HomeMy WebLinkAbout08-01-2022 Planning Commission Agenda PacketJuly 7, 2022 Planning Commission Minutes 1 The Planning Commission met Thursday, July 7, 2022, at 5:00 PM at the City Municipal Complex, 161 N. Section Street in the Council Chambers. Present: Lee Turner, Chairman; Rebecca Bryant, Vice-Chair; Art Dyas; Harry Kohler; John Worsham; Hollie MacKellar; Corey Martin, City Council Liaison; Hunter Simmons, Planning and Zoning Manager; Mike Jeffries, Development Services Manager; Casey Potts, City Planner; Michelle Melton, City Planner; Allie Knutson, Secretary; and Chris Williams, City Attorney. Absent: Clarice Hall-Black Chairman Turner called the meeting to order at 5:02 PM. Approval of the Minutes from June 6, 2022, Meeting: Allie Knutson, Secretary, noted that the minutes had been amended to reflect a misspelling of Attorney McDill’s name during the Public Hearing for case SD 21.51. John Worsham made a motion to accept the minutes as corrected with no further changes and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, Art Dyas, Harry Kohler, John Worsham, Corey Martin, and Hollie MacKellar. NAY: None. UR 22.06 Request of AT&T for an 11.52.11 Utility Review and approval of the proposed underground installation of approximately 3,274 LF of buried fiber cable in the ROW and 12,645 LF of overlashed aerial fiber to existing support strands beginning at 435 Liberty Street. Summary: Hunter Simmons, Planning and Zoning Manager, presented the case summary, stating that there are six utility review cases on the agenda and all of the comments in UR 22.06 apply to the other utility review cases as well. He also showed a map of the proposed installation. Recommendation: Staff recommends approval of UR 22.06 subject to the following conditions: 1. A pre-construction meeting shall be held with the City prior to issuance of any permits. 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. a. An additional right-of-way permit may be required for the potholing procedures. 4. Follow-up activities below required by staff and the applicant: a. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. 5. Provide draft door hanger for approval at time of pre-construction. July 7, 2022 Planning Commission Minutes 2 6. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. 7. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 8. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 9. Utilities boxes shall be concentrated near existing boxes. 10. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, unless otherwise required by the Fairhope Building Department. Chairman Turner stated that this is not a public hearing but asked if anyone from the public had any questions about 11.52.11 cases. No questions were asked. Harry Kohler mentioned that above ground utility boxes are not as attractive as underground utility boxes and asked if either could be required. Mr. Simmons stated that each company has different types, the utility boxes that are feeding the houses are subsurface. Some will be above ground but those are sparser, and fiber is handled with cabinets. Motion: John Worsham made a motion to approve Case SR 22.06, subject to staff recommendations. Harry Kohler seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, Art Dyas, Harry Kohler, John Worsham, Hollie MacKellar, and Corey Martin. NAY: None. UR 22.07 Request of AT&T for an 11.52.11 Utility Review and approval of the proposed underground installation of approximately 11,377 LF of buried fiber cable in the ROW and 9,215 LF of overlashed aerial fiber to existing support strands beginning at 755 Fairhope Avenue. Summary: Hunter Simmons, Planning and Zoning Manager, presented the case summary and showed a map of the proposed installation south of Gayfer Avenue, around North Ingleside Street and Edwards Avenue. Recommendation: Staff recommends approval of UR 22.07 subject to the following conditions: 1. A pre-construction meeting shall be held with the City prior to issuance of any permits. 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. a. An additional right-of-way permit may be required for the potholing procedures. 4. Follow-up activities below required by staff and the applicant: a. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. 5. Provide draft door hanger for approval at time of pre-construction. July 7, 2022 Planning Commission Minutes 3 6. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. 7. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 8. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 9. Utilities boxes shall be concentrated near existing boxes. 10. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, unless otherwise required by the Fairhope Building Department. Motion: Art Dyas made a motion to approve Case UR 22.07, subject to staff recommendations. Harry Kohler seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, Art Dyas, Harry Kohler, John Worsham, Hollie MacKellar, and Corey Martin. NAY: None. UR 22.08 Request of AT&T for an 11.52.11 Utility Review and approval of the proposed underground installation of approximately 4,268 LF of buried fiber cable in the ROW and 4,848 LF of overlashed aerial fiber cable beginning at 498 Nichols Avenue. Summary: Hunter Simmons, Planning and Zoning Manager, presented the case summary and showed a map of the proposed installation south of Nichols Avenue between Mershon Street and Section Street. Recommendation: 1. A pre-construction meeting shall be held with the City prior to issuance of any permits. 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. a. An additional right-of-way permit may be required for the potholing procedures. 4. Follow-up activities below required by staff and the applicant: a. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. 5. Provide draft door hanger for approval at time of pre-construction. 6. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. 7. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 8. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 9. Utilities boxes shall be concentrated near existing boxes. 10. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, July 7, 2022 Planning Commission Minutes 4 unless otherwise required by the Fairhope Building Department. Motion: John Worsham made a motion to approve Case UR 22.08, subject to staff recommendations. Harry Kohler seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, Art Dyas, Harry Kohler, John Worsham, Hollie MacKellar, and Corey Martin. NAY: None. UR 22.09 Request of AT&T for an 11.52.11 Utility Review and approval of the proposed underground installation of approximately 10,685 LF of buried fiber cable in the ROW and 15,443 LF of overlashed aerial fiber cable beginning at 405 Forester Avenue. Summary: Hunter Simmons, Planning and Zoning Manager, presented the case summary and showed a map of the proposed installation around Triangle Drive and North Section Street. Recommendation: 1. A pre-construction meeting shall be held with the City prior to issuance of any permits. 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. a. An additional right-of-way permit may be required for the potholing procedures. 4. Follow-up activities below required by staff and the applicant: a. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. 5. Provide draft door hanger for approval at time of pre-construction. 6. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. 7. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 8. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 9. Utilities boxes shall be concentrated near existing boxes. 10. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, unless otherwise required by the Fairhope Building Department. Motion: Corey Martin made a motion to approve UR 22.09, subject to staff recommendations. Harry Kohler seconded the motion and the motion carried unanimously with the following vote: July 7, 2022 Planning Commission Minutes 5 AYE: Lee Turner, Rebecca Bryant, Art Dyas, Harry Kohler, John Worsham, Hollie MacKellar, and Corey Martin. NAY: None. UR 22.10 Request of Point Broadband for an 11.52.11 Utility Review and approval of the proposed underground installation of approximately 36,039 LF of buried fiber cable in the ROW beginning at 407 Volanta Avenue. Summary: Hunter Simmons, Planning and Zoning Manager, presented the case summary and showed a map of the proposed installation around Willow Lake Drive and Volanta Avenue. Recommendation: 1. A pre-construction meeting shall be held with the City prior to issuance of any permits. 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. a. An additional right-of-way permit may be required for the potholing procedures. 4. Follow-up activities below required by staff and the applicant: a. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. 5. Provide draft door hanger for approval at time of pre-construction. 6. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. 7. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 8. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 9. Utilities boxes shall be concentrated near existing boxes. 10. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, unless otherwise required by the Fairhope Building Department. Motion: Art Dyas made a motion to approve Case UR 22.10, subject to staff recommendations. Corey Martin seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, Art Dyas, Harry Kohler, John Worsham, Hollie MacKellar, and Corey Martin. NAY: None. July 7, 2022 Planning Commission Minutes 6 UR 22.11 Request of Point Broadband for an 11.52.11 Utility Review and approval of the proposed underground installation of approximately 44,687 LF of buried fiber cable in the ROW beginning at 531 Gayfer Avenue. Summary: Hunter Simmons, Planning and Zoning Manager, presented the case summary and showed a map of the proposed installation from the west side of Gayfer Avenue to North Mobile Street. Recommendation: 1. A pre-construction meeting shall be held with the City prior to issuance of any permits. 2. Consultation with the City’s horticulturalist, to determine if the required depth of bore must be increased so that no trees are impacted by the project. The contractor is responsible for any damaged trees. 3. At all street crossing locations, conduct potholing to determine exact location and elevation of existing utilities. Reflect the exact elevation of utilities and GPS coordinates of the pothole locations on a set of as-built drawings. a. An additional right-of-way permit may be required for the potholing procedures. 4. Follow-up activities below required by staff and the applicant: a. Upon satisfactory review and approval by ROW Construction Inspector, as-builts will be submitted to the mapping technician for inclusion in GIS utility maps as needed. 5. Provide draft door hanger for approval at time of pre-construction. 6. Provide a Traffic Control Plan to ROW Inspector prior to commencement of any work. 7. Ensure enough space for proposed work is available within existing easement, if not applicant is responsible for either expanding existing easement or acquiring an additional easement. 8. Applicant shall contact Alabama One Call to locate all existing utilities (750ft max per day). 9. Utilities boxes shall be concentrated near existing boxes. 