Loading...
HomeMy WebLinkAbout05-01-2023 Planning Commission Agenda PacketApril 3, 2023 Planning Commission Minutes 1 The Planning Commission met Monday, April 3, 2023, at 5:00 PM at the City Municipal Complex, 161 N. Section Street in the Council Chambers. Present: Lee Turner, Chairman; Rebecca Bryant, Vice-Chair; Harry Kohler; John Worsham; Hollie MacKellar; Erik Cortinas, Building Official; Hunter Simmons, Planning and Zoning Manager; Michelle Melton, City Planner; and Cindy Beaudreau, Planning Clerk Absent: Art Dyas, Jack Burrell Chairman Turner called the meeting to order at 5:00 PM. Approval of the Minutes March 6, 2023: John Worsham made a motion to approve the minutes as presented from the March 6, 2023, meeting. Rebecca Bryant seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. Appointment of Planning Commission Secretary: Erik Cortinas made a motion to appoint Cindy Beaudreau as the Planning Commission Secretary. Harry Kohler seconded the motion and motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. Consideration of Agenda Items: UR 23.04 Request of C-Spire on an 11.52.11 Utility Review and approval of the proposed installation of approximately 1,013 LF of buried fiber cable in the ROW starting at Fairhope Ave. and continuing to Bankplus. Summary: Hunter Simmons, Planning and Zoning Director, presented the Utility Review. The locates are limited to 750’ per day. The plan is to save as many of the large trees as possible and the contractor is responsible for any damage to the trees. Staff recommends approval subject to the following conditions: 1. A pre -construction meeting shall be held with the City prior to issuance of any permits. 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. 4. An additional right-of-way permit may be required for the potholing procedures. 5. Follow-up activities below required by staff and the applicant: April 3, 2023 Planning Commission Minutes 2 6. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. 7. Provide draft door hanger for approval at time of pre-construction. 8. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. 9. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 10. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 11. Utilities boxes shall be concentrated near existing boxes. 12. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, unless otherwise required by the Fairhope Building Department. Motion: Erik Cortinas made a motion to approve the installation of buried cable in the ROW starting at Fairhope Ave. and continuing to Bankplus subject to staff conditions. John Worsham seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. UR 23.05 Request of C-Spire on an 11.52.11 Utility Review and approval of the proposed installation of approximately 1,217 LF of buried fiber cable in the ROW along Magnolia Ave., crossing N. Church St. and continuing to N. Summit St. Summary: Hunter Simmons, Planning and Zoning Director, presented the Utility Review. The locates are limited to 750’ per day. The plan is to save as many of the large trees as possible and the contractor is responsible for any damage to the trees. Staff recommends approval subject to the following conditions: 1. A pre -construction meeting shall be held with the City prior to issuance of any permits. 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. 4. An additional right-of-way permit may be required for the potholing procedures. 5. Follow-up activities below required by staff and the applicant: 6. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. 7. Provide draft door hanger for approval at time of pre-construction. 8. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. April 3, 2023 Planning Commission Minutes 3 9. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 10. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 11. Utilities boxes shall be concentrated near existing boxes. 12. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, unless otherwise required by the Fairhope Building Department. Rebecca Bryant voiced concerns about the heritage trees on Church and Magnolia. Motion: John Worsham made a motion to recommend approval of UR 23.05 subject to staff recommendations. Rebecca Bryant seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. SD 23.10 Public hearing to consider the request of the Applicant, Seth Moore, acting on behalf of the owners, FST and Charles B. Davison, for approval of Domes Place, a 2-lot minor subdivision. The property is approximately 1.68 acres and is located north of Morphy Ave. and east of Bishop Rd. PPIN #: 14481 Summary: Hunter Simmons, Planning and Zoning Director, presented Domes Place, a 2-lot minor subdivision located north of Morphy Ave. and east of Bishop Rd. Property is zoned R-1. Staff recommends approval of SD 23.10 with no conditions. Chairman Turner opened the public hearing at 5:09pm. Having no one present to speak, the public hearing was closed at 5:09pm. Hollie MacKellar asked about the single tax having a sidewalk down Morphy Ave. Chairman Turner explained that the next phase is to connect to Bishop Rd. and then to County Road 13 on the south side but nothing on the north side. Motion: Rebecca Bryant made a motion to approve Case SD 23.10 with no conditions. Harry Kohler seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. April 3, 2023 Planning Commission Minutes 4 SD 23.11 Public hearing to consider the request of the Applicant, Seth Moore, acting on behalf of the owners, FST and Myrick Enterprises, LLC, for approval of Myrick Place, a 3-lot minor subdivision. The property is approximately 1.26 acres and is located on the north side of Estella St. just west of N. Greeno Rd. PPIN #: 77843 Summary: Michelle Melton, Planner, presented Myrick Place, a 3-lot minor subdivision located on the north side of Estella St. just west of N. Greeno Rd. Property is zoned B-4. Staff recommends approval of SD 23.11 Myrick Place Subdivision with no conditions. Seth Moore spoke about the issue regarding adding sidewalks and how the sidewalks would touch the road and how there are numerous trees. Hollie MacKellar stated that the sidewalk near Gambino’s is the busiest sidewalk in town and it touches the road. Hunter Simmons stated that the sidewalk could meander around the trees. Chairman Turner opened the public hearing at 5:21pm. Having no one present to speak, the public hearing was closed at 5:21pm. Motion: John Worsham made a motion to approve Case SD 23.11 subject to the following condition: 1. Sidewalks to be installed along Estella St. Hollie MacKellar seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. SD 23.12 Public hearing to consider the request of the Applicant, S.E. Civil, LLC on behalf of the owners, FST and Washington Square, an 8-unit Multiple Occupancy Project. The property is approximately 1.74 acres and is located on the west side of Bishop Rd. just north of Morphy Ave. PPIN #: 108443 Summary: Hunter Simmons, Planning and Zoning Director, presented Washington Square, an 8-unit Multiple Occupancy Project located on the west side of Bishop Rd. just north of Morphy Ave. Property is zoned R-5. Staff recommends approval of SD 23.12 with the following condition: 1. Certificates of Occupancy for residential shall not be obtained until the final MOP plat has been approved. Larry Smith, S.E. Civil, LLC spoke about the sidewalks along Bishop Rd and requested not to install sidewalks within the private development. A conversation followed regarding the private drive and the ability to install a drivable surface near the existing transformer. Erik suggested the honeycomb pavers that the City currently has in stock. April 3, 2023 Planning Commission Minutes 5 Chairman Turner opened the public hearing at 5:27pm. Mike Baugh, 56 Hoffren Dr., was concerned about the need for a barrier between his home and the back of the building. The public hearing was closed at 5:30pm. Chairman Turner asked Larry Smith, S.E. Civil, LLC to address the landscape plan. Larry Smith stated that landscape plan meets the minimum requirement but does not include a visual barrier and that the greenspace will stay the same as today. Erik Cortinas asked if the landscape plan had been reviewed. Rebecca Bryant asked if the MOP had a landscape plan back then. Hunter Simmons explained that there was no MOP back then. Motion: Hollie MacKellar made a motion to approve Case SD 23.12 subject to staff condition. Erik Cortinas seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. Hollie MacKellar wanted to revisit the sidewalk discussion to ensure that a sidewalk would be installed since it was not included in the staff recommendations. Hunter Simmons explained that this is a private road with no address, but the trash will be picked up. Erik Cortinas and Hollie MacKellar suggested that a paver or gravel sidewalk could be swung around. George Roberds, applicant, agreed to build an ADA sidewalk on the south side of the development connected to Bishop Rd. by final plat. Chairman Turner reopened the public hearing at 5:57pm. Having no one present to speak, the public hearing was closed at 5:58pm. Motion: Hollie MacKellar revised her motion to approve Case SD 23.12 subject to the following conditions: 1. The CO for residential shall not be obtained until the final MOP plat has been approved. 2. Sidewalks to be built on the south side of the development connected to Bishop Rd. by final plat. Erik Cortinas seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. SD 23.14 Public hearing to consider the request of the Applicant, Jade Consulting, on behalf of the owner, Encounter Development, LLC., for preliminary plat approval of Commercial Retail Center, a 13-lot subdivision. The property is approximately 35.16 acres and is located on the Northeast corner of State Highway 181 and State Highway 104. PPIN #: 108453 April 3, 2023 Planning Commission Minutes 6 Summary: Michelle Melton, Planner, presented Encounter Development, LLC, for preliminary plat approval of Commercial Retail Center, a 13- lot subdivision located on the northeast corner of State Highway181 and State Highway 104. The property is zoned B-2. Michelle Melton and Hunter Simmons discussed the extensive traffic study and whether the area requires a traffic signal. The City may choose to limit building permits and/or Certificates of Occupancy until the signal has been installed, or a Concurrence Letter from ALDOT has been received. Staff recommends approval of SD 23.14 with the following conditions: 1. Revised utility plans shall be approved by the City of Fairhope Water/Sewer Superintendent prior to issuance of a construction permit. 2. Revised drainage plans shall be approved by the City of Fairhope Public Works Director prior to issuance of a construction permit. 3. Provide the required buffer strip adjacent to the north property. 