial uses. No changes to the foot print of the structure or grading of the site are proposed as part of this project that would alter the existing runoff flow pattern. Sincerely, David M. Shumer, P.E. AL P.E. #24109