10. For permitting purposes, applicants shall provide subsurface utility engineering quality-level C, unless otherwise required by the Fairhope Building Department. Motion: John Worsham made a motion to approve Case UR 22.11, subject to staff recommendations. Harry Kohler seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, Art Dyas, Harry Kohler, John Worsham, Hollie MacKellar, and Corey Martin. NAY: None SR 22.06 Request of the Applicant, Lieb Engineering Company, acting on behalf of the Owner, WCTT Properties LLC, for Site Plan Approval of 309 Ingleside. The property is approximately 1.62 acres and is located on the northeast corner of S. Ingleside Street and Nichols Avenue. PPIN #: 25788 Summary: July 7, 2022 Planning Commission Minutes 7 Casey Potts, City Planner, presented the case summary, elevations and floor plans were shown. The subject property lies within the Medical Overlay District and there is a corresponding MOP case on the agenda as well (SD 22.20). Within the Medical Overlay District, the B-4 development standards and area and dimensional requirements apply. However, the recorded plat provides setbacks of 35’ front, 35’ rear, and 10’ side, meeting what is required. A building located in any commercial zone may have a height of 35’ if it contains both residential and commercial space. All other buildings have a maximum height of 30’. The materials of the townhomes are cementitious siding, board and batten siding, and shingles. The materials of the commercial buildings are brick veneer and aluminum canopies and garage doors. Right-of-way will be dedicated to the City of Fairhope along Nichols Avenue and revised landscape plans shall be provided to and approved by the City Horticulturist. As proposed by the applicant, there are eight townhomes, four mixed use office/residential units, one restaurant, and one office space. The applicant shall revise five parking spaces to be pervious. A sidewalk is proposed along the western and southern edges of the property and a crosswalk is proposed at the southwest corner across Ingleside. In any district where commercial use abuts a residential use, a fence of solid appearance shall be installed, thus, an 8’ privacy fence is shown at the north property line where residential abuts commercial use. Garbage is collected in a dumpster at the northwest corner of the property. The dumpster is screened by a wooden fence. All signs shall meet the City of Fairhope Sign Ordinance. The floorplans show a partition wall on the first floor of the western commercial building. The applicant has clarified that this is inaccurate and that there will be one restaurant unit on the first floor. Recommendation: Staff recommends conditional approval of Case SR 22.06, 309 South Ingleside, with the following conditions: 1. Revise five parking spaces in the site plan to be pervious spaces. 2. Revise landscape plans to account for right-of-way dedication and obtain approval from the City Horticulturist. Chris Lieb with Lieb Engineering Company was available for questions. Chairman Turner asked about the dumpster location in relation to the sidewalk. Mr. Lieb stated that the sidewalk intends to dead-end at the rear parking lot and does not continue to the north, but if it is desired to continue to the north, the extension of the sidewalk can go in the right-of- way to the property line. Rebecca Bryant asked about the lack of elevators being shown on the site plan. Mr. Simmons stated that this case is just to approve the site plan of what the building looks like. The plans will have to be revised between approval and time of permit based on occupancy and use. July 7, 2022 Planning Commission Minutes 8 Chairman Turner stated that he would rather see a natural buffer between the residential and commercial properties instead of a privacy fence. Mr. Simmons stated that the Tree Ordinance comes into play as well with three alternatives: a 20-foot landscape buffer, a double row of 6- foot hedges and/or a fence with a single row of 6-foot hedges. A fence is still required with the 20-foot landscape buffer unless they choose to do an additional row of hedges. Chairman Turner asked when a requirement for a sidewalk to go to the property line should be made between the Site Plan and MOP cases. Mr. Simmons replied that both cases should have that added condition. Hollie MacKellar asked what additional crosswalks were being considered. Mr. Simmons replied that they are evaluating where the sidewalks are for future connectivity. Motion: John Worsham made a motion to recommend approval of Case SR 22.06, to City Council, subject to staff recommendations plus an added condition: 1. Revise five parking spaces in the site plan to be pervious spaces. 2. Revise landscape plans to account for right-of-way dedication and obtain approval from the City Horticulturist. 3. The sidewalk shall extend the full length of the property along S. Ingleside Street. Art Dyas seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, Art Dyas, Harry Kohler, John Worsham, Hollie MacKellar, and Corey Martin. NAY: None SD 21.51 Public hearing to consider the request of the Applicant, Jade Consulting, LLC, on behalf of the Owner, D.R. Horton, Inc., for Preliminary Plat Approval of Lone Oak Farms Subdivision, an 82-lot Major Subdivision. The property is approximately 57.72 acres and is located on the northeast corner of Pierce Road and County Road 32. PPIN #: 17050 Summary: Attorney Chris Williams recused himself for the duration of the hearing for Case SD 21.51. Mike Jeffries, Development Services Manager, presented the case summary. This project was tabled at last month’s Planning Commission Meeting in order to gather additional information such as a third-party drainage review and to have discussions with Baldwin County. To recap what was presented at the previous meeting, extensive water upgrades will be required to service the proposed development. Costs and installation of the required upgrades are the responsibility of the developer and will be evaluated by the Water Department at time of construction. A traffic study was conducted with no improvements being recommended at this time. Landscaping requirements were met. The note on lot 82 “FUTURE PHASE 2 AREA” needs to be removed, resubdivision of lot 82 may only occur if future mitigation of wetlands can July 7, 2022 Planning Commission Minutes 9 be accomplished and nothing within this review and/or a potential approval implies that lot 82 will be further subdivided. Sidewalks and street trees shall be installed prior to submittal of final plat application, the applicant has requested to not install sidewalks along CR32 and Pierce Road. A pre-construction meeting is required prior to issuance of building permits. The City contracted John Cameron, P.E. with Neel-Schaffer, Inc. to conduct a third-party drainage review. Mr. Cameron concluded that he did have concerns about “sending stormwater that previously flowed in one basin to another basin post development.” Mr. Cameron also acknowledged the applicant’s proposed design does not violate any Fairhope code that he is aware of. The City was informed that Pierce Road meets the County’s requirements for existing roadways and there are no planned drainage or roadway improvements by the County at that area. Baldwin County Highway Department will have the review authority at permitting and may require drainage or roadway improvements at that time. Recommendation: Staff recommends approval SD 21.51 Lone Oak Farms preliminary plat with the following conditions: 1. Remove “FUTURE PHASE 2 AREA” from lot 82. 2. Drainage infrastructure in lot 82 needs to be included in COMMON AREA 1. 3. Add blanket utility/drainage easement to all common areas. 4. Add minimum lot width and area to Site Data Table. 5. Add sidewalk easement along the ROWs of CR 32 and Pierce Road. 6. Developer is responsible for the construction of, and all costs associated with, all off-site water service upgrades determined necessary by the City of Fairhope Water Department. 7. Prior to issuance of any building permit the final construction documents for the water upgrades shall be approved by the City of Fairhope Water Department. 8. All water upgrades shall be installed prior to submittal of Final Plat application. 9. Any drainage or roadway improvements required by Baldwin County shall be completed prior to application for final plat. Chairman Turner was in favor of having sidewalks installed on pierce Road for future connectivity. Art Dyas asked if the subdivision, as proposed, met the Subdivision Regulations. Mr. Jeffries stated that it does. Mr. Dyas suggested setting the easement, but also having developers pay into a fund to put in sidewalks where they don’t currently exist. Trey Jinright, Jade Consulting, requested that he respond to any comments or questions after the public hearing is closed. Chairman Turner stated that he had not planned to have a public hearing as one had been had at the previous meeting, but staff advertised a public hearing for this case on the agenda. Chairman Turner opened the public hearing, requesting that citizens not repeat comments that were made at the last meeting. July 7, 2022 Planning Commission Minutes 10 Ken Underwood, 14715 Oak Street, Magnolia Springs, AL 36555, spoke regarding the drainage review conducted by John Cameron. Two drawings were submitted, one depicting the pre- project drainage and one depicting the post-project drainage. Pre-project, a total of 21.21 acres drained into the detention pond at the northeast corner of the property. With the revised drawing, it was increased to 31.626 acres, a 49.1% increase in total area that is discharging into the grady pond with no outlet. When this pond gets to a certain level, it flows across a field to the east, then to the southeast, then flows across four residential lots. One of the homes had been flooded three times in the past. It will be disastrous to the farmland. Jessica McDill stated that she is the Attorney representing Sonny Hill Farms and presented slides she had prepared. She spoke of applicability of State Law to Planning Commissions pertaining to surface water drainage and referenced Art. V.B.2.d. from Fairhope’s Subdivision Regulations and Kay-Noojin Development Co. v. Hackett, 45 So. 2d 792 (ala. 1950), that had been sent to the Commissioners prior to the meeting. She also mentioned that this case should be evaluated by whichever standard is higher between the City and the County and referenced 5.11.2, Design System Standards, from Baldwin County’s Subdivision Regulations, stating that drainage rights must be secured by the applicant and indicated on the Final Plat if water is being diverted into an unnatural water system or on to private land adjacent to the subdivision. Ms. McDill also referenced Art. V.9.c. regarding off premises drainage easements possibly requiring the Owner to handle runoff into a natural drainage channel. The lower land is being forced to absorb the 49.1% increase of water and the Applicant has not secured drainage easements from the property owners. The revised plan does not comply with express regulations and applicable law and violates the Fairhope Subdivision Regulations. Ms. McDill also spoke with the County regarding the width and condition of Pierce Road. Pierce Road does not meet the minimum standards and is a prescriptive right-of-way. 8 lots will have direct access to Pierce Road, but there are no plans to improve the road. A photo was shown of the ditches on the west side of Pierce Road after it had rained on July 5, 2022, and of school traffic on Highway 32. Ms. McDill requested that the case be denied. Herb McKee, 211 Park Drive, stated that he owns farmland east of the proposed project and was concerned that the excess water from the subdivision will destroy farmland and crops. Arthur Hartshorn, 11293 CR 32, stated that he owns 30 acres of farmland and believes that the proposed subdivision will flood properties and farmland. He has seen his neighbors deal with the existing flooding under normal conditions. Curtis Pilot, owner of Sonny Hill Farms on County Road 32, stated that he is concerned with the lack of sidewalks proposed on County Road 32. There is a group of bicyclists that ride on Pierce Road, and he would like sidewalks to be reconsidered as Pierce Road is not wide enough. Chairman Turner closed the Public Hearing and asked Mr. Jinright to address the comments. Mr. Jinright stated that he agrees with the nine conditions recommended by staff. The property moves water in four directions, all directions have been modeled and have been looked at to reduce flows. For the two-year storm, 25.5% less flow is being released then pre-development. The water leaves the pond, hits a level-spreader, enters a wetland area which is a Waters of the US, travels down a blueline stream through the properties that were discussed, under the double July 7, 2022 Planning Commission Minutes 11 culverts on County Road 32 and heads south towards Fish River. A ten-year storm provides 26% reduction in flow, twenty five-year storm provides 17% reduction, and a one-hundred-year storm provides 3% reduction in flow. Councilman Martin asked Mr. Jinright if he was stating that there would be no adverse effects on patrons who would reside downstream of the proposed development. Mr. Jinright stated that is correct because they model larger than just the project per the Subdivision Regulations. Councilman Martin asked if it was correct that before the runoff gets to Fish River and passes through several properties, it do no harm to those properties. Mr. Jinright stated yes, the project would be releasing less water post-development than it does now at pre-development. Art Dyas stated