4. Each lot shall require a mandatory Site Plan Review. Projected trip generation shall be provided for each use with the Site Plan Review Application to be calculated cumulatively. Hunter Simmons stated that the revised utility and drainage plans had already been received. Harry Kohler asked who would review the mandatory site plan. Hunter Simmons stated that ultimately the City Council will approve the mandatory site plan, but the Planning Commission will approve it first and make the recommendation to the City Council. Trey Jinright, Jade Consulting, spoke on behalf of the applicant and stated that they agree with the staff conditions. Chairman Turner confirmed that the water would be going to the Pensacola Branch. Harry Kohler asked what was going on Lot 1. Trey Jinright stated that a WAWA would be on Lot 1. Rebecca Bryant asked for confirmation that all the infrastructure including the drainage would be completed with this project with the exception of additional drainage on Lot 13. Rebecca Bryant continued the drainage conversation asking if there was an outfall structure on the northeast corner. There will be. There will also be a 12’ multi-use trail where golf carts could go travel on. Hunter Simmons asked Trey Jinright to speak on ingress/egress. Trey Jinright stated that they would try to limit the curb cuts by developing shared parking areas. Chairman Turner opened the public hearing at 5:50pm. Having no one present to speak, the public hearing was closed at 5:50pm. Motion: Hollie MacKellar made a motion to recommend approval of SD 23.14 with staff recommendations. Erik Cortinas seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. April 3, 2023 Planning Commission Minutes 7 Old/New Business: SD 21.18 – Estates at the Verandas, Phase 3 – Request of the applicant, Dewberry, for an extension of two years for preliminary plat approval. Summary: Hunter Simmons, Planning and Zoning Director, presented the request for an extension for Estates at the Verandas, Phase 3. Chairman Turner recommended approving a one-year extension. Motion: Erik Cortinas made a motion to grant a one-year extension for final plat approval of SD 21.18 Estates at the Verandas, Phase 3. John Worsham seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. SD 23.04 – Klumpp PUD discussion Summary: Hunter Simmons, Planning and Zoning Director, presented staff concerns related to the constructed wetlands and a detention pond used interchangeably. It is recommended to provide an area to get the sediment out of the way. Staff has not received that type of plan yet. A maintenance plan will also be needed. Scott Hutchinson was present for the applicant. Harvest Green amenity discussion Summary: Hunter Simmons, Planning and Zoning Director, brought this item to the Planning Commission based on concerns previously made regarding the timing of amenities being constructed. Larry Smith, S.E. Civil, LLC presented a list of amenities for Harvest Green West and East and the timeline. Larry Smith requested approval to have the amenities completed within 12 months after the final plat of Phase 1. Max Dearing, Terracore, stated that they are actively installing the amenities now and reiterated that he did not want to be held up at final plat due to the amenities not being completed. Erik Cortinas stated that permits had been issued in January 2023, for the structures in Harvest Green West and that all permits could be pulled at final plat and that the amenities could be tracked through individual permits. John Worsham suggested that the horizontal amenities could be constructed prior to the first CO being issued. Chairman Turner recommended that the final plat includes notes stating that the plat is approved subject to the amenities being completed prior to the first house being constructed. Terracore and S.E. Civil agreed to prioritize amenity construction. April 3, 2023 Planning Commission Minutes 8 Adjournment Erik Cortinas made a motion to adjourn. Motion passed unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, John Worsham, Harry Kohler, Hollie MacKellar, and Erik Cortinas. NAY: None. Adjourned at 6:29pm. _______________________ ________________________ Lee Turner, Chairman Cindy Beaudreau, Secretary This digital package has been condensed for size and some documents may not contain all the original pages. All submittals were reviewed in full by staff in preparation for the reports prepared for the Planning Commission. GALLERY BLVDSTATE HWY 104STATE HWY 181City of FairhopePlanning Commission May 1, 2023 ¯ STATE HWY 104STATE HWY 181SR 23.04 - Encounter Development, Wawa Legend Roads Parcels Corporate LimitsZoning Classification B-2 - General Business District PUD - Planned Unit Development R-1 - Low Density Single-Family Planning Jurisdiction ^ Project Name:WawaSite Data:2.73 acresProject Type:Site Plan ApprovalJurisdiction:Fairhope Planning JurisdictionZoning District:B-2PPIN Number:108453General Location:Northeast corner of the intersection of State Highway 181 & 104Surveyor of Record:Jade ConsultingEngineer of Record:Jade ConsultingOwner / Developer:Encounter Development LLCSchool District:Fairhope Elementary School Fairhope Middle and High Schools Recommendation: Prepared by: Michelle Melton µ µ Approval Site Plan Review Application Checklist* *This checklist is intended for convenience purposes only. Refer to the City of Fairhope Zoning Ordinance and other applicable City Ordinances for additional requirements. 2 copies of the Site Plan 2 sets of Construction Plans 1 copy of the Site Plan in PDF format on disk Site Plan Review Application with Articles of Incorporation attached Overall Site Plan Curb Cut Locations Dumpster Location and Screening Grading and Drainage Plans BMP Plan A Topographic and Boundary Survey Pedestrian Circulation Plan Building Elevations indicating exterior construction materials Legal Description and Property Map Landscape Plan, including tree preservation plan (Existing and Proposed Contours shall be on the Landscape Plan) All landscape plans shall be in compliance with Ordinance No. 1223 – Tree Ordinance. 20% of the total property (not including the right of way) shall be landscaped A 20’ landscaped buffer is required where commercial/industrial abuts residential A Site Lighting Plan indicating light locations, mounting height, wattages and fixture types A Site Data Table including but not limited to: • Current Zoning • Lot Size • Proposed Building Height • Total Gross Floor Area • Proposed Building Coverage • Percentage of Impervious Area, excluding the Building • Percentage of Proposed Landscaping (60% of the required plant materials shall be located between the building walls and public streets) • Proposed number of parking spaces/ required number of parking spaces • Percentage of proposed Green-space Aerial Photograph with Site Plan and topographic lines overlaid Utility Plans Loading/unloading space (if applicable) Drive-up window locations (if applicable) Total number of Proposed Buildings, Proposed Uses and the Square Footages of each Phasing Schedule for Projects being developed over an extended period of time Location, materials, and elevations of any and all fences and/or walls. Location of mechanical equipment (mechanical equipment shall be screened) Flow Modeling Plans submitted shall include but not be limited to: • Name of Project • Date of preparation, including all revision dates • Appropriate Scale • North Arrow • Preparer’s Name, Phone Number and Fax Number • Name of Owner Compliance with the City’s Comprehensive Plan and the standards, goals and intent of the Fairhope Zoning Ordinance All signage requires a sign permit All Applicable Outside Agency Permits (e.g. ALDOT, ADEM, COE, etc.) Please note that this document only applies to properties within the City of Fairhope. 1 SR 23.04 WAWA Site Plan – May 1, 2023 Summary of Request: Request of Applicant, JADE Consulting, LLC (“JADE”), on behalf of owner, Encounter Development, LLC, for Site Plan Approval of WAWA. Trey Jinright, III, PE, is the authorized agent and engineer for the project. The subject property is zoned B-2 General Business District and is approximately 2.73 acres. The property is located on the northeast corner of Alabama State Highways 104 and 181. Staff has already reviewed details of the major subdivision in which this site is located last month with Case SD 23.14. This is the only site within the development that has direct ingress/egress to Hwy 104 and Hwy 181. Setbacks: B-2 does not have side setbacks and this being a corner lot the site faces both Alabama Highways 104 and 181, which requires highway construction setbacks. The highway construction setbacks are 125’ along Hwy 181 and 100’ along Hwy 104. The provided setbacks accomplish the required 20’ greenspace buffers along the highways. Applicant has ALDOT’s consent to provide greenspace within the highway construction setback along Hwy 181. The email from ALDOT is within the packet. There are 20’ setbacks facing the interior roads (Encounter Drive and Bushel Drive). Building(s): The buildings meet the height restriction of B-2. Architectural elevations are provided as attachments. Front elevations are shown in Figure 1. Materials for the building are primarily brick, metal roof and overhangs, and cement. Figure 1. Front Architectural Elevations Landscaping Plan: This site did not have any existing trees. However, there is an extensive landscaping plan that has been reviewed. The planting strip facing Hwy 104 provides for required perimeter trees, but the 1'!15 l'/1! Sll':/IOBI ~ GAS G!JlCj>'/ (Sl.CPE)) PROl'C!iR> 2 SR 23.04 WAWA Site Plan – May 1, 2023 spacing do not meet the intentions of the Tree Ordinance. The screening vegetation around the dumpster needs to be re-visited because the proposed species does not grow tall enough to efficiently screen said dumpster, which is the intent of the ordinance. Revised plans shall be received prior to sending the Site Plan to City Council for final approval. (Ordinance #1444, Section20.5-4(6)). Parking: Parking meets the requirements of Zoning Ordinance, as well as the perimeter landscape screening requirements of the Tree Ordinance. Sidewalks: This Site Plan includes interior sidewalks on the site in addition to the required 8’ sidewalk directly outside of the store and provides for full vehicular access off Encounter Drive and Bushel Drive. The sidewalks are situated at the perimeter along Bushel Drive and Encounter Drive. A 12’ wide multi-use trail is proposed within the larger development. For this site, the multi-use trail appears within the highway construction setback along Hwy 104. The multi-use trail then extends across Bushel Drive to connect with the greater trail system for the development. The applicant has provided ADA approved crosswalks across ingress/egress points. There are no current plans within the ALDOT right-of-way for pedestrian connectivity across state highways. Locations, intensity, and heights of exterior lights: The parking area was originally designed with over 50 parking spaces, which allowed 20’ light poles. The number of spaces were reduced to 49. Article IV, Section B.3, limits light poles in parking lots with 50 or fewer spaces to 10 feet overall height. A photometric plan was not provided, however, will be required at time of building permit application. Plans currently illustrate 20’ poles, which will need to be revised. Mechanical equipment: Mechanical equipment has been finalized, reviewed, and accepted, and all appear on the Site Plan. Fences: There is not any proposed fencing. Dumpster location and screening: Garbage is collected in a commercial dumpster located in the northeast corner of the site, outside the setbacks, and surrounded with a 9’ tall metal and stucco enclosure as shown in Figure 2. Storm water: Storm water was thoroughly reviewed in Case SD 23.14. See below. The Encounter Commercial Retail site drains in a single primary direction, west to east, into an upper tributary of Pensacola Branch. The project’s stormwater run-off is designed to be collected by a series of inlets and routed via a storm pipe network to a single wet detention pond located on Lot 13. If and when Lot 13 has a development plan the stormwater management system will need to be updated. LID methods are suggested to control the run off characteristics. The stormwater management system regulates post development run off release rates below its respective predevelopment rates as required by the City of Fairhope. Figure 2: Dumpster Enclosure FRONT ELEVATION ,~, -,~-••.,. - "!"