that the adjacent property owners already have problems and wanted to clarify that Mr. Jinright is stating that the project will not make the existing problems worse. Mr. Jinright stated that was correct. Art Dyas stated that many of the culverts were put in 75-80 years ago and the County does not want to be apart of the problem. Rebecca Bryant stated that it is not the developer’s responsibility to fix existing problems, but it is known that the problem is not going to be fixed by the County or another responsible party, and that maybe development should not be allowed there if the problem is going to persist. Councilman Martin stated that he was not sure how feasible staff’s condition #9 was because the County has not addressed known problems. Mr. Simmons wanted to clarify one statement on that condition, the County used to send the City comments to be reviewed. With new state bills, Baldwin County now has the ability to review cases as well, but City staff cannot interpret regulations for Baldwin County. Under new laws, Baldwin County has full power to review this case and intends to do so pursuant to their regulations. Rebecca Bryant stated that at this time, there is no assurance from the County that the road or the drainage will be improved. Hollie MacKellar asked what the sewage capabilities were and had concerns about the infrastructure. Mr. Simmons stated that it connects to Baldwin County Sewage, so he was not entirely sure. Mr. Jinright stated that they are not just adding 82 lots, they are also adding a massive amount of infrastructure on site. It should improve the current situation by releasing less flow on the properties downstream. The City has a massive water system improvement project in this area, but this project is fully funding, designing, and constructing a 12-inch watermain that is one mile long. The current line is not dependable for fire protection. Regarding sewer, the site will also have a pump station with gravity sewer. Chairman Turner asked if the traffic study called for any kind of improvements like a blinking light as a lot of accidents have happened on Danne Road. Mr. Jinright stated that this case is also being reviewed by the County. Fairhope’s Planning Commission’s decision is one of the items that the County is waiting on to finish their review including stormwater and traffic issues. At this point, traffic improvements are not warranted. Baldwin County Highway standards require a minimum of 18-feet of asphalt and a 2-foot grass shoulder. Pierce Road is 19-20-feet of pavement. Councilman Martin asked where they got their numbers in the traffic study and if they included any other developments in the area. Mr. Jinright stated the numbers were obtained from traffic counts. Mr. Simmons stated that during their review, Baldwin County Highway Department has an opportunity on the front end to require Applicants to look beyond the intersections that directly relate to the project. Mr. Jinright stated that he did not do the study, so July 7, 2022 Planning Commission Minutes 12 he does not know if Baldwin County asked for other intersections to be looked at, but Pierce Road is a dead end and just past this project, the road turns to a single-lane road. A citizen mentioned that this subdivision’s streets will be used as access to County Road 32. Mr. Simmons replied that the County has recognized that the proposed subdivision will give secondary access to those who reside on Pierce Road when it is flooding. Chairman Turner stated that this project seems to meet the Subdivision Regulations but thinks that sidewalks should be required on Pierce Road. Rebecca Bryant had concerns about the sidewalks encroaching on the wetlands that are part of the drainage capacity for the site. Motion: John Worsham made a motion to approve Case SD 21.51, subject to staff conditions plus an added condition: 1. Remove “FUTURE PHASE 2 AREA” from lot 82. 2. Drainage infrastructure in lot 82 needs to be included in COMMON AREA 1. 3. Add blanket utility/drainage easement to all common areas. 4. Add minimum lot width and area to Site Data Table. 5. Add sidewalk easement along the ROWs of CR 32 and Pierce Road. 6. Developer is responsible for the construction of, and all costs associated with, all off-site water service upgrades determined necessary by the City of Fairhope Water Department. 7. Prior to issuance of any building permit the final construction documents for the water upgrades shall be approved by the City of Fairhope Water Department. 8. All water upgrades shall be installed prior to submittal of Final Plat application. 9. Any drainage or roadway improvements required by Baldwin County shall be completed prior to application for final plat. 10. Sidewalks must be installed along Pierce Road either in the right-of-way or in an easement. Art Dyas seconded the motion and the motion carried with the following vote: AYE: Lee Turner, Art Dyas, John Worsham, and Hollie MacKellar. NAY: Harry Kohler, Rebecca Bryant, and Corey Martin. A brief intermission was taken. SD 22.20 Public hearing to consider the request of the Applicant, Lieb Engineering Company, acting on behalf of the Owner, WCTT Properties LLC, for Preliminary Approval of 309 Ingleside, a 14-unit Multiple Occupancy Project. The property is approximately 1.62 acres and is located on the northeast corner of S. Ingleside Street and Nichols Avenue. PPIN #: 25788 Summary: Casey Potts, City Planner, presented the case summary. Commissioners previously reviewed and recommended approval of the Site Plan application for this project. July 7, 2022 Planning Commission Minutes 13 A 16” water main exists along Ingleside. Two 8” water lines will run from the 16” main and service the buildings on site. Water meters shall be placed together and located to avoid disturbance with protected trees. Sewer will gravity feed to sanitary sewer manholes west of the townhomes and south of the commercial buildings. Power runs along the western and southern borders of the property. Three transformers will be placed on site, but load information is required. Gas is available and the restaurant unit will utilize gas. Gas line from the ROW to th e building shall be placed to avoid disturbance with protected trees. Communications will be through AT&T. Trash pickup will be private via a trash dumpster located near the northwest corner of the building and is screened and gated. A traffic study was not triggered for this project. Stormwater is collected in underground pipes and carried to an underwater detention pond located at the middle of the property to discharge to an existing stormwater structure along the west side of Ingleside. A drainage easement will be required before permitting. A 20’ landscape strip is provided along Nichols Avenue. Landscape plans have not been updated to reflect the dedication of right-of-way along Nichols Avenue. Revised landscape plans shall be submitted to and approved by the City Horticulturist. Fifteen percent of the site is greenspace, exceeding the 10% required for a commercial MOP. Recommendation: Staff recommends approval of SD 22.20, subject to the following conditions: 1. Approval of SR 22.06 by the Fairhope City Council. 2. Work with respective utility and planning departments regarding ingress/egress, utility, and drainage easements and show on the Lot Plan and plat. 3. All utilities shall be approved by the respective utility department prior to submitting for building permit. 4. Add a note to the site plan that the mixed-use building shall be restricted from short term rentals. 5. Provide documentation regarding the maintenance responsibilities of the common area. 6. Provide a copy of the covenants and restrictions. 7. Recording of a plat will be required, showing the right-of-way dedication, easements, and all lots. 8. O&M shall be recorded with the Baldwin County Probate. 9. Provide paperwork for Nichols Avenue right-of-way dedication. 10. Provide revised landscape plans for review and approval by the City Horticulturist. 11. Erosion and Sediment Control Plan shall say the construction entrance will be 20’x50’. Chairman Turner opened the Public Hearing. Gary Gover, 300 Lincoln Street, mentioned that the site had significant historical structures and hoped for further investigation and memorialization of the history. Chairman Turner closed the Public Hearing. Winston Smith addressed Mr. Gover’s comment by saying that he and Councilman Martin had met several times and he had also met with someone from the Historical Commission. A house mover has also looked at the house, but it is not feasible to move it. Other ideas to memorialize the history include naming of the park, a monument, a fountain, or artwork. Councilman martin July 7, 2022 Planning Commission Minutes 14 stated that the property will be recognized as “historical” by the state and will be presented to be recognized on a national level. The family of Nancy Lewis will provide photos for the preservation piece at the state and national level. While there is no legal sustenance to preserve the house, the applicants and developers have been working with the family to put a memorial on site. Mrs. Potts reminded Commissioners that there was a condition of approval added to the Site Plan Review regarding sidewalks that may be worth considering for the approval of the MOP. Rebecca Bryant had a suggestion to save money and reduce the size of the drainage bank by increasing the amount of pervious parking if the soils are right. Motion: Art Dyas made a motion to approve Case SD 22.20, subject to staff recommendations plus two added conditions: 1. Approval of SR 22.06 by the Fairhope City Council. 2. Work with respective utility and planning departments regarding ingress/egress, utility, and drainage easements and show on the Lot Plan and plat. 3. All utilities shall be approved by the respective utility department prior to submitting for building permit. 4. Add a note to the site plan that the mixed-use building shall be restricted from short term rentals. 5. Provide documentation regarding the maintenance responsibilities of the common area. 6. Provide a copy of the covenants and restrictions. 7. Recording of a plat will be required, showing the right-of-way dedication, easements, and all lots. 8. O&M shall be recorded with the Baldwin County Probate. 9. Provide paperwork for Nichols Avenue right-of-way dedication. 10. Provide revised landscape plans for review and approval by the City Horticulturist. 11. Erosion and Sediment Control Plan shall say the construction entrance will be 20’x50’. 12. The sidewalk will extend the full length of the property along S. Ingleside Street. 