-- , ---"-""'<, ;:=======,----:-··, RIGHT ELEVATION LEFT ELEVATI ON REAR ELEVATION 3 SR 23.04 WAWA Site Plan – May 1, 2023 Location and size of all signage: A sign plan was provided and reviewed by Christina Lejuene. The sign plan exceeded the allotted amount and revisions are underway at WAWA corporate headquarters. A revised sign plan shall be in compliance with the Sign Ordinance. Erosion control: An Erosion Control plan was submitted with the application and is acceptable. Utilities: A utility plan was submitted and has been reviewed and approved by the appropriate providers. ADA Requirements: ADA requirements have been met. Traffic: An extensive traffic study was done in affiliation with the greater Encounter Commercial Retail Center and the Rockwell development to the north on Hwy 181. An existing traffic light is located at the intersection of Hwys 181 and 104. There is a right in/right out driveway onto northbound Hwy 181 from Encounter Drive. There is another right in/right out driveway from Bushel Drive to eastbound Hwy 104. Recommendation: Staff recommends conditional approval of case SR 23.04 with the following conditions: 1.) Landscape Plans shall be revised pursuant to this report and the Tree Ordinance prior to submission to the City Council. 2.) A photometric plan shall be submitted and approved prior to applying for a building permit. 3.) Revised signage plan shall conform to the Sign Ordinance. Article II, Section C.2.d. (Site Plan Review Criteria) Criteria – The application shall be reviewed based on the following criteria: (1) Compliance with the Comprehensive Plan; The property is currently zoned B-2 and the uses currently proposed (restaurant, retail and office) are allowed in B-2. (2) Compliance with any other approved planning documents; Will be met prior to vertical construction/applying for building permit. (3) Compliance with the standards, goals, and intent of this ordinance and applicable zoning districts; The standards of the zoning ordinance have been, or shall be by condition of approval, met. (4) Compliance with other laws and regulations of the City; Meets (5) Compliance with other applicable laws and regulations of other jurisdictions; Meets (6) Impacts on adjacent property including noise, traffic, visible intrusions, potential physical impacts, and property values; Meets (7) Impacts on the surrounding neighborhood including noise, traffic, visible intrusions, potential physical impacts, and property values; Property is zoned B-2, which allows for such things and the site does not abut conflicting uses. (8) Overall benefit to the community; No Conflicts. (9) Compliance with sound planning principles; Meets (10) Compliance with the terms and conditions of any zoning approval; 4 SR 23.04 WAWA Site Plan – May 1, 2023 Meets (11) Any other matter relating to the health, safety, and welfare of the community; Nothing noted (12) Property boundaries with dimensions and setback lines; Meets (13) Location of proposed buildings and structures indicating sizes in square feet; Meets (14) Data to show percentage of lot covered with existing and proposed buildings; Meets (15) Elevations indicating exterior materials; Front, side, and rear elevations were provided. (16) The locations, intensity, and height of exterior lights; A photometric will be submitted and will be reviewed at a later date. (17) The locations of mechanical equipment; All relevant requirements are met. (18) Outside storage and/or display; Meets (19) Drive-up window locations (must be away from residential uses/districts and not in front of building); n/a (20) Curb-cut detail and location(s); Provided. Permits from ALDOT required. (21) Parking, loading, and maneuvering areas; Meets (22) Landscaping plan in accordance with the City Landscape Ordinance; Needs to be revisited pursuant to this staff report. (23) Location, materials, and elevation of any and all fences and/or walls; Meets (24) Dumpster location and screening; and Meets (25) Location and size of all signage. A revised signage plan is underway and the revised plan shall conform to the Sign Ordinance. LEGEND PROPOSED LIGHT DUTY ASPHALT PROPOSED HEAVY DUTY ASPHALT PROPOSED LIGHT DUTYCONCRETE (BROOM FINISH) PROPOSED HEAVY DUTYCONCRETE (BROOM FINISH) BENCHMARK 6"x6" CONCRETE MONUMENT FOUND CAPPED REBAR SET R.O.W. W SS GAS RIGHT-OF-WAY CENTERLINE CENTERLINE EXIST. OVERHEAD UTILITY AND UTILITY POLE EXIST. GUY WIRE AND UTILITY POLE EXIST. WATER LINE EXIST. SANITARY SEWER LINE EXIST. GAS LINE EXIST. UNDER GROUND CABLE LINE EXIST. STORM PIPE EXIST. POWER POLE EXIST. ELECTRICAL VAULT EXIST. WATER VALVE EXIST. FIRE HYDRANT EXIST. SANITARY SEWER MANHOLE EXIST. GAS VALVE EXIST. GAS REGULATOR EXIST. COMMUNICATION MARKER EXIST. COMMUNICATION VAULT EXIST. ASPHALT PAVING EXIST. CONCRETE EXIST. GRAVEL G OHE GUY UGE UGE EXIST. UNDERGROUND ELECTRIC LINE TC TC EXIST. TRAFFIC CONTROL LINE E EXIST. ELECTRICAL METER TR EXIST. ELECTRICAL TRANSFORMER G S EXIST. GAS MARKER EXIST. SANITARY SEWER MARKER C c EXIST. NATURAL GAS VENT PIPE TV EXIST. CABLE TELEVISION PEDESTAL S EXIST. SANITARY SEWER VALVE PROPOSED EASEMENT LINE PROPOSED SETBACK LINE PROPOSED 24" CONCRETE CURB & GUTTER PROPOSED 6" CONCRETE CURB PROPOSED STAMPED CONCRETE(SEE WAWA STANDARD DETAIL) S S S E G G S SAA F85 F/B V2021.1 (6,119 SF)8 SPACES8 SPACES 11 SPACES 9 SPACES8 SPACES 2 SPCS 125' HIGHWAY CONSTRUCTION SETBACK100' HIGHWAY CONSTRUCTION SETBACK E 5344 WESTBOUND 5764 EASTBOUND 8850 SOUTHBOUND5825 NORTHBOUND2 SPCS F.F.E. 116.00 ENCOUNTER DRIVE (50' R.O.W.PUBLIC )BUSHEL DRIVE (50' R.O.W.PUBLIC)15' PUE 20' BSL 15' PUE20' BSL 20' GREENSPACE BUFFER20' GREENSPACE BUFFERFUEL PRICING SIGN FUEL PRICING SIGN REQD., FULL ACCESS DRIVEWAY (W/ MOUNTABLE STAMPED CONC. AND BROOM FINISH CONCRETE APRON) REQD., FULL ACCESS DRIVEWAY (W/ MOUNTABLE STAMPED CONC. AND BROOM FINISH CONCRETE APRON)RIGHT-IN/RIGHT-OUT DRIVEWAYE-STOP E-STOP REQ'D., 24" CURB AND GUTTER ALDOT TYPE M-2, TYPICAL REQ'D., 8-MPD STACKED CANOPY (BY OTHERS) REFER TO STANDARD DRAWINGS FOR DIMENSIONS LINEWORK SHOWN HEREON PROVIDED BY WAWA REQD., 6" CURB REQD., 4" STAMPED CONC. (SEE WAWA STANDARD DETAIL AND PATTERN) REQD., WAWA TYPE B1 CURB W/ STAMPED CONCRETE (SEE STANDARD DETAIL) REQD., WAWA TYPE B1 CURB W/ STAMPED CONCRETE (SEE STANDARD DETAIL) RIGHT-IN/RIGHT-OUT DRIVEWAY REQD. H/C STRIPING (SEE DETAIL ON C11.0) REQ'D., 24" CURB AND GUTTER ALDOT TYPE M-2, TYPICAL REQD. VAN ACCESSIBLE H/C SIGN GASOLINE VENT STACK EREQD. 8' CONCRETE SIDEWALK REQ'D., 4" YELLOW PAINTED STRIPE LIMITED BUILD AREA FOR FUTURE EV PARKING REQD., 4" STAMPED CONC. (SEE WAWA STANDARD DETAIL AND PATTERN) 1 TRAILER SP SITE PLANWAWAENCOUNTER DEVELOPMENT, LLCJOB NO: SCALE: DATE: DRAFTER: SHEET: 22-1840.20 APRIL 2023 PWM208 Greeno Rd. North, Ste. CFairhope, Alabama 36532P.O. Box 1929Fairhope, Alabama 36533Phone: (251) 928-3443jadengineers.com (AL) CA-3157-EPRELIMINARY PLANS ONLYNOT FOR CONSTRUCTIONAPPR.DATEREVISIONNO.3/22/23INITIAL CITY SUBMITTAL1.4/25/23PARKING REVISION2.PROPOSED JOINT LAYOUT: NOTES TO CONTRACTOR: 1. EVERY EFFORT HAS BEEN MADE TO ENSURE THAT THE BUILDING INDICATED IN THESE DRAWINGS MATCHES THE ARCHITECTS LATEST BUILDING AND FOUNDATION PLAN. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO CONFIRM THE AGREEMENT BETWEEN THE BUILDING FOOT PRINT SHOWN IN THESE PLANS AND THE ARCHITECTS BUILDING FOOTPRINT AND FOUNDATION PLANS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND. 2. THE CONTRACTOR SHALL PROTECT AND MAINTAIN ANY EXISTING SLOPES AND INFRASTRUCTURES ON THE SITE ( I.E. PIPES, INLETS, ETC.). 3. CONTRACTOR TO VIDEO ALL EXISTING SEWER AND DRAIN LINES TO ENSURE THEY ARE CLEAR AND IN PROPER WORKING ORDER. PROVIDE VIDEO TO THE OWNER. 4. AFTER THE STORM DRAIN SYSTEM IS COMPLETED THE CONTRACTOR SHALL VIDEO THE SYSTEM AND SUBMIT VIDEO TO THE OWNER FOR REVIEW. 5. THE CONTRACTOR SHALL MAINTAIN ACCESS TO THE SITE FOR THE DURATION OF THE PROJECT. 6. ALL EARTHWORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH GEOTECHNICAL RECOMMENDATIONS. 7. ALL CONDUIT LOCATIONS FOR POWER, TELEPHONE, AND CABLE SHALL BE COORDINATED WITH ARCHITECTURAL PLANS AND LOCAL UTILITY PROVIDERS. PROPOSED CONTRACTION/SAWCUT JOINT PROPOSED EXPANSION JOINT 1" = 30' ( IN FEET ) 0 1 inch = ft. GRAPHIC SCALE 3030 30 C3.0 SITE DATA TABLE STATE OF ALABAMA COUNTY OF BALDWIN CITY OF FAIRHOPE (ADDRESS TBD) FAIRHOPE, AL 36532 WAWA STORE NUMBER: 5804 WAWA BUILDING TYPE:F85 F/B WAWA CANOPY TYPE:STACKED 8 GAS CANOPY (SLOPED) # MPD: 8 EX. TAX PARCEL ID: 05-46-01-02-0-000-001.510 PROPOSED PARCEL SIZE: APPROX. 2.854 ACRES ZONING: B-2 - GENERAL BUSINESS DISTRICT BUILDING SETBACKS: FRONT (HWY 181): 125' HIGHWAY CONSTRUCTION SETBACK (AS SHOWN) FRONT (HWY 104): 100' HIGHWAY CONSTRUCTION SETBACK (AS SHOWN) SIDE/REAR:20' LANDSCAPE BUFFERS: FRONT:20' GREENSPACE BUFFER SIDE:N/A REAR:N/A GENERAL PARKING STANDARDS: 0-400 SF GFA = 4 SPACES + 400-5000 SF GFA = 1 SPACE/400 SF + OVER 5000 SF GFA = 1 SPACE/200 SF 400 SF GFA = 4 SPACES + 4600 SF / 400 SF = 11.5 SPACES + 1119 SF / 200 SF = 5.5 SPACES 21 TOTAL SPACES "A MINIMUM OF 2 OFF-STREET PARKING SPACES IS REQUIRED WITH AN ADDITIONAL OFF-STREET PARKING SPACE FOR EACH LUBRICATION OR WASH BAY" 2 SPACES MINIMUM + 16 BAYS = 16 SPACES 18 TOTAL SPACES "1 SPACE FOR EACH 4 SEATS UP TO 52 SEATS AND 1 SPACE FOR EACH 6 SEATS THEREAFTER" 7 TABLES (W/ 4 SEATS) = 7 TOTAL SPACES VEHICLE PARKING REQUIRED:46 SPACES "NO USE SHALL PROVIDE MORE THAN 20% MORE THAN THE PARKING REQUIRED BY TABLE 4-3." 46 SPACES * 1.2 = 55.2 SPACES VEHICLE PARKING PROVIDED:49 SPACES (INC. 3 H/C) WAWA PARKING INFORMATION: "ZONE A":25 SPACES (INC. 3 H/C) "ZONE B":14 SPACES "ZONE C":10 SPACES (INC. 8 FUTURE EV SPACE & 2 AIR COMPRESSOR SPACES) TOTAL:49 SPACES (INC. 3 H/C) WAWA SQUARE FOOTAGE INFORMATION: ASPHALT:36,137 S.F. LAWN AREA (TO BE MOWED):52,190 S.F. MULCH AREA:790 S.F. CURVE DATA (SEE SURVEY): BUILDING DOOR LOCATIONS: NOTES: 1. ALL JOINTS AROUND BUILDING TO MATCH WAWA STANDARD DETAIL ON SHEET C11.1 2. ALL JOINTS ON CONCRETE PAD OVER UST ARE PER UST ENGINEER/CONTRACTOR I I I I I I I I I I I I I I I I I I I I I I I I I ) / 0 0 I I 1-~ I I I I I I I I I I I 1 I I 1 I I -----' " '----= - -.. -. -.. _\. -- ~ CMF □ CRSO ucc IE ~ V: ® 0 0 I I -~ L..;:_j D D D Ill F---:7 I..:__,_:_] From:Smith, Michael To:Paul Marcinko Cc:Trey Jinright; Lee Rambo; William Graham; McCracken, Paul; Denton, Samantha H. Subject:RE: State Hwy 181 & State Hwy 104 - Fairhope, AL Date:Wednesday, January 18, 2023 3:42:20 PM Attachments:Wawa - HCS Exhibit (1-17-23).pdf ALDOT does not object to the area shown being counted as green space for the development. Michael Smith, P.E.Area Permit Mngr.Office: 251- 470- 8273Cell: 251 - 331 - 0104 CONFIDENTIALITY NOTICE: The contents of this email message and any attachments are intended solely for the addressee(s) and may contain confidential and/or privileged information and may be legally protected from disclosure. If you are not the intended recipient of this message or their agent, or if this message has been addressed to you in error, please immediately alert the sender by reply email and then delete this message and any attachments. If you are not the intended recipient, you are hereby notified that any use, dissemination, copying, or storage of this message or its attachments is strictly prohibited. From: Paul Marcinko <pmarcinko@jadengineers.com> Sent: Wednesday, January 18, 2023 6:37 AM To: Smith, Michael <smithmi@dot.state.al.us> Cc: Trey Jinright <tjinright@jadengineers.com>; Lee Rambo <lrambo@jadengineers.com>; William Graham <wgraham@jadengineers.com> Subject: State Hwy 181 & State Hwy 104 - Fairhope, AL Good morning Michael – Per our conference call last week regarding this project I have attached this exhibit as a follow up. We have shown in green our greenspace buffer within the HCS (red line). Please advise if this is acceptable to ALDOT. Paul Marcinko, P.E. JADE Consulting, LLC 208 Greeno Road North, Suite C (36532) P.O. Box 1929 Fairhope, AL 36533 pmarcinko@JADEngineers.com 251.895.6063 (cell) 251.928.3443 (office) 251.928.3665 (fax) CONFIDENTIALITY NOTICE- The information contained in this e-mail and any attachments to it may be legally privileged and include confidential information. If you are not the intended recipient, be aware that any disclosure, distribution or copying of this e-mail or its attachments is prohibited. If you have received this e-mail in error, please notify the sender immediately of that fact by return e-mail and permanently delete the e-mail and any attachments to it. USE OF DIGITAL FILES: Any digital files attached to this transmission have been provided for your convenience. JADE Consulting, LLC. makes no express or implied warranties as to its suitability of the attached electronic files for any specific purpose. Although we believe the attached files to be accurate and safe at the time of transfer these files can be easily changed or corrupted. Therefore, it is the user's responsibility to examine these electronic files for corruption or virus contamination prior to use. Coordination for updates is the responsibility of the recipient. We are also not responsible to the recipient or any other users allowed by the recipient to employ this data for updating the files or for compatibility with the user's hardware and/or software. TRAFFIC IMPACT ANALYSIS for Corte Property Final Report July 2022 Prepared by: CCMOCW. .... .. ,,..,. USA Maite.-J.. DtTRAN<X HWY 104 -•-A .L . HIGHWAY 181 (RMI VARIES (POSTED 45M ' > I !~•· I ' A1'0H -.:--- 0 falt,lna --C0MMCROAL US[ -------- &2 ACRtS a&ll. ell( 10 DTDf) ui:-.-'f0tflff 104 l'lll'OSIDUl0"""1Y """'""'-, .. ,,..,. 1-L NEEL~SCHAFFER - -7 ,r 111 111 I I i i I I I• I I I I I I I I -~ CORTE PROPERTY FAIRHOPE, AL 5 - 1 Neel-Schaffer, Inc. Mobile, Alabama M:\Projects\NS-17220 Corte Property TIA\Report\Sec5_Precom.doc Section 5 Conclusions 5.1 Auxiliary Lane Warrants The traffic volumes at the intersections of AL Highway 104 with Driveway 1, AL Highway 104 with Driveway 2, and AL Highway 181 with Driveway 3 were evaluated to determine if the warrants outlined in the National Cooperative Highway Research Program (NCHRP) Report 457, Evaluating Intersection Improvements: An Engineering Study Guide are anticipated to be met for constructing auxiliary turn lanes. Report 457 contains graphical illustrations of the volume requirements for auxiliary lane warrants. The threshold volume requirements for installation of a left turn lane utilize a combination of the left turning volume, the through traffic that would be behind the left turning volume (VA), and the opposing volume of traffic (VO) that could conflict with the left turning vehicles. The right turning traffic utilizes the advancing volume and right turning volume. The auxiliary lane warrants were evaluated using the 2026 total traffic volumes at the intersections of AL Highway 104 with Driveway 1, AL Highway 104 with Driveway 2, and AL Highway 181 with Driveway 3. Based on anticipated traffic volumes, an eastbound left turn lane on AL Highway 104 onto Driveway 1, a westbound right turn lane on AL Highway 104 onto Driveway 2, and a northbound right turn lane on AL Highway 181 onto Driveway 3 are warranted. 5.2 Conclusions Development of the project site with a 100-unit active senior living complex along with projected commercial use is not anticipated to create capacity related deficiencies along the existing roadways that cannot be mitigated. Some improvements are being constructed as part of other developments such as a northbound right turn lane on AL Highway 181 onto Rockwell Development. ALDOT requested that traffic from the Publix development and Rockwell Development be included in this study. The studies for these developments show a level-of-service of “F” for the eastbound and westbound approach to the shared access. While the Publix study did not show a mitigation measure, the Rockwell study said the mitigation measure to improve the level-of- service and maintain full access would be the installation of a traffic signal. 5.3 Signal Warrant Analysis Signal Warrants were analyzed using the existing ALDOT counts collected in January 2020 with the addition of the anticipated site traffic. To determine if a traffic signal can be installed at a particular intersection, the traffic signal warrants outlined in the Manual on Uniform Traffic Control Devices (MUTCD) must be evaluated. There are nine warrants outlined in the MUTCD. Warrant 1 Eight-Hour Vehicle Volume Warrant 2 Four-Hour Vehicle Volume Warrant 3 Peak Hour Warrant 4 Pedestrian Volume Warrant 5 School Crossing Warrant 6 Coordinated Signal System CORTE PROPERTY FAIRHOPE, AL 5 - 2 Neel-Schaffer, Inc. Mobile, Alabama M:\Projects\NS-17220 Corte Property TIA\Report\Sec5_Precom.doc Warrant 7 Crash Experience Warrant 8 Roadway Network Warrant 9 Intersection Near a Grade Crossing The first three warrants (the vehicular volume warrants) are the typical warrants that are evaluated to determine whether a traffic signal could be a potential improvement at an intersection. The volumes warrants are based on the higher volume minor street approach and the combined two-way major street approach volumes. The eight-hour warrant sets forth minimum volumes for eight hours of the day for the heaviest volume approach of the minor street and the combined approach volume of the major street. The four-hour warrant and peak hour warrant involve plotting points on a graph based on volumes from the major and minor streets. Each of the three vehicular volume warrants have two alternatives for the signal warrant evaluation. The first is commonly referred to as a “full warrant”, where the minimum threshold is at the highest level and there are no adjustments for speed or population. The other is a “reduced warrant”, or 70% warrant. In this instance, the minimum threshold is reduced based on either a 40 mph or greater speed on the major street or if the intersection lies within the built- up area of an isolated community. The intersection of AL Highway 181 and Rockwell was evaluated to determine if a traffic signal may be warranted at this location. Since the posted speed on AL Highway 181 is 55 mph, the 70% reduction warrants could be applied. ITE’s Trip Generation Manual, 11th Edition has a table per land use with the percentage of trips per hour based on the 24-hour total (Daily Total). The percentages are for total, entering, and exiting trips. An analysis was conducted using the percentage of half the daily traffic exiting the westbound approach to AL Highway 181, as the exiting volume is what is required for the minor street approach. Trip assignments from the Rockwell Development for the apartments and trip assignments from this study were used to reduce the overall daily existing volume per land use. The following tables illustrate the results of the calculations. CORTE PROPERTY FAIRHOPE, AL 5 - 3 Neel-Schaffer, Inc. Mobile, Alabama M:\Projects\NS-17220 Corte Property TIA\Report\Sec5_Precom.doc Land Use Code Land Use Setting Time Period Daily Trips Time Exiting Exiting Reduction1 Rank 12:00 - 1:00 AM 0.40% 3 2 21 1:00 - 2:00 AM 0.30% 3 2 21 2:00 - 3:00 AM 0.40% 3 2 21 3:00 - 4:00 AM 0.30% 3 2 21 4:00 - 5:00 AM 1.40% 12 10 19 5:00 - 6:00 AM 2.60% 22 18 16 6:00 - 7:00 AM 6.90% 58 46 4 7:00 - 8:00 AM 10.80% 91 73 1 8:00 - 9:00 AM 8.50% 72 58 2 9:00 - 10:00 AM 4.90% 41 33 8 10:00 - 11:00 AM 4.80% 41 33 8 11:00 - 12:00 PM 4.70% 40 32 11 12:00 - 1:00 PM 4.10% 35 28 15 1:00 - 2:00 PM 4.40% 37 30 13 2:00 - 3:00 PM 4.90% 41 33 8 3:00 - 4:00 PM 5.30% 45 36 7 4:00 - 5:00 PM 5.60% 47 38 6 5:00 - 6:00 PM 7.60% 64 51 3 6:00 - 7:00 PM 6.70% 57 46 4 7:00 - 8:00 PM 4.70% 40 32 11 8:00 - 9:00 PM 4.20% 36 29 14 9:00 - 10:00 PM 2.70% 23 18 16 10:00 - 11:00 PM 2.40% 20 16 18 11:00 - 12:00 AM 1.40% 12 10 19 Source: ITE Trip Generation, 11th Edition 1 - Reductions are for approximate 1/2 right turns Multifamily Housing (Low-Rise) General Urban/Suburban Weekday 1691 % of 24-Hour Vehicle Trips 220 CORTE PROPERTY FAIRHOPE, AL 5 - 4 Neel-Schaffer, Inc. Mobile, Alabama M:\Projects\NS-17220 Corte Property TIA\Report\Sec5_Precom.doc Land Use Code Land Use Setting Time Period Daily Trips Time Exiting Exiting Reduction1 Rank 12:00 - 1:00 AM 0.80% 17 6 19 1:00 - 2:00 AM 0.50% 11 4 21 2:00 - 3:00 AM 0.30% 6 2 22 3:00 - 4:00 AM 0.30% 6 2 22 4:00 - 5:00 AM 0.30% 6 2 22 5:00 - 6:00 AM 0.70% 15 5 20 6:00 - 7:00 AM 1.90% 40 14 17 7:00 - 8:00 AM 3.10% 65 23 15 8:00 - 9:00 AM 3.40% 72 25 13 9:00 - 10:00 AM 3.30% 69 24 14 10:00 - 11:00 AM 3.70% 78 27 12 11:00 - 12:00 PM 7.70% 162 57 3 12:00 - 1:00 PM 12.00% 252 88 1 1:00 - 2:00 PM 8.70% 183 64 2 2:00 - 3:00 PM 6.50% 137 48 6 3:00 - 4:00 PM 5.70% 120 42 9 4:00 - 5:00 PM 5.60% 118 41 10 5:00 - 6:00 PM 6.50% 137 48 6 6:00 - 7:00 PM 7.40% 156 55 4 7:00 - 8:00 PM 6.60% 139 49 5 8:00 - 9:00 PM 5.80% 122 43 8 9:00 - 10:00 PM 4.60% 97 34 11 10:00 - 11:00 PM 2.90% 61 21 16 11:00 - 12:00 AM 1.80% 38 13 18 Source: ITE Trip Generation, 11th Edition 1 - Reductions are for traffic using other driveways Fast-Food Restaurant with Drive-Through Window 934 Weekday General Urban/Suburban % of 24-Hour Vehicle Trips 4207 CORTE PROPERTY FAIRHOPE, AL 5 - 5 Neel-Schaffer, Inc. Mobile, Alabama M:\Projects\NS-17220 Corte Property TIA\Report\Sec5_Precom.doc Land Use Code Land Use Setting Time Period Daily Trips Time 220 934 Total Rank 12:00 - 1:00 AM 2 6 8 21 1:00 - 2:00 AM 2 4 6 22 2:00 - 3:00 AM 2 2 4 23 3:00 - 4:00 AM 2 2 4 23 4:00 - 5:00 AM 10 2 12 20 5:00 - 6:00 AM 18 5 23 18 6:00 - 7:00 AM 46 14 60 13 7:00 - 8:00 AM 73 23 96 4 8:00 - 9:00 AM 58 25 83 7 9:00 - 10:00 AM 33 24 57 15 10:00 - 11:00 AM 33 27 60 13 11:00 - 12:00 PM 32 57 89 6 12:00 - 1:00 PM 28 88 116 1 1:00 - 2:00 PM 30 64 94 5 2:00 - 3:00 PM 33 48 81 8 3:00 - 4:00 PM 36 42 78 11 4:00 - 5:00 PM 38 41 79 10 5:00 - 6:00 PM 51 48 99 3 6:00 - 7:00 PM 46 55 101 2 7:00 - 8:00 PM 32 49 81 8 8:00 - 9:00 PM 29 43 72 12 9:00 - 10:00 PM 18 34 52 16 10:00 - 11:00 PM 16 21 37 17 11:00 - 12:00 AM 10 13 23 18 Land Use General Urban/Suburban Weekday 220 & 934 Multifamily & Fastfood The Reduction column shows the anticipated exiting volume for each land use for the exiting westbound approach. Based on the proposed geometry and that the volume on AL Highway 181 is well beyond that required in the eight our warrants, the westbound volume is required to be a minimum of 53 in the eighth highest hour. The calculations based on ITE’s national studies, show the eighth highest hour to have 81 vehicles when the apartments from Rockwell and a fast-food restaurant with drive-through are combined thus meeting the eight-hour warrants. The fast-food restaurant could be from either the Rockwell site or the Corte Property Site. It is not anticipated that a proposed convenience store at the corner of AL Highway 181 and AL Highway 104 would contribute much to the exiting traffic of this intersection. Signal Warrant worksheets are located in the Appendix. CORTE PROPERTY FAIRHOPE, AL 5 - 6 Neel-Schaffer, Inc. Mobile, Alabama M:\Projects\NS-17220 Corte Property TIA\Report\Sec5_Precom.doc 5.4 Recommendations A traffic signal is warranted using ITE’s national studies. The signal would meet warrants at the completion of the Apartments from Rockwell and the addition of one convenience store that fronts AL Highway 181 either in the Rockwell site or the Corte Property site. If a signal is installed, it is recommended that the signal be interconnected with existing and proposed signals to the immediate north and south to provide progression of northbound and southbound traffic. The southbound left at the intersection is recommended to be lengthened to provide 200 feet of storage. In addition, an eastbound left turn lane on AL Highway 104 onto Driveway 1, a westbound right turn lane on AL Highway 104 onto Driveway 2, and a northbound right turn lane on AL Highway 181 onto Driveway 3 is recommended. POST OFFICE BOX 1929 ● FAIRHOPE, ALABAMA 36533 TELEPHONE (251) 928-3443 WWW.JADENGINEERS.COM JINRIGHT & ASSOCIATES DEVELOPMENT ENGINEERS April 20, 2023 Ms. Michelle Melton City of Fairhope Planning 451 Pecan Ave. Fairhope, AL 36532 RE: WAWA Food Mart JADE No.: ENCOUNTER 22-1840 Application No. SR 23.04 Dear Ms. Melton: We respectfully submit on behalf of our client our response to comments dated April 13, 2023. Listed below in bold italic are our responses to the review comments: 1. Please change references to Florida statutes and agencies in the various notes’ sections. Response: All references to Florida have either been removed or corrected. All forthcoming plan set revisions will no longer include this reference. 