13. A memorial will be placed upon the property. John Worsham seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, Art Dyas, Harry Kohler, John Worsham, Hollie MacKellar, and Corey Martin. NAY: None SD 22.22 Public hearing to consider the request of the Applicant, Sawgrass Consulting, LLC, acting on behalf of the Owner, Eastpark LLC, for Final Plat Approval of Parkstone Subdivision, a 41-lot Major Subdivision. The property is approximately 12.84 acres and is located on the east side of US Highway 98, north side of Parker Road, across from the Fairhope Publix. PPIN #: 32028 Summary: July 7, 2022 Planning Commission Minutes 15 Mike Jeffries, Development Services Manager, presented the case summary. Preliminary approval was granted in September of 2020. The property is zoned PUD with a site plan that was approved in December of 2019. The Site Data Table and Final Plat were shown on the screen. The approved landscape plans called for a 12’X12’ gazebo on the northern common area, walking trails through the common areas, and benches placed in common areas. The walking paths have been installed and are made of a rock/slag material. The applicant has requested the benches be installed once homes are constructed for fear of theft. Staff does have an invoice from Home Depot for the purchase of the benches. Due to a drainage inlet being installed in the wrong location, the applicant requested permission to shift lots 38 and 39 as the inlet had been placed in the middle of lot 38, preventing a driveway. The shift and slope of the land due to a detention pond made a walking path impracticable. The applicant provided a sketch of the alteration which included two additional pavilions and additional trees and flower beds, which staff supported. Currently, there is one small pavilion around lots 38 and 39 and one small pavilion where the gazebo was shown to go. On the As-Builts, the gazebo is described in detail as a 12’x12’ gazebo with a gable roof, rough sawn timber posts, beams, and rafters with a metal roof, but in its place currently is an open, wooden pavilion. The applicant was allowed to use existing infrastructure for this development. A final inspection was performed, and some outstanding items remain. At this time, the developer is requesting items 2, 3, and 5 be removed from the punch list. The road to the lift station is currently gravel and had areas of wash out and erosion. The applicant has lined a drainage swale with filter cloth and rip rap. Due to concerns of this not being a permanent fix, the City reserves the right to reinspect the road after six months and at the discretion of the Water and Sewer Superintendent, require a new solution which could include an asphalt or concrete drive to be installed in the easement to service the lift station at the developer’s expense. The drainage inlets have open tops and need safety grates installed. The applicant has agreed to complete this and must have them fabricated. An estimated time was not provided. The Punch List items listed as “incomplete” are as follows: 1. Provide invoice for missing chimney seal for existing manhole behind lot 31 2. Clean out the wet well 3. Install ¾ inch water service for lift station 4. Install safety grates on pond inlets 5. Install fence around lift station 6. Abandoned 6” sewer line from wet well headed northwest needs to be capped 7. Provide easement agreements for drainage easement across western adjacent property and reflect the recorded instrument # for the agreement on the plat 8. Install gazebo in northern common area per landscape plans 9. Install missing pavilion as shown on altered plans around lot 38&39 10. Provide copy of invoice for benches not installed in common areas The Applicant either requested to remove items number 2, 3, 5, 8, and 9, or is in disagreement with said items. July 7, 2022 Planning Commission Minutes 16 Recommendation: Staff recommends denial of Case SD 22.22 as it does not meet the preliminary landscape plans, there are several items that are incomplete and do not have a time frame for completion, and there are items that the developer desires to not complete. Chairman Turner asked why this case is being heard. Mr. Jeffries stated that there was pressure from the developer to get it on the agenda. Chairman Turner has never seen a Final Plat recommended for denial and asked if it were denied, would it go through Preliminary Approval again. Mr. Jeffries stated that if it were denied, the applicant could submit a new application for Final Plat Approval. Chairman Turner stated that with the lots being rearranged due to the drainage being installed in the incorrect spot, it does not meet the green space requirements. Rebecca Bryant added that they had required a walking trail to be installed, but now it has been altered to two dead end trails due to the shifting of the lots. Mr. Simmons stated that this was approved as a PUD and comments had been made regarding staff’s support of barely meeting green space requirements during that approval. Any Applicant can ask for Final Plat Approval and risk all of the costs of development to end up getting denied. Tom Granger, Sawgrass Consulting, addressed the items that were requested to be removed from the punch list. Item 2, “Clean out the wet well”, was done in April due to a preliminary inspection. Mr. Granger requested that they not have to do it again. Item 3, “Install ¾ inch water service for lift station”, the Owner is willing to put the line in, but needs some direction on where it goes. If the City is willing to do the tap, the service line can be installed. Item 5, “Install fence around lift station”, they have reached out to Fairhope Water and Sewer, but have not been able to coordinate a time to meet. Standards require a 50’x50’ fence around a lift station, but this is an existing lift station, a 50’x50’ fence cannot be put around this structure. The Owner did not request that this item be taken off but needs direction on how it should be oriented. There were issues with the landscape plans as he did not coordinate with the Landscape Architect very well. Chairman Turner asked if Mr. Granger would like to hold this case over for 30 days till the next Planning Commission Meeting. Art Dyas agreed with Chairman Turner’s idea to hold the case over. Matt Sankey stated that they did not refuse to put in the gazebo. He had met with staff when the walking trail was moved, and a long list of items were compiled to improve the landscape plan. He had suggested to remove the gazebo, but the plans that came from Mr. Granger did not reflect that. His understanding was that they would build two gazebos, add additional plantings, and change the material of the walkway. There was some confusion with Mr. Jeffries because the As-Builts were inaccurate. Art Dyas stated that it sounds like an issue between he and Mr. Granger, not with staff. Councilman Martin asked Mr. Sankey is he would be able to address the greenspace issue within thirty days. Mr. Sankey replied that they would be able to. Mr. Simmons stated that he had administratively approved the walking trail to be broken up. Chairman Turner opened the public hearing. Gary Gover, 300 Lincoln Street, was concerned about connectivity in the North Fairhope village center and if what is existing is safe enough for pedestrian/bike travel, specifically across Parker Road. Connectivity is needed to footpath along N. Greeno Road towards Rock Creek. Mr. Jeffries responded that there is a crosswalk from the proposed subdivision to the other side of July 7, 2022 Planning Commission Minutes 17 Parker Road with a sidewalk towards Publix and a sidewalk toward Greeno Road and heading north. Chairman Turner closed the public hearing. Motion: Art Dyas made a motion to table Case SD 22.22 to be heard at the next Planning Commission Meeting, less than 30 days away. John Worsham seconded the motion and the motion carried with the following vote: AYE: Lee Turner, Art Dyas, Harry Kohler, and John Worsham. NAY: Rebecca Bryant, Hollie MacKellar, and Corey Martin. SD 22.23 Public hearing to consider the request of the Applicant, Mullins, LLC, acting on behalf of the Owner, Lennar Homes of Alabama, LLC, for Final Plat Approval of Live Oak Estates, a 76-lot Major Subdivision. The property is approximately 33.66 acres and is located at the southwest corner of State Highway 181 and Bay Meadows Avenue. PPIN #: 15078 Summary: Mike Jeffries, Development Services Manager, presented the case summary. The map, aerial, final plat, and site data table were shown on the screen. The property is zoned PUD and has an approved site plan. The asphalt testing failed 7/17 core samples and does not meet the minimum standards. The applicant will be required to add a 1” overlayment of asphalt and supply new test reports to be approved by the Public Works Director. Bac-T tests need to be redone. Due to the recent drought conditions, the Fairhope Water Department has suspended doing the tests at this time. The applicant is coordinating with the Water Department to have this test performed as soon as possible. Common area trees and landscaping has been installed. The pond was proposed as a stocked pond for fishing but has not been stocked. Final plat must be recorded within 120 days after the date of final approval. Sidewalks and street trees not installed have a performance bond and performance bond agreement to be installed within two years. The engineer has provided his engineers certificate for the design and construction of the improvements constructed for the subdivision and shall sign the plat once the road deficiencies are corrected. Current walking trails are mowed paths, staff requests a more substantial primitive walking trail. The current owner is different from the one shown on the Baldwin County Parcel Viewer, staff will need confirmation that Lennar Homes of Alabama is the current owner. ALDOT has issued the permit and holds a performance bond for the work required to install a north bound left turn lane and do all necessary grading and drainage work. Follow‐Up Activities Required by Staff and the Applicant include a copy of the recorded plat, a copy of the recorded O&M Agreement, the Maintenance and Guaranty (M&G) Agreement executed by the developer - the mayor signs this agreement to fully execute it, (include the instrument # from the recorded plat and include 30 days in paragraph 3). July 7, 2022 Planning Commission Minutes 18 Recommendation: Staff recommends approval SD 22.23, Live Oak Estates Subdivision final plat, with the following conditions: 1. Apply a 1” overlayment of asphalt and supply new test reports to be approved by the Public Works Director. 2. Provide Bac-T tests reports to be reviewed and approved by the Water and Sewer Superintendent. 3. Add a future through street sign at Golden Leaf Ave and Hardwood Avenue. 4. Provide invoice confirming the pond has been stocked with fish. 5. Provide detail for primitive walking trail to be approved by the Planning Director. 6. Provide Subdivision Performance Bond and Signed Subdivision Performance Bond Agreement to be reviewed and approved by the Planning Director. 7. Confirmation of current owner * Conditions of approval shall be completed prior to the final plat recording (120 days). John Worsham asked if the Applicant had agreed to complete all of the items listed in staff’s conditions of approval. Mr. Simmons stated that if they don’t, the plat will not be signed. Mr. Jeffries gave details on the remaining items, they have agreed to do the overlayment, the Bac-T tests are on hold, they have agreed to the future through street sign, they have not agreed nor disagreed to the stocked pond, they have a walking trail, but staff does not feel that a mowed trail meets the intent. Art Dyas said “primitive” seems open-ended. Mr. Jeffries stated that the last subdivision had a rock/slag trail, they could also do a mulch path with a border. Rebecca Bryant asked about the letter that was received regarding the citizen who stated that they had water going under their house and that the silt fences were failing. Mr. Simmons stated that this issue has been monitored. Chairman Turner stated that the citizen is in the audience and can further explain during the public hearing. Joe Rector, Mullins, LLC, stated that Breland Homes was purchased by Lennar Homes with a transfer of land. The Owner has agreed to the conditions that staff has presented. Chairman Turner opened the Public Hearing. Wayne Hathorn, 19251 State Highway 181, was concerned with flooding problems he has been experiencing in the front and rear of his property. He stated that water is going under his house and a termite inspector advised him of increased moisture, he has had to put plywood over his vents. He requested that the drainage be looked at again before receiving approval. Julie Comer, 9551 Bay Meadows Avenue, wanted to know how a traffic study done at preliminary plat would apply now at final plat. She also wanted to know how to get sidewalks installed along Bay Meadows Avenue. Chairman Turner responded by saying that traffic studies are done prior to final plat. Final plat approval is ensuring that the subdivision was built as approved at preliminary. He also mentioned that Fairhope Single Tax is starting to build sidewalks on Windmill Road, they could be installed on Bay Meadows Avenue as well if neighbors were willing to pitch in if they want them there. July 7, 2022 Planning Commission Minutes 19 Chairman Turner closed the Public Hearing. Mr. Rector stated that their detention exceeds requirements and that discharge rates will be decreased once homes are built. Mr. Simmons added that the Engineer for this project, Todd Wheeler, could not make it to the meeting. Staff has photos of flooding before construction had started and that swales and inlets had been installed. Rebecca Bryant stated that the site is about 30-feet higher than Mr. Hathorn’s property at the corner of the site. Mr. Hathorn stated that all of the water from the site goes to the rear of his property, causing flooding and that the inlet is getting backed up. Mr. Rector stated that once there is a fully functioning subdivision, there should be less water leaving the site than before the subdivision was started. Art Dyas stated that they need to do remedial work. Chairman Turner suggested holding the case over for 30 days and having the engineer meet with Mr. Hathorn. Mr. Rector responded that there are millions of dollars invested in the project and that they have gone through the process to get the project approved while meeting all of the requirements. Chairman Turner stated that the Engineer for the project is not present, and he would like the Engineer to look at the site. Mr. Simmons stated that when he went to the site around nine months ago, the site was sheet flowing to Mr. Hathorn’s property. Today, the water that was sheet flowing to that property is now going to the detention pond. Chairman Turner suggested either approving the case with the condition that the Engineer meets with staff and Mr. Hathorn to ensure everything is working correctly or holding it over. Mr. Simmons agreed to meet. Attorney Chris Williams clarified that the condition would be to confirm that it was constructed according to the approved design and plans that have already been approved. Mr. Rector had no objection. Motion: Councilman Martin made a motion to approve Case SD 22.23, subject to staff conditions plus an added condition: 1. Apply a 1” overlayment of asphalt and supply new test reports to be approved by the Public Works Director. 2. Provide Bac-T tests reports to be reviewed and approved by the Water and Sewer Superintendent. 3. Add a future through street sign at Golden Leaf Ave and Hardwood Avenue. 4. Provide invoice confirming the pond has been stocked with fish. 5. Provide detail for primitive walking trail to be approved by the Planning Director. 6. Provide Subdivision Performance Bond and Signed Subdivision Performance Bond Agreement to be reviewed and approved by the Planning Director. 7. Confirmation of current owner. 8. Engineer of Mullins, LLC to meet with a staff member from the Planning Department and the owner of 19251 State Highway 181 to ensure that drainage is working as designed. John Worsham seconded the motion and the motion carried with the following vote: AYE: Lee Turner, Rebecca Bryant, Hollie MacKellar Art Dyas, Harry Kohler, John Worsham and Corey Martin. NAY: None. July 7, 2022 Planning Commission Minutes 20 SD 22.24 Public hearing to consider the request of the City of Fairhope Planning and Zoning Department to accept Resolution Number 2022-03 for a proposed amendment to add Appendix J, Amendments, in the City of Fairhope Subdivision Regulations. Summary: Mike Jeffries, Development Services Manager, presented the amendment summary. This amendment is to add Appendix J at the end of the Subdivision Regulations to show the previous amendments. Appendix J would include the date, the case, and a brief description of the amendment. Recommendation: Staff recommends approval of Case SD 22.24, Resolution Number 2022-03, for the proposed amendment. Chairman Turner opened the public hearing. Having no one present to speak, Chairman Turner closed the public hearing. Motion: Art Dyas made a motion to approve Case SD 22.24, accepting Resolution Number 2022-03, to approve the proposed amendment to the Subdivision Regulations. Rebecca Bryant seconded the motion and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, Hollie MacKellar Art Dyas, Harry Kohler, John Worsham and Corey Martin. NAY: None. Old/New Business Discussion of club house in The Flats at Easy Bay, SD 21.03. Hunter Simmons stated that the Flats at East Bay are what was approved as Carmel Park Flats, the apartments on Twin Beech. A condition of approval was that the improvements of the roundabout and the turn lanes shall be installed before they receive CO of occupied buildings. The turn lanes are already installed, but he is not sure what the timing of the roundabout will be. They have a club house there as part of the amenities and what their intent was within that condition is that no one will be occupying the apartments, it was not meant to include the club house. The developer is planning to use the club house for staging and as an office during construction. Mr. Simmons asked if any of the Commissioners had any objection with that interpretation of the condition. No one objected. Adjournment John Worsham made a motion to adjourn, and the motion carried unanimously with the following vote: AYE: Lee Turner, Rebecca Bryant, Art Dyas, Harry Kohler, John Worsham, Hollie MacKellar, and Corey Martin. NAY: None July 7, 2022 Planning Commission Minutes 21 Adjourned at 7:46 p.m. ____________________________ ________________________ Lee Turner, Chairman Allie Knutson, Secretary This digital package has been condensed for size and some documents may not contain all the original pages. All submittals were reviewed in full by staff in preparation for the reports prepared for the Planning Commission. S O U T H L A N D BLVD GARRISONBLVDGREENO RDMUSKET AV MCCLELLAN BLVDCRAFTSMANAVSHARPSBURG AVE PEMBERTONLOOPOLD BATTLES RD FLOURNOYWAY BONHAM LN ATWATERAV BARTLETT AV GARRISONBLVD KE MP E RLNGREENO RDWRIGHTBLVDPALE MOON CT BRIGITTEMITCHELL LN VIVIANLOOP GUARISCO LN MCARTHURLNSAGE LNCOUNTY RD 34 City of FairhopePlanning Commission August 1, 2022 ¯ CROSSOVEROLD BATTLES RD GREENO RDGREENO RDFLOURNOY WAY WRIGHT BLVDCOUNTY RD 34BRIGITTE MITCHELL LNZC 22.09 The Shops at Point Clear Legend RoadsParcelsCorporate Limits Zoning ClassificationPUD - Planned Unit DevelopmentPlanning Jurisdiction ^ Project Name: The Shops at Point Clear Site Data: 21.18 AcresProject Type: Cond. Annexation w/ Rezoning to B-2Jurisdiction: Fairhope Planning JurisdictionZoning District: UnzonedPPIN Number: 17515, 391379, 391372, 391373, 391374, 391375, 391376General Location: Northwest corner of Greeno Road and Old Battles RoadSurveyor of Record: Engineer of Record: Trey Jinright, Jade ConsultingOwner / Developer: RW Battles, LLCSchool District: Fairhope Elementary School Fairhope Middle and High Schools Recommendation: ApprovedPrepared by: Hunter Simmons µ µ 1 ZC 22.09 The Shops at Point Clear – August 1, 2022 Summary of Request: Applicant, Jade Consulting LLC, acting on behalf of the Owner, RW Battles LLC, is requesting to establish an initial zoning of B-2, General Business District, concurrent with conditional annexation into the City of Fairhope. The property is approximately 21.18 acres and is located on the northwest corner of Greeno Road and Old Battles Road. Comments: The subject property is currently outside the City of Fairhope’s municipal boundary and un-zoned. The subject property lies within the City of Fairhope’s permitting jurisdiction and a permit has been issued for the site. Construction has begun. The property to be annexed is generally located on the map below. A replat/common lot line move with the property to the north is in progress. The resulting lots will be contiguous with Fairhope Corporate Limits. The adjusted lot lines shall be recorded with Baldwin County Probate Office prior to adoption by the Fairhope City Council. This site is not within a commercial/village node within Fairhope’s current Comprehensive Plan. However, the City is currently in the process of updating its Comprehensive Plan and acknowledge the intersection of Greeno Rd and Old Battles Rd development pattern change since the last update and will need to be considered a future node at this intersection. If annexation and B-2 Zoning are approved, future uses for the outparcels shall meet the Fairhope Zoning Ordinance requirements. 2 ZC 22.09 The Shops at Point Clear – August 1, 2022 The outparcels were created via an Administrative Replat (City)/Common Lot Line Exemption (County). The Publix site received approval for a 16-unit Multiple Occupancy Project (Case SD 21.09) in 2021. Important to note, this is a straight re-zoning request and does not include a site plan for intended uses. Update: When this application was received the subject property was un-zoned, but within the City of Fairhope Planning Jurisdiction. On July 19, 2022, the Baldwin County Commission enacted zoning for Planning Districts 8 and 37. The subject property is now zoned B4 (Major Commercial District) as shown on the map below. The Zoning Ordinance defines B-2 General Business District as follows: “B-2 General Business District: This district is intended to provide opportunity for activities causing noise and heavy traffic, not considered compatible in the more restrictive business district. These uses also serve a regional as well as a local market and require location in proximity to major transportation routes. Recreational vehicle parks, very light production and processing activities are included.” Criteria – The application shall be reviewed based on the following criteria: (1)Compliance with the Comprehensive Plan; Response: Meets RSF-E 28 2' •F. 3 ZC 22.09 The Shops at Point Clear – August 1, 2022 (2)Compliance with the standards, goals, and intent of this ordinance; Response: Staff is appreciative of the application, which intends to annex into the City of Fairhope and fall under the City’s development guidelines. (3)The character of the surrounding property, including any pending development activity; Response: Meets (4)Adequacy of public infrastructure to support the proposed development; Response: This is a re-zoning request, without a Site Plan review. The subject property lies within the City’s permitting jurisdiction. Site Construction has begun. (5)Impacts on natural resources, including existing conditions and ongoing post-development conditions; Response: Construction was permitted through the City of Fairhope. (6)Compliance with other laws and regulations of the City; Response: At the time of any redevelopment all applicable laws of the City will be applied. If granted, any use within B-2 zoning will be allowed ‘by right’. (7)Compliance with other applicable laws and regulations of other jurisdictions; Response: At the time of a redevelopment all applicable laws will be applied. (8)Impacts on adjacent property including noise, traffic, visible intrusions, potential physical impacts, and property values; and, Response: Prior to application for annexation and rezoning, the subject property was reviewed as a Multiple Occupancy Project for Lot 5. That reviewed considered the above-mentioned impacts. Future development on outparcels may require further reviews, depending on the projects proposed on those parcels. (9)Impacts on the surrounding neighborhood including noise, traffic, visible intrusions, potential physical impacts, and property values. Response: Staff cannot not anticipate any significant issues relating to this criterion. Recommendation: Staff recommends Case ZC 22.09, The Shops at Point Clear, be approved for conditional annexation, with initial zoning of B-2 General Business District. RW BATTLES, LLC 418 Scott St., Montgomery, AL 36106 July 6, 2022 Mayor Sherry Sullivan City of Fairhope 555 South Section Street Fairhope, AL 36533 Re: Shops at Point Clear, Fairhope, AL Dear Mayor Sullivan: RW Battles, LLC is the corporate entity which is developing the 21-acre project known as the Shops at Point Clear. This development is located on the NWC of U.S. 98 (Greeno Road) and Old Battles Road. The Shops at Point Clear will consist of a new 48,387 square foot Publix Grocery Store as well as 18,800 square feet of new retailers and five (5) new outparcels. This is a development that should be very convenient to those living in the Point Clear area of Fairhope. Construction has been underway at the site since the Spring of 2021, and the project should open in October 2022. RW Battles, LLC is excited to bring this new retail project online for all those customers who were not served by a development such as this in the area. Some developers build a project and then sell it when it opens. However, RW Battles, LLC plans on keeping this project for years to come, and to operate it efficiently and maintain it as a Class-A center. A lot of money is being spent on landscaping this project. It should be a very attractive landscaping area of Fairhope. Many trees have been kept in different areas of the site and coupled with the new landscaping, the Shops at Point Clear should stand out to the citizens of Fairhope. Sincerely, RW Battles, LLC LEGAL DESCRIPTION    STATE OF ALABAMA  COUNTY OF BALDWIN    LOTS 1, 2, 3, 4, 5, 7 & 9, RW BATTLES LLC REPLAT, AMENDED PLAT, AS RECORDED ON SLIDES 2785 A‐C  OF THE RECORDS IN THE OFFICE OF THE JUDGE OF PROBATE, BALDWIN COUNTY, ALABAMA;      Revised 06/2006 U.S JUSTICE DEPARTMENT INFORMATION 0 Size of property (acres or square feet),_2_5_._o_a ___________ _ O If property is occupied, give number of housing units _O ________ _ O Number of Persons residing in each unit, and their race_O ________ _ 0 If property is unoccupied, give proposed use_M_O_P __________ _ D If property is being developed as a subdivision, give subdivision name D Number of lots within proposed subdivision ____________ _ I, N_ A, 1'L,\,+{-t!.Y-a Notary Public in and for said State and County, hereby certify that C!b1e L S-IA.,l i~M.P N whose name(s) is/are signed to the forgoing Petition and who is /are known to me, this day appeared before me and, being first duly sworn, acknowledge that he/she/they have voluntarily executed this Petition on this day same bears date. Given under my Hand and Seal this I f ~ay of J LJ y , 20~, ~. Nancy A. Butler ~ a A J. I}~. fr.Ii NOTARY PUBLIC • rt,,~ -(./.):(,A;;{,..U,'L,' :~~-· • ~% Muscogee County~ Georgia Notry Publi \~ . l'!r j My Commission Expires 't::~~1•./ MayS,2025 M · · • ~ /, "o"e: ··~ y comm1ss1on expires ~ , t?