2. Please confer with Code Enforcement regarding the Signage Plan. Christina Lejeune at (251) 990- 0206 or (christina.lejeune@fairhopeal.gov). Response: Communication was received and delivered to Wawa. JADE has removed the additional monument sign from our plans. We appreciate the discussion on 4/19/2023 and this response is to confirm that further revisions are taking place by the sign vendor to provide a revised plan set soon. 3. Please confer with the landscape architect about the screening vegetation around the dumpster. Taller species will screen the dumpster better, which is the intent of the requirement. Response: Understood, this comment will be resolved on the final set of plans and after the below comment is resolved. 4. Please confirm with Jamie Rollins that the tree plantings along the perimeter and landscaping within the interior are in accordance with Ordinance #1444, Section 20.5-4(5) and (6), specifically. (“Tree Ordinance”) He can be reached at (251) 850-6036 or (jamie.rollins@fairhopeal.gov). Response: We appreciate the city discussing this ordinance with us so our team has a better understanding. Some internal discussions are still needed and we appreciate the city reviewing ideas before we determine the final design. Respectfully, JADE CONSULTING, LLC Paul Marcinko, PE Project Manger Enclosure PM\sr CROSSOVERGREENO RDGARRISON BLVDGREENO RDBURNSIDE AVE OLD BATTLES RD FLOURNOY WAY SOUTHLAND B L V D MCARTHURLN CRAFTSMANAVEWRIGHT BLVDVIVIANLOOPPALE MOON CT BRIGITTE MITCHELL LNCOUNTY RD 34 City of FairhopePlanning Commission May 1, 2023 ¯GREENO RDGREENO RDOLD BATTLES RD CROSSOVER FLOURNOY WAY COUNTY RD 34WRIGHT BLVDBRIGITTE MITCHELL LNSD 23.15 - Publix at Point Clear Legend Roads Parcels Corporate LimitsZoning Classification B-2 - General Business District PUD - Planned Unit Development Planning Jurisdiction^ Project Name:Publix at Point ClearSite Data:25.50 acresProject Type:MOP Final ApprovalJurisdiction:Fairhope Planning JurisdictionZoning District:B-2PPIN Number:17515General Location:Northwest corner of Greeno Road and Old Battles RoadSurveyor of Record:Jade ConsultingEngineer of Record:Jade ConsultingOwner / Developer:RW Battles LLCSchool District:Fairhope Elementary School Fairhope Middle and High Schools Recommendation: Prepared by: Hunter Simmons µ µ Approval Page 7 of 10 Final Plat Application Checklist* *This checklist is intended for convenience purposes only. Refer to the Subdivision Regulations for a complete list of requirements.  2 Copies of the Plat  2 Sets of As-Builts  1 Copy of the Plat on PDF format on disk  Proof of 911 approval of street names  1 Copy of As-Builts on GIS for Water/Sewer Department  Water: bacteria tests, pressure test, flow test  Sewer: video, pressure test, vacuum test  Roads: core samples and test data  Electric: street light invoice  Financial Guaranty, if applicable (only after 90% complete)  Errors and Omission Insurance  Maintenance Bond  Operations and Maintenance Plan for Storm Water Pond (stand alone document)  Street Tree Plan  Final Plans and calculations for utility layouts  Certificate of County Engineer’s approval for extra-territorial plats  Certificate of County Zoning, (must be signed and zoning of property, if any, indicated)  Memorandum of Transmittal signed indicating County’s receipt of plat/plans for development being submitted before Planning Commission.  Digital and/or video image, reflecting a date and time stamp, of the storm drains  Engineer’s Certificate of design conformance. Please note that if your site is located outside the City of Fairhope limits, but in the planning jurisdiction, the County documentation is required and your application will be considered incomplete without the County documentation. 1 SD 23.15 Shoppes at Point Clear – MOP, Final Summary of Request: The Applicant is RW Battles, LLC. Trey Jinright, III, with JADE Consulting, is the authorized agent and the engineer of record for the project. This application is final approval for a 16-unit Multiple Occupancy Project (“MOP”) on approximately 21.18 acres and is located on the northwest corner of Greeno Road (U.S. Hwy 98) and Old Battles Road (County Road 34). The property is currently zoned B-2 and was annexed into the City on December 22, 2022. The project is to be known as Publix at Point Clear. Preliminary MOP review was completed in February 2021 (SD 21.09). The 16 units approved in this Final MOP are included on Lot 5 as shown on the general layout plan below. The largest building has Publix as its anchor tenant and consists of 48,387ft² with an adjoining tenant space consisting of 14,000ft². There is a free-standing existing building consisting of 4,800ft². The height for each of the buildings is 35 feet or less. There are 334 total parking spaces. Comments: - Utilities: Water, sewer, and gas services are available through the City of Fairhope. Electric is provided by Riviera Utilities and AT&T is the telecommunications provider. There are various utility easements throughout the property that will be dedicated herewith. o Water – City of Fairhope o Sewer – City of Fairhope f 2 SD 23.15 Shoppes at Point Clear – MOP, Final o Power – Provided by Riviera Utilities o Communications – AT&T o The internal rights-of-way, roads, easements and drainage facilities are private and will be maintained by the developer/owner. o Utility easements are recorded on the replat in Slides 2785-B and 2776-C in the Probate Court. Public Water and Sewer Infrastructure were installed by the Developer’s contractor and will need to be accepted by the City Council for maintenance. A Maintenance Bond and Maintenance and Guarantee Agreement shall be required prior to acceptance. - Traffic Study: A traffic study was conducted that recommended three (3) turning lanes, which have been Installed. - Wright Boulevard and Flournoy Way shall be owned and maintained by the Developer. - Drainage: Prior to opening the Publix store, the Engineer provided a substantial completion letter stating drainage was operating properly. As part of this closeout some areas of the existing pond were restabilized with sod. A Stormwater Facility Agreement outlying maintenance for the drainage system was recorded on January 16, 2023. - Landscaping: Prior to opening the store, the Landscape Architect provided a substantial completion letter. All of the landscaping is complete and approved by the City. All required sidewalks are installed. - Greenspace: The proposed project is commercial which requires 10% greenspace or 2.11 acres. The project has 2.93 acres of greenspace. During preliminary review “Lot 7” was a separate lot with the only approved use as a park as shown in Figure 1 below. Figure 2 illustrates the new layout with the two lots combined as created by replats recorded as Slides 2785-B and 2776-C in the Probate Court. The use for the acreage along Old Battles Rd is still park and contains a mulch walking trail which connects to the overall sidewalk network. 3 SD 23.15 Shoppes at Point Clear – MOP, Final Figure 1: Preliminary layout of lots 5 and 7. Figure 2: Current Layout of Lot 5 .n .. • I I -l • LOT 9 , .• 1tM:.. a,.ceo sr t MI\I Ff( 9i.00 I ...:f--.-.,. --. Slt'Y'l4"W 17..a' ---------, t LOT 1 19'-=~ :~ l,l"f'Ttt-4.00 l; LOT 2 ~ ~ ~~~~ ')· -I MN HE !M.00 : j" ~ NN"»"1•"lJ,..le' -------·...-1 ,_ :e ~ '• ii -:--: l iy_~~.J ---n, . .-.r--o I I~ lolN rf[_ ... t4QO I :1 '11~~--------• ''p WCII !_l!:!."t!"!!.14_7!1 I I LOT+ I '~~1f-too!~ \ I -I kl ... L-L ____ J • ' • LOT LAYOUT, LOT DIMENSIONS, MINIMUM FINISHED FLOOR, BUILDING SETBACK LINES, AND SIDEWALK EASEMENT EXHIBIT ,· -so· 4 SD 23.15 Shoppes at Point Clear – MOP, Final A dog park was also constructed in the greenspace on the north side of the property near the pond. - Wetlands: There are no wetlands on the property pursuant to a 2019 Wetland Assessment Report. - Comprehensive Plan: Case 23.15 Publix at Point Clear is in compliance with the City’s Comprehensive Plan, the Fairhope Zoning Ordinance, and all other applicable regulations. Follow Up Requirements of Applicant: 1. An MOP Site Plan shall be recorded with Probate like a Final Plat. Staff shall approve the MOP Site Plan prior to recording. The MOP Site Plan shall be for Lot 5 with units as shown above. The General Layout Plan shall be relabeled MOP Site Plan and the following items added: a. Signature blocks shall be added on the cover page. b. Remove replat Site Data Table. The 16 units approved within this MOP are contained within Lot 5. 2. Provide Maintenance Bond and Maintenance and Guarantee Agreement for utilities being accepted by the City of Fairhope. Recommendation of Case SD 23.15 Shoppes at Point Clear: Staff recommends approval subject to the following condition(s): 1. Complete the aforementioned “Follow Up Requirement(s) of Applicant” 2. The park area, formally lot 7, shall be restricted to greenspace/park use only. 6.Al"!TY G.\TI! ~ ~ 00G &..T~Y. ~ C,Gl,ICll:l!'Tl!:IIUAL.KAl'O~l9AD. ~- l.;i.&S,i,l ~ol("J.f!ur1,1 ,-~ ~ r,.,-. r~e l>la-l,T\"'I"'. ~ tu.0-4 AltlA "'TH I Tm. ■NHO T~. \ POST OFFICE BOX 1929 ● FAIRHOPE, ALABAMA 36533 TELEPHONE (251) 928-3443 WWW.JADENGINEERS.COM JINRIGHT & ASSOCIATES DEVELOPMENT ENGINEERS April 20, 2023 Ms. Michelle Melton City of Fairhope Planning 451 Pecan Ave. Fairhope, AL 36532 RE: Publix at Pointe Clear JADE No.: ROARK-1692 Application No. SD 23.15 Dear Ms. Melton: We respectfully submit on behalf of our client our response to comments dated April 13, 2023. Enclosed are (1) one revised plans referenced in our responses. Listed below in bold italic are our responses to the review comments: 1. Please confer and confirm with John Thomas, ROW Construction Inspector Supervisor, that all ADA approaches to the building are acceptable. He can be reached at (251) 279-6232 or (john.thomas(fairhopeal.gov). Response: Please see email from 4/14/2023 from John Thomas which we have included with this response. All approaches to the building appear to be acceptable. 2. Please respond to comments from Kim Burmeister regarding stabilization on the pond bank and question about the aerator sent via email. Response: All comments have been resolved. We appreciate the coordination with the city and our crews/team to get this resolved. 3. Planting areas on the south side of the parking lot need re-mulching. Response: It is unclear to us who made this comment or to which area it applies. Please advise if anything else is required and we will get it resolved. Respectfully, JADE CONSULTING, LLC Paul Marcinko, PE Project Manger Enclosure PM\sr This Instrument Prepared By: BALDWIN COUNTY, ALABAMA HARRY D'Dl.lVE. JR. PROBATE JUDGE Filed/cert. 1/19/2D23 11 :39 AM TOTAL S 67.00 19 Pages r-...:1 c:::i --=-~ ~ c.