-,,.:J I, _____________ a Notary Public in and for said State and County, hereby certify that ____________ whose name(s) is lare signed to the forgoing Petition and who is/are known to me, this day appeared before me and, being first duly sworn, acknowledge that he/she/they have voluntarily executed this Petition on this day same bears date , Given under my Hand and Seal this ___ day of _____ , 20 __ , (Seal) Notary Public My commission expires _______ _ I, _____________ a Notary Public in and for said State and County, hereby certify that ____________ whose name(s) is/are signed to the forgoing Petition and who is/are known to me, this day appeared before me and, being first duly sworn, acknowledge that he/she/they have voluntarily executed this Petition on this day same bears date . Given under my Hand and Seal this ___ day of _____ , 20 __ , (Seal) Notary Public My commission expires _______ _ Backroom :Users :mray :Library :Ma1l :POP, i nl'n0,(,h,.rnrl""n ...,..-.ln':n ;e!RiJ:'4-:O n•t•Jf\..U:anV m k.-.v ~J;"U.' C:-;,11,"'"'"' rAr ,1,,,. o ,. m;n,.-"ltt 'li.-.h •P,..titinn rn-P' -'J"n ?'t ,.,,. ,-1 .,,. July 23,2022 Ms. Casey Potts Planner City of Fairhope 555 S. Section Street Fairhope, AL 36533 Re: Zoning Change, Greeno and Old Battles Roads Area Dear Ms. Potts: Thank you again for your assistance the other day. You provide excellent customer service. It is our understanding the Planning Commission will be considering a zoning change on August 1, 2022, for an area north of the Shoppes at Point Clear shopping center and east of the Old Battles Village subdivision. The change will allow for high density residential development, which potentially could mean the construction of apartment buildings. We also understand the zoning change was approved by the Baldwin County Commissioners; However, the zoning change is within the extraterritorial area of Fairhope for zoning and planning purposes. Our concerns are threefold: 1) Drainage. It is our understanding Truland Builders had to buy out the owners of five homes on Craftsman Avenue that have their backyards abutting Point Clear Creek due to flooding. We also understand that drainage issues on Point Clear Creek are a point of contention between the City of Fairhope and Baldwin County as to which entity bears responsibility for improvements. We suspect the construction of apartments and sizeable parking lots with resulting increases in runoff will only exacerbate the drainage problem. 2) Traffic. We think most homeowners in Old Battles Village are looking forward to the opening of the Shoppes at Point Clear. However, we are sure many of them have concerns about traffic congestion on Old Battles Road and the intersection of Old Battles and Greeno. 3) Property values. If the construction of high-density residences impacts drainage and traffic issues, it might impact property values adversely in Old Battles Village. Thank you for sharing our concerns with the Planning Commission. Sincerely, Terry and Judith Ullrich Terry and Judith Ullrich 229 Garrison Blvd. Fairhope, AL 36532 (504) 625-5809 tullri@bellsouth.net STATE OF ALABAMA DOMESTIC LIMITED LIABILITY COMPANY (LLC) CERTIFICATE OF FORMATION 1. THE NAME OF THE LIMITED LIABILITY COMPANY 3.THE NAME AND STREET (NO PO BOXES) ADDRESS OF THE REGISTERED AGENT LOCATED AT THE REGISTERED OFFICE (MUST BE LOCATED IN ALABAMA): MAILING ADDRESS IN ALABAMA OF REGISTERED OFFICE (IF DIFFERENT FROM STREET ADDRESS): 5. CHECK ONLY IF THE TYPE APPLIES TO THE LIMITED LIABILITY COMPANY BEING FORMED: 2. THIS FORM WAS PREPARED BY: 4. THE UNDERSIGNED CERTIFY THAT THERE IS AT LEAST ONE MEMBER OF THE LIMITED LIABILITY COMPANY. NON-PROFIT LLC NON-PROFIT SERIES LLC PROFESSIONAL SERIES LLC PROFESSIONAL LLC COMPLYING WITH TITLE 10A, CHAPTER 5A, ARTICLE 8 SERIES LLC COMPLYING WITH TITLE 10A, CHAPTER 5A, ARTICLE 11 (FOR COUNTY PROBATE OFFICE USE ONLY) (FOR SOS OFFICE USE ONLY) MONTGOMERY COUNTY, ALABAMA Probate Judge: J C LOVE, III Filed:06/25/2020 04:46 PM Total:$55.00 3 PAGES Certified Copy 5101469RW Battles, L.L.C. Ray W. Roark II Ray W Roark II 418 Scott Street Montgomery, AL 36106 MONTGOMERY AlabamaSec. Of State635-732 DLL06/25/202016:47:00$100.00$0.00 -------$100.00DateTimeFileExpTotal□ □ □ □ □ 6.THE UNDERSIGNED SPECIFY AS THE EFFECTIVE DATE AND THE TIME OF FILING ATTACHED ARE ANY OTHER MATTERS THE MEMBERS DETERMINE TO INCLUDE HEREIN 7.ORGANIZER(S) - OPTIONAL Not Applicable 06/25/2020 Ray W Roark II Manager/Member DATE ELECTRONIC SIGNATURE & TITLE 06/25/2020 16:41:40 □ John H. Merrill Secretary of State P.O. Box 5616 Montgomery, AL 36103-5616 I, John H. Merrill, Secretary of State of Alabama, having custody of the Great and Principal Seal of said State, do hereby certify that pursuant to the provisions of Title 10A, Chapter 1, Article 5, Code of Alabama 1975, and upon an examination of the entity records on file in this office, the following entity name is reserved as available: RW Battles, L.L.C. This name reservation is for the exclusive use of Ray W. Roark II, 418 Scott Street, Montgomery, AL 36104-0000 for a period of one year beginning September 05, 2019 and expiring September 05, 2020 In Testimony Whereof, I have hereunto set my hand and affixed the Great Seal of the State, at the Capitol, in the city of Montgomery, on this day. September 05, 2019 Date RES853686 John H. Merrill Secretary of State STATE OF ALABAMA N SECTION STNBANCROFTSTOAK AV PINE AV City of FairhopePlanning Commission August 1, 2022 ¯ OAK AV N SECTION STNBANCROFTSTSD 22.21 - 404 Oak Avenue MOP Legend RoadsCentral Business DistrictParcelsCorporate LimitsZoningDistrict Zoning ClassificationB-2 - General Business DistrictB-3a - Tourist Resort Lodging DistrictB-4 - Business and Professional DistrictP-1 - ParkingR-2 - Medium Density Single-FamilyPlanning Jurisdiction ^µ µ Project Name: 404 Oak AvenueSite Data: 0.18 acresProject Type: 4-Unit MOPJurisdiction: Fairhope Planning JurisdictionZoning District: B-4PPIN Number: 14546General Location: South side of Oak Street, between N. Section St & N. Bancroft StSurveyor of Record: Barton and Schumer EngineeringEngineer of Record: Barton and Schumer EngineeringOwner / Developer: 404 Oak LLCSchool District: Fairhope Elementary School Fairhope Middle and High Schools Recommendation: Approved with ConditionsPrepared by: Casey Potts ----- 1  SD 22.21 404 Oak Street MOP – August 1, 2022    Summary of Request:  Request of 404 Oak LLC for four‐unit Multiple Occupancy Project Approval of 404 Oak Street. There are three  residential units and one office unit.  Lieb Engineering Company is the engineer for the project.  The subject  property is zoned B‐4, lies within the Central Business District, and is approximately 6,054 SF.  The property is  located on Oak Street and lies west of Bancroft Street.   Comments:  ‐ Utilities: All connections and work in City of Fairhope ROW will require permitting from City of Fairhope.  o Water – The site will utilize existing water services to the building. The services to each unit will be included in the rental rates. o Sewer – The site will utilize existing sewer services to the building. The services to each unit will be included in the rental rates. o Power – The site will utilize existing power services to the building. The services to each unit will be included in the rental rates. o Gas – The site will utilize existing gas services to the building. The services to each unit will be included in the rental rates. o Communications – AT&T o Trash pickup will be collected via shared rolling cans and picked up by the City of Fairhope. ‐ Traffic Study: A traffic study was not triggered for this project.   ‐ Drainage: The building is existing. Stormwater will be conveyed through existing stormwater conveyance  systems.  ‐ Landscaping: The building is existing. A landscape plan was not required for interior renovations.  ‐ Parking: Three parking spaces are required for the three residential units. They are provided. One space is  handicap and is van‐accessible, which ADA requires.  The van‐accessible space and its surrounding sidewalk  will be made of concrete. An extension of the concrete sidewalk adjacent to the van‐accessible space is  required, as shown in Figure 1. The remaining spaces and the access drive will be made of gravel.  Figure 1: Ingress/Egress and Parking Schematic  ‐ Sidewalk: Sidewalk will be installed at along Oak Street, within the right‐of‐way. The applicant met with  Public Works and the approved sidewalk is shown in the plans.  The sidewalk is ADA compliant.  2  SD 22.21 404 Oak Street MOP – August 1, 2022    General Comments:  o A replat to remove historic lot lines will be required. o All work done in ROW will require permitting from City of Fairhope. Staff Recommendation of Case SD 22.21 404 Oak Street:  Staff recommends approval with the following conditions.  1.A replat to remove common lot lines shall be recorded. 2.Extend the concrete along the rear of the ADA‐compliant, van‐accessible parking space. Owner List Brandon Pilot Jerod Pilot Ross Wilson Carter Harsh Daniel Powell David Martin BARTON & SHUMER ENGINEERING, LLC 3213 MIDTOWN PARK SOUTH MOBILE, AL 36606 251.219.4942 www.bartoneng.com June 6, 2022 Mr. Richard Johnson, PE City of Fairhope 555 S. Section Street Fairhope, Alabama 36532 RE: 404 Oak Avenue MOP – Drainage Narrative Dear Mr. Johnson: A Multiple Occupancy Project is proposed at the existing residence at 404 Oak Avenue which is located in the southwest quadrant of the intersection of Oak Avenue and North Bancroft Street. The site slopes toward the northeast with existing inlets on the north side of Oak Avenue and the east side of Bancroft Street. Bancroft Street has a significant northward slope beyond Oak Avenue where any runoff will enter a natural drainage feature that drains to Mobile Bay. The existing residence is located on multiple parcels and has an existing driveway with aggregate parking. The project consists of renovating the existing residence to provide for residential and commercial uses. No changes to the foot print of the structure or grading of the site are proposed as part of this project that would alter the existing runoff flow pattern. Sincerely, David M. Shumer, P.E. AL P.E. #24109 STATE OF ALABAMA COUNTY OF BALDWIN BALDWIN COUNTY, ALABAMA _. HARRY D'OLIVE, JR. PROBATE JUDGE c,o Filed/cert. 12:06:2021 01 :02:06 PM 0) Total: $28.00 ~ 6 Pages .,i::.. EASEMENT AGREEMENT -1>- ' This Easement Agreement is entered into on the Jp__ day of _JJc--7'cc_-e,_. _____ ~ 2021, by and between PETER F, SIKOROWSKI & LAURIE S, SIKOROWSKI, HOUSTON HOLDINGS OF FL, LLC, and the FAIRHOPE STNGLE TAX CORPORATION (hereinafter "the FSTC"). WHEREAS, PETER F. SIKOROWSKI & LAURIE S. SIKOROWSKI are the leasehold owners of certain property, commonly known as 404 Oak A venue, Fairhope, Alabama, 3653 2, and more particularly described as follows: 1be East 10 feet of Lot One(!), the East 10.0 feet of the North Half of Lot Two (2), the West 71.0 feet of the North Half of Lot Seven (7), and the West 71.0 feet of Lot Eight (8), Block Two (2), Division Four (4), lands of the Fairhope Single Tax Corporation in the City of Fairhope, Alabama, being approximately 81 feet by 99 feet, as recorded in Misc. Book I, Pages 320-21, Probate Records, Baldwin County, Alabama, Frac'l Section 17, Township 6 South, Range 2 East. 46-03-37-0-007-068.503 WHEREAS, HOUSTON HOLDINGS OF FL, LLC is the leasehold owner of certain property, commonly known as 406 Oak Avenue, Fairhope, Alabama, 36532, and more particularly described as follows: The East 61 feet of Lot Eight (8) and the East 61 feet of the North Half of Lot Seven (7), Block Two (2), Division Four ( 4), lands of the Fairhope Single Tax Corporation in the City of Fairhope, Alabama, being approximately 61 feet by 99 feet, as recorded in Misc. Book I, Pages 320-21, Probate Records, Baldwin County, Alabama, Frac'l Section 17, Township 6 South, Range 2 East. 46-03-37-0-007-068.513 NOW, THEREFORE, for and in consideration of the sum often dollars ($10.00) and other good and valuable consideration, the receipt of which is hereby acknowledged, and the covenants Page 1 of6 and agreements contained herein, PETER F. SIKOROWSKI & LAURIE S. SIKOROWSK! and HOUSTON HOLDINGS OF FL, LLC, being the leasehold owners of 404 Oak Avenue and 406 Oak Avenue, as described above, do hereby agree and bind themselves and their heirs or assigns as follows: 1. There currently exists a 20-foot Easement for ingress and egress, for the benefit of 404 Oak Avenue, across the South 20 feet of 406 Oak Avenue, the Easement more particularly described as follows: The South 20 feet of the East 61 feet of the North Half of Lot Seven (7), Block Two (2), Division Four (4), lands of the Fairhope Single Tax Corporation in the City of Fairhope, Alabama, as recorded in Misc. Book 1, Pages 32()-21, Probate Records, Baldwin County, Alabama, Frac'l Section 17, Township 6 South, Range 2 East. 2. The terms and conditions of this easement agreement may be amended, from time to time, upon the joint agreement of the owners of 404 Oak Avenue and 406 Oak Avenue. Any amendment shall be in writing and recorded in the Office of the Judge of Probate of Baldwin County, Alabama. 