-=i --=-JADE Consulting, LLC PO Box 1929 Fairhope, AL 36533 ll~IRlltt~;1~,1~~ttlll ll City of Fairhope, Alabama Storm Water Facility Maintenance Agreement THIS STORM WATER FACILITY MAINTENA~E AGREEMENT (this "Agreement") is made, executed and entered into this ...lJe_ day of ~A/\,JJ M'-( , 2023, by RW Battles, LLC (hereinafter called "Landowner''), to and for the benefit of the City of Fairhope, Alabama, a municipal corporation organized under the laws of the State of Alabama (here inafter called the "City"). Recitals: WHEREAS, Landowner is the owner of that certain real property located in Baldwin County, Alabama and more particularly described on Exhibit "A" attached hereto and by reference made a part hereof (the "Property"); WHEREAS, Landowner is in the process and constructing and developing a subdivision on the Property to be known as Publix at Pointe Clear (the "Subdivision"); WHEREAS, Landowner has applied with the City for Multiple Occupancy Project approval for the Site Plan, a copy of which is attached hereto as Exhibit "B" (the "Site Plan"); WHEREAS, as a condition to the approval of the Site Plan, the City requires the construction and improvement of certain storm water management facilities as shown and referenced on the Site Plan and/or otherwise approved by the City in writing (the "Facilities"); WHEREAS, as a further condition to the approval of the Site Plan. the City requires that the Facilities be constructed and adequately maintained by Landowner, its successors and assigns. including any homeowners association formed by Landowner for purposes of managing and maintaining any common areas of the Subdivision (the "Association"); Agreement: NOW THEREFORE, for and in consideration of the premises and other good and valuable consideration, the receipt, adequacy and sufficiency of which are hereby acknowledged, Landowner, intending to be legally bound, hereby covenants and agrees to and for the benefit of the City as follows: 1 14 Stormwater Long Term Maintenance Plan Publix at Pointe Clear Introduction This Long Tenn Maintenance Plan (hereinafter referred to as "Plan1 rExhibit C") with a Checklist ("Exhibit D") are components of the Operation and Maintenance Agreement for Publix at Pointe Clear. Its main purpose is to identify the development's stormwater best management practice (BMP) system components . including the structural components, locations and maintenance needs. This Plan includes the following elements: • Description and locations of stormwater system components to be inspected (below and on Site Plans); • Schedule of inspections and techniques used to inspect and maintain the stormwater system to ensure proper function as designed, induding a documentation checklist for each type of BMP and a schedule for potential maintenance items that must be addressed; • Where and how trash, sediment and other pollutants removed from the stormwater system will be disposed; • Schematics of BMPs located on the site (Site Plans); and • Person(s) and phone number(s) of who will be responsible for BMP inspection and maintenance; if the organization that will be responsible is yet to be organized, list the name, address and phone number of the person or entity with interim responsibility. Stormwater System Components -Narrative Components for the development were selected based on guidance from the Alabama Handbook for Erosion Control, Sediment Control, and Stonnwater Management on Construction Sites and Urban Areas (Alabama Soil and Water Conservation Committee-March 2014) and the Low Impact Development Handbook for the State of Alabama (Alabama Department of Environmental Management Alabama Cooperative Extension System Auburn University-2014 ). Links to resources are available at Alabama Department of Environmental Management (ADEM) website for construction general permits at: http:l/www.adem.state.al.usJprogramslwater/construchonstormwa ter .cnt. The development consists of a combination of conventional and Low Impact Development (LIO) stormwater management components. LID is a systematic, interdisciplinary approach to stormwater management that can result in improved stormwater quality, improved health of local water bodies, reduced flooding, increased groundwater recharge, more attractive landscapes, wildlife habitat benefits, and improved quality of life. "It minimizes runoff and employs natural processes such as infiltration, evapotranspiration (evaporation and transpiration from plants), and storage of stormwater at multiple fine scale locations to be as near to the source of stormwater as possible. Successful implementation of LID recreates a more natural hydrologic cycle in a developed watershed." (Low Impact Handbook, 2014) LID is successful only if planned, designed, constructed, and maintained appropriately. This Plan was designed to help the site owner maintain all of the stormwater management system components as detailed below. This site uses grading, grass swales, and a system of underground pipes to collect (via dome, grate and weir inlets) and route stormwater to bioretention ponds, a wet detention basin and constructed wetlands. The wet detention basin (LID) is a depression in the landscape to capture and store runoff while providing JADE Consulting, LLC Page2of5 January 16, 2023 Stormwater Long Term Maintenance Plan Publix at Pointe Clear habitat for flood/drought tolerant native vegetation with specialized underlying soil media designed to meet a desired stormwater quanfity treatment storage volume. It holds stormwater runoff and releases it slowly to prevent downstream flooding and stream erosion. It is an affective water quality and peak discharge reduction measure allowing sedimentation fallout, flow attenuation, assisting in evapotranspiration, and improving the stormwater quality. The basin's inlet structure is reinforced with riprap and fabric underiayment. It has a riser pipe outfall with riprap enforcement at the end pipe which drains to the adjacent constructed stormwater wetlands/habitat restoration area. The constructed stormwater wetlands / habitat restoration (LID) area is designed to treat stonnwater and function similarfy to natural wettands using biological, chemical, and physical processes to cycle nubients, and breakdown ottler pollutants for treatment of stormwater runoff. It mimics the filtration and cleansing capabilities of natural wettands while providing temporary storage. It uses shallow pools, complex micro• topography, and both aquatic and riparian vegetation to effectively treat stormwater. Additional benefits include: enhanced biodiversity and ecological benefits to urban areas; flood attenuation for improved water quality, reduced erosion, and downstream habitat; reduced peak flows downstream; decreased sediment loads; reduction of downstream bank erosion; filtration of pollutants and nubient uptake from plants. The four grass swales (LID) collect, direct, and slow surface flows of stonnwater. They are shallow, open channels stabilized with grass designed to filter pollutants and convey stormwater. They also provide limited quality treabnent, and some moderate flow attenuation. The two, interconnected bioretention ponds {LID) are depressions in the landscape with underlying specialized soil media (sand filters) that capture and store runoff for a short time, while providing habitat for native vegetation that is both flood and drought tolerant. They remove pollutants in stormwater runoff through adsorption, filtration, sedimentation, volatilization, ion exchange, and biological decomposfon. Peak runoff rates and runoff volumes can be reduced, groundwater can be recharged and stream channels may be protected ttlrough minimized peak discharges. Permeable pavers (LID) are used as an alternative in place of traditional concrete or asphalt with a pervious surf ace and gravel base to infiltrate stormwater and reduce stormwater runoff through temporary storage. Stormwater is held in the gravel base layer, or subbase, before leaving the system through exfiltration into surrounding soils or through an underdrain. Grass buffers and greenways (also known as "Grass Filter Strips") (LID) are linear areas of grass that receive sheet flow of stormwater runoff from a nearby impervious surface in order to reduce peak discharge rates, encourage sediment deposition, and provide limited infiltration. They are planted with turf grass, which is easy to maintain and blends seamlessly into urban landscapes. A greenway surrounds the project and buffers surround the disturbed area (north, west and south sides) of ttle basin. In-line Storrnwater Storage: In-line stormwater storage, or "treabnent train" is a series of techniques or processes used together to maximize the control of pollutants from runoff. This site employs grass swales . interconnected bioretention basins/sand filters, the wet basin and consbucted wetlands as a treabnent train . The underground collection network includes 15, 18, 36, and 48 inch HOPE (high density polyethylene) pipes with junction boxes and dome, weir and grate inlets allowing access for cleanout. The network collects and routes stormwater between areas of the stormwater management system. JADE Consulting , UC Page3of5 January 16, 2023   882 Harbor Boulevard Suite 101 Destin, FL 32541 Office (850) 269-0663 www.callieandco.com         January 23, 2023 City of Fairhope 555 S. Section St. Fairhope, AL 56532 Re: Publix at Battles Road & U.S Hwy. 98 To whom it may concern: This letter is to inform you that the installation of the landscape related construction items for this project are substantially complete and in accordance with the project plans and specification. Please feel free to contact me with any questions or concerns at (850) 586-1200 Sincerely, Callie Barker Landscape Architect L o u d P l onners Londscope Arc b ilech • • • Subdivision: Publix - Greeno Road/Old Battles Road Subdivision location: NW corner of Greeno Road & Old Battles Road - Fairhope Requested by: Charlie Trotman Email: charlie@trotmancompany.com Phone: 334-270-2727 Reservation valid through: 5/25/2022 We have approved the following road names for the development listed above. The road names are reserved for one year (365 days) from the date of this letter. If the road name changes in any way from what is listed on this confirmation letter, please contact our office for approval. If you find that you need these road names reserved beyond one year, you must contact us requesting as such or the road names will be automatically released and labeled “available for use”. DIR ROAD NAME SUFFIX POST DIR WRIGHT BLVD FLOURNOY WAY Please feel free to contact our office with any questions or concerns. Signed: Samantha Roberts Date: 5-25-2021 PAUL MUELLER Chairman DAVID WILSON Vice Chairman BILLY PAPPAS Secretary/Treasurer JOBY SMITH Director RAYMOND LOVELL ALAINNA ELLIOTT AL TOLBERT ANTHONY LOWERY MARK D. RYAN General Counsel P.O. BOX 924, ROBERTSDALE, ALABAMA 36567 251-947-3911 EMERGENCY POLICE • FIRE • MEDICAL DIAL 9-1-1 SECTION STDENTONLNPETIOLE D RCALYX CIRCity of FairhopePlanning Commission May 1, 2023 ¯SECTION STDENTON LNPETIOLE D RCALYX CIRSD 23.16 - Hilltop Phase II Legend Roads Parcels Corporate LimitsZoning Classification PUD - Planned Unit Development TR - Tourist Resort Planning Jurisdiction^ Project Name:Hilltop Phase IISite Data:4.70 acresProject Type:Final Plat ApprovalJurisdiction:Fairhope Planning JurisdictionZoning District:PUDPPIN Number:40591General Location:West side of Section Street on Petiole Drive, North of Petiole DriveSurveyor of Record:Jade ConsultingEngineer of Record:Jade ConsultingOwner / Developer:Two Hands Design & Development LLCSchool District:Fairhope Elementary School Fairhope Middle and High Schools Recommendation: Prepared by: Hunter Simmons µ µ -□ C Ii!:] 1 SD 23.16 Hill Top, Phase Two – May 1, 2023 Hill Top, Phase II Summary of Request: The owner is Two