3. This easement agreement shall be deemed to be a covenant running with the land and any futnre leasehold owners of 404 Oak Avenue and 406 Oak A venue shall be bound by the terms and conditions of this agreement. 4. This easement agreement is subject to the terms and conditions of the 99-year ground lease issued to each leasehold owner by the FSTC and by the laws of the State of Alabama. 5. The FSTC does hereby join in this agreement for the purpose of acknowledging the terms and conditions of this agreement and no more. Page 2 of6 NORTH 0 10'20' SCALE: 1" = 10' REVISIONS A ISSUED FOR REVIEW , " 0 A K ~ A S T R E E T a. .a. __ ----;r-------------- REQ'D: 8' WIDE CONCRITE SIDEWALK 66' Right-of-Way (Paved) NOTES: S sa•50• 47" E 10.0J' (M d) 10.00' (Rec) o' ~ ' :g <\i (.) .....J Q:) 7 6 22 ,._ ._ C) .....J h.. C) -.J f$ ' /1 f ]' • 0: - /:0 ~ 1-8 q_O O ai ~ O> F'OW!d Steel./ ROWICI Rod // & :--i.. O~Q0 I El vat d c} ~ ~0• ID I :. Wood Deck ~ ~ ~ /Go ct Elevat d I '),G O Wood O c I ~ t>-, D.4' ~ t>-.c:, ~ Brick St~ w~ I 8Qf;:l ~- I 'r F'Oln:I Crimp I Topp· sa•Jo• 21" 10.00 REQ'D: CONCRETE WHEELSTOP (lYPICAL) REQ'D: GRAVEL PAVING C, ~ :f - 13. ,. IS! LIEB ENGINEERING COMPANY i A / '-a -....J -s $. a g I N 89•35, 4 ,, W 60.87' (Rec \) "' s 89° 61.00' Property Address: 406 Oak Avenue ;=:=:.::::,-----•... _ .. ::-:-- •• A • •• ~ -. - \_ 61.a· r OUlld R bar & Cap ( ) < CD EXISTING FIRE HYDRANT \ AT INTERSECTION OF BANCROFT AND PINE CnY PRCMDED FLOW DATk STATIC 65 PSI RESIDUAL 54 PSI FLOW 650 GP~ 404 OAK STREET NOT VALID WITHOUT THE DATED SIGNATURE AND SEAL OF AN ALABAMA LICENSED ENGINEER. SITE PLAN 1. EACH UNIT SHALL BE SPRINKLED. LIEB ENGINEERING COMPANY ALABAMA LICENSED ENGINEER: CHRISTOPHER JAY LIEB, P.E. LICENSE NUMBER 31204 1----------------------, 1290 MAIN STREET, SUITE E ALABAMA CERTIFICATE OF AUTHORIZATION NUMBER: 4938 FAIRHOPE, AL DAPHNE, AL 36526 OWNER: PH: (251 ) 978 -9779 >---J-OB-NU-M-BE-R-~DR-AW_N_B_Y_: -J-LG ___ DA-TE-: -7-/-6/_2_02_2_S_C_AL-E,-1-.. =-1 O-, ----+-SH-EE_T_N-UM_B_ER_~----------~----i C1 .0 A 2022-066 CHECKED BY: ~ APPROVED BY: -91_ ENGR: -91_ OF USHWY98P A R K E R R D SOUTH DR VI ALETRENTI NOPEARLYGHASKIN DRSOUTHDR USHWY98PRESBYTERIANDR OLD MILL RDSIBLEY C IR VIAMARIA W ILDOAKSRDHIGH RIDGE RDVIALEBELLEZZACity of FairhopePlanning Commission August 1, 2022 ¯USHWY98PARKER RD CROSSOVER PEARLYGHASKIN DRUSHWY98HIGH RIDGE RDSD 22.22 - Parkstone Legend RoadsParcelsCorporate LimitsZoningDistrict Zoning ClassificationB-2 - General Business DistrictB-4 - Business and Professional DistrictPUD - Planned Unit DevelopmentR-1 - Low Density Single-FamilyPlanning Jurisdiction ^µ µ Project Name: ParkstoneSite Data: 12.84 acresProject Type: Subdivision Final PlatJurisdiction: Fairhope Planning JurisdictionZoning District: PUDPPIN Number: 32028General Location: East side of U.S. Highway 98, North of Parker RoadSurveyor of Record: Sawgrass Consulting LLCEngineer of Record: Sawgrass Consulting LLCOwner / Developer: Eastpark LLCSchool District: Fairhope Elementary School Fairhope Middle and High Schools Recommendation: Approved with ConditionsPrepared by: Mike Jeffries 1 SD 22.22 Parkstone Final Plat – August 1, 2022 Summary of Request: The owner is Eastpark LLC. The engineer and applicant is Sawgrass Consulting, LLC. This application is for Final Plat Approval of Parkstone Subdivision, a 41-lot Major Subdivision. The property is approximately 12.84 acres and is located on the east side of US Highway 98, north side of Parker Road, and across from the Fairhope Publix. The preliminary plat was approved at the September 2020 Planning Commission meeting (Case SD 20.23). The property is zoned PUD and has a corresponding site plan. The subdivision must be built in substantial conformance to the approved site plan within the PUD. An excerpt of the site data table is included below: A final walk through was performed by the City and a punch list of items needing attention was created and sent to the applicant. The review letter and response letter from the applicant is provided in the Planning Commission Packet. Comments Water/Sewer: The applicant was allowed to use existing infrastructure for this development. A final inspection was performed, and a few items remain that should be completed prior to the meeting. The road to the lift station is currently gravel and had areas of wash out and erosion. The applicant has lined a drainage swale with filter cloth and rip rap. Due to concerns of this not being a permanent fix, the City reserves the right to reinspect the road after six months and, at the discretion of the Water and Sewer Superintendent, require a new solution which could include an asphalt or concrete drive to be installed in the easement to service the lift station at the developer’s expense. Public Works: The drainage inlets have open tops and safety grates have been installed. The thermoplastic for the cross walk across Parker Road is the only remaining item and should be completed prior to the meeting. Landscaping: The approved landscape plans called for a 12’X12’ gazebo on the northern common area, walking trails through the common areas, and benches placed in common areas. The walking paths have been installed and are made of a rock/slag material. The applicant has requested the benches be installed once homes are constructed for fear of theft. Due to a drainage inlet installed in the wrong location, the applicant requested permission to shift Lots 38 and 39. The shift and slope of the land due to a detention pond made a walking path impracticable. The applicant provided a sketch of the alteration which included two additional pavilions and additional trees and flower beds, of which staff supported. The gazebo and pavilions have been installed. SITE DATA TOTAL ACREAGE = 12.84 ACRES± TOTAL LINEAR FOOTAGE OF STREETS = 1,845 L.F.± TOTAL NUMBER OF LOTS = 41 LOTS MINIMUM LOT SIZE = 6,304 S.F.± (0.14 ACRES±)(LOT 21) ZONING = CITY OF FAIRHOPE PUD (SEE PUD ORDINANCE #1668) AND BALDWIN COUNTY 8-2 (TAX 05-46-03-05-0-000-010.008 ONLY) MAXIMUM LOT COVERAGE = 48% MAXIMUM BUILDING HEIGHT = 30 FEET 2 SD 22.22 Parkstone Final Plat – August 1, 2022 Incomplete Punch List items: 1. Install fence around lift station 2. Complete cross walk striping/thermoplastic across Parker Road The City of Fairhope Subdivision Regulations contain the following criteria in Article V.B.2. Approval Standards. “2. Consistency with Plans, Regulations and Laws - The Planning Commission shall not approve the subdivision of land if the Commission makes a finding that such land is not suitable for platting and development as proposed, due to any of the following: a. The proposed subdivision is not consistent with the City’s Comprehensive Plan, and/or the City’s Zoning ordinance, where applicable; • Meets b. The proposed subdivision is not consistent with the City’s Comprehensive Plan or any other plan or program for the physical development of the City including but not limited to a Master Street Plan, a Parks Plan, a Bicycle Plan, a Pedestrian Plan, or the Capital Improvements Program; • Meets c. The proposed subdivision is not consistent with these Regulations; • Does not meet d. The proposed subdivision is not consistent with other applicable state or federal laws and regulations; • Meets e. The proposed subdivision otherwise endangers the health, safety, welfare or property within the planning jurisdiction of the City.” • Meets Recommendation: Staff recommends Approval with Conditions of SD 22.22 Parkstone final plat. 1. Install fence around lift station to be approved by the City of Fairhope Water and Sewer Department. 2. Replace stormwater manhole lid between lots 19 and 20 with a sanitary sewer lid. 3. Complete striping/thermoplastic crosswalk on Parker Road. ORDI A CE NO. 1668 AN ORDlN CE AME DlNG ORDIJ'I CE 0. 1253 KNOWN A THE ZONLNG ORDI A CE TO AMEND ORDl ANCE 0 , 1273; A PL ED U IT DEVELOPMENT O WN AS .EAST PARK SUBDIVISION · TO APPROVE A REVI ED MASTER P L N; PROVIDI GA SEVERABILITY CLAUSE; A D PROVIDT GA EFFECT IVE DATE. 13E IT ORDAi ED BY THE CITY COUNC IL OF nrn CITY OP PAI R.MOPE, ALABAMA as follows : The ordinance knoWJl as the Zoning Ordinance ( o. 1253), adopted 27 Jone 2005, together with the Zoning Map of1he City ofFairhope , be 1111d 1l1e siune hereby is changed and.alte red in respect lo Lhat ce11a in pro perty describe d below: After the ap pro priate pub lic notice and hearit1g ofthe Planning Commission ofd1e City of Fairhope , Alabama has fo rwar ded a fa ornble rcconm,1endation. The prope rty ofWenilell and Charloue Barnhill, to be known as E.1~L Park PUD ,generally located on the nor th side of Parker Roat! just eas t of US Highway 98 , Fairho pe, Alabama . East Park PUD PPl #: 15985 und 32028 Legal Description: (Case 11t1mber Z 19.14) COMMENCJNG AT THE NORTH.EAST CORNER OF SECTLON 5. TOWNSH IP 6 SOUTH , RA GE 2 EAST, BAL DWIN COUNTY, ALABAMA ; THENCE RUN ·-89°16'49"-W , 15 45.07 FEET TO THE POI NT OF BEG INNlNG , SAlD POINT ALSO BETNG LOCATED O I THE WEST LINE OF HJGH RIDGE ESTATES , ACCORDING TO TH E PLAT THEREOF RECORDED Ai MAJ,' BOOK 7, PAGE ll IN THE OFFJCE OF TJ-IE JUDGE OF PROBATE, 13ALDWI COUNTY , ALABAMA ; THENCE RU S-00 °23'25 "-W , ALONG SA ID WEST LLNE, 5'18.79 FE-ETTO A POINT; TRENCERUNS-00°27'13"-W, 615.40 FEET TO A POINT; THENCE RU N-88°59'13"-W' LEA VTNG SAID WEST LINE, 208.48 F'EETTOA POJNT;THENCE RUN S-00 °2~'04 "-W ' 149.90 FEET TO A PO INT LOCATED O THE NORTH RIGHT or-w A y LINE OP PARKER ROAD; THENCE RU N-89°07'38"-W, ALONG SA ID NORTH RIGHT OF WAY LINE, 131.27 FEET TO A PO INT; TI~ENCE RUN '-89 °07'28"-W. 83.64 FEET TO A POINT ; THENCE RUN -89 °22'35"-W , 15.89 FEET TO A POINT ; THENCE RUN N-00 °18'39"-E, LEAVTNG SAIDNORTHRIGHTOF WAY Lll\TE ,397 .73 FEETTO APOINT ;THENCERUNN- 00 °14'45"-E, 327 .32 FEET TO A POI T; THENCE RUN N-89°58'14"-W , 83.35 FEET TO A POINT; THENCE RUN N-00 °21 '47"-E, 279. 72 F'EETTO A POINT; THENCE RUN S-89°57' 19 "· E, 83 .06 FEET TO A POINT ; THENCE RU N-00 °23'16"-E , 284.58 FEET TO A POfNT ; THENCE RUN S-88 °23'31"-E , 434 .06 FEET TO THE POINT OF BEGJ NING . I. That, attached as ''Exhib it A" is an 11pproved si te plan. The property mu$t develop in subs tantia l con fo rmonce wi th the approve d si te plan and suppo 1ting documents . Any substa11tial deviatiou from the attached site plan, as determined by the Director of Planning, will require re-approval by the Plannlng Commission and the Ci ty Counc il of 1he Ci ty of Fairhope, A labamn , as Q PtJD nmc11dmc111. 2. T hat, auac hed as "Exhibit B" is an approved project narrative. 