Hands Design and Development, LLC. The engineer and applicant is Jade Consulting, LLC. This application is for Final Plat approval of an 8-lot major subdivision located on the north side of Hill Top Phase I. The subject property is 4.7+/- acres with the smallest lot 15,000 S.F. and largest lot 19,875 S.F. The average lot size is 16,692 S.F. The subject property is zoned PUD and has been annexed into the City of Fairhope since receiving Preliminary Plat approval on March 2, 2020 (Case SD 20.11). Excerpts of the site data table are included below: Punch List: - Remaining Street Trees will be planted on May 3. A contract for the work was provided and installation will be inspected prior to signing of Final Plat. - A delineator post shall be installed at SSMH19. - Not a punch list item, but staff does note a change that was administratively approved since the Commission reviewed the Preliminary Plat. Landscape plans shown in Figure 1 illustrate what was approved during Preliminary Plat. Staff approved the revised landscape plans shown in Figure 2. The area is currently grass and stabilized. SIT[ DATA LIN . FT . STR EETS: 5,606 L.F . NUMBER OF LOTS : 63 SMA LL EST LOT: 14.477 S.F . LARGEST LOT: 56 ,328 S.F. COMMON AREAS : 12 .33 AC WETLANDS : 4 .81 AC DETENTION : 1.68 AC GREEN SPACE : 5.65 AC (11 .5%) TOTAL AREA: 49.30 AC DENSITY : 1.28 LOTS/ACRE WATER SERVICE : crrtY OF FA IRH OPE SEWER SERVICE : CITY OF FA IRHOPE ELE CTR IC SERVIC E: RIVIERA UTILITIES T ELEPHON E SERVIC E: AT&T GAS SE RV ICE: CITY OF FA IRHOPE PR INCIPAL BUILDING STANDARDS R-1 ZONE : BUILDING HEIG HT: 30' MAX . ALLOWABLE LOT COVERAGE : 40% RE QU IRED SETBACKS : FR ONT: 40 FEET REAR : 35 FEET SIDE : 10 FEET STREET SIDE : 20 FEET MIN LOT AREA : 15 ,000 S.F. 2 SD 23.16 Hill Top, Phase Two – May 1, 2023 Figure 1 Figure 2 Comments: - Final plat must be recorded within 120 days after the date of final approval. The City of Fairhope Subdivision Regulations contain the following criteria in Article V.B.2. Approval Standards. “2. Consistency with Plans, Regulations and Laws - The Planning Commission shall not approve the subdivision of land if the Commission makes a finding that such land is not suitable for platting and development as proposed, due to any of the following: a. The proposed subdivision is not consistent with the City’s Comprehensive Plan, and/or the City’s Zoning ordinance, where applicable; • Meets 3 SD 23.16 Hill Top, Phase Two – May 1, 2023 b. The proposed subdivision is not consistent with the City’s Comprehensive Plan or any other plan or program for the physical development of the City including but not limited to a Master Street Plan, a Parks Plan, a Bicycle Plan, a Pedestrian Plan, or the Capital Improvements Program; • Meets c. The proposed subdivision is not consistent with these Regulations; • Meets d. The proposed subdivision is not consistent with other applicable state or federal laws and regulations; • Meets e. The proposed subdivision otherwise endangers the health, safety, welfare or property within the planning jurisdiction of the City.” • Meets Follow‐Up Activities Required by Staff and the Applicant: • Copy of the recorded plat • Copy of the recorded O&M Agreement • Maintenance and Guaranty (M&G) Agreement executed by the developer – this document is not considered fully executed until City Council approves the Acceptance Resolution and the Mayor signs said agreement. o Remember to include the instrument # from the recorded plat o Please include 30 days in paragraph 3 Recommendation: Staff recommends approval SD 23.16 Hill Top, Phase Two final plat with the following conditions: 1. Installation of the remaining punch list items. 2. Complete required follow up activities. 3. Engineer’s signature block shall be included and signed for the Final Plat. COMMONAREA #6x22232425 14 13 CO A 15 16 17 18 EXIST. NW WET POND NORMAL POOL ELEV. 96.50 100 YR HW ELEV. 99.55 PETIOLE DRIVE 50' R.O.W.CALYX CIRCLE40' R.O.W.50' R.O.W.30 31 32 3334 35 36 37 COMMON AREA #7 COMMON AREA #8 CA #9 CA #10 GENERAL LAYOUTSLR/WMG MAR 2023 1642.20HILL TOP SUBDIVISION PH 2TWO HANDS DESIGN & DEVELOPMENT, LLCAPPR.DATEREVISIONNO.2-17-2020CITY COMMENT1208 N. Greeno Road, Ste. CFairhope, Alabama 36532P.O. Box 1929Fairhope, Alabama 36533Phone: (251) 928-3443jadengineers.com (AL) CA-3157-E1-17-2022SSMH REVISIONS21-21-2022IFC33-23-2023ASBUILT4C3 1" = 40' SITE DATA TABLE STATE OF ALABAMA COUNTY OF BALDWIN CITY OF FAIRHOPE EXIST. TAX PARCEL ID:05-46-09-30-0-000-038.000 05-46-09-30-0-000-040.000 ZONING: HILL TOP PUD 2021 YARD SETBACKS: FRONT:30' SIDE:10' / 20' (CORNER LOT) REAR:30' TOTAL TRACT ACREAGE:4.71 AC TOTAL NUMBER OF LOTS:8 NET DENSITY:1.70 LOT/AC LINEAR FEET OF STREETS:992 LF AVERAGE LOT SIZE:16,692 SF SMALLEST LOT SIZE:15,000 SF COMMON AREAS:32,341 SF ≈ 0.742 AC GREENSPACE AREA:22,292 SF ≈ 0.511 AC SIDEWALK & RAMP NOTES: 1. ALL ADA RAMPS AND CROSSWALK STRIPING WITHIN THE R.O.W. AS WELL AS SIDEWALKS WITHIN COMMON AREAS SHALL BE CONSTRUCTED AT THIS TIME. 2. REMAINING SIDEWALKS TO BE CONSTRUCTED BY THE DEVELOPER OF EACH LOT. ( IN FEET ) 0 1 inch = ft. GRAPHIC SCALE 4040 40 LOW IMPACT DEVELOPMENT TECHNIQUES: THE FOLLOWING IS A LIST OF THE LOW IMPACT DEVELOPMENT TECHNIQUES APPLIED IN THE CONSTRUCTION OF HILL TOP SUBDIVISION: 1. WET BASIN 2. SAND FILTER 3. GRASS SWALES 4. GRASS BUFFERS 5. IN-LINE STORMWATER STORAGE 6. SITE DESIGN FOR HABITAT 7. GREENWAYS 8. BIO-RETENTION 9. LEVEL SPREADER S89'53'32"W 201.28' (A) 13" 0 BONNER, BOBBIE J. C/0 CROWN CASTLE INC. 4017 WASHINGTON ROAO MCMURRAY, PA 15317 UNZO en z 52 ~ JOB NO: SCALE: DATE: DRAFTER: SHEET: 991 0 0 1 0 1 1 0 2 1 0 3 1041 0 5 1 0 6 107108 1 0 9 107 106 105 104 1 0 7 108 CALYX CIRCLE12 3 gal Cinnamon Girl Distylium 22 3 galHenry's Garnet Sweetspire Henry's Garnet Sweetspire 3 gal 18 Tom`s Dwarf Waxmyrtle 3 gal 9 10 3 gal Saw Palmetto 5 15 galLongleaf Pine Longleaf Pine 15 gal 3 Saw Palmetto 3 gal 6 Limelight Hydrangea 3 gal 4 1 6-8` Ht., Multi-trunkChaste Tree 3 45 galTeddy Bear Magnolia Teddy Bear Magnolia 45 gal 3 African Iris 1 gal 156 Chaste Tree6-8` Ht., Multi-trunk 1 Saw Palmetto 3 gal 7 10 3 galLimelight Hydrangea 5 15 galLongleaf Pine Longleaf Pine15 gal 3 Tom`s Dwarf Waxmyrtle 3 gal 9 23 3 galCinnamon Girl Distylium 5 3 galSaw Palmetto 7 3 gal Limelight Hydrangea 226 1 galAfrican Iris Cut new trench bed edge from existing turf & remove turf inside bed area. (typ.) 38 1 galDune Sunflower Carefully hand remove ex. brush from around base of oak. Grub bamboo roots by hand without cutting oak roots over 1" in dia. 151 1 galAnnuals Cinnamon Girl Distylium 3 gal 23 10 3 galTom`s Dwarf Waxmyrtle 8 3 galTom`s Dwarf Waxmyrtle 10 3 galTom`s Dwarf Waxmyrtle White Cloud Muhly Grass3 gal 28 9 3 galTom`s Dwarf Waxmyrtle 12,370 sf sodExisting Sod Border mulched iris pockets with a crimped 8" pinestraw band. (typ.)23.00 '16.00'25.00 '18.00'Ex. Large Oak Limits of sand filter bed. Hand dig gently in this area. Do NOT contaminate sand with other soils except plant mix. (typ.)CALYX CIRCLEHILLTOP PHASE 2 COMMON AREAFAIRHOPE, AL R PLAN L-1.1 LANDSCAPE NORTH NOTES: 1. BASE SURVEY PROVIDED BY JADE ENGINEERING. 2. LOCATION OF STRUCTURES, HARDSCAPE, AND EXISTING VEGETATION SHALL BE FIELD VERIFIED. 3. VERIFY ALL LAYOUT AND DIMENSIONS IN FIELD. 4. PLANT COUNTS ARE FOR CONVENIENCE ONLY. FIELD VERIFY ACCORDINGLY. 5. CONTRACTOR IS RESPONSIBLE FOR ENSURING POSITIVE DRAINAGE. 6. CONTRACTOR TO OBTAIN ALL REQUIRED PERMITS. 7. NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES IN DRAWINGS OR FIELD CONDITIONS. 8. REFER TO ARCH. / CIVIL FOR ALL UTILITIES, GRADING, DRAINAGE, & HARDSCAPE. Copywright. This drawing and its contents are the property of Espalier, LLC and may not be copied or used in anyway without written permission from Espalier.DRAFT - FOR REVIEW ONLY0 SCALE: feet1632 48 1/16" = 1'-0" ~-"~~ -~~ ~--.······· I • 0 - I g • J L ~~ I i I /.\ ~~-I ' -C--:-:-tt-------11 I --1 --..._ - I ,-- L---------~--~~----- (_) .._____ 1 •• ---, (_) i ) r -- r , ✓ U.) " I j -I C... _) n / I 0 0 J 1 ' I I I I I I \ ' ------------_Ji;__ - - 30 rLl7..J7____r-7 ESPALIER landscape architecture Espalier, LLC P.O. Box 1247 Fairhope , Alabama 36533 P: 251.454.3500 espalierdesign.com ISSUED/REVISED DESIGNEDIJ'I' fll.[tl.'JolE JC HILLTOP2LA DRAMIB'I' SHEIT JC -~~ JC -=~ 2315 3/7/23 TREES CODE QTY BOTANICAL NAME COMMON NAME CONT SIZE REMARKS MT2 6 Magnolia grandiflora `Southern Charm` Teddy Bear Magnolia 45 gal Greenforest Nursery PP 16 Pinus palustris Longleaf Pine 15 gal 4` Ht. Min. VS 2 Vitex agnus-castus `Shoal Creek` Chaste Tree 6-8` Ht., Multi-trunk Approve photo of exact plant with LA. SHRUBS CODE QTY BOTANICAL NAME COMMON NAME SIZE FIELD3 SPACING REMARKS DM2 58 Distylium X `PIIDIST-V` TM Cinnamon Girl Distylium 3 gal 42" o.c. HD 38 Helianthus debilis Dune Sunflower 1 gal 72" o.c. HL 21 Hydrangea paniculata 'Limelight' Limelight Hydrangea 3 gal 60" o.c. IV 40 Itea virginica 'Henry's Garnet' Henry's Garnet Sweetspire 3 gal 48" o.c. MW 28 Muhlenbergia capillaris `White Cloud` White Cloud Muhly Grass 3 gal 36" o.c. MT 55 Myrica cerifera `Tom`s Dwarf` Tom`s Dwarf Waxmyrtle 3 gal 48" o.c. TS 28 Serenoa repens Saw Palmetto 3 gal 60" o.c. GROUND COVERS CODE QTY BOTANICAL NAME COMMON NAME CONT FIELD3 SPACING REMARKS AA 151 Annuals Annuals 1 gal 15" o.c. Seasonal DM 382 Dietes bicolor `Moraea` African Iris 1 gal 24" o.c. SC 12,370 sf Existing Sod Existing Sod sod PLANT SCHEDULE APPROVED NURSERIES: 1. GREEN FOREST NURSERY 2. FLOWERWOOD NURSERY 3. GREENS NURSERY 4. CHERRY LAKE NURSERY Other nurseries may he approved at the discretion of the landscape architect. NOTES: 1. LONG LEAF PINESTRAW ALL BEDS EXCEPT 4"& 1 GAL. POTS. 2. 4"& 1 GAL. POTS TO BE PLANTED IN 3" OF PLANTING MIX AND TOP DRESSED WITH GROUND PINEBARK. 3. USE WOODACE FERTILIZER TABS IN ALL PLANTING PITS. SEE NOTES. 4. PREP. PLANTING PITS & GROUNDCOVER AREAS WITH PLANTING MIX. SEE NOTES. 5. THIS PLANT LIST IS FOR CONVENIENCE ONLY. CONTRACTOR TO VERIFY. 6. ALL BEDS SHALL RECEIVE FREEHAND PRE-EMERGENT PER MANUFACTURERS RECOMMENDATIONS. 7. SEE LANDSCAPE NOTES. LANDSCAPE NOTES: 1. This section covers furnishing and installing all landscape plants and non-plant materials covered by the drawings and these specifications. The work shall include materials, labor, equipment and services as described herein and indicated on the drawings. Also, the work shall include the maintenance of all plants and planting areas until acceptance by the Owner, and fulfillment of all guarantee provisions as herein specified. 2. Before beginning work, the contractor shall thoroughly acquaint himself with the existing site conditions and proposed plans. The intent is to provide a smooth transition between existing conditions that are to remain and the new site features with minimal damage to existing trees and vegetation. 3. Contractor is made aware of active existing underground utilities. It is the contractors responsibility to familiarize himself with the location of said utilities and other obstructions. The contractor shall investigate and verify, in the field, the existence and location of all utilities and any existing irrigation piping, and take necessary precautions to prevent their disturbance and avoid interruption of service. Contractor is responsible for calling appropriate line location service. All damaged utilities shall be replaced to owners satisfaction by contractor with no additional charge to owner. 4. Discrepancies between site conditions and conditions on plans shall be call to the attention of the Owner immediately. 5. Existing grades shall be verified in field prior to beginning any work. Discrepancies shall be brought to the landscape architects attention immediately. Landscape contractor to provide fine grading to ensure positive drainage. 