3. T hat, the follow ing development regulations shall govem: Overall Development: Lots : There s hall be 44 lots tornl. Density; Density shaJJ not excee d 3 .4ll lots per acre . Accessory Structures and Dwellings: No accessory structures or dwellings are allowed , R-1, Low Density Single-Family, lies to the north and south oftbe site. Property to the east and west are zoned by Baldwin County. Property to the east is zoned Baldwin County RSF-2, Medium Density Single-Family . Property to the west is Baldwin County 82 and B3 -both business zoning. Across Parker road, to the south, is the Fly Creek PUD. The immediately adjacent property is the current location of a Publix grocery store and shopping center. The proposed density of the single-family lots, which is denser that surrounding properties, offers an appropriate transition to adjacent business uses and meets the intent of the Comprehensive Plan. Spacing and Setbacks are prescribed on the site plan (Appx. 5) and within the applicant's narrative (Appx. 3). The existing PUD prohibits Accessory Structures. The applicant requests one commercial lot where lots 30 and 31 currently exist, and which are adjacent to Parker Rd, north of the entrance into the development. B-2 zoning is requested on the commercial lot. Allowable uses shall conform to those allowed by B-2 Zoning within the City of Fairhope Zoning Code . Dimensional standards for B-2 zoning will also apply unless explicitly requested and approved as part of this PUD amendment. It is important to note the proposed commercial lot is adjacent to a current residential property to the north, which, if the commercial use is approved, will need to meet requirements prescribed by the City of Fairhope 's Tree Ordinance. There being adjacent commercial lots to the west and south, and due its location in a Village Center, the commercial lot, and the corresponding B- 2 use, meets the intent of the Comprehensive P lan. There are two means of ingress/egress intersecting existing public roads as shown on both the existing PUD and the proposed amended PUD -one accessible from Parker Rd and one accessible from Greeno Rd. An easement provides ingress/egress directly onto Greeno Rd. At this time, the ingress/egress and the associated easement is not intended as a public road to be maintained by the City of Fairhope. Per our public works department, as part of the Fly Creek PUD, a traffic study determined Parker Rd has been improved as much as possible. Therefore, a traffic study is not required at this time, but the City does retain the right to require a traffic study if needed now or later, as part of the subdivision review. An existing cell tower exists within the PUD. Per the most recent Zoning Ordinance, the proposed single-family housing would not be alJowed within the fall line of an existing tower. However, the existing PUD was approved prior to adoption of new requirements for cell towers. Consequently, the cell tower and approved single-family housing may be viewed as an existing non-confom1ity. Background Prior to 2005, this property was used as a 90-unit mob1le home park within unincorporated Baldwin County. 2 ZC 19.14 East Park PUD Amendment-October 7, 2019 On October 24, 2005 the Fairhope City Council approved Ordinance No. 1273, which rezoned the Subject Property from RI to a PUD to allow for reduced lot sizes. A copy of Ordinance No. 1273 is appended below. Staff Recommendation: Approve With Conditions Conditio11s o(Approva/: In addition to Accessory Structures, also prohibit Accessory Dwellings. To make use of the rearranged greenspace, add a walking trail on the site plan. Provide an easement to access the pump station. Provide proof of western easement that provides secondary access directly to Greeno Rd. Planning Commission Recommendatio11: Art Dyas made a motion to accept the staff recommendation to APPROVE with the following conditions: 1 . In addition to accessory structures, also prohibit accessory dwellings. 2. To make use of the rearranged greenspace, add a walking trail on the site plan. 3. Provide an easement to access the pump station. 4. Provide proof of western easement that provides .secondary access directly to Greeno Road. Harry Kohler 2nd the motion and the motion carried unanimously with the fo ll owing vote: A YE - Art Dyas, Rebecca Bryant, Harry Koh ler, Lee Turner, Hollie MacKellar, and Richard Peterson. NAY-none. Appends Appx. 1: Aerial of site Appx. 2: Rezoning Application Appx. 3: Applicant's Narrative Appx. 4 : Existing PUD Site Plan Appx. 5: Proposed PUD Site Plan Appx. 6: Ordinance 1273 -East Park PUD 3 zc 19.14 East Park PUO Amendment -October 7, 2019 Appendix 1: Aerial Images of Site Comparison Table Feature Existing PUD Proposed PUD Total Acreage •12.104 12.64 Number of Lots 47 44 Density 3.88 lots/acre 3,48 lats/acre Road Length 3,175 ff 1,mlf Greenspace 1.06 acres 2.53 acres lot WJdth at Street 70ft 54ft Average Lot Size 5,660 sf 6,722 sf Typical lot Dimensions 70' X 75' 54' x lZS' Setbacks 20' front and rear Lots 1-17, 21-43 10' side 20' front and rear 7' side, 15' side street Lots 18-21 15' front and rear, 7' side Lot 44 (Commercial) B-2 zoning Dimensions Commercial None 1 Lot (0.45 acres) Figure 3 * As we understand, the original PUO was presented in final fortn with the addition of lots 30 and 31 included on what is designated as the Commercial Lot fronting on Parker Road on the proposed PUD Amendment. The preliminary submittals of the original PUO in 2005, had not inch.1ded these two lots so the acreage (12.104 acres) did not include lots 30 and 31 in the total acreage computation. The Amended PUO includes this Commercial Lot acreage for a total overall acreage of 12.64 acres. The East Park PUD meets the Fairhope Comprehensive Plan as it Is located at a Village Center as part of the North Village District within the Greeno Road Corridor Overlay. The Residential Development wlll Include sidewalks which will connect to the existing sldewalks and crosswalk on Parker Road for connectivity to Publix, a bank, and other adjoining commercial operations. Utilities Water, Sewer, and Power are all available and currently exist within the Development. The Water and P.owerwill be relocated to conform with the new street and lot layout. We will utilize as much of the existing gravity sewer as feasible with the addition and relocation of manholes and piping as necessary to accommodate the proposed street and lot layout. We have been In contact with the City of Fairhope Utilities Department to confirm that the City maintains an active sewer lift station on site capable of serving the proposed Development. As part of the Subdivision Development, easements will be established and infrastructure provided, for access to the existing lift station and accessory structures. Dimension Table-Lots and Principle Structure Min. Lot Min. Use Area Lot Setbacks Avg. Lot Width I I I Area Front Rear Side 5,970sf ResldentJal 54' 20' 20' 7' 6,720 sf Commercial 0,45 acres 131' 20' 20' 10' ·~ote: No accessory structures or dwelllngs wJJI be allowed, Cell Tower I Street Side I 15' ZO' Max. total ' Max. lot Height coverage by prlnclple structure 48% 35' 30' A cell tower and ancillary support structures currently exist on the property as identified on Figure 2. The property encompassed by the Tower is fenced and access controlled by a Locked gate. This fenced area will be identified by an easement with a designated use In-the PUD for a Communication Tower. It is unlikely the Tower will ever be put out of service, however, should the tower ever be deemed unnecessary or no longer useful, this area will convert to Green Space for use by the residents of the PUD . . Requested Amendments to East Park PUD • Convert two Residential lots to one commercial lot • Establish an Easement for the Cell Tower Property • Red·uce overall lot density • Increase average lot size • Reduce roadway length • Provide more greenspace • Reduce side yard setbacks from 10 feet to 7 feet Inlet I-6 Sta. 4+00± at Lot Line of Lot 38 Proposed Walking Trail (Original) Approx. 25’ between Lot Corner and Property Line -- •. ~ ' .• ' .. ~ ' , <. ,. !.,.. ~--. :~-., : "'-Css -~---=----~ ......... D--<'""°" "' ' \ '2-,-7.JP I I \\ \ \ Installed Inlet I-6 Sta. 3+75± Placed Inlet in middle of Lot 38 3.75’ between Lot Corner and Property Line Shift Lots 38 and 39 SW so Installed Inlet is on Lot Line Small Pavilion Small Pavilion VIA E-MAIL ATTACHMENT June 15, 2022 Mr. Tom Granger, PE Sawgrass Consulting, LLC 30673 Sgt. E.I Boots Thomas Drive Spanish Fort, AL 36527 SD 22.22 Dear Mr. Granger, This review package is derived from various components of the City of Fairhope Subdivision Regulations, Zoning Ordinance, and/or staff recommendations. Staff has reviewed the subject application to determine if the application meets all the requirements of the City of Fairhope Subdivision Regulations. The following non-exhaustive list summarizes the outstanding items requiring revision and resubmission or follow-up information for the subject application discussed during the DRC meeting. Please note that The City of Fairhope reserves the right to make additional comments to this application prior to the Planning Commission meeting date. 1. General repairs include the following: o Rain stoppers in all sewer manholes COMPLETED o Remove excess valley gutter expansion joints to improve flow COMPLETED o Grind and seal all hairline cracks in gutters (marked with single paint line) COMPLETED o Jet and clean all sanitary sewer inverts COMPLETED o Freshen up all BMPs throughout development COMPLETED 2. ADA ramp at intersection of Treadstone and Parker needs reworked COMPLETED 3. Lot 5 restabilize water box COMPLETED 4. SSMH STA 6-19 rework invert to match flow COMPLETED 5. Adjust water valves to be flush COMPLETED 6. Remove and replace gutter in front of ADA crosswalk ramp at common area COMPLETED 7. Areas around curb and gutter need to be restabilized COMPLETED 8. SSMH STA 10-50 Unnecessary bend creating possible obstruction issues. Will be inspected in 2 years at end of maintenance period and may require straightening. COMPLETED 9. Between lots 19/20 change manhole lid to sanitary LID IS OLD/ODD SIZE, COMPLETED SOON AS POSSIBLE WHEN LID IS LOCATED. CITY INDICATED THEY MAY HAVE ONE THIS SIZE. 10. Lot 23&24 water meter box turned backwards COMPLETED 11. SSMH STA 13-93 needs riser, in front of lot 23 COMPLETED 12. Lot 25 water box lid backwards COMPLETED 13. Chimney seal needed, existing manhole behind lot 31 COMPLETED VIA E-MAIL ATTACHMENT 14. Suck out wet well COMPLETED. 15. Missing ¾ inch water service for lift station COMPLETED 16. Both pond inlets need safety grate COMPLETED 17. Invert needs to be regrouted, SSMH behind lot 36 COMPLETED 18. Fence around lift station COMPLETED BY 7/26/22 19. Abandoned 6” line from wet well headed northwest needs to be capped COMPLETED 20. Fencing around the lift station needs to be installed per water and sewer specs COMPLETED BY 7/26/22 21. Gravel road is eroding out to lift station. Provide solution to the problem. Will be reinspected after 6 months and if problem persists a new solution will be required and at the costs of the developer. Possibly asphalt drive and concrete flume. COMPLETED. 22. A lot of record needs to be created around the lift station to be deeded to the City of Fairhope. COMPLETED 23. Provide easement agreements for drainage easement across western adjacent property and reflect the recorded instrument # for the agreement on the plat. COMPLETED 24. Add general note that all common areas have a blanket drainage/utility easement. COMPLETED 25. Revise general note 13, FFE shall be 15” not 18”. COMPLETED 26. Gazebo needs to be a “12’ X 12’ gazebo with gable roof, rough sawn timber, posts, beams, & rafters, with metal roof” per the landscape plans. COMPLETED 27. There is a pavilion missing per the altered landscaping approved for the requested lot shift of lots 38&39. COMPLETED BY 7/30/22 28. AS-BUILTS are not accurate. At minimum does not show the lot shift nor the removal of lot 33 that was converted to common area. COMPLETED 29. The benches are missing from the common areas. As discussed due to the fear of theft a condition of approval will allow them to be provided at a later time. COMPLETED The application is scheduled for Planning Commission consideration on Thursday, July 7, 2022. A response to this letter addressing all outstanding items is required no later than 3:00 PM on Wednesday, June 22, 2022. If the deadline passes with no response, the application will be withheld from the agenda due to an incomplete application. Please provide two (2) copies of the revised plans in 11x17 format, one (1) full size copy and provide a digital copy in Adobe pdf format. Please feel free to contact me at (251) 928-8003 Ext. 457 with questions. Respectfully, Mike Jeffries City of Fairhope Development Services Manager