6. The landscape architect shall have the right to reject any and all work and/or materials at any stage of progress which in his opinion do not meet the requirements of these plans and specifications. Such rejected material shall be removed from the site immediately and replaced with acceptable materials. 7. Landscape contractor is responsible for obtaining all state and local permits and licenses required to perform this work. 8. Landscape contractor shall abide by all state and local laws and ordinances. Contractor shall also conform to POA or ARB guidelines if applicable. 9. All work shall comply with the current edition of the Standard Building Code published by the Southern Building Code Congress International, Inc. 10. Topsoil shall be sandy/loam natural, friable, and fertile with a PH of 5.5 to 6.5. Topsoil shall be free from roots, stones, debris, noxious weeds, or any substance harmful to plant growth. Quality of Topsoil to be approved by Landscape Architect. 11. Once delivered to the site, the contractor is responsible for the protection, including theft, of all materials. 12. The landscape plan is to serve as a guide for installation. Field adjustment and changes to layout may be made by Landscape Architect. 13. Contractor shall layout all plant material per planting plans and schedule a site meeting with landscape architect for approval with a minimum of 48 hours notice. 14. Quantities shown on plant list are for convenience only. 15. All groundcover & flower beds shall receive 3" minimum of planting mix consisting of decomposed pinebark or mushroom compost and blended into the top 6" of existing soil. Rake beds smooth and top dress with 2" min. of ground pinebark prior to planting. 16. All tree and shrub planting pits shall be backfilled with 75% excavated soil & 25% planting mix consisting of decomposed pinebark or mushroom compost. 17. All trees shrubs and groundcovers shall be planted with Woodace fertilizer tabs at rates per manufactures recommendations. All planting beds shall also be top dressed with a slow release Osmocote fertilizer or equal per manufactures recommendations prior to mulching. 18. All beds shall receive Freehand pre-emergent herbicide or equal. 19. Unless otherwise noted, all beds shall receive 3" compacted depth of fresh Long Leaf pine straw free from sticks and pine cones. Groundcover areas with 4" plants or plugs shall be mulched with pulverized pinebark mulch unless otherwise noted. 20. All bed lines shall have 3" V-Shaped trenches. See detail. 21. All plant material shall meet or exceed federal, state, and county laws requiring inspection for plant disease and insect control. 22. All plant material shall be Florida #1 or better and meet the latest standards of the "American Standards for Nursery Stock". 23. All trees shall be staked with arbor guy (or equal) tree stakes per manufactures recommendations. 24. All disturbed areas shall be irrigated and sodded. 25. Contractor shall maintain all plantings and lawn areas until final acceptance by owner and landscape architect. Unless specified otherwise, maintenance includes mowing, edging, weeding, blowing, pruning, watering, mulching, etc. 26. Brown or defoliated plants shall be removed and replaced immediately. 27. All materials and workmanship for landscape and irrigation shall be guaranteed for a minimum of one year from final acceptance. 28. No work shall be performed in any R.O.W. without approval by the appropriate Federal, State, County, or City authority. LANDSCAPE NOTES1 MULCH TREE RING 3" DEEP (TYP.) KEEP MULCH OFF TRUNK +/-2" SPECIFIED PLANTING MIX. WASH IN BACKFILL TO REMOVE AIR POCKETS AND SETTLE SOIL. 4" SOIL WATER WELL ABOVE FINISH GRADE SET TOP OF ROOTBALL 1.5" ABOVE FINISH GRADE. SLOPE SOIL AWAY FOR POSITIVE DRAINAGE. FINISH GRADE UNDISTURBED SUBGRADE SPECIFIED FERTILIZER TABS ARBORGUY STAKING KITS OR EQUAL. INSTALL PER MANUFACTURERS SPECS AND SIZING. 3 REQUIRED 120° APART. HIGH VISIBILITY FLAGGING TAPE TREE PLANTING ARBORGUY ANCHORS TO BE DRIVEN INTO UNDISTURBED SUBGRADE. NOT PLANTING PIT. 2 SHRUB PLANTING DETAIL NOTE: LANDSCAPE CONTRACTOR IS RESPONSIBLE TO ENSURE POSITIVE DRAINAGE IN ALL DIRECTIONS AND AWAY FROM ALL STRUCTURES. SHRUBS TO BE PLANTED 1" HIGHER THAN FINISH GRADE. 3" OF MULCH AS SPECIFIED SOIL BACKFILL AS SPECIFIED WITH FERTILIZER TABS AS SPECIFIED AT RATE PER MANUFACTURER SPECIFICATIONS. LIMITS OF MULCH BED. EDGE OF SOD, WALK, OR CURB BUILDING FACADE OR WALL 32" Min.o.c. spacing o.c. spacing 32" Min. 2 x Dia. of Rootball 6" MIN. 3 GROUNDCOVER PLANTING DETAIL NOTE: LANDSCAPE CONTRACTOR IS RESPONSIBLE TO ENSURE POSITIVE DRAINAGE IN ALL DIRECTIONS AND AWAY FROM ALL STRUCTURES. PLANTING BED PER SPECIFICATIONS 2" OF PINEBARK MULCH FOR ALL 4" POTS UNLESS OTHERWISE NOTED. MULCH AS SPECIFIED FOR 1 GAL. GROUNDCOVERS. O.C. SPACING (TYP.) UNDISTURBED SUBGRADE LIMITS OF MULCH BED. EDGE OF SOD, WALK, OR CURB BUILDING FACADE OR WALL 4 SUBGRADE TRENCH BED EDGE 3" OF MULCH AS SPECIFIED CROWN MULCH AS SHOWN TO ENSURE POSITIVE DRAINAGE MULCH TO BE 1" LOWER THAN FINISH GRADE AT EDGE FINISH GRADE NOTE: TRENCH EDGE SHALL BE LOCATED AT ALL SOFT AND HARD EDGES. 1" 3" 3" 5 DRAFT - FOR REVIEW ONLYCALYX CIRCLEHILLTOP PHASE 2 COMMON AREAFAIRHOPE, AL Copywright. This drawing and its contents are the property of Espalier, LLC and may not be copied or used in anyway without written permission from Espalier. LANDSCAPE L-1.2 DETAILS o~N.T.S_-----LA-02 Q--;;;:;-NTS ____ _ LA-16 0 --;:;N:;:;-.T.S.~----------LA-03 o~N.T.S_-----LA-01 0 N.T.S. LA-04 0 0 0 0 n LJ m LJ □ @:s ~ ESPALIE R landscape arch itecture Espalier, LLC . P.O. Box 1247 Fairhope , Alabama 36533 P, 251.454.3500 espalierdesign.com ~ ISSUED/REVISED ~ ~ DESIGNEDIJ'I' JC -~~ JC -~~ JC 3/7/23 "~-HILLTOP2LA COMMONAREA #6x22232425 14 13 CO A 15 16 17 18 EXIST. NW WET POND NORMAL POOL ELEV. 96.50 100 YR HW ELEV. 99.55 PETIOLE DRIVE 50' R.O.W. 107 105106 107 10010 0 1041 0 0 104 1 0 3 1 0 0 9 2 10010596 9798991 0 0 1 0 1 1 0 2 1 0 3 1 0 4 1 0 5 10 6 107108 1 0 9 107 106 9 5 9 8 10110 2 10310 4 104103102101 9998106 105 104 1 0 7 108 10 9 TPTPTPTPTPTPTPT P TP TP TP TPTPTPTPTPTPT P TP TPTPT P TP TP TP TP TP TP TP TP TP TP 10710 7 106106105105 10510 5 10 5 10 4 101 102 103 104 105 106 107 107 107 108 107103103104104104105103104103104101 102103104 105 1051061071051061051051041 0 5 1 0 5 1 0 4106105105107106106 1081071061061051041031021011 0 3 9798 100100101101102 102 101 102 103 IN PLACE, 8" CLEAN OUT INV 97.55 IN PLACE, 3 EA. 8"x6" TEE WYE IN PLACE, 8"x8" TEE WYE W/ 8" CLEAN OUT INV. 97.30 IN PLACE, 3 EA. 6" CLEAN OUT INV. 98.00 IN PLACE, 6" PERFORATED PVC UNDERDRAIN IN PLACE, 8" PERFORATED PVC UNDERDRAIN IN PLACE, 48 SY CL I RIP-RAP CHECK DAM & FABRIC, TOP OF DAM ELEV. 102.00' NORTH DRY POND TOP OF BERM ELEV. 105.00 100 YR HW ELEV. 104.39 9995969998979 6 IN PLACE, RIP-RAP ENERGY DISSIPATOR BERM, SEE DETAIL ON SHEET C23 TPTPTPTPTPTP TP TPTP30 31 32 3334 35 36 37 COMMON AREA #7 COMMON AREA #8 CA #9 IN PLACE, P-43, 47LF 22"x13" RCAP @ 2.58% IN PLACE, P-44, 47LF 22"X13" RCAP @ 2.56% IN PLACE, P-45, 125LF 24" RCP @ 0.24% IN PLACE, P-46, 172LF 24" RCP @ 0.20% IN PLACE, P-47, 48LF 22"X13" RCAP @ 0.67% IN PLACE, END-18, 4:1 22"x13" PIPE END TREATMENT INV. 103.10 IN PLACE, END-19, 6:1 22"x13" PIPE END TREATMENT W/ 5 SY CL II RIP-RAP & FABRIC INV. 101.89 IN PLACE, END-20, 4:1 22"x13" PIPE END TREATMENT INV. 103.12 IN PLACE, END-21, 6:1 22"x13" PIPE END TREATMENT W/ 5 SY CL II RIP-RAP & FABRIC INV. 101.92 IN PLACE, OS-4, 48" DIA. STRUCTURE W/ CONTECH RS-48 TRASH RACK OR APPROVED EQUAL RIM ELEV = 103.87 (N)2.5'x1' ORIFICE INV: 102.27 (N)8" SOILDWALL PVC INV (IN): 96.89 (S)24" RCP INV (OUT): 96.72 IN PLACE, SI-14, EAST JORDAN 24" BEEHIVE GRATE, MODEL NO. EJ1205 TYPE 02 RIM ELEV = 103.98 (N)24" RCP INV (IN): 96.42 (W)24" RCP INV (OUT): 96.39 IN PLACE, END-22, 4:1 24" PIPE END TREATMENT W/ 90 SY CL II RIP-RAP & FABRIC INV. 96.05 IN PLACE, END-27, 4:1 PIPE END TREATMENT INV. 101.82 IN PLACE, END-28, 4:1 PIPE END TREATMENT INV. 101.50 IN PLACE, END-23, 4:1 22"x13" PIPE END TREATMENT INV. 102.39 IN PLACE, END-24, 4:1 PIPE END TREATMENT INV. 102.35 IN PLACE, P-50, 16LF 22"x13" RCAP @ 0.25% IN PLACE, END-25, 4:1 PIPE END TREATMENT INV. 102.30 IN PLACE, END-26, 4:1 22"x13" PIPE END TREATMENT INV. 102.05 IN PLACE, P-51, 16LF 22"x13" RCAP @ 1.59% IN PLACE, P-58, 53LF 8" SOILDWALL PVC @ 0.72% CA #10 R.O.W. GAS TEL x x x x x x RIGHT-OF-WAY CENTERLINE CENTERLINE PROPERTY LINE PROPERTY LINE (ADJACENT) EXIST. EASEMENT LINE EXIST. OVERHEAD UTILITY AND UTILITY POLE EXIST. GUY WIRE AND UTILITY POLEGUY EXIST. WATER LINE EXIST. SANITARY SEWER LINE EXIST. GAS LINE EXIST. TELEPHONE LINE EXIST. WIRE FENCE LINE EXIST. PIPE PROPOSED EASEMENT LINE PROPOSED SETBACK LINE PROPOSED 24" CONCRETE CURB & GUTTER PROPOSED 12" FLUSH CURB EXIST. POWER POLE EXIST. ASPHALT PAVING EXIST. GRAVEL PROPOSED LIGHT DUTY ASPHALT PROPOSED LIGHT DUTYCONCRETE (BROOM FINISH) PROPOSED HEAVY DUTY CONCRETE (BROOM FINISH) EXIST. 1 FOOT CONTOUR104 105 EXIST. 5 FOOT CONTOUR EXIST. GRADE SPOT ELEVATION PROPOSED 1 FOOT CONTOUR PROPOSED 5 FOOT CONTOUR 104 105 FINISHED GRADE ELEVATION (TOP OF CURB) FINISHED GRADE ELEVATION DRAINAGE DIRECTION PROPOSED RIP RAP W/ FILTER BLANKET LEGEND BENCHMARK CAPPED REBAR FOUND(KOUNTZ) CAPPED REBAR FOUND(MOORE) CAPPED REBAR FOUND(HMR) CAPPED REBAR FOUND(CA 0092LS) RAILROAD SPIKE FOUND CRIMP TOP PIPE FOUND CAPPED REBAR SET(WATTIER) 1/2" REBAR FOUND PP PP o o o o o o EXIST. CHAINLINK FENCE LINE EXIST. LIVE OAK TREE EXIST. OAK TREE EXIST. PINE TREE EXIST. PECAN TREE EXIST. MAGNOLIA TREE EXIST. CAMPHOR TREE EXIST. MAPLE TREE EXIST. SWEETGUM TREE EXIST. CHERRY TREE EXIST. POPCORN TREE EXIST. UNKNOWN TREE DRAINAGE PLANSLR/WMG MAR 2023 1642.20HILL TOP SUBDIVISION PH 2TWO HANDS DESIGN & DEVELOPMENT, LLCAPPR.DATEREVISIONNO.2-17-2020CITY COMMENT1208 N. Greeno Road, Ste. CFairhope, Alabama 36532P.O. Box 1929Fairhope, Alabama 36533Phone: (251) 928-3443jadengineers.com (AL) CA-3157-E1-17-2022SSMH REVISIONS21-21-2022IFC33-23-2023ASBUILT4C9 1" = 40' ( IN FEET ) 0 1 inch = ft. GRAPHIC SCALE 4040 40 NOTES: 1. THE CONTRACTOR SHALL PROTECT AND MAINTAIN ANY EXISTING SLOPES AND INFRASTRUCTURES ON THE SITE ( I.E. PONDS, INLETS, ETC.). 2. AFTER THE STORM DRAIN SYSTEM AND SANITARY SEWER SYSTEM IS COMPLETED THE CONTRACTOR SHALL VIDEO THESE SYSTEMS AND SUBMIT VIDEO TO THE ENGINEER OF RECORD FOR REVIEW. 3. THE CONTRACTOR SHALL MAINTAIN ACCESS TO THE SITE FOR THE DURATION OF THE PROJECT. 4. ALL EARTHWORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH GEOTECHNICAL RECOMMENDATIONS. 5. ALL CONDUIT LOCATIONS FOR POWER, TELEPHONE, AND CABLE SHALL BE COORDINATED WITH ARCHITECTURAL PLANS AND LOCAL UTILITY PROVIDERS. 1. MANHOLE STEPS SHALL BE PROVIDED FOR ALL STRUCTURES OVER 4' DEEP. DRAINAGE NOTE: SOIL NOTE: NO RED SOIL OR CLAY IS ALLOWED IN POND CONSTRUCTION LOW IMPACT DEVELOPMENT TECHNIQUES: THE FOLLOWING IS A LIST OF THE LOW IMPACT DEVELOPMENT TECHNIQUES APPLIED IN THE CONSTRUCTION OF HILL TOP SUBDIVISION: 1. WET BASIN 2. SAND FILTER 3. GRASS SWALES 4. GRASS BUFFERS 5. IN-LINE STORMWATER STORAGE 6. SITE DESIGN FOR HABITAT 7. GREENWAYS 8. BIO-RETENTION 9. LEVEL SPREADER BONNER, BOBBIE J. C/0 CROWN CASTLE INC. 4017 WASHINGTON ROAO MCMURRAY, PA 15317 UNZO ---·' ✓~-/ -,J11 '° '~~:;::. "IO ~;l·f ~l " ~~A :I } )~1: 7 • • ,.. / 12 • : • •1 12· _ I Jr "f.'. / 1 . ) 1 i / 1;, // • l 11 I &I 15"" ,~-)6 14"" /0 ·I • / / I // • 14 13" /~I-_ I/ I 13 ... j I I • •• 1-/2"" /. • 12"" I .... / / \ \ / 12. I I 12• "] I I ... -/ • j 12 ,/,,,. A 15_ I ,_ . ----_]& RECORD DRAWING -c- ~ CRF(1) CRF(2) CRF(3) CRF(4) RRSF RBF CTF CRS -----u---- f-------0,--- SURVEY PROVIDED BY: WA1TIER SURVEYING, INC. PROFESSIONAL LAND SURVEYORS 4321 Downtowner Loop N., Suite 201 251-342-2640 Mobile, Alobomo 36609 fox 251 -342 -2648 JOB NO: SCALE: DATE: DRAFTER: SHEET: