HomeMy WebLinkAbout03-01-2021 Planning Commission Agenda Packet Part 1Planning Commission Meeting
March 1, 2021
IMPORTANT UPDATE: Please note that as the City is responding to current
COVID-19 concerns, it is important to keep members of the public, our Planning
Commission, and staff as safe as possible. For that reason, we will conduct the
Planning Commission meeting on March 1, 2021 as a remote video conference
meeting. We will continue to update
https://www.fairhopeal.gov/departments/planning-and-zoning for the latest
information.
The City of Fairhope Planning Commission will hold a virtual public hearing
at 5:00 PM on Monday, March 1, 2021. Microsoft Teams will be utilized to host our
virtual meeting. We will strive to meet the intent of the State’s Open Meetings Act
under unprecedented circumstances. If you would like your comments to be
considered prior to the meeting, please mail comments to the Planning
Department at P.O. Box 429, Fairhope, AL 36533, e-mail
to planning@fairhopeal.gov or hand deliver to 555 S. Section Street (a drop box is
provided in our lobby) by 3:00 PM on Monday, March 1, 2021.
To participate during the public hearings you may join by computer or
smartphone:
Please send a request to planning@fairhopeal.gov. We will send you a calendar
invitation and instructions by 3:00 PM on Monday, March 1, 2021.
You may also join by telephone at: +1 334-530-5148
Access code: 978 012 380#
Please call in 10-15 minutes prior to the 5:00PM start time.
If you are unable to participate by either of the methods above, you may submit a
written request to planning@fairhopeal.gov, or call (251) 990-0214 and we will do
our best to accommodate.
As always, our meetings are also live streamed on YouTube. You may follow
along with the meeting at https://www.youtube.com/user/cityoffairhope.
Our response is changing daily. Please monitor
https://www.fairhopeal.gov/departments/planning-and-zoning for the latest
information.
MANLEY RD STATE HWY 181STONE CREE K BLV D
LAK E V IEWDRSILAGE DR WINESAPDRAMADOR AVTHOMPSON HALL RDCHET AV
TWIN BEECH RD
SERPENT I NEDRHEMLO CK DR
FAIRFIELD DRFORTUNED
R
ABELI
ACT
ONYX LNB O ULD E R C R EEK AV
AVENUE OF
THE PI NESFAIRFAXDRWHITTINGTONAV
TRUXTON ST
HOLCOMB
BLVDS E D GEFIELD AV
HARVESTRDG
CHESWICK AV
FEATHER TR
COUNTY RD 13BARNDLINGSTELI STHILTONLNNARROWLEAFBLVD
THEAKSTON STSURTEES STLAMBTON STSUMMER OAKS PLNEWS
OMELNBAY MEADOWS AV
DERBY LN
LONGLEAF LN
CRA
CKWILLOWAVCity of FairhopePlanning Commission
February 1, 2021
¯THOMPSON HALLRDTWIN BEECH RD
AMADOR AV
SUMMER OAKS PLSD 21.03 - Carmel Park Flats
Legend
COF Corp. Limits
PUD - Planned Unit Development
R-1 - Low Density Single-Family
R-2 - Medium Density Single-Family
R-3 - High Density Single-Family
R-3PGH - Patio/Garden Single-Family
R-A - Residential/Agriculture District
COF Planning Jurisdiction
¯
¯
^
Project Name:
Carmel Park FlatsSite Data:
20.24 acresProject Type:
242 Unit MOPJurisdiction:
Fairhope Planning JurisdictionZoning District:
UnzonedPPIN Number:
14962 & 254668General Location:
Southwest corner of intersection of CR
44 and Thompson Hall Rd.Surveyor of Record:
SE Civil, LLCEngineer of Record:
SE Civil, LLCOwner / Developer:
FST, Matthew Malone/68V PaydirtSchool District:
Fairhope West Elementary School
Fairhope Middle and High Schools Recommendation:
Approved w/ ConditionsPrepared by:
Mike Jeffries
1 SD 21.03 Carmel Park Flats – March 1, 2021
Summary of Request:
The applicant is 68V Pay Dirt, LLC and the property is currently owned by FST Matt Malone. Larry Smith with
SE Civil, LLC is the engineer of record for the project and the authorized agent. This application is for a 242
unit Multiple Occupancy Project containing approximately 20.24 acres and is located at the southwest
corner of the intersection of CR 44 (a.k.a.Twin Beech Road) and Thompson Hall Road, to be known as Carmel
Park Flats. The property is unzoned Baldwin County but lies within the Planning Jurisdiction of Fairhope and
is being reviewed as a Multiple Occupancy Project (MOP) under the City of Fairhope’s Subdivision
Regulations. This application is for preliminary approval. If approved an application for final MOP approval
must be submitted to close out the project and record any necessary documents.
Comments:
-Staff has received numerous letters in opposition, and they are included at the end of this report.
-Two traffic studies were conducted. The first study did not recommend any improvements. Staff
requested a revised study to confirm the traffic impacts. The study included major intersections along CR
44 from SR 181 to SR 98. Also incorporated were known future developments and known future
improvements to CR 44.
o The results of the study recommended a left turn lane and a four way stop at the intersection of
CR 44 and Boothe Road. In addition to these improvements the applicant is proposing to also
install a right turn lane. At time of construction all applicable permits will be required from
Baldwin County Highway Department.
-Sewer inside the development will remain private. The individual units will gravity feed to a lift station on
the south side of the property then be forced to CR 44 to connect to Fairhope’s Sewer system using a
gravity line installed by the developer and utilizing the existing lift station in Woodlawn. In addition the
developer will pay an aid to construction to go towards purchasing and installing a generator for the
existing lift station.
-Drainage has been reviewed and approved by City of Fairhope’s Public Works Director, Richard Johnson,
P.E. Water will be collected in a series of inlets and underground drainage. The underground drainage
will discharge into two (2) proposed ponds on the property. Pond 1 will be a wet retention pond that will
discharge into Pond 2. Pond 2 will be a dry detention pond that discharges into the existing wooded
wetland channel on the southwest corner of the property.
-25% greenspace is required resulting in 5acres+/-. 7.85 acres is being provided as shown on the site data
table.
-The proposed buildings comply with the 35’ maximum height.
-The entrance is located on CR 44 and is a split entry/exit. The entrance and internal road widths meet
fire code.
Additional Comments:
-Planning Commission held a public hearing and held this case over from the February 1st, 2021 Planning
Commission meeting for further study and additional information particularly in regards to the traffic
study. The City hired a third-party Shane Bergin, a Professional Traffic Engineer, with NEEL_SCHAFFER,
INC to review the revised traffic study requested by staff previously. The full review is included in the
staff report.
-The conclusion of the review as stated by Shane “It is my opinion that the construction of the
proposed Carmel Park Development will not have a significant impact to the roadway network as long
as the planned improvements are constructed. If you have any questions or comments regarding this
review, please call me”.
2 SD 21.03 Carmel Park Flats – March 1, 2021
Staff Recommendation:
Approve with the following conditions:
1. A letter confirming all onsite sewer is to remain privately maintained and is not the responsibility of the
City of Fairhope or Baldwin County signed by the development owner.
2. A note added on the recorded site plan “All sewer infrastructure within the property boundary is to
remain private and is not the responsibility of the City of Fairhope nor Baldwin County.”
3. Traffic improvements including west bound and east bound turn lanes into the development from CR 44
shall be installed before application for Final MOP approval.
4. A replat combining the two lots.
5. Sidewalks added along property along CR 44.
6. Since all Traffic Impact Studies were predicated on two Twin Beech (CR44) Road improvement projects being
complete (functioning) prior to the proposed development generating any residential traffic, no certificates of
occupancies (CO’s) shall be issued for Carmel Park Flats MOP until such time that Substantial Completion is issued
on the following projects by their Project Owners:
1. ALDOT/City of Fairhope Project No. ATRP2-02-2020-204-CN, Adding Turn Lanes on CR 44 at US
98 and Upgrading Traffic Signal at CR 44 and US 98, City of Fairhope
2. Baldwin County Project No. HW18069000, Intersection Improvements at County Road 13 and
County Road 44 (Roundabout)
PLANNED DEVELOPMENTSITE PLANCivil Engineering& Surveying880 Holcomb Blvd, Ste 2FFairhope, AL 36532251-990-6566VICINITY MAPN.T.S.SECTION 27, TOWNSHIP 6 SOUTH, RANGE 2 EASTBALDWIN COUNTY, ALABAMAJanuary 2021CARMEL PARK FLATSCERTIFICATE OF APPROVAL BY THE COUNTY ENGINEERTHE UNDERSIGNED, AS COUNTY ENGINEER OF BALDWIN COUNTY, ALABAMA, HEREBYAPPROVES THE WITHIN PLAT FOR THE RECORDING OF SAME IN THE PROBATE OFFICE OFBALDWIN COUNTY, ALABAMA THIS ____ DAY OF _________________, 20___.____________________________COUNTY ENGINEERCERTIFICATE OF APPROVAL BY THE BALDWIN COUNTYTHE UNDERSIGNED, AS _____________________OF BALDWIN COUNTY PLANNING AND ZONINGCOMMISSION, HEREBY CERTIFIES THAT, AT IS MEETING OF______________________________,______________________________ THE BALDWIN COUNTY PLANNING AND ZONING COMMISSIONAPPROVED THE WITHIN PLAT FOR THE RECORDING OF THE SAME IN THE PROBATE OFFICE OFBALDWIN COUNTY, ALABAMA, THIS THE ____ DAY OF _________________, 20___.BY:____________________________ITS:____________________________CERTIFICATE OF APPROVAL BY THE BALDWIN COUNTY E-911 ADDRESSINGTHE UNDERSIGNED, AS AUTHORIZED BY THE BALDWIN COUNTY E-911 BOARD, HEREBYAPPROVES THE ROAD NAMES AS DEPICTED ON THE WITHIN PLAT AND HEREBY APPROVES THEWITHIN PLAT FOR THE RECORDING OF SAME IN THE PROBATE OFFICE OF BALDWIN, ALABAMATHIS ____ DAY OF _________________, 20___.____________________________AUTHORIZED SIGNATURECERTIFICATE OF APPROVAL BY THE BALDWIN COUNTY PLANNING DIRECTORTHE UNDERSIGNED, AS DIRECTOR OF THE BALDWIN COUNTY PLANNING AND ZONINGDEPARTMENT, HEREBY APPROVES THE WITHIN PLAT FOR THE RECORDING OF SAME IN THEPROBATE OFFICE OF BALDWIN, ALABAMA THIS ____ DAY OF _________________, 20___.____________________________PLANNING DIRECTORPLANNING AND ZONING COMMISSIONCARMEL PARK FLATS9376 Twin Beech Road (County Hwy 44)Fairhope, AlabamaSHEET1 of 220200672JRBDRAWNDATESCALEJOB No.12/21/20N.T.S.SEALAFFIXREVISIONDATESITETWIN BEECH ROADTHOMPSON HALL ROAD
CO RD 13 COWPEN CREEKSR 181
I HEREBY STATE THAT ALL PARTS OF THIS SURVEY AND DRAWING HAVE BEEN COMPLETED IN ACCORDANCE WITHTHE CURRENT REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR SURVEYING IN THE STATE OF ALABAMA TOTHE BEST OF MY KNOWLEDGE, INFORMATION, AND BELIEF.LOTS 3 AND 4, MALLORY ESTATES, AS SHOWN BY MAP OR PLAT THEREOF RECORDED AT SLIDE 2129-C, BALDWINCOUNTY PROBATE RECORDS.______________________________________DAVID E DIEHL AL. P.L.S. NO. 26014 DATESURVEY NOT VALID WITHOUT ORIGINAL SIGNATURE AND SEAL.CERTIFICATE OF LEASEHOLD OWNERSHIPWE, THE UNDERSIGNED, ____________________ AS PROPRIETOR(S), HAVE CAUSED THE LANDEMBRACED IN THE WITHIN PLAT TO BE SURVEYED, LAID OUT AND PLATTED TO BE KNOWN ASCARMEL PARK FLATS, BALDWIN COUNTY, ALABAMA.DATED THIS ___ DAY OF _______________, 20____._______________________________________________PRINT NAME SIGNATURESTATE OF ALABAMACOUNTY OF BALDWINI,_______________, NOTARY PUBLIC IN AND FOR SAID COUNTY, IN SAID STATE, HEREBYCERTIFY THAT _____________________, AS OWNER OF THE LANDS PLATTED HEREON ISSIGNED TO THE FOREGOING INSTRUMENT, AND WHO IS KNOWN TO ME, ACKNOWLEDGEDBEFORE ME ON THIS DAY THAT, BEING INFORMED OF THE CONTENT OF THE INSTRUMENT,AND AS SUCH LEASEHOLD OWNER AND WITH FULL AUTHORITY, EXECUTED THE SAMEVOLUNTARILY.GIVEN UNDER MY HAND AND OFFICIAL SEAL THE _____ DAYOF______________________________.________________________________________________NOTARY PUBLIC MY COMMISSION EXPIRESCERTIFICATE OF NOTARY PUBLIC:CERTIFICATE OF OWNERSHIPWE, FAIRHOPE SINGLE TAX CORPORATION, AN ALABAMA CORPORATION, HEREBY STATE THATWE ARE THE OWNERS OF THE LANDS DESCRIBED HEREON.WE, _______________ AND __________________, WHOSE NAMES AS PRESIDENT ANDSECRETARY HAVE CAUSED THE SAME TO BE SURVEYED AND SUBDIVIDED AS INDICATEDHEREON, FOR THE USES AND PURPOSES HEREIN SET FORTH AND DO HEREBY ACKNOWLEDGEAND ADOPT THE SAME UNDER THE DESIGN AND TITLE HEREON INDICATED.DATED THIS THE ___________ DAY OF ___________________.FAIRHOPE SINGLE TAX CORPORATION, AN ALABAMA CORPORATIONBY:_______________________________ AS ITS: PRESIDENTBY:_______________________________ AS ITS: SECRETARYSTATE OF ALABAMACOUNTY OF BALDWINI,_________________, NOTARY PUBLIC IN AND FOR SAID COUNTY, IN SAID STATE, HEREBYCERTIFY THAT _____________________, AS PRESIDENT, AND _________________________, ASSECRETARY, OF FAIRHOPE SINGLE TAX CORPORATION, AN ALABAMA CORPORATION, ASOWNER OF THE LANDS PLATTED HEREON IS SIGNED TO THE FOREGOING INSTRUMENT, ANDWHO ARE KNOWN TO ME, ACKNOWLEDGED BEFORE ME ON THIS DAY THAT, BEING INFORMEDOF THE CONTENT OF THE INSTRUMENT, AND IN THEIR CAPACITY AS SUCH OWNER AND WITHFULL AUTHORITY, EXECUTED THE SAME VOLUNTARILY.GIVEN UNDER MY HAND AND OFFICIAL SEAL THE _____ DAYOF______________________________.________________________________________________NOTARY PUBLIC MY COMMISSION EXPIRESCERTIFICATE OF NOTARY PUBLIC:
SHEET2 of 220200672JRBDRAWNDATESCALEJOB No.12/21/201"=50'SEALAFFIXREVISIONDATERKnow what'sbelow.before you dig.CallPLANNED DEVELOPMENTSITE PLANCivil Engineering& Surveying880 Holcomb Blvd, Ste 2FFairhope, AL 36532251-990-65662000255010050 SCALEBUILDING HEIGHTSITE ANALYSIS±35 FEETLANDSCAPE AREA10.51 AC (52.1%)TOTAL ACREAGE±20.19 AC BUILDING SETBACKS:FRONT YARD:PROPERTY ZONINGUN-ZONEDSIDE YARD:REAR YARD:35 FEET10 FEET30 FEETMAX. GROUND COVER RATIO N/APROPOSED BUILDINGS131,317 SFMAX. BUILDING HEIGHT N/AGROUND COVER RATIO0.479IMPERVIOUS AREA9.68 AC (47.9%)NOTE:THE INTERNAL RIGHTS-OF-WAY, ROADS, EASEMENTS AND DRAINAGE FACILITIES AREPRIVATE AND WILL BE MAINTAINED BY THE DEVELOPER/OWNER. THE INTERNALRIGHT-OF-WAYS, ROADS, EASEMENTS AND DRAINAGE FACILITIES WILL NOT BEMAINTAINED BY BALDWIN COUNTY. IF INDIVIDUAL LOTS, SITES, UNITS, ETC., ARE TOBE SOLD, THE DEVELOPER/OWNER SHALL BE REQUIRED TO MEET THE CURRENTBALDWIN COUNTY SUBDIVISION REGULATIONS IN EFFECT AT THAT TIME, AND THEPROPERTY SHALL BE BROUGHT INTO COMPLIANCE WITH THOSE REGULATIONSPRIOR TO SUCH SALE OR ATTEMPTED SALE.UNITS242DENSITY11.99 UNITS/ACSITE DATA (BALDWIN COUNTY):1. ACREAGE IN TOTAL TRACT: 20.19 ACRES2. SMALLEST LOT SIZE: 1,540 SF3. TOTAL SQUARE FEET OF EACH LOT OR UNIT: 118,122 SF4. TOTAL NUMBER OF LOTS OR UNITS: 2425. TOTAL NUMBER OF BEDROOMS:4716. LINEAR FEET IN STREETS: 3,800 LF (PRIVATE)7. NUMBER OF PARKING SPACES: 484 SPACES8. AMOUNT OF IMPERVIOUS SURFACE: 421,530 SF9. DENSITY: 11.99 UNITS/AC10. TOTAL SF OF ALL AREAS RESERVED FOR TOTAL OPEN SPACE: 457,628 SF (10.51 AC)11. TOTAL SF OF ALL AREAS RESERVED FOR USEABLE OPEN SPACE: 383,481 SF (8.80 AC)12. COMMON AREA:182,098 SF (4.18 AC)OWNER:FAIRHOPE SINGLE TAX CORP.336 FAIRHOPE AVE.FAIRHOPE, AL 36532FLOOD ZONE:PROPERTY LIES IN FLOOD ZONE "X" UNSHADED AS SCALED FROM FLOOD INSURANCERATE MAPS NUMBER 01003C0663M, COMMUNITY NUMBER 015000, PANEL 0663,SUFFIX "M', DATED APRIL 19, 2019 AND NUMBER 01003C0780M, COMMUNITY NUMBER015000, PANEL 0780, SUFFIX "M', DATED APRIL 19, 2019.UTILITY PROVIDERS:WATER - FAIRHOPE PUBLIC UTILITIESSEWER - FAIRHOPE PUBLIC UTILITIESELECTRIC - BALDWIN EMCTELEPHONE - AT&TLESSEE/DEVELOPER:68 V PAY DIRT, LLC29891 WOODROW LANE, SUITE 300SPANISH FORT, AL 36527USABLE OPEN SPACE REQUIRED (50% OF REQ. OPEN SPACE) 2.02 ACOPEN SPACE REQUIRED (20%) 4.04 ACGREENSPACE CALCULATIONS (CITY OF FAIRHOPE):ACREAGE IN TOTAL TRACT: 20.19 ACRESWETLANDS:0.01 ACRESPONDS:1.70 ACRESASPHALT ROADS:1.99 ACRESNET ACREAGE: 16.49 ACRESDENSITY (NET) = 242 UNITS/16.49 ACRES:14.68 UNITS/ACREGREENSPACE REQUIRED (25% OF 20.19 ACRES): 5.05 ACRESGREENSPACE PROVIDED:7.85 ACRESVICINITY MAPN.T.S.SECTION 27, TOWNSHIP 6 SOUTH, RANGE 2 EASTBALDWIN COUNTY, ALABAMASITETWIN BEECH ROADTHOMPSON HALL ROADCO RD 13 COWPEN CREEKSR 181 CARMEL PARK FLATS9376 Twin Beech Road (County Hwy 44)Fairhope, AlabamaREQUIRED PARKINGPROVIDED PARKING484 SPACES484 SPACESPROPOSEDEXISTINGSITE PLAN LEGENDTRAFFIC CONTROL ARROWCURB & GUTTERSTANDARD PARKING QUANTITYMEDIUM DUTY ASPHALT PAVINGX" SYSL - X" WIDE SINGLE YELLOW SOLID LINEX" DYSL - X" WIDE DOUBLE YELLOW SOLID LINEX" SWSL - X" WIDE SINGLE WHITE SOLID LINEACCESSIBLE PARKING SPACECONCRETE PAVINGPERVIOUS CONCRETE PAVINGHEADER CURBRIBBON CURBX
TRAFFIC IMPACT STUDY (Revised)
Carmel Park Apartments
Fairhope, Alabama
Prepared for:
Baldwin County Highway Department
On behalf of:
S.E. Civil, LLC
880 Holcomb Blvd., Suite 2F
Fairhope, AL 36532
Ph: (251)-990-6566
Prepared by:
Samantha Islam, Ph.D., P.E.
ASSR Consultants, LLC
3870 Branford Ct
Mobile, AL 36619
Ph: (251)-545-9681
December 31, 2000
i
TABLE OF CONTENTS
Overview and Executive Summary .......................................................................................... 1
1.0 Introduction ...................................................................................................................... 4
2.0 Proposed Development .................................................................................................. 5
2.1 Site Description .................................................................................................................. 5
2.2 Site Location ...................................................................................................................... 5
2.3 Zoning (Current and Proposed) ...................................................................................... 5
2.4 Time Frame of Development ........................................................................................... 5
3.0 Background Information ................................................................................................. 6
3.1 Background Traffic Growth ............................................................................................. 6
3.2 Offsite Development ........................................................................................................ 6
3.3 Planned and Programmed Roadway Improvements .................................................. 7
4.0 Existing Conditions ........................................................................................................... 8
4.1 Project Study Area ........................................................................................................... 8
4.2 Existing Geometric Data ................................................................................................. 8
4.3 Existing Condition Traffic Count ..................................................................................... 8
4.4 Existing Conditions Capacity Analysis ........................................................................... 9
4.5 Existing Conditions Signal Warrant Analysis ................................................................. 10
5.0 Future Conditions ........................................................................................................... 11
5.1 Trip Generation Estimates ............................................................................................. 11
5.2 Directional Distribution of Development Traffic .......................................................... 11
5.3 Development Horizon Year .......................................................................................... 12
5.4 Projected Future Traffic Volumes ................................................................................. 12
5.5 Future Signal Warrant Analysis ...................................................................................... 13
5.6 Future Traffic Conditions Capacity Analysis ................................................................ 14
5.7 Left/right Turn Lane Warrant Analysis ........................................................................... 15
6.0 Conclusions/Recommendations .................................................................................. 17
7.0 References ...................................................................................................................... 18
APPENDIX - A: Proposed Site Layout ........................................................................................ A
APPENDIX – B: Traffic counts ...................................................................................................... B
APPENDIX – C: Existing Conditions Capacity Analysis .......................................................... C
APPENDIX – D: Trip Generation Rates ..................................................................................... D
APPENDIX – E: Future Conditions Capacity Analysis without Development ....................... E
ii
APPENDIX – F: Future Conditions Capacity Analysis with Development ............................. F
APPENDIX – G: Turn Lane Warrant Analysis ............................................................................. G
List of Tables
Table 1: AADTs on Twin Beech Road (CR-44) and SR-181 Adjacent to the Proposed
Development .............................................................................................................. 6
Table 2 : Existing (2020) Peak Hour Volumes at CR-44 and SR-181 Intersection ................... 9
Table 3 : Existing Condition Capacity Analysis Results ............................................................ 9
Table 4: Trip Generation Rates and Percentage Entering and Exiting ............................... 11
Table 5: Trip Generation Volumes (Trip Ends) ........................................................................ 11
Table 6: Projected Peak Hour Turning Volumes without Proposed Development............. 13
Table 7: Projected Peak Hour Turning Volumes at CR-44 and SR-181 Intersection with
Proposed Development .......................................................................................... 13
Table 8 : Intersection Capacity Analysis Results for 2022 without and with Carmel Park . 14
Table 9 : Capacity Analysis Results for Twin Beech Rd at Boothe Rd after Conversion to 4-
way Stop Controlled ................................................................................................ 15
Table 10: Left/right Turn Lane Warrant Analysis for CR-44 at Carmel Park ......................... 16
List of Figures
Figure 1: Overall Vicinity Map .................................................................................................... 2
Figure 2 : General Site Plan ........................................................................................................ 3
Figure 3 : Generated Traffic by the Proposed Development .............................................. 12
1
OVERVIEW AND EXECUTIVE SUMMARY
A traffic impact study was conducted for the proposed Carmel Park Apartments in
Fairhope, Alabama. The site is located on Twin Beech Road (CR-44) across from
Thompson Hall Road. An overall vicinity map is provided in Figure 1. The proposed
development will consist of 242 dwelling units. The development is expected to be
completed and operational in the first quarter of 2022. A general site plan is provided in
Figure 2. A detailed site plan is provided in Appendix-A. This study was conducted to
determine the impact of the proposed development on the adjacent transportation
network.
This study investigated the effect of the proposed development on the adjacent Twin
Beech Road (County Road 44) and associated transportation facilities. Trip generation
estimation was performed using the method recommended in the ITE Trip Generation
Manual. Using the trip ends predicted in the trip generation step, the trip distribution step
was performed to determine the hourly volumes by direction to and from the proposed
development. A method recommended in the Highway Capacity Manual was then
used to evaluate the traffic operating conditions on the section of Twin Beech Road
adjacent to the proposed development with and without the development. Based on
this analysis, the additional traffic volumes from the proposed development are not
expected to adversely affect the traffic operations on the segment of Twin Beech Road
(CR-44) adjacent to the proposed development. In addition, the capacity analyses were
performed for the four major intersections on Twin Beech Road from SR-181 to US-98. The
results show that all the intersections except Twin Beech Road at Boothe Road will
experience adequate overall level of services (LOS) of C or better during both AM and
PM peak hours without and with Carmel Park Development in 2022. The individual
approaches will experience LOS of D or better. It should be noted that a LOS of D or
better is acceptable for an intersection. For the intersection of Twin Beech Road and
Boothe Road, overall intersection LOS was not calculated since it is a two-way stop-
controlled intersection. The results show that the north and southbound approaches will
experience some level of delay as indicated by the level of service E for both without
and with the proposed development in 2022. Further, analyses show that the LOS at this
intersection can be improved by converting the intersection from a two-way stop
controlled to a four-way stop controlled intersection. This conversion will improve the
approach level of services to D or better.
To evaluate if a left turn lane is warranted to access the proposed development from
Twin Beech Road, a method recommended in AASHTO Green Book, 7th Edition was used.
This method revealed that a left turn lane is desirable on Twin Beech Road for the
generated traffic turning into the proposed development. Similarly, to determine if a right
turn lane is warranted on Twin Beech Road, a method recommended in NCHRP Report
No. 457 was used. According to this method, a right-turn lane is not warranted on Twin
Beech Road to access the proposed development through the proposed access.
2
Figure 1: Overall Vicinity Map
3
Figure 2 : General Site Plan
4
1.0 INTRODUCTION
A traffic Impact Study (TIS) for the proposed Carmel Park Apartments in the City of
Fairhope, Alabama was conducted to determine the impacts of the proposed
development on the surrounding transportation network. The resulting impacts were
analyzed to assess possible improvements or mitigation measures in the study area.
This report discusses the general project parameters, the methodology used to perform
the TIS, the results obtained from the analysis and the conclusions and recommendations
for the improvements needed.
Sources of information used in this study include:
1. Baldwin County Traffic Impact Study requirements. Appendix 6 of the Baldwin
County Subdivision Regulations, August 6, 2019.
2. Alabama Department of Transportation (ALDOT) Access Management Manual,
January 2013 Edition.
3. Institute of Transportation Engineers Trip Generation Manual, 10th Edition.
4. Highway Capacity Manual, 6th Edition.
5. A Policy on Geometric Design of Highways and Streets, 7th Edition, 2018.
6. Evaluating Intersection Improvements: An Engineering Study Guide, NCHRP Report
457.
Average daily traffic (ADT) data for Twin Beech Road (CR-44) were obtained from the
Alabama Department of Transportation’s traffic data website.
5
2.0 PROPOSED DEVELOPMENT
2.1 Site Description
A traffic impact study was conducted for the proposed Carmel Park Apartments in
Fairhope, Alabama. The site is located on County Road 44 (Twin Beech Road) across from
Thompson Hall Road. The development is expected to be completed and operational in
2022. The Carmel Park Apartment Complex will consist of 242 dwelling units. A general
site plan is provided in Appendix-A. The proposed development will be connected to
County Road 44 using a major driveway.
2.2 Site Location
The proposed development will be located on CR-44 across from Thompson Hall Road
and approximately ½ mile West of the intersection of CR-44 and SR-181 in Fairhope,
Alabama as shown in the overall vicinity map in Figure 1.
2.3 Zoning (Current and Proposed)
The site for the proposed development is currently unzoned.
2.4 Time Frame of Development
The proposed development is expected to be completed and become operational in
2022.
Analyses of the impact on traffic conditions were performed for the following two
scenarios:
• projected traffic without the proposed development in 2022;
• projected traffic with the proposed development in 2022.
6
3.0 BACKGROUND INFORMATION
3.1 Background Traffic Growth
To come up with a reasonable traffic growth rate, we first examined the trend in the
Annual Average Daily Traffic (AADT) on Twin Beech Road (County Road 44) and SR-181
in the vicinity of the proposed site. The AADT information, as obtained from ALDOT’s
Alabama Traffic Data website, is provided in Table 1. Based on the most recent available
AADT’s, the average growth rate is 4.3% on Twin Beech Road and 4.2% on SR-181.
However, considering future land use growth in the study area and surroundings, a slightly
higher growth rate of 4.5% has been used in this study.
Table 1: AADTs on Twin Beech Road (CR-44) and SR-181 Adjacent to the Proposed
Development
Route Year AADT
CR-44 2019 4422
CR-44 2018 4335
CR-44 2017 4220
CR-44 2016 3900
SR-181 2019 12839
SR-181 2018 11626
SR-181 2017 11360
SR-181 2016 11360
The following equation was used to estimate the projected traffic volume (Vprojected) from
the existing traffic volume (Vcurrent):
𝑉pojected = 𝑉current ∗(1 +𝐺𝑟𝑜𝑤𝑡ℎ 𝑅𝑎𝑡𝑒
100 )
(Projected year−Current year)……………….(1)
3.2 Offsite Development
There are several known off-site developments in the vicinity of the proposed site, which
will impact traffic in the study area. These developments are:
i. Firethorne Single-family Subdivision: A 228-lot residential subdivision located
northeast of the intersection of SR-181 and Twin Beech Road. The subdivision will
be fully completed in 2030. Phases I and II (109 lots) have already been
completed. Phase III containing 30 units will be completed in 2021 and Phase IV
containing 33 will be completed in 2024.
ii. Live Oak State Single-family Subdivision: Live Oak State is a 76-lot residential
subdivision to be located in the southwest corner of the intersection of SR-181 and
Bay Meadows Avenue. This development is currently under construction and
expected to be fully completed in 2025.
iii. Twin Beech Estates Single-family Subdivision: Twin Beech Estates is located on Twin
Beech Road, approximately 0.4 mile east of the proposed Carmel Park
7
development. The subdivision is in its final stage of development and only 20 units
are remaining to be built.
While calculating the future traffic volumes, traffic volumes generated from these offsite
developments that are attracted to the study area were considered in addition to the
traffic generated from the proposed development.
3.3 Planned and Programmed Roadway Improvements
There are three known planned or programmed roadway improvements/modifications
within the study area that could impact the traffic condition within the study area during
the timeframe for the proposed development. These improvements are:
i. The posted speed limit on Twin Beech Road (CR-44) within the study area will be
reduced from 45 mph to 35 mph.
ii. The intersection of County Road 44 and County Road 13 will be modified from a
traditional 4-leg intersection to a single- lane roundabout.
iii. Left turn lanes will be added to the Twin Beech Road (CR-44) approaches of US-
98 and CR-44 intersection.
8
4.0 EXISTING CONDITIONS
4.1 Project Study Area
The project study area includes the segment of Twin Beech Road (CR-44) from SR-181 to
US-98, the major intersections along this segment and the proposed connection point.
The intersections that were analyzed are:
I. intersection of Twin Beech Road and SR-181 (signalized),
II. intersection of Twin Beech Road and County Road 13 (CR-13) (4-way stop
controlled)
III. Intersection of Twin Beech Road and Boothe Road (two-way stop controlled), and
IV. Intersection of Twin Beech Road and US-98 (signalized)
The major land use within the study area is residential.
4.2 Existing Geometric Data
Twin Beech Road (CR-44) within the study area is a two-lane undivided roadway with 10
feet travel lanes and very narrow paved shoulders. It is functionally classified as a major
collector. The current posted speed limit is 45 mph in the vicinity of the proposed project
site. However, the speed limit will be reduced to 35 mph.
4.3 Existing Condition Traffic Count
For the section of Twin Beech Road (CR-44) adjacent to the proposed site, the 2019 AADT,
K-factor, D-factor and percentage of truck traffic (TDHV) were obtained from ALDOT’s
traffic data website. The AADT, K, D and TDHV are 4422 vehicles/day, 0.11, 0.61 and 4%
respectively. Assuming a 4.5% growth factor, the existing (2020) AADT is 4422*(1 + 0.045)1
=4621 vehicles/day. More details of estimating projected quantity from existing quantity
using the growth factor is provided in Section 3.1 of this report.
Turning volume counts were performed at the intersection of Twin Beech Road (CR-44)
and SR-181 on Tuesday, October 13 during AM and PM peak hours. The peak hour turning
volumes at other three intersections described in Section 4.1 were collected on
Wednesday, December 16, 2020. These turning volumes included school traffic. These
turning volumes are provided in Table 2. The turning volume counts are also provided in
Appendix-B.
9
Table 2 : Existing (2020) Peak Hour Volumes at CR-44 and SR-181 Intersection
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
Twin Beech Road at SR-181
Morning 106 392 - - 320 185 166 - 89 - - -
Afternoon 108 366 - - 373 183 142 - 84 - - -
Twin Beech Road at CR-13
Morning 34 119 53 12 67 57 34 112 22 30 170 19
Afternoon 23 110 73 28 109 35 46 201 26 43 158 35
Twin Beech Road at Boothe Road
Morning 22 27 20 11 28 29 19 121 28 25 230 37
Afternoon 12 23 28 31 22 35 33 268 44 24 178 24
Twin Beech Road at US-98
Morning 57 763 81 181 467 57 74 93 51 79 72 61
Afternoon 50 573 51 103 636 63 114 93 44 30 81 97
4.4 Existing Conditions Capacity Analysis
The section of Twin Beech Road (CR-44) adjacent to the proposed development is a two-
lane highway. Therefore, using the Highway Capacity Manual (6th Edition) method, two-
lane highway level of service (LOS) analysis was performed for the existing traffic
condition. The results of LOS calculations are provided in Appendix-C. The analysis shows
that a level of service (LOS) of B exists during existing condition peak hours. A level of
service of B indicates excellent traffic flow condition on CR-44.
Table 3 : Existing Condition Capacity Analysis Results
Peak Hour Northbound Southbound Eastbound Westbound Overall
Intersection
Intersection of Twin Beech Rd & SR181
Morning A A D - B
Afternoon A A D - B
Twin Beech Rd & CR-13
Morning C B C C C
Afternoon C C C C C
Intersection of Twin Beech Rd & Boothe Rd
Morning C C A A **
Afternoon C D A A **
Intersection of Twin Beech Rd & US-98
Morning D C C D C
Afternoon B B B B B
** Note: Overall LOS is not reported for a two-way stop-controlled intersection since the free approaches always
experience zero delay.
As discussed in Section 4.1, four intersections on Twin Beech Road were analyzed in this
study. The summary of capacity analysis results for existing condition are provided in Table
10
3. The results show the all the intersections except Twin Beech Road at Boothe Rd
experience overall level of services (LOS) of C or better during both AM and PM peak
hours. Since the intersection of Twin Beech Road and Boothe Road is a two-way stop
controlled intersection, overall LOS was not calculated. However, all the approaches of
the intersection experienced LOS of D or better. It should be noted that a LOS of D or
better is acceptable for an intersection.
4.5 Existing Conditions Signal Warrant Analysis
Existing condition signal warrant analysis in not applicable is this study.
11
5.0 FUTURE CONDITIONS
The following general parameters describe the future traffic conditions:
5.1 Trip Generation Estimates
The proposed development will be an apartment complex consisting of 242 dwelling
units. The proposed site is planned to have a driveway access to Twin Beech Road. Using
the aforementioned information, the trip generation estimation for the proposed
development was performed according to the ITE Trip Generation Manual 10th Edition.
The trip generation rates and volumes are shown in Tables 4 and 5. Appendix-D provides
more details regarding these trip generation rates.
5.2 Directional Distribution of Development Traffic
Using the trip ends estimated in the trip generation phase, the directional distribution of
the generated traffic was calculated in the trip distribution phase. In order to estimate
the directional distribution of generated traffic, the logical route, the land use type of the
proposed facility, the land use of the surrounding areas, the entrance/exit type and
location, etc. were considered. The general distributions of generated traffic to and from
the proposed development are shown in Figure 3.
Table 4: Trip Generation Rates and Percentage Entering and Exiting
ITE
Code
Unit Daily
Total
(Av/
Eq)
Daily
(In)
(%)
Daily
(Out)
(%)
AM-PK
(Av/Eq)
AM-
Peak
(In)
(%)
AM-
Peak
(Out)
(%)
PM-
Peak
(Av/Eq)
PM-
Peak
(In)
(%)
PM-
Peak
(Out)
(%)
Multifamily
Housing (mid-
rise)
221 Dwelling
unit
Eq 3* 50 50 Eq 4* 26 74 Eq 5* 61 39
*Notes: T=5.45(X)-1.75 …. Eq 3
LN(T)=0.98*LN(X) – 0.98 …. Eq 4
LN(T)=0.96*LN(X) – 0.63 …. Eq 5
(Source: ITE Trip Generation Manual, 10th Edition) Av – average; Eq – Equation; X – Dwelling Unit
Table 5: Trip Generation Volumes (Trip Ends)
ITE
Code
Dwelling
Units
Daily
Total
Daily
(In)
Daily
(Out)
AM-
Peak
Hour
Total
AM-
Peak
Hour
(In)
AM-
Peak
Hour
(Out)
PM-
Peak
Hour
Total
PM-
Peak
Hour
(In)
PM-
Peak
Hour
(Out)
221 242 1318 659 659 82 22 61 104 64 41
*Note: Trips in and out may not add up to the total number of trips due to rounding.
12
Figure 3 : Generated Traffic by the Proposed Development
5.3 Development Horizon Year
The proposed development is expected to be completed and operational in the first
quarter of 2022.
5.4 Projected Future Traffic Volumes
Using a 4.5% growth rate, the traffic volumes for 2022 were calculated using the following
equation:
𝑉𝑜𝑙𝑢𝑙𝑒2022 = 𝑉𝑜𝑙𝑢𝑙𝑒2020 ∗1.0452022−2020 …………………………..(6)
Table 6 shows the projected peak hour turning volumes without the proposed
development (no-build) in 2022 at the four intersections on Twin Beech Road discussed
in Section 4.1. Table 7 shows the projected peak hour turning volumes at the same
intersections with the proposed development in 2022.
13
Table 6: Projected Peak Hour Turning Volumes without Proposed Development
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
Twin Beech Road at SR-181
Morning 118 431 - - 351 210 187 - 100 - - -
Afternoon 121 402 - - 409 206 162 - 94 - - -
Twin Beech Road at CR-13
Morning 38 130 60 16 74 63 38 130 25 35 200 23
Afternoon 26 121 82 33 120 39 51 234 29 49 182 41
Twin Beech Road at Boothe Road
Morning 25 30 24 15 31 32 21 139 31 31 265 43
Afternoon 14 26 34 36 25 39 37 305 49 29 203 29
Twin Beech Road at US-98
Morning 63 834 92 201 510 63 81 105 56 92 84 72
Afternoon 55 626 61 118 695 69 125 107 49 36 93 110
Table 7: Projected Peak Hour Turning Volumes at CR-44 and SR-181 Intersection with
Proposed Development
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
Twin Beech Road at SR-181
Morning 121 431 - - 351 220 215 - 108 - - -
Afternoon 129 402 - - 409 235 181 - 99 - - -
Twin Beech Road at CR-13
Morning 38 130 61 17 74 63 38 139 25 36 225 24
Afternoon 26 121 83 34 120 39 51 260 29 50 199 42
Twin Beech Road at Boothe Road
Morning 25 30 26 16 31 32 21 147 31 35 286 44
Afternoon 14 26 38 37 25 39 37 327 49 32 217 30
Twin Beech Road at US-98
Morning 63 834 95 204 510 63 81 108 56 99 92 80
Afternoon 55 626 68 126 695 69 125 115 49 41 98 115
5.5 Future Signal Warrant Analysis
Future signal warrant analysis is not applicable in this study.
14
5.6 Future Traffic Conditions Capacity Analysis
Before and after level of service (LOS) analysis was performed for the section of County
Road 44 (Twin Beech Road) adjacent to the proposed development using the projected
traffic volumes for 2022. The analysis results are provided in Appendices E and F. The results
show that the levels of service will remain at an adequate level (LOS C) during both peak
hours for both without and with Carmel Park development in 2022.
Table 8 : Intersection Capacity Analysis Results for 2022 without and with Carmel
Park
Peak Hour Scenario Northbound Southbound Eastbound Westbound Overall
Intersection
Intersection of Twin Beech & SR181
Morning Without
Carmel Park
A A D - B
With
Carmel Park
A A D - B)
Afternoon Without
Carmel Park
A A D - B
With
Carmel Park
A A D - B
Intersection of Twin Beech & CR-13
Morning Without
Carmel Park
A A A A A
With
Carmel Park
A A A A A
Afternoon Without
Carmel Park
A A A A A
With
Carmel Park
B A A A A
Intersection of Twin Beech & Boothe Rd
Morning Without
Carmel Park
E E A A **
With
Carmel Park
E E A A **
Afternoon Without
Carmel Park
D E A A **
With
Carmel Park
D E A A **
Intersection of Twin Beech & US-98
Morning Without
Carmel Park
B B D C C
With
Carmel Park
C B D D C
Afternoon Without
Carmel Park
B B C D B
With
Carmel Park
B B C D C
** Note: Overall LOS is not reported for a two-way stop-controlled intersection since the free approaches always
experience zero delay.
15
Level of Service (LOS) analyses were also performed for four intersections on Twin Beech
Road, as discussed in Section 4.1, to determine how these intersections would perform
without and with the proposed development in 2022. It should be noted that in 2022, the
intersection of Twin Beech Road and CR-13 will be modified into a single lane
roundabout. Also, the intersection of Twin Beech Road and US-98 will be improved as
discussed in Section 3.3. The summary of results of the analyses are presented in Table 8.
The detailed results are provided in Appendices E and F. The results show that all the
intersections except Twin Beech Road at Boothe Road will experience overall levels of
service (LOS) of C or better during both AM and PM peak hours. As discussed earlier, since
the intersection of Twin Beech Road and Boothe Road is a two-way stop-controlled
intersection, overall LOS was not calculated. The results for this intersection show that the
Twin Beech Road approaches (i.e. east and westbound) will experience no delay (LOS
A). However, the Boothe Road approaches (i.e. north and southbound) will experience
some level of delay as indicated by the level of service E both without and with the
proposed development in 2022. It should be noted that a LOS of D or better is acceptable
for an intersection. Further, analyses show that the LOS at this intersection can be
improved by converting the intersection from a two-way stop controlled to a four-way
stop controlled intersection. This conversion will improve the approach level of services
to D or better (see Table 9). Table 9 shows LOS results with Caramel Park development in
2022 after the intersection improvement to a 4-way stop controlled.
Table 9 : Capacity Analysis Results for Twin Beech Rd at Boothe Rd after
Conversion to 4-way Stop Controlled
Peak Hour Northbound Southbound Eastbound Westbound Overall
Intersection
Morning B B C D C
Afternoon B B D B C
5.7 Left/right Turn Lane Warrant Analysis
To determine if a left turn lane is needed on Twin Beech Road for the generated traffic
turning left into the proposed development, a method recommended in the AASHTO
Green Book, 7th Edition was used. AASHTO Green Book provides a chart to determine if a
left turn lane is desirable at unsignalized intersections with streets or driveways where the
major road is uncontrolled, and the minor road is stop- or yield-controlled. The Chart is
provided in Appendix-G. The peak hour turning volumes into the driveway and adjacent
Twin Beech Road through volumes are provided in Table 10. From the table provided in
Appendix-G, it is evident that a left turn lane is desirable on Twin Beech Road during both
peak hours for the generated traffic turning into the proposed development. Similarly, to
determine if a right turn bay is warranted on Twin Beech Road, a chart from NCHRP
Report No. 457 was used (see Figure G.1 in Appendix G). From the chart it is evident that
none of the right turn volumes and one direction major road volumes combination
satisfies the right turn lane warrant based on the 40-mph major street speed. It should be
noted that the major street speed is 35 mph in this study. Since the warrant is not met for
40 mph, the warrant is not met for a lower major road speed as well.
16
Table 10: Left/right Turn Lane Warrant Analysis for CR-44 at Carmel Park
WB Through WB Left EB Through EB Right
AM 341 13 323 10
PM 364 38 280 27
17
6.0 CONCLUSIONS/RECOMMENDATIONS
Based on the analysis performed in this study, the additional traffic volumes from the
proposed development are not expected to adversely affect the traffic operations on
the segment of Twin Beech Road (CR-44) adjacent to the proposed development. In
addition to roadway segment analyses, the capacity analyses were performed for the
four major intersections on Twin Beech Road from SR-181 to US-98. The results show that
all the intersections except Twin Beech Road at Boothe Road will experience adequate
overall level of services (LOS) of C or better during both AM and PM peak hours without
and with Carmel Park Development in 2022. The individual approaches will experience
LOS of D or better. It should be noted that a LOS of D or better is acceptable for an
intersection. For the intersection of Twin Beech Road and Boothe Road, the overall
intersection LOS was not calculated since it is a two-way stop-controlled intersection. The
results of analyses for this intersection show that the individual Boothe Road approaches
(i.e. north and southbound approaches) will experience some level of delay as indicated
by the level of service E both without and with the proposed development in 2022.
Further, analyses show that the LOS at this intersection can be improved by converting
the intersection from a two-way stop controlled to a four-way stop controlled
intersection. This conversion will improve the approach level of services to D or better.
To evaluate if a left turn lane is warranted to access the proposed development from
Twin Beech Road, a method recommended in AASHTO Green Book, 7th Edition was used.
According to this method, a left turn lane is desirable on Twin Beech Road for the
generated traffic turning left into the proposed development. Similarly, to determine if a
right turn lane is warranted on Twin Beech Road, a method recommended in NCHRP
Report No. 457 was used. According to this method, a right-turn lane is not warranted on
Twin Beech Road to access the proposed development through the proposed access.
18
7.0 REFERENCES
1. Baldwin County Traffic Impact Study requirements. Appendix 6 of the Baldwin
County Subdivision Regulations, August 6, 2019.
2. Alabama Department of Transportation (ALDOT) Access Management Manual,
January, 2013 Edition.
3. Institution of Transportation Engineers (ITE) Trip Generation Manual, 10th Edition.
4. Highway Capacity Manual, 6th Edition.
5. A Policy on Geometric Design of Highways and Streets, 7th Edition, 2018.
6. Evaluating Intersection Improvements: An Engineering Study Guide, NCHRP Report
457.
A
APPENDIX - A: PROPOSED SITE LAYOUT
P:\GCD\GCD-2020\2020012-FAIRHOPEAPARTMENTS\DD\FA-A1-01K.gxd--Scale1:480
B
APPENDIX – B: TRAFFIC COUNTS
Intersection of Twin Beech Road and SR-181
Morning Peak Hour
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
8:30-8:45 32 101 - - 97 60 50 - 22 - - -
8:45-9:00 26 106 - - 71 42 42 - 23 - - -
9:00-9:15 23 98 - - 80 45 39 - 24 - - -
9:15-9:30 25 87 - - 72 38 35 - 20 - - -
Total 106 392 - - 320 185 166 - 89 - - -
Afternoon Peak Hour
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
2:30-2:45 23 82 - - 85 45 30 - 15 - - -
2:45-3:00 22 85 - - 99 46 32 - 19 - - -
3:00-3:15 29 111 - - 83 41 40 - 26 - - -
3:15-3:30 34 88 - - 106 51 40 - 24 - - -
Total 108 366 - - 373 183 142 - 84 - - -
Intersection of Twin Beech Road and CR-13
Morning Peak Hour
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
8:30-8:45 13 41 36 2 16 25 17 38 13 16 50 7
8:45-9:00 13 31 8 6 20 15 9 28 6 5 55 7
9:00-9:15 7 24 6 2 16 6 5 28 2 4 31 3
9:15-9:30 1 23 3 2 15 11 3 18 1 5 34 2
Total 34 119 53 12 67 57 34 112 22 30 170 19
Afternoon Peak Hour
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
2:30-2:45 3 15 15 6 23 5 8 45 4 15 39 7
2:45-3:00 6 24 6 5 26 6 9 47 7 15 33 13
3:00-3:15 8 33 13 8 34 13 12 38 7 8 41 11
3:15-3:30 6 38 39 9 26 11 17 71 8 5 45 4
Total 23 110 73 28 109 35 46 201 26 43 158 35
Intersection of Twin Beech Road and Boothe Road
Morning Peak Hour
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
8:30-8:45 13 41 36 2 16 25 17 38 13 16 50 7
8:45-9:00 13 31 8 6 20 15 9 28 6 5 55 7
9:00-9:15 7 24 6 2 16 6 5 28 2 4 31 3
9:15-9:30 1 23 3 2 15 11 3 18 1 5 34 2
Total 34 119 53 12 67 57 34 112 22 30 170 19
Afternoon Peak Hour
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
2:30-2:45 3 15 15 6 23 5 8 45 4 15 39 7
2:45-3:00 6 24 6 5 26 6 9 47 7 15 33 13
3:00-3:15 8 33 13 8 34 13 12 38 7 8 41 11
3:15-3:30 6 38 39 9 26 11 17 71 8 5 45 4
Total 23 110 73 28 109 35 46 201 26 43 158 35
Intersection of Twin Beech Road and US-98
Morning Peak Hour
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
8:30-8:45 16 244 43 88 145 13 14 37 17 47 17 17
8:45-9:00 27 263 26 60 131 11 23 37 17 14 19 15
9:00-9:15 7 130 8 15 80 10 19 10 6 11 20 13
9:15-9:30 7 126 4 18 111 23 18 9 11 7 16 16
Total 57 763 81 181 467 57 74 93 51 79 72 61
Afternoon Peak Hour
NB SB EB WB
LT TH RT LT TH RT LT TH RT LT TH RT
2:30-2:45 10 119 19 31 148 9 22 27 11 4 13 19
2:45-3:00 18 173 15 25 150 11 29 25 12 5 28 27
3:00-3:15 12 145 10 23 155 24 30 22 8 13 17 25
3:15-3:30 10 136 7 24 183 19 33 19 13 8 23 26
Total 50 573 51 103 636 63 114 93 44 30 81 97
C
APPENDIX – C: EXISTING CONDITIONS
CAPACITY ANALYSIS
Project Name: Traffic Impact Study for Carmel Park Apartment (CR-44)
Scenario: Twin Beech Road Existing Condition (2020) - AM Peak Hour
Step1
Highway Class III
Posted Speed Limit 45
Demand volume in analysis direction, Vd 291
Demand volume in opposite direction, Vo 255
Peak hour factor (PHF)d 0.85
Peak hour factor (PHF)o 0.85
Lane Width 10
Shoulder Width 0
Access Point Density (per mile)39
Percentage of Truck (PT)4
Percentage of RV (RV)0
Passenger Car Equivalent (ET)ATS 1.9
Passenger Car Equivalent (ET)PTSF 1.1
Passenger Car Equivalent (ER)1
Heavy Vehicle Factor,
fHV,ATS = 1/(1+PT(ET-1) + PR(ER-1))0.965251 (Equation 15-4 of HCM)
ATS Grade adjustment factor, fg,ATS =1 Using Exhibit 15-9
Step 2: Estimate the FFS
Lane and shoulder width adjustment factor, fLS =5.3 Exhibit 15-7
Adjustment factor for access point density, fA =9.75 Exhibit 15-8
Base Free-flow Speed, BFFS =55
FFS = BFFS - fLS - fA=39.95 (Equation 15-2 of HCM)
Step 3: Demand adjustment for ATS
fg,ATS=1 Exhibit 15-9
vd,ATS =Vd/(PHF*fg,ATS*fHV,ATS) =354.6776471 (Equation 15-3 of HCM)
vo,ATS =Vo/(PHF*fg,ATS*fHV,ATS) =310.8 (Equation 15-3 of HCM)
Step 4: Estimate ATS
fnp,ATS =0.9 0% in both drection Exhibit 15-15
ATSd= FFS -0.00776(vd,ATS+vo,ATS)-fnp,ATS=33.88589 (Equation 15-6 of HCM)
Step 5:Estimate the PFFS
PFFS = (ATSd)/(FFS)=85%
Step 6: Determine LOS (Exhibit 15-3 of HCM)
LOS A = NO
LOSB =YES
LOS C =NO
LOS D =NO
LOS E =NO
LOS F =NO
Project Name: Traffic Impact Study for Carmel Park Apartment (CR-44)
Scenario: Twin Beech Road Existing Condition (2020) - PM Peak Hour
Step1
Highway Class III
Posted Speed Limit 45
Demand volume in analysis direction, Vd 291
Demand volume in opposite direction, Vo 226
Peak hour factor (PHF)d 0.85
Peak hour factor (PHF)o 0.85
Lane Width 10
Shoulder Width 0
Access Point Density (per mile)39
Percentage of Truck (PT)4
Percentage of RV (RV)0
Passenger Car Equivalent (ET)ATS 1.9
Passenger Car Equivalent (ET)PTSF 1.1
Passenger Car Equivalent (ER)1
Heavy Vehicle Factor,
fHV,ATS = 1/(1+PT(ET-1) + PR(ER-1))0.965251 (Equation 15-4 of HCM)
ATS Grade adjustment factor, fg,ATS =1 Using Exhibit 15-9
Step 2: Estimate the FFS
Lane and shoulder width adjustment factor, fLS =5.3 Exhibit 15-7
Adjustment factor for access point density, fA =9.75 Exhibit 15-8
Base Free-flow Speed, BFFS =55
FFS = BFFS - fLS - fA=39.95 (Equation 15-2 of HCM)
Step 3: Demand adjustment for ATS
fg,ATS=1 Exhibit 15-9
vd,ATS =Vd/(PHF*fg,ATS*fHV,ATS) =354.6776471 (Equation 15-3 of HCM)
vo,ATS =Vo/(PHF*fg,ATS*fHV,ATS) =275.4541176 (Equation 15-3 of HCM)
Step 4: Estimate ATS
fnp,ATS =0.9 0% in both drection Exhibit 15-15
ATSd= FFS -0.00776(vd,ATS+vo,ATS)-fnp,ATS=34.16018 (Equation 15-6 of HCM)
Step 5:Estimate the PFFS
PFFS = (ATSd)/(FFS)=86%
Step 6: Determine LOS (Exhibit 15-3 of HCM)
LOS A = NO
LOSB =YES
LOS C =NO
LOS D =NO
LOS E =NO
LOS F =NO
HCM 6th Signalized Intersection Summary
2: Twin Beech Road & SR-181 10/20/2020
Twin Beech Road and SR-181 10/13/2020 EXISTING AM Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 166 89 106 392 320 185
Future Volume (veh/h) 166 89 106 392 320 185
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 200 96 128 426 390 240
Peak Hour Factor 0.83 0.93 0.83 0.92 0.82 0.77
Percent Heavy Veh, %222222
Cap, veh/h 244 217 640 1461 1309 1109
Arrive On Green 0.14 0.14 0.04 0.78 0.70 0.70
Sat Flow, veh/h 1781 1585 1781 1870 1870 1585
Grp Volume(v), veh/h 200 96 128 426 390 240
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1870 1870 1585
Q Serve(g_s), s 10.6 5.4 1.8 6.3 7.7 5.2
Cycle Q Clear(g_c), s 10.6 5.4 1.8 6.3 7.7 5.2
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 244 217 640 1461 1309 1109
V/C Ratio(X) 0.82 0.44 0.20 0.29 0.30 0.22
Avail Cap(c_a), veh/h 476 423 861 1461 1309 1109
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 40.8 38.6 3.6 3.0 5.5 5.2
Incr Delay (d2), s/veh 6.7 1.4 0.2 0.5 0.6 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.9 0.1 0.4 1.5 2.5 1.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 47.6 40.0 3.7 3.5 6.1 5.6
LnGrp LOS D D AAAA
Approach Vol, veh/h 296 554 630
Approach Delay, s/veh 45.1 3.6 5.9
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 80.0 17.3 7.9 72.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 76.0 26.0 16.0 56.0
Max Q Clear Time (g_c+I1), s 8.3 12.6 3.8 9.7
Green Ext Time (p_c), s 2.6 0.7 0.2 3.1
Intersection Summary
HCM 6th Ctrl Delay 12.9
HCM 6th LOS B
HCM 6th Signalized Intersection Summary
2: Twin Beech Road & SR-81 10/20/2020
Twin Beech Road and SR-181 10/13/2020 EXISTING PM Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 142 84 108 366 373 183
Future Volume (veh/h) 142 84 108 366 373 183
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 160 104 137 446 424 203
Peak Hour Factor 0.89 0.81 0.79 0.82 0.88 0.90
Percent Heavy Veh, %222222
Cap, veh/h 206 183 655 1497 1341 1137
Arrive On Green 0.12 0.12 0.04 0.80 0.72 0.72
Sat Flow, veh/h 1781 1585 1781 1870 1870 1585
Grp Volume(v), veh/h 160 104 137 446 424 203
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1870 1870 1585
Q Serve(g_s), s 8.3 5.9 1.7 5.9 7.9 3.9
Cycle Q Clear(g_c), s 8.3 5.9 1.7 5.9 7.9 3.9
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 206 183 655 1497 1341 1137
V/C Ratio(X) 0.78 0.57 0.21 0.30 0.32 0.18
Avail Cap(c_a), veh/h 488 434 882 1497 1341 1137
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 40.8 39.8 3.1 2.5 4.9 4.4
Incr Delay (d2), s/veh 6.2 2.8 0.2 0.5 0.6 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.9 5.3 0.5 1.6 2.4 1.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 47.0 42.5 3.3 3.0 5.5 4.7
LnGrp LOS D D AAAA
Approach Vol, veh/h 264 583 627
Approach Delay, s/veh 45.3 3.1 5.3
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 80.0 15.0 7.9 72.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 76.0 26.0 16.0 56.0
Max Q Clear Time (g_c+I1), s 7.9 10.3 3.7 9.9
Green Ext Time (p_c), s 3.2 0.7 0.3 3.3
Intersection Summary
HCM 6th Ctrl Delay 11.6
HCM 6th LOS B
HCM 6th AWSC
3: CR-13 & CR-44 12/31/2020
12/16/2020 Existing AM_2020 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Intersection Delay, s/veh 16.3
Intersection LOS C
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 34 112 22 30 170 19 34 119 53 12 67 57
Future Vol, veh/h 34 112 22 30 170 19 34 119 53 12 67 57
Peak Hour Factor 0.50 0.74 0.42 0.47 0.77 0.68 0.65 0.73 0.37 0.50 0.84 0.57
Heavy Vehicles, %222222222222
Mvmt Flow 68 151 52 64 221 28 52 163 143 24 80 100
Number of Lanes 010010010010
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1111
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1111
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1111
HCM Control Delay 15.3 16.8 18.5 13.1
HCM LOS C C C B
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %17% 20% 14% 9%
Vol Thru, %58% 67% 78% 49%
Vol Right, % 26% 13% 9% 42%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 206 168 219 136
LT Vol 34 34 30 12
Through Vol 119 112 170 67
RT Vol 53 22 19 57
Lane Flow Rate 359 272 313 204
Geometry Grp 1111
Degree of Util (X) 0.612 0.483 0.548 0.362
Departure Headway (Hd)6.147 6.393 6.314 6.404
Convergence, Y/N Yes Yes Yes Yes
Cap 584 562 569 558
Service Time 4.205 4.458 4.376 4.473
HCM Lane V/C Ratio 0.615 0.484 0.55 0.366
HCM Control Delay 18.5 15.3 16.8 13.1
HCM Lane LOS C C C B
HCM 95th-tile Q 4.1 2.6 3.3 1.6
HCM 6th AWSC
3: CR-13 & CR-44 12/31/2020
12/16/2020 Existing PM_2020 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Intersection Delay, s/veh 20.3
Intersection LOS C
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 46 201 26 43 158 35 23 110 73 28 109 35
Future Vol, veh/h 46 201 26 43 158 35 23 110 73 28 109 35
Peak Hour Factor 0.68 0.71 0.81 0.72 0.88 0.67 0.72 0.72 0.47 0.78 0.80 0.67
Heavy Vehicles, %222222222222
Mvmt Flow 68 283 32 60 180 52 32 153 155 36 136 52
Number of Lanes 010010010010
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1111
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1111
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1111
HCM Control Delay 24.4 18.1 20.6 15.7
HCM LOS CCCC
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %11% 17% 18% 16%
Vol Thru, %53% 74% 67% 63%
Vol Right, % 35% 10% 15% 20%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 206 273 236 172
LT Vol 23 46 43 28
Through Vol 110 201 158 109
RT Vol 73 26 35 35
Lane Flow Rate 340 383 292 224
Geometry Grp 1111
Degree of Util (X) 0.632 0.709 0.554 0.442
Departure Headway (Hd)6.696 6.667 6.842 7.091
Convergence, Y/N Yes Yes Yes Yes
Cap 541 544 525 507
Service Time 4.722 4.692 4.906 5.159
HCM Lane V/C Ratio 0.628 0.704 0.556 0.442
HCM Control Delay 20.6 24.4 18.1 15.7
HCM Lane LOS CCCC
HCM 95th-tile Q 4.4 5.7 3.3 2.2
HCM 6th TWSC
8: Boothe Rd & CR-44 12/31/2020
12/16/2020 Existing AM_2020 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Int Delay, s/veh 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 19 121 28 25 230 37 22 27 20 11 28 29
Future Vol, veh/h 19 121 28 25 230 37 22 27 20 11 28 29
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 48 66 33 37 75 54 61 68 50 69 35 60
Heavy Vehicles, % 2 22222222222
Mvmt Flow 40 183 85 68 307 69 36 40 40 16 80 48
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 376 0 0 268 0 0 848 818 226 824 826 342
Stage 1 ------306306-478478-
Stage 2 ------542512-346348-
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1182 - - 1296 - - 281 311 813 292 307 701
Stage 1 ------704662-568556-
Stage 2 ------525536-670634-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1182 - - 1296 - - 187 279 813 228 275 701
Mov Cap-2 Maneuver ------187279-228275-
Stage 1 ------676636-545519-
Stage 2 ------386500-573609-
Approach EB WB NB SB
HCM Control Delay, s 1 1.2 24.2 23.5
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)301 1182 - - 1296 - - 336
HCM Lane V/C Ratio 0.385 0.033 - - 0.052 - - 0.429
HCM Control Delay (s) 24.2 8.2 0 - 7.9 0 - 23.5
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 1.7 0.1 - - 0.2 - - 2.1
HCM 6th TWSC
8: Boothe Rd & CR-44 12/31/2020
12/16/2020 Existing PM_2020 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Int Delay, s/veh 6.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 33 268 44 24 178 24 12 23 28 31 22 35
Future Vol, veh/h 33 268 44 24 178 24 12 23 28 31 22 35
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 65 60 70 75 91 75 60 48 100 60 50 73
Heavy Vehicles, % 2 22222222222
Mvmt Flow 51 447 63 32 196 32 20 48 28 52 44 48
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 228 0 0 510 0 0 903 873 479 895 888 212
Stage 1 ------581581-276276-
Stage 2 ------322292-619612-
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1340 - - 1055 - - 258 289 587 261 283 828
Stage 1 ------499500-730682-
Stage 2 ------690671-476484-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1340 - - 1055 - - 198 264 587 200 258 828
Mov Cap-2 Maneuver ------198264-200258-
Stage 1 ------472473-691658-
Stage 2 ------585648-385458-
Approach EB WB NB SB
HCM Control Delay, s 0.7 1.1 23.4 28.3
HCM LOS C D
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)290 1340 - - 1055 - - 295
HCM Lane V/C Ratio 0.331 0.038 - - 0.03 - - 0.487
HCM Control Delay (s) 23.4 7.8 0 - 8.5 0 - 28.3
HCM Lane LOS C A A - A A - D
HCM 95th %tile Q(veh) 1.4 0.1 - - 0.1 - - 2.5
HCM 6th Signalized Intersection Summary
13: US-98 & CR-44 01/01/2021
12/16/2020 Existing AM_2020 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 74 93 51 79 72 61 57 763 81 181 467 57
Future Volume (veh/h) 74 93 51 79 72 61 57 763 81 181 467 57
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 92 148 68 188 80 68 108 1045 172 355 577 92
Peak Hour Factor 0.80 0.63 0.75 0.42 0.90 0.90 0.53 0.73 0.47 0.51 0.81 0.62
Percent Heavy Veh, %222222222222
Cap, veh/h 171 254 103 263 98 74 464 1147 188 393 1457 232
Arrive On Green 0.30 0.30 0.30 0.30 0.30 0.30 0.06 0.38 0.38 0.16 0.47 0.47
Sat Flow, veh/h 376 854 349 647 330 248 1781 3055 502 1781 3071 488
Grp Volume(v), veh/h 308 0 0 336 0 0 108 607 610 355 333 336
Grp Sat Flow(s),veh/h/ln 1580 0 0 1225 0 0 1781 1777 1780 1781 1777 1782
Q Serve(g_s), s 0.0 0.0 0.0 8.2 0.0 0.0 2.9 25.5 25.7 10.2 9.6 9.6
Cycle Q Clear(g_c), s 13.1 0.0 0.0 21.3 0.0 0.0 2.9 25.5 25.7 10.2 9.6 9.6
Prop In Lane 0.30 0.22 0.56 0.20 1.00 0.28 1.00 0.27
Lane Grp Cap(c), veh/h 528 0 0 435 0 0 464 667 668 393 843 846
V/C Ratio(X) 0.58 0.00 0.00 0.77 0.00 0.00 0.23 0.91 0.91 0.90 0.40 0.40
Avail Cap(c_a), veh/h 536 0 0 442 0 0 500 667 668 410 843 846
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 23.9 0.0 0.0 27.3 0.0 0.0 13.5 23.4 23.4 19.4 13.4 13.4
Incr Delay (d2), s/veh 1.6 0.0 0.0 8.2 0.0 0.0 0.3 18.7 19.0 22.3 1.4 1.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.9 0.0 0.0 6.8 0.0 0.0 1.0 12.6 12.7 5.8 3.5 3.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 25.5 0.0 0.0 35.5 0.0 0.0 13.8 42.0 42.4 41.7 14.8 14.8
LnGrp LOS C A A D A A B D D D B B
Approach Vol, veh/h 308 336 1325 1024
Approach Delay, s/veh 25.5 35.5 39.9 24.1
Approach LOS CDDC
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 16.8 34.1 27.9 9.0 41.9 27.9
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 13.1 29.6 23.8 6.1 36.6 23.8
Max Q Clear Time (g_c+I1), s 12.2 27.7 15.1 4.9 11.6 23.3
Green Ext Time (p_c), s 0.1 1.3 1.2 0.0 3.7 0.1
Intersection Summary
HCM 6th Ctrl Delay 32.5
HCM 6th LOS C
HCM 6th Signalized Intersection Summary
13: US-98 & CR-44 01/01/2021
12/16/2020 Existing PM_2020 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 114 93 44 30 81 97 50 573 51 103 636 63
Future Volume (veh/h) 114 93 44 30 81 97 50 573 51 103 636 63
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 168 131 54 42 92 145 69 796 109 132 795 94
Peak Hour Factor 0.68 0.71 0.81 0.72 0.88 0.67 0.72 0.72 0.47 0.78 0.80 0.67
Percent Heavy Veh, %222222222222
Cap, veh/h 289 183 66 128 193 257 363 1113 152 379 1207 143
Arrive On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.06 0.35 0.35 0.08 0.38 0.38
Sat Flow, veh/h 630 635 229 154 669 890 1781 3140 430 1781 3201 378
Grp Volume(v), veh/h 353 0 0 279 0 0 69 450 455 132 441 448
Grp Sat Flow(s),veh/h/ln 1494 0 0 1713 0 0 1781 1777 1793 1781 1777 1802
Q Serve(g_s), s 3.8 0.0 0.0 0.0 0.0 0.0 1.2 10.9 10.9 2.2 10.2 10.2
Cycle Q Clear(g_c), s 10.6 0.0 0.0 6.8 0.0 0.0 1.2 10.9 10.9 2.2 10.2 10.2
Prop In Lane 0.48 0.15 0.15 0.52 1.00 0.24 1.00 0.21
Lane Grp Cap(c), veh/h 538 0 0 578 0 0 363 630 636 379 670 680
V/C Ratio(X) 0.66 0.00 0.00 0.48 0.00 0.00 0.19 0.71 0.72 0.35 0.66 0.66
Avail Cap(c_a), veh/h 807 0 0 882 0 0 471 1061 1070 699 1312 1330
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 16.1 0.0 0.0 15.0 0.0 0.0 9.7 13.8 13.8 9.9 12.8 12.8
Incr Delay (d2), s/veh 1.4 0.0 0.0 0.6 0.0 0.0 0.3 1.5 1.5 0.5 1.1 1.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.2 0.0 0.0 2.3 0.0 0.0 0.3 3.4 3.4 0.6 3.0 3.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 17.5 0.0 0.0 15.6 0.0 0.0 10.0 15.4 15.4 10.5 13.9 13.9
LnGrp LOS BAABAAABBBBB
Approach Vol, veh/h 353 279 974 1021
Approach Delay, s/veh 17.5 15.6 15.0 13.5
Approach LOS BBBB
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.7 22.1 18.8 7.6 23.2 18.8
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 13.1 29.6 23.8 6.1 36.6 23.8
Max Q Clear Time (g_c+I1), s 4.2 12.9 12.6 3.2 12.2 8.8
Green Ext Time (p_c), s 0.2 4.7 1.7 0.0 5.2 1.4
Intersection Summary
HCM 6th Ctrl Delay 14.8
HCM 6th LOS B
D
APPENDIX – D: TRIP GENERATION RATES
T = 5.45(X)-1.75 = 5.45*242 - 1.75 = 1318 In = 1318*0.5 = 659 Out = 1318*0.5 = 659
T = EXP(0.98 LN(X)-0.98) = EXP(0.98*LN(242)-0.98) = 82 In = 0.26*82 = 22 Out = 0.74*82 = 61
T = EXP(0.96 LN(X)-0.63) = EXP(0.96*LN(242)-0.63) = 104 In = 0.61*104 = 64 Out = 0.39*104 = 41
E
APPENDIX – E: FUTURE CONDITIONS CAPACITY
ANALYSIS WITHOUT
DEVELOPMENT
Project Name: Traffic Impact Study for Carmel Park Apartment (CR-44)
Scenario: Twin Beech Road No Build Condition (2022) - AM Peak Hour
Step1
Highway Class III
Posted Speed Limit 35
Demand volume in analysis direction, Vd 328
Demand volume in opposite direction, Vo 287
Peak hour factor (PHF)d 0.85
Peak hour factor (PHF)o 0.85
Lane Width 10
Shoulder Width 0
Access Point Density (per mile)39
Percentage of Truck (PT)4
Percentage of RV (RV)0
Passenger Car Equivalent (ET)ATS 1.9
Passenger Car Equivalent (ET)PTSF 1.1
Passenger Car Equivalent (ER)1
Heavy Vehicle Factor,
fHV,ATS = 1/(1+PT(ET-1) + PR(ER-1))0.965251 (Equation 15-4 of HCM)
ATS Grade adjustment factor, fg,ATS =1 Using Exhibit 15-9
Step 2: Estimate the FFS
Lane and shoulder width adjustment factor, fLS =5.3 Exhibit 15-7
Adjustment factor for access point density, fA =9.75 Exhibit 15-8
Base Free-flow Speed, BFFS =45
FFS = BFFS - fLS - fA=29.95 (Equation 15-2 of HCM)
Step 3: Demand adjustment for ATS
fg,ATS=1 Exhibit 15-9
vd,ATS =Vd/(PHF*fg,ATS*fHV,ATS) =399.7741176 (Equation 15-3 of HCM)
vo,ATS =Vo/(PHF*fg,ATS*fHV,ATS) =349.8023529 (Equation 15-3 of HCM)
Step 4: Estimate ATS
fnp,ATS =0.9 0% in both drection Exhibit 15-15
ATSd= FFS -0.00776(vd,ATS+vo,ATS)-fnp,ATS=23.23329 (Equation 15-6 of HCM)
Step 5:Estimate the PFFS
PFFS = (ATSd)/(FFS)=78%
Step 6: Determine LOS (Exhibit 15-3 of HCM)
LOS A = NO
LOSB =NO
LOS C =YES
LOS D =NO
LOS E =NO
LOS F =NO
Project Name: Traffic Impact Study for Carmel Park Apartment (CR-44)
Scenario: Twin Beech Road No Build Condition (2022) - PM Peak Hour
Step1
Highway Class III
Posted Speed Limit 35
Demand volume in analysis direction, Vd 327
Demand volume in opposite direction, Vo 256
Peak hour factor (PHF)d 0.85
Peak hour factor (PHF)o 0.85
Lane Width 10
Shoulder Width 0
Access Point Density (per mile)39
Percentage of Truck (PT)4
Percentage of RV (RV)0
Passenger Car Equivalent (ET)ATS 1.9
Passenger Car Equivalent (ET)PTSF 1.1
Passenger Car Equivalent (ER)1
Heavy Vehicle Factor,
fHV,ATS = 1/(1+PT(ET-1) + PR(ER-1))0.965251 (Equation 15-4 of HCM)
ATS Grade adjustment factor, fg,ATS =1 Using Exhibit 15-9
Step 2: Estimate the FFS
Lane and shoulder width adjustment factor, fLS =5.3 Exhibit 15-7
Adjustment factor for access point density, fA =9.75 Exhibit 15-8
Base Free-flow Speed, BFFS =45
FFS = BFFS - fLS - fA=29.95 (Equation 15-2 of HCM)
Step 3: Demand adjustment for ATS
fg,ATS=1 Exhibit 15-9
vd,ATS =Vd/(PHF*fg,ATS*fHV,ATS) =398.5552941 (Equation 15-3 of HCM)
vo,ATS =Vo/(PHF*fg,ATS*fHV,ATS) =312.0188235 (Equation 15-3 of HCM)
Step 4: Estimate ATS
fnp,ATS =0.9 0% in both drection Exhibit 15-15
ATSd= FFS -0.00776(vd,ATS+vo,ATS)-fnp,ATS=23.53594 (Equation 15-6 of HCM)
Step 5:Estimate the PFFS
PFFS = (ATSd)/(FFS)=79%
Step 6: Determine LOS (Exhibit 15-3 of HCM)
LOS A = NO
LOSB =NO
LOS C =YES
LOS D =NO
LOS E =NO
LOS F =NO
HCM 6th Signalized Intersection Summary
2: Twin Beech Rd & SR-181 01/03/2021
Twin Beech Road and SR-181 10/13/2020 Before AM Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 187 100 118 431 351 210
Future Volume (veh/h) 187 100 118 431 351 210
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 225 108 142 468 428 273
Peak Hour Factor 0.83 0.93 0.83 0.92 0.82 0.77
Percent Heavy Veh, %222222
Cap, veh/h 269 240 591 1437 1279 1084
Arrive On Green 0.15 0.15 0.04 0.77 0.68 0.68
Sat Flow, veh/h 1781 1585 1781 1870 1870 1585
Grp Volume(v), veh/h 225 108 142 468 428 273
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1870 1870 1585
Q Serve(g_s), s 12.1 6.1 2.2 7.7 9.3 6.5
Cycle Q Clear(g_c), s 12.1 6.1 2.2 7.7 9.3 6.5
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 269 240 591 1437 1279 1084
V/C Ratio(X) 0.84 0.45 0.24 0.33 0.33 0.25
Avail Cap(c_a), veh/h 468 416 801 1437 1279 1084
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 40.8 38.3 4.2 3.6 6.4 6.0
Incr Delay (d2), s/veh 6.7 1.3 0.2 0.6 0.7 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.8 5.6 0.7 2.4 3.1 1.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 47.6 39.6 4.4 4.2 7.1 6.5
LnGrp LOS D D AAAA
Approach Vol, veh/h 333 610 701
Approach Delay, s/veh 45.0 4.2 6.9
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 80.0 19.0 8.3 71.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 76.0 26.0 16.0 56.0
Max Q Clear Time (g_c+I1), s 9.7 14.1 4.2 11.3
Green Ext Time (p_c), s 3.4 0.8 0.3 3.6
Intersection Summary
HCM 6th Ctrl Delay 13.6
HCM 6th LOS B
HCM 6th Signalized Intersection Summary
2: Twin Beech Road & SR-181 01/03/2021
Twin Beech Road and SR-181 10/13/2020 Before PM Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 162 94 121 402 409 206
Future Volume (veh/h) 162 94 121 402 409 206
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 182 116 153 490 465 229
Peak Hour Factor 0.89 0.81 0.79 0.82 0.88 0.90
Percent Heavy Veh, %222222
Cap, veh/h 228 203 608 1476 1314 1114
Arrive On Green 0.13 0.13 0.04 0.79 0.70 0.70
Sat Flow, veh/h 1781 1585 1781 1870 1870 1585
Grp Volume(v), veh/h 182 116 153 490 465 229
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1870 1870 1585
Q Serve(g_s), s 9.6 6.6 2.1 7.2 9.5 4.8
Cycle Q Clear(g_c), s 9.6 6.6 2.1 7.2 9.5 4.8
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 228 203 608 1476 1314 1114
V/C Ratio(X) 0.80 0.57 0.25 0.33 0.35 0.21
Avail Cap(c_a), veh/h 481 428 824 1476 1314 1114
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 40.8 39.5 3.7 2.9 5.7 5.0
Incr Delay (d2), s/veh 6.3 2.5 0.2 0.6 0.7 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.5 0.1 0.6 2.1 3.0 1.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 47.1 42.0 3.9 3.5 6.4 5.4
LnGrp LOS D D AAAA
Approach Vol, veh/h 298 643 694
Approach Delay, s/veh 45.1 3.6 6.1
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 80.0 16.3 8.3 71.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 76.0 26.0 16.0 56.0
Max Q Clear Time (g_c+I1), s 9.2 11.6 4.1 11.5
Green Ext Time (p_c), s 3.6 0.8 0.3 3.7
Intersection Summary
HCM 6th Ctrl Delay 12.2
HCM 6th LOS B
HCM 6th Roundabout
3: CR-13 & CR-44 12/31/2020
Before AM-2022 12/16/2020 Before AM-2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Intersection Delay, s/veh 7.2
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 312 368 398 231
Demand Flow Rate, veh/h 319 375 406 236
Vehicles Circulating, veh/h 198 319 291 399
Vehicles Exiting, veh/h 437 378 226 295
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 6.0 7.8 7.9 6.7
Approach LOS AAAA
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976 4.976
Entry Flow, veh/h 319 375 406 236
Cap Entry Lane, veh/h 1128 997 1026 919
Entry HV Adj Factor 0.980 0.981 0.981 0.980
Flow Entry, veh/h 312 368 398 231
Cap Entry, veh/h 1104 978 1006 900
V/C Ratio 0.283 0.376 0.396 0.257
Control Delay, s/veh 6.0 7.8 7.9 6.7
LOS AAAA
95th %tile Queue, veh 1221
HCM 6th Roundabout
3: CR-13 & CR-44 12/31/2020
12/16/2020 Before PM_2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Intersection Delay, s/veh 8.0
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 441 336 378 250
Demand Flow Rate, veh/h 450 342 385 255
Vehicles Circulating, veh/h 265 284 456 317
Vehicles Exiting, veh/h 307 557 259 309
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 8.2 7.0 9.8 6.2
Approach LOS AAAA
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976 4.976
Entry Flow, veh/h 450 342 385 255
Cap Entry Lane, veh/h 1053 1033 867 999
Entry HV Adj Factor 0.981 0.982 0.981 0.980
Flow Entry, veh/h 441 336 378 250
Cap Entry, veh/h 1033 1014 850 979
V/C Ratio 0.427 0.331 0.444 0.255
Control Delay, s/veh 8.2 7.0 9.8 6.2
LOS AAAA
95th %tile Queue, veh 2121
HCM 6th TWSC
8: Boothe Rd & CR-44 12/31/2020
Before AM-2022 12/16/2020 Before AM-2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Int Delay, s/veh 10.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 139 31 31 265 43 25 30 24 15 31 32
Future Vol, veh/h 21 139 31 31 265 43 25 30 24 15 31 32
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 48 66 33 37 75 54 61 68 50 69 35 60
Heavy Vehicles, % 2 22222222222
Mvmt Flow 44 211 94 84 353 80 41 44 48 22 89 53
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 433 0 0 305 0 0 978 947 258 953 954 393
Stage 1 ------346346-561561-
Stage 2 ------632601-392393-
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1127 - - 1256 - - 230 261 781 239 259 656
Stage 1 ------670635-512510-
Stage 2 ------468489-633606-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1127 - - 1256 - - 133 226 781 172 225 656
Mov Cap-2 Maneuver ------133226-172225-
Stage 1 ------638605-487465-
Stage 2 ------317445-524577-
Approach EB WB NB SB
HCM Control Delay, s 1 1.3 38.3 36.4
HCM LOS E E
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)236 1127 - - 1256 - - 272
HCM Lane V/C Ratio 0.564 0.039 - - 0.067 - - 0.602
HCM Control Delay (s) 38.3 8.3 0 - 8.1 0 - 36.4
HCM Lane LOS E A A - A A - E
HCM 95th %tile Q(veh) 3.1 0.1 - - 0.2 - - 3.6
HCM 6th TWSC
8: Boothe Rd & CR-44 12/31/2020
12/16/2020 Before PM_2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Int Delay, s/veh 9.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 37 305 49 29 203 29 14 26 34 36 25 39
Future Vol, veh/h 37 305 49 29 203 29 14 26 34 36 25 39
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 65 70 70 75 91 75 60 48 100 60 50 73
Heavy Vehicles, % 2 22222222222
Mvmt Flow 57 436 70 39 223 39 23 54 34 60 50 53
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 262 0 0 506 0 0 957 925 471 950 941 243
Stage 1 ------585585-321321-
Stage 2 ------372340-629620-
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1302 - - 1059 - - 237 269 593 240 263 796
Stage 1 ------497498-691652-
Stage 2 ------648639-470480-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1302 - - 1059 - - 171 242 593 173 236 796
Mov Cap-2 Maneuver ------171242-173236-
Stage 1 ------466467-648624-
Stage 2 ------532612-367450-
Approach EB WB NB SB
HCM Control Delay, s 0.8 1.1 27.8 39.4
HCM LOS D E
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)267 1302 - - 1059 - - 261
HCM Lane V/C Ratio 0.418 0.044 - - 0.037 - - 0.626
HCM Control Delay (s) 27.8 7.9 0 - 8.5 0 - 39.4
HCM Lane LOS D A A - A A - E
HCM 95th %tile Q(veh) 2 0.1 - - 0.1 - - 3.8
HCM 6th Signalized Intersection Summary
13: US-98 & CR-44 01/01/2021
Before AM-2022 12/16/2020 Before AM-2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 81 105 56 92 84 72 63 834 92 201 510 63
Future Volume (veh/h) 81 105 56 92 84 72 63 834 92 201 510 63
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 95 124 66 108 99 85 74 981 108 236 600 74
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, %222222222222
Cap, veh/h 245 156 83 246 132 113 495 1564 172 385 1676 206
Arrive On Green 0.06 0.14 0.14 0.07 0.14 0.14 0.05 0.48 0.48 0.09 0.53 0.53
Sat Flow, veh/h 1781 1149 611 1781 929 798 1781 3228 355 1781 3185 392
Grp Volume(v), veh/h 95 0 190 108 0 184 74 540 549 236 334 340
Grp Sat Flow(s),veh/h/ln 1781 0 1760 1781 0 1727 1781 1777 1806 1781 1777 1800
Q Serve(g_s), s 3.7 0.0 8.5 4.2 0.0 8.3 1.6 18.3 18.4 5.1 9.0 9.0
Cycle Q Clear(g_c), s 3.7 0.0 8.5 4.2 0.0 8.3 1.6 18.3 18.4 5.1 9.0 9.0
Prop In Lane 1.00 0.35 1.00 0.46 1.00 0.20 1.00 0.22
Lane Grp Cap(c), veh/h 245 0 239 246 0 245 495 861 875 385 935 947
V/C Ratio(X) 0.39 0.00 0.79 0.44 0.00 0.75 0.15 0.63 0.63 0.61 0.36 0.36
Avail Cap(c_a), veh/h 251 0 391 246 0 388 526 861 875 522 935 947
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 28.2 0.0 34.1 28.0 0.0 33.6 9.4 15.6 15.6 12.2 11.3 11.3
Incr Delay (d2), s/veh 1.0 0.0 5.9 1.2 0.0 4.6 0.1 3.4 3.4 1.6 1.1 1.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.6 0.0 3.9 1.8 0.0 3.7 0.5 6.9 7.0 1.7 3.1 3.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 29.2 0.0 40.1 29.3 0.0 38.3 9.6 19.0 18.9 13.8 12.3 12.3
LnGrp LOS C A D C A D ABBBBB
Approach Vol, veh/h 285 292 1163 910
Approach Delay, s/veh 36.4 34.9 18.4 12.7
Approach LOS D C B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.9 44.0 10.0 15.6 8.6 47.4 9.5 16.0
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 13.7 34.7 5.5 18.1 5.5 42.9 5.3 18.3
Max Q Clear Time (g_c+I1), s 7.1 20.4 6.2 10.5 3.6 11.0 5.7 10.3
Green Ext Time (p_c), s 0.3 5.5 0.0 0.5 0.0 3.8 0.0 0.5
Intersection Summary
HCM 6th Ctrl Delay 20.2
HCM 6th LOS C
HCM 6th Signalized Intersection Summary
13: US-98 & CR-44 01/01/2021
12/16/2020 Before PM_2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 125 107 49 36 93 110 55 626 61 118 695 69
Future Volume (veh/h) 125 107 49 36 93 110 55 626 61 118 695 69
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 139 119 54 42 109 122 65 736 72 139 818 81
Peak Hour Factor 0.90 0.90 0.90 0.85 0.85 0.90 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, %222222222222
Cap, veh/h 234 229 104 273 130 146 386 1631 159 433 1676 166
Arrive On Green 0.06 0.19 0.19 0.04 0.16 0.16 0.05 0.50 0.50 0.06 0.51 0.51
Sat Flow, veh/h 1781 1218 553 1781 806 902 1781 3270 320 1781 3266 323
Grp Volume(v), veh/h 139 0 173 42 0 231 65 400 408 139 445 454
Grp Sat Flow(s),veh/h/ln 1781 0 1771 1781 0 1708 1781 1777 1813 1781 1777 1812
Q Serve(g_s), s 5.3 0.0 7.4 1.6 0.0 11.0 1.4 12.2 12.2 3.1 13.6 13.6
Cycle Q Clear(g_c), s 5.3 0.0 7.4 1.6 0.0 11.0 1.4 12.2 12.2 3.1 13.6 13.6
Prop In Lane 1.00 0.31 1.00 0.53 1.00 0.18 1.00 0.18
Lane Grp Cap(c), veh/h 234 0 333 273 0 276 386 886 904 433 912 930
V/C Ratio(X) 0.59 0.00 0.52 0.15 0.00 0.84 0.17 0.45 0.45 0.32 0.49 0.49
Avail Cap(c_a), veh/h 234 0 383 324 0 374 420 886 904 616 912 930
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 28.4 0.0 30.6 27.6 0.0 34.0 10.0 13.6 13.6 9.9 13.2 13.2
Incr Delay (d2), s/veh 4.0 0.0 1.3 0.3 0.0 11.6 0.2 1.7 1.6 0.4 1.9 1.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.5 0.0 3.1 0.7 0.0 5.3 0.5 4.5 4.5 1.0 4.9 5.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 32.4 0.0 31.8 27.9 0.0 45.5 10.2 15.2 15.2 10.3 15.1 15.1
LnGrp LOS C A C C A D BBBBBB
Approach Vol, veh/h 312 273 873 1038
Approach Delay, s/veh 32.1 42.8 14.8 14.4
Approach LOS C D B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 9.6 46.2 7.6 20.2 8.4 47.4 9.8 18.0
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 13.7 34.7 5.5 18.1 5.5 42.9 5.3 18.3
Max Q Clear Time (g_c+I1), s 5.1 14.2 3.6 9.4 3.4 15.6 7.3 13.0
Green Ext Time (p_c), s 0.2 4.4 0.0 0.5 0.0 5.4 0.0 0.6
Intersection Summary
HCM 6th Ctrl Delay 19.9
HCM 6th LOS B
F
APPENDIX – F: FUTURE CONDITIONS CAPACITY
ANALYSIS WITH DEVELOPMENT
Project Name: Traffic Impact Study for Carmel Park Apartment (CR-44)
Scenario: Twin Beech Road Build Condition (2022) - AM Peak Hour
Step1
Highway Class III
Posted Speed Limit 35
Demand volume in analysis direction, Vd 331
Demand volume in opposite direction, Vo 323
Peak hour factor (PHF)d 0.85
Peak hour factor (PHF)o 0.85
Lane Width 10
Shoulder Width 0
Access Point Density (per mile)40
Percentage of Truck (PT)4
Percentage of RV (RV)0
Passenger Car Equivalent (ET)ATS 1.9
Passenger Car Equivalent (ET)PTSF 1.1
Passenger Car Equivalent (ER)1
Heavy Vehicle Factor,
fHV,ATS = 1/(1+PT(ET-1) + PR(ER-1))0.965251 (Equation 15-4 of HCM)
ATS Grade adjustment factor, fg,ATS =1 Using Exhibit 15-9
Step 2: Estimate the FFS
Lane and shoulder width adjustment factor, fLS =5.3 Exhibit 15-7
Adjustment factor for access point density, fA =10 Exhibit 15-8
Base Free-flow Speed, BFFS =45
FFS = BFFS - fLS - fA=29.7 (Equation 15-2 of HCM)
Step 3: Demand adjustment for ATS
fg,ATS=1 Exhibit 15-9
vd,ATS =Vd/(PHF*fg,ATS*fHV,ATS) =403.4305882 (Equation 15-3 of HCM)
vo,ATS =Vo/(PHF*fg,ATS*fHV,ATS) =393.68 (Equation 15-3 of HCM)
Step 4: Estimate ATS
fnp,ATS =0.9 0% in both drection Exhibit 15-15
ATSd= FFS -0.00776(vd,ATS+vo,ATS)-fnp,ATS=22.61442 (Equation 15-6 of HCM)
Step 5:Estimate the PFFS
PFFS = (ATSd)/(FFS)=76%
Step 6: Determine LOS (Exhibit 15-3 of HCM)
LOS A = NO
LOSB =NO
LOS C =YES
LOS D =NO
LOS E =NO
LOS F =NO
Project Name: Traffic Impact Study for Carmel Park Apartment (CR-44)
Scenario: Twin Beech Road Build Condition (2022) - PM Peak Hour
Step1
Highway Class III
Posted Speed Limit 35
Demand volume in analysis direction, Vd 364
Demand volume in opposite direction, Vo 280
Peak hour factor (PHF)d 0.85
Peak hour factor (PHF)o 0.85
Lane Width 10
Shoulder Width 0
Access Point Density (per mile)40
Percentage of Truck (PT)4
Percentage of RV (RV)0
Passenger Car Equivalent (ET)ATS 1.9
Passenger Car Equivalent (ET)PTSF 1.1
Passenger Car Equivalent (ER)1
Heavy Vehicle Factor,
fHV,ATS = 1/(1+PT(ET-1) + PR(ER-1))0.965251 (Equation 15-4 of HCM)
ATS Grade adjustment factor, fg,ATS =1 Using Exhibit 15-9
Step 2: Estimate the FFS
Lane and shoulder width adjustment factor, fLS =5.3 Exhibit 15-7
Adjustment factor for access point density, fA =10 Exhibit 15-8
Base Free-flow Speed, BFFS =45
FFS = BFFS - fLS - fA=29.7 (Equation 15-2 of HCM)
Step 3: Demand adjustment for ATS
fg,ATS=1 Exhibit 15-9
vd,ATS =Vd/(PHF*fg,ATS*fHV,ATS) =443.6517647 (Equation 15-3 of HCM)
vo,ATS =Vo/(PHF*fg,ATS*fHV,ATS) =341.2705882 (Equation 15-3 of HCM)
Step 4: Estimate ATS
fnp,ATS =0.9 0% in both drection Exhibit 15-15
ATSd= FFS -0.00776(vd,ATS+vo,ATS)-fnp,ATS=22.709 (Equation 15-6 of HCM)
Step 5:Estimate the PFFS
PFFS = (ATSd)/(FFS)=76%
Step 6: Determine LOS (Exhibit 15-3 of HCM)
LOS A = NO
LOSB =NO
LOS C =YES
LOS D =NO
LOS E =NO
LOS F =NO
HCM 6th Signalized Intersection Summary
2: Twin Beech Rd & SR-181 01/04/2021
Twin Beech Road and SR-181 10/13/2020 After AM Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 215 108 121 431 351 220
Future Volume (veh/h) 215 108 121 431 351 220
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 259 116 146 468 428 286
Peak Hour Factor 0.83 0.93 0.83 0.92 0.82 0.77
Percent Heavy Veh, %222222
Cap, veh/h 302 269 570 1405 1246 1056
Arrive On Green 0.17 0.17 0.05 0.75 0.67 0.67
Sat Flow, veh/h 1781 1585 1781 1870 1870 1585
Grp Volume(v), veh/h 259 116 146 468 428 286
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1870 1870 1585
Q Serve(g_s), s 14.3 6.6 2.4 8.4 10.0 7.4
Cycle Q Clear(g_c), s 14.3 6.6 2.4 8.4 10.0 7.4
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 302 269 570 1405 1246 1056
V/C Ratio(X) 0.86 0.43 0.26 0.33 0.34 0.27
Avail Cap(c_a), veh/h 458 407 771 1405 1246 1056
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 40.8 37.6 4.9 4.2 7.3 6.9
Incr Delay (d2), s/veh 9.9 1.1 0.2 0.6 0.8 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.0 0.1 0.8 2.8 3.5 2.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 50.8 38.7 5.1 4.8 8.1 7.5
LnGrp LOS D D AAAA
Approach Vol, veh/h 375 614 714
Approach Delay, s/veh 47.0 4.9 7.8
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 80.0 21.1 8.6 71.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 76.0 26.0 16.0 56.0
Max Q Clear Time (g_c+I1), s 10.4 16.3 4.4 12.0
Green Ext Time (p_c), s 3.4 0.9 0.3 3.6
Intersection Summary
HCM 6th Ctrl Delay 15.4
HCM 6th LOS B
HCM 6th Signalized Intersection Summary
2: Twin Beech Road & SR-181 01/03/2021
Twin Beech Road and SR-181 10/13/2020 After PM Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 181 99 129 402 409 235
Future Volume (veh/h) 181 99 129 402 409 235
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 203 122 163 490 465 261
Peak Hour Factor 0.89 0.81 0.79 0.82 0.88 0.90
Percent Heavy Veh, %222222
Cap, veh/h 249 221 586 1456 1290 1094
Arrive On Green 0.14 0.14 0.05 0.78 0.69 0.69
Sat Flow, veh/h 1781 1585 1781 1870 1870 1585
Grp Volume(v), veh/h 203 122 163 490 465 261
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1870 1870 1585
Q Serve(g_s), s 10.8 7.0 2.4 7.7 10.0 6.0
Cycle Q Clear(g_c), s 10.8 7.0 2.4 7.7 10.0 6.0
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 249 221 586 1456 1290 1094
V/C Ratio(X) 0.82 0.55 0.28 0.34 0.36 0.24
Avail Cap(c_a), veh/h 474 422 793 1456 1290 1094
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 40.8 39.2 4.1 3.2 6.2 5.6
Incr Delay (d2), s/veh 6.4 2.1 0.3 0.6 0.8 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.1 0.1 0.7 2.3 3.3 1.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 47.2 41.3 4.4 3.9 7.0 6.1
LnGrp LOS D D AAAA
Approach Vol, veh/h 325 653 726
Approach Delay, s/veh 45.0 4.0 6.7
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 80.0 17.6 8.6 71.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 76.0 26.0 16.0 56.0
Max Q Clear Time (g_c+I1), s 9.7 12.8 4.4 12.0
Green Ext Time (p_c), s 3.6 0.8 0.3 3.8
Intersection Summary
HCM 6th Ctrl Delay 13.0
HCM 6th LOS B
HCM 6th Roundabout
3: CR-13 & CR-44 12/31/2020
12/26/2020 After AM_2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Intersection Delay, s/veh 7.5
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 324 404 401 233
Demand Flow Rate, veh/h 331 413 409 238
Vehicles Circulating, veh/h 204 319 305 436
Vehicles Exiting, veh/h 470 395 230 296
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 6.1 8.3 8.1 7.0
Approach LOS AAAA
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976 4.976
Entry Flow, veh/h 331 413 409 238
Cap Entry Lane, veh/h 1121 997 1011 885
Entry HV Adj Factor 0.980 0.979 0.981 0.980
Flow Entry, veh/h 324 404 401 233
Cap Entry, veh/h 1098 975 992 867
V/C Ratio 0.295 0.414 0.405 0.269
Control Delay, s/veh 6.1 8.3 8.1 7.0
LOS AAAA
95th %tile Queue, veh 1221
HCM 6th Roundabout
3: CR-13 & CR-44 12/31/2020
12/16/2020 After PM_2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Intersection Delay, s/veh 8.5
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 477 358 381 252
Demand Flow Rate, veh/h 486 365 389 257
Vehicles Circulating, veh/h 268 284 494 338
Vehicles Exiting, veh/h 327 599 260 311
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 8.8 7.2 10.5 6.4
Approach LOS AABA
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Follow-Up Headway, s 2.609 2.609 2.609 2.609
Critical Headway, s 4.976 4.976 4.976 4.976
Entry Flow, veh/h 486 365 389 257
Cap Entry Lane, veh/h 1050 1033 834 978
Entry HV Adj Factor 0.981 0.982 0.979 0.981
Flow Entry, veh/h 477 358 381 252
Cap Entry, veh/h 1030 1014 816 958
V/C Ratio 0.463 0.353 0.467 0.263
Control Delay, s/veh 8.8 7.2 10.5 6.4
LOS AABA
95th %tile Queue, veh 2231
HCM 6th TWSC
8: Boothe Rd & CR-44 12/31/2020
12/26/2020 After AM_2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Int Delay, s/veh 12.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 147 31 35 286 44 25 30 26 16 31 32
Future Vol, veh/h 21 147 31 35 286 44 25 30 26 16 31 32
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 48 66 33 37 75 54 61 68 50 69 35 60
Heavy Vehicles, % 2 22222222222
Mvmt Flow 44 223 94 95 381 81 41 44 52 23 89 53
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 462 0 0 317 0 0 1041 1010 270 1018 1017 422
Stage 1 ------358358-612612-
Stage 2 ------683652-406405-
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1099 - - 1243 - - 208 240 769 216 238 632
Stage 1 ------660628-480484-
Stage 2 ------439464-622598-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1099 - - 1243 - - 112 204 769 149 203 632
Mov Cap-2 Maneuver ------112204-149203-
Stage 1 ------628597-456434-
Stage 2 ------287416-511569-
Approach EB WB NB SB
HCM Control Delay, s 1 1.4 49.1 45.9
HCM LOS E E
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)211 1099 - - 1243 - - 244
HCM Lane V/C Ratio 0.65 0.04 - - 0.076 - - 0.677
HCM Control Delay (s) 49.1 8.4 0 - 8.1 0 - 45.9
HCM Lane LOS E A A - A A - E
HCM 95th %tile Q(veh) 3.9 0.1 - - 0.2 - - 4.4
HCM 6th TWSC
8: Boothe Rd & CR-44 12/31/2020
12/16/2020 After PM_2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Intersection
Int Delay, s/veh 10.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 37 327 49 32 217 30 14 26 38 37 25 39
Future Vol, veh/h 37 327 49 32 217 30 14 26 38 37 25 39
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 65 70 70 75 91 75 60 48 100 60 50 73
Heavy Vehicles, % 2 22222222222
Mvmt Flow 57 467 70 43 238 40 23 54 38 62 50 53
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 278 0 0 537 0 0 1012 980 502 1006 995 258
Stage 1 ------616616-344344-
Stage 2 ------396364-662651-
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1285 - - 1031 - - 218 250 569 220 245 781
Stage 1 ------478482-671637-
Stage 2 ------629624-451465-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1285 - - 1031 - - 153 222 569 153 218 781
Mov Cap-2 Maneuver ------153222-153218-
Stage 1 ------447451-628605-
Stage 2 ------511593-347435-
Approach EB WB NB SB
HCM Control Delay, s 0.8 1.1 31.4 49.5
HCM LOS D E
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)249 1285 - - 1031 - - 236
HCM Lane V/C Ratio 0.464 0.044 - - 0.041 - - 0.7
HCM Control Delay (s) 31.4 7.9 0 - 8.6 0 - 49.5
HCM Lane LOS D A A - A A - E
HCM 95th %tile Q(veh) 2.3 0.1 - - 0.1 - - 4.6
HCM 6th Signalized Intersection Summary
13: US-98 & CR-44 01/01/2021
12/26/2020 After AM_2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 81 108 56 99 92 80 63 834 95 204 510 63
Future Volume (veh/h) 81 108 56 99 92 80 63 834 95 204 510 63
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 95 127 66 116 108 94 74 981 112 240 600 74
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, %222222222222
Cap, veh/h 300 233 121 311 188 163 460 1239 141 411 1518 187
Arrive On Green 0.06 0.20 0.20 0.06 0.20 0.20 0.06 0.39 0.39 0.15 0.48 0.48
Sat Flow, veh/h 1781 1159 603 1781 923 803 1781 3214 367 1781 3185 392
Grp Volume(v), veh/h 95 0 193 116 0 202 74 542 551 240 334 340
Grp Sat Flow(s),veh/h/ln 1781 0 1762 1781 0 1726 1781 1777 1804 1781 1777 1800
Q Serve(g_s), s 3.8 0.0 8.8 4.6 0.0 9.5 2.2 24.3 24.3 6.2 10.9 11.0
Cycle Q Clear(g_c), s 3.8 0.0 8.8 4.6 0.0 9.5 2.2 24.3 24.3 6.2 10.9 11.0
Prop In Lane 1.00 0.34 1.00 0.47 1.00 0.20 1.00 0.22
Lane Grp Cap(c), veh/h 300 0 354 311 0 351 460 685 696 411 847 858
V/C Ratio(X) 0.32 0.00 0.54 0.37 0.00 0.58 0.16 0.79 0.79 0.58 0.39 0.40
Avail Cap(c_a), veh/h 300 0 354 311 0 351 460 685 696 411 847 858
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 26.6 0.0 32.3 26.7 0.0 32.3 14.4 24.4 24.5 16.3 15.2 15.2
Incr Delay (d2), s/veh 2.8 0.0 5.9 3.4 0.0 6.7 0.7 9.1 9.0 6.0 1.4 1.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.8 0.0 4.2 2.2 0.0 4.5 0.9 10.8 10.9 2.7 4.1 4.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 29.3 0.0 38.2 30.1 0.0 39.1 15.2 33.5 33.4 22.2 16.6 16.6
LnGrp LOS C A D C A D B C C C B B
Approach Vol, veh/h 288 318 1167 914
Approach Delay, s/veh 35.2 35.8 32.3 18.0
Approach LOS D D C B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 18.2 39.2 10.0 22.6 10.0 47.4 9.8 22.8
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 13.7 34.7 5.5 18.1 5.5 42.9 5.3 18.3
Max Q Clear Time (g_c+I1), s 8.2 26.3 6.6 10.8 4.2 13.0 5.8 11.5
Green Ext Time (p_c), s 0.3 4.0 0.0 0.5 0.0 3.8 0.0 0.6
Intersection Summary
HCM 6th Ctrl Delay 28.2
HCM 6th LOS C
HCM 6th Signalized Intersection Summary
13: US-98 & CR-44 01/01/2021
12/16/2020 After PM_2022 Synchro 10 Light Report
Dr. Samantha Islam Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 125 115 49 41 98 115 55 626 68 126 695 69
Future Volume (veh/h) 125 115 49 41 98 115 55 626 68 126 695 69
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 147 135 58 48 109 128 65 736 80 148 818 81
Peak Hour Factor 0.85 0.85 0.85 0.85 0.90 0.90 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, %222222222222
Cap, veh/h 233 234 100 263 129 152 384 1594 173 430 1668 165
Arrive On Green 0.06 0.19 0.19 0.04 0.17 0.17 0.05 0.49 0.49 0.06 0.51 0.51
Sat Flow, veh/h 1781 1241 533 1781 784 921 1781 3233 351 1781 3266 323
Grp Volume(v), veh/h 147 0 193 48 0 237 65 404 412 148 445 454
Grp Sat Flow(s),veh/h/ln 1781 0 1774 1781 0 1705 1781 1777 1807 1781 1777 1812
Q Serve(g_s), s 5.3 0.0 8.3 1.8 0.0 11.3 1.5 12.5 12.6 3.4 13.7 13.7
Cycle Q Clear(g_c), s 5.3 0.0 8.3 1.8 0.0 11.3 1.5 12.5 12.6 3.4 13.7 13.7
Prop In Lane 1.00 0.30 1.00 0.54 1.00 0.19 1.00 0.18
Lane Grp Cap(c), veh/h 233 0 334 263 0 281 384 876 891 430 908 926
V/C Ratio(X) 0.63 0.00 0.58 0.18 0.00 0.84 0.17 0.46 0.46 0.34 0.49 0.49
Avail Cap(c_a), veh/h 233 0 382 308 0 372 418 876 891 606 908 926
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.1 0.0 31.0 27.5 0.0 34.0 10.2 14.0 14.0 10.2 13.4 13.4
Incr Delay (d2), s/veh 5.4 0.0 1.6 0.3 0.0 12.5 0.2 1.7 1.7 0.5 1.9 1.9
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.7 0.0 3.6 0.8 0.0 5.5 0.5 4.6 4.7 1.1 5.0 5.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 34.5 0.0 32.7 27.8 0.0 46.5 10.4 15.7 15.7 10.6 15.3 15.3
LnGrp LOS C A C C A D BBBBBB
Approach Vol, veh/h 340 285 881 1047
Approach Delay, s/veh 33.5 43.4 15.3 14.6
Approach LOS C D B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 9.9 45.9 7.9 20.3 8.4 47.4 9.8 18.4
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 13.7 34.7 5.5 18.1 5.5 42.9 5.3 18.3
Max Q Clear Time (g_c+I1), s 5.4 14.6 3.8 10.3 3.5 15.7 7.3 13.3
Green Ext Time (p_c), s 0.2 4.4 0.0 0.6 0.0 5.4 0.0 0.5
Intersection Summary
HCM 6th Ctrl Delay 20.6
HCM 6th LOS C
G
APPENDIX – G: TURN LANE WARRANT ANALYSIS
Table G.1 : Guideline for Determining a Left turn Lane (Source: A Policy on Geometric
Design of Highways and Streets, 7th Edition, 2018)
Figure G.1: Guideline for Determining a Major-Road Right Turn Bay
(Source: NCHRP Report No. 457)
Responses to the Comments from the City
Please provide review comments from Baldwin County Planning and Zoning and/or Baldwin
County Highway Department.
Response: Our responses to Baldwin County’s comments have been provided.
Staff requests the study area for the Traffic Impact Study (TIS) be enlarged to include the
intersection of County Road (CR) 13 and CR44, the intersection of CR4 and US HWY 98, as well as
the intersection of CR44 and Boothe Road. The new data shall be collected during a 72-hour
window when schools are in full, in-person, session.
Response: The traffic study has been revised to include the additional three intersections
as recommended in the comment. Additional data was collected as per recommendation
in the comment.
Verify the inclusion of traffic counts including, but not limited to new developments such as
Twin Beech Estates, Live Oak Estates, Firethorne, and the Dollar General store located at the
intersection of CR44 and Boothe Road.
Response: Traffic generated from the new offsite developments have been included in
the revised study. Please see revised Sections 3.2. Traffic from the new Dollar General is
already included in the counts.
The City of Fairhope is considering lowering the speed limit along CR44 to 35mph along section
of CR that has been accepted by the city. How will a 35 mph speed limit affect the TIS?
Response: Analyses for future year (2022) have been revised for 35 mph speed limit
along CR-44.
Improvements to the intersections of US HWY 98 and CR44 as well as CR44 and CR13 are
forthcoming. Are those improvements considered by the TIS?
Response: These improvements have been considered in the revised study. Please see
revised Section 3.3 and other relevant sections in the revised report.
1. The ALDOT traffic from 2019 only looked at one location where ALDOT have statistics. When
I looked on the viewer I went all the way back to 2014 and the growth rate for the specific
sites east and west of the new development show 2.5% to 3.48% increase in AADT yearly.
The TIS given chosen rate was 3.0%.
Response: This comment has been addressed and a growth rate of 4.5 has been used based
on additional years and additional location in the vicinity of the project. Please see revised
Section 3.1.
2. There were no other off site developments (section 3.2) listed that would affect this study. I
know there were some quadplexes and a new Dollar General that may be generating more
trips now through the build out of the development. We can double check with Fairhope on
this.
Response: Sections 3.2 and 3.3 have been updated based on the information from the city.
Please see revised Sections 3.2 and 3.3. The analyses have been revised accordingly.
3. The trip generation used has the fitted line equation shown. The area highly car dependent,
while the generation per unit was calculated around 5.44 trips/unit. The value should be on
the higher end of the range (8-11trips/unit/day) due to the vehicle dependence.
Response: The fitted equations provided in the ITE Trip Generation Manual are based on
sound statistical regression method and the quality of these equations are measured by r-
square (r2) or coefficient of determination. In general, if the r-square value of a fitted
equation is larger than 0.5, the fitted equations are of acceptable quality in terms of fitting
the data. The fitted equations used in this study have r-square values 0.67 or greater (see
Appendix-D). Therefore, we used the generation rates based on the fitted equations
provided in ITE Trip Generation Manual. I have reviewed several approved TIS for projects in
Baldwin county and they used rates based on fitted equations. For example, the TIS for Live
Oak States development, which is in the vicinity of our study area, used fitted equations.
4. Current intersection movement counts were taken Oct 13, and there still is a small impact
from the COVID pandemic that could be causing a few discrepancies with this TIS.
Response: Use of a slightly higher growth rate should have taken care of any such slight
discrepancy (if any) to some extent.
5. The site is 2 vehicles away from needing a LT lane in the PM and 3 from needing a RT lane in
the PM.
Response: The speed limit on Twin Beech Road will be reduced to 35 mph. ALDOT Quick
Guide is applicable for speed limit 45 mph or more. Therefore, the method has been revised.
Please see revised Section 5.7.
6. If the ALDOT quick lane guide is followed:
a. Step 1 Peak Hr Inbound = 242units * 0.40 trips/unit = 96.8 trips
b. Step 2 Direction of Approach = (From their Table 8) 58% LT; 42% RT
c. Step 3 Peak HR Volumes =
58% lefts * 96.8 trips = 57 LT > 40 LT movements required, Left TL warrants
d. 42% rights * 98.6 trips = 41 RT > 30 RT movements required, Right TL
warrants
IF they followed the ALDOT guidelines both turn-lanes warrant.
Response: Please see the previous response and also see the revised Section 5.7.
7. From a safety point, with the study for TLs being showing right under the warranting
amount, we could potentially see more fender-bender accidents from the eastbound (RT)
movement. Potentially there could be more side impact and fender-bender type accidents
from the westbound (LT). Accidents of both types regardless of severity would also create a
delay of service during peak time use.
Response: TL analyses have been revised because of a future reduction of CR-44 speed limit
to 35 mph. Please see revised Section 5.7.
engineers
planners
surveyors
environmental
scientists
landscape
architects
851 East I-65 Service Road South, Suite 1000, Mobile, AL 36606•
Office 251-471-2000 • Fax 251-471-5997
February 19, 2021
Mr. Richard Johnson, PE
Mr. Hunter Simmons
City of Fairhope
555 South Section Street
Fairhope, AL 36532
REFERENCE: REVIEW OF TRAFFIC ANALYSIS
CARMEL PARK APARTMENTS
Dear Mr. Johnson and Simmons:
Neel-Schaffer has completed their review of the Traffic Impact Study (Revised) for the proposed Carmel Park
Apartments in Fairhope, Alabama. Please note that a review was not completed for the original report since
there were significant revisions.
Review of Background and Existing Conditions
The revised report states that the traffic volumes generated from the offsite developments (Firethorne, Live
Oak, and Twin Beech Estates) were considered in addition to the traffic generated from the proposed
development. However, it is not clear how these volumes were considered or if they were included. I would
assume they were not since their proposed completion dates are beyond Year 2022 when this proposed
development is supposed to be completed.
Turning movement counts were collected on October 13, 2020 for the intersection of Hwy 181 and Twin
Beech Road. Students were not in class at the Baldwin County Schools this date and the intersection was not
recounted on December 16, 2020 when the additional intersections were counted. The appendix only
provides one hour of traffic counts in the morning and in the afternoon. It is difficult to determine if the
counts provided covered the peak hour of the intersections. The report indicates a morning peak of 8:30 –
9:30 and an afternoon peak of 2:30 – 3:30. A quick review of ALDOT counts on Twin Beech from 2017 with
one (1) hour increments show the morning peak hour to be 7:00 – 8:00 and the afternoon to be 5:00 – 6:00.
These reports also show the morning traffic to be almost double between 7:00 – 8:00 than between 8:00 –
9:00. Twin Beech Road is a main route for school traffic, thus having peak hours that coincide with school
drop-off and pick-up would be expected. The existing conditions capacity analysis as presented in the report
appear to be consistent with standard practice based on the volumes presented in the report.
Review of Trip Generation and Trip Distribution
The report calculates the trip generation for the proposed development based on ITE Land Use 221, Multi-
Family Housing Mid-Rise. The definition of Mid-Rise is a building between three (3) and ten (10) stories. It
appears that the proposed building will be three stories. ITE Land Use 220, Multi-Family Housing Low-Rise
is a related land use with a definition of a building between one (1) and two (2) stories. Land Use 220 has trip
generation rates higher than Land Use 221. While either are acceptable land uses, the low-rise generation
would have been more conservative.
Review of Carmel Park TIA
________________________________________________________________________________________
851 East I-65 Service Road South, Suite 1000, Mobile, AL 3 6606
Office 251-471-2000 • Fax 251-471-5997
The report presents the trip distribution in a figure. While one could argue some differing percentages across
the network, it would only change the trips by a couple of vehicles thus not changing the results of the
analysis.
Review of Site Related Traffic Impacts
The report provides analysis for Year 2022 with and without the development. These analyses were
performed with the planned improvements to the intersection of County Road 13 and Twin Beech Road
(roundabout) and the intersection of U.S. Highway 98 and Twin Beech Road (eastbound/westbound left turn
lanes). If the proposed project is completed in 2022, these two intersections will have greater delay than what
is shown in the report due to the planned improvements lagging. The report does not show an analysis of the
planned driveway with Twin Beech Road. However, utilizing the volumes presented in the report, the
analysis would yield acceptable levels-of-service at the proposed driveway.
The analysis of Twin Beech Road and Boothe Road indicates a level-of-service of “E” for the northbound and
southbound approaches. The report states that these could be improved by installing a four-way stop at this
location. While that is true, the eastbound and westbound approaches would decrease from LOS A to LOS C
and LOS D. Also, a four-way stop should not be installed unless the warrants outlined in the current edition
of the Manual on Uniform Traffic Control Devices (MUTCD) are satisfied. These warrants include both
correctable crashes and volumes warrants. Based on the volumes presented in the report, it is unlikely that the
volume warrants would be satisfied. An examination of the crash history would need to be completed to
determine if that warrant could be satisfied.
The report also provides turn lane warrant analysis to determine if auxiliary lanes are warranted at the
proposed driveway entrance. The report utilizes the AASHTO “Green Book” for the left turn warrants and
the NCHRP Report No. 457 for the right turn warrants. The report indicates that a left turn lane is desirable,
and a right turn lane is not warranted. The City of Fairhope has auxiliary lane warrants in their Subdivision
Regulations. If these warrants were utilized in the report, neither lanes would be warranted based on the
volumes presented in the report. If a left turn lane is constructed, it should be of adequate length to provide
proper storage, deceleration, taper, and transition.
Review of City and County Comments and Responses
A review was completed to comments and responses that were provided with the revised report. It appears
that a majority of the comments were addressed with changes in methodology and inclusions in the revised
report. One comment questioned the traffic count on October 13th with possible impacts from COVID-19.
The responses stated that a slightly higher growth should take care of any such slight discrepancy, if any. As
stated earlier in this letter, one of the bigger issues with the October 13th count was that no students were
present at school on that day. Also, a higher growth rate would only apply to the growth of the counted traffic
to Year 2022. If a COVID-19 factor was known, it would be applied to the existing counts, then the future
counts would be calculated from this adjusted volume. The results would be higher traffic both in the existing
analysis and in the future analysis.
A comment from the City requested that new data be collected during a 72-hour window when schools are in
full, in-person, session. The response indicated additional data was collected as per recommendation in the
comment. New data was collected December 16th. Data was collected two days prior to Christmas break and
might have been lower as some high school students do not have to attend if they have completed their finals.
Also, the Appendix only provides one (1) hour of data in the morning and afternoon. If 72-hours of data was
collected, it should have been provided in the Appendix.
Review of Carmel Park TIA
________________________________________________________________________________________
851 East I-65 Service Road South, Suite 1000, Mobile, AL 3 6606
Office 251-471-2000 • Fax 251-471-5997
Conclusions of Review
The revised report provides analysis that is consistent with the standards of our practice with the data that is
presented. There may be discrepancies with the peak hour volumes, timing of the data collection, and
possible COVID-19 impacts. However, the planned improvements to County Road 13 and to Highway 98
along with the proposed left turn lane into the site, mitigate any potential capacity issues at most of the
intersections and are discussed following this section. The intersection of Twin Beech and Boothe Road is
projected to operate at capacity for the approaches to Boothe Road. Careful consideration should be given to
the recommended improvement in the report. A four-way stop conversion should meet the warrant
requirements in the MUTCD.
COVID-19 Impacts
It is well known that COVID-19 has had an impact on traffic volumes. Without having yearly counts in the
area, it is virtually impossible to determine a value of the impacts. In the Mobile Area, some of the major
arterials are still showing volumes approximately 10% below those of 2019. Also, there has been a shift in
work (working from home) and in school (virtual school). In the planning commission meeting, it was stated
that the schools are down 15% – 20% in attendance for in-person students due to COVID-19.
Twin Beech Road is shown to have an AADT of 4,400 vehicles during 2019 according to ALDOT. This
number has been calculated as the last true count was in 2017. However, a two-lane roadway has a capacity
of approximately 14,000 vehicles per day. The issues that exist with Twin Beech Road would be at the
intersections of the side streets where Twin Beech is required to stop (Hwy 181, CR 13, and Hwy 98). The
intersection with Highway 181 already provides auxiliary turn lanes on all approaches thus providing the
maximum capacity for two 2-lane roadways. The other two intersections that currently require Twin Beech
Road to stop are programmed for improvements. The intersection with County Road 13 is programmed to be
converted to a roundabout and the intersection with Highway 98 is programmed to provide auxiliary lanes
(dedicated left) along both approaches of Twin Beech Road. A single-lane roundabout has shown that it can
process upwards of 25,000 vehicles a day. The roadway network should be able to handle the increase of
traffic from COVID-19 impacts plus several years of significant growth with the planned improvements at
County Road 13 and Highway 98.
One misconception that seems to exist is that apartment developments generate more traffic than single-
family home developments. The ITE Trip Generation Manual is the national standard to forecast the trips
that are generated by a development based on planned use and size. This manual is currently in the 10th
Edition and considers apartments as multifamily housing. Included in multi-family housing is apartments,
townhouses, and condominiums as studies have shown no clear differences in trip making patterns between
these three types of multi-family housing. The Manual indicated that on average, a single-family home
generates 9.44 trips per lot per day. A multi-family (low-rise) unit generates an average of 7.32 trips per lot
per day. This equates to an average of 2.12 more trips per day for a house verses and a multi-family unit.
It is my opinion that the construction of the proposed Carmel Park Development will not have a significant
impact to the roadway network as long as the planned improvements are constructed. If you have any
questions or comments regarding this review, please call me at (251) 471-2000.
Review of Carmel Park TIA
________________________________________________________________________________________
851 East I-65 Service Road South, Suite 1000, Mobile, AL 3 6606
Office 251-471-2000 • Fax 251-471-5997
Sincerely,
NEEL-SCHAFFER, INC.
Shane M. Bergin, P.E., PTOE, PTP, RSP1
Professional Traffic Engineer
880 Holcomb Blvd, Suite 2F Fairhope, Alabama 36532 251-990-6566
DRAFT
January 15, 2021
Mike Jeffries, QCI
Fairhope Planning Department
555 S. Section Street
Fairhope, Alabama 36532
Re: SD 21.03 Carmel Park Flats (MOP) – Sanitary Sewer
Dear Mike:
This letter is to serve as a summary of the sanitary sewer improvements that are proposed for the above
referenced project. These improvements have been discussed with Jason Langley and we believe it helps
solve both our need for sanitary sewer and also helps resolve some issues the city has in the area.
The sewer from the site will be gravity to a lift station as currently shown on our drawings. The sewer
system on-site will be privately owned and maintained. The force main from the lift station will
discharge to a new gravity line that the developer will install on the south side of Twin Beech Road and
head east to Bonaventure. The gravity sewer will turn south down Bonaventure and connect to the
existing sewer system within that development via a doghouse manhole. This new gravity system within
the right of way will be installed by the developer per Fairhope Utilities Standards and Specifications.
The gravity sewer within the right of way will be owned and maintained by the City. The developer will
also pay, through an aid to construction fee the amount of $xx,xxx., to go towards the cost of purchasing
and installing a generator for the existing lift station in Woodlawn.
If you have any questions, please let me know.
Sincerely,
Larry Smith, PE
Partner
YOSEMITEBLVDLANDRY LNSOPHIEFALLSAV
KAI ETEU R FA LLSA V
HATCHETT CREEK AV
GULLFOSS STKI NLOCK FALLS AV
SUTHERLANDCIRSTATE HWY 104
IGUAZU FALL S A V MCPHILLIPSRDLANGFORD RDCity of FairhopePlanning Commission
March 1, 2021
¯KAI ETEUR FALLS A V
YO
S
EM
I
T
E
B
LVD
LANDRY LNSTATE HWY 104
KINLOCK FALLS AV
GULLFOSS STSUTHER
L
A
N
D
CI
R
I GUAZU FALLS A V
SD 21.06 - Fairhope Falls, Phase 3
Legend
COF Planning Jurisdiction
¯
¯
^
Project Name:
Fairhope Falls Ph 3Site Data:
16.19 acresProject Type:
33-lot Major Subdivision FinalJurisdiction:
Fairhope Planning JurisdictionZoning District:
Unzoned Baldwin CountyPPIN Number:
286553General Location:
South side of Hwy. 104 and west of
Yosemite Blvd.Surveyor of Record:
Dewberry EngEngineer of Record:
Dewberry EngOwner / Developer:
TH Fairhope Falls 2018, LLCSchool District:
Fairhope East, Middle, and High School Recommendation:
Approved w/ ConditionsPrepared by:
Mike Jeffries
1 SD 21.06 Fairhope Falls Ph3 – March 1, 2021
Summary of Request:
The owner and applicant is TH Fairhope Falls 2018 LLC. Dewberry is the authorized agent and Engineer of
Record for the project. This final plat application is for a 33-lot subdivision located on the south side of Hwy.
104 and west of Yosemite Blvd. It will connect to the existing Fairhope Falls Subdivision phases 1 and 2. The
property is currently unzoned but does have an approved Village Subdivision and preliminary plat approval
that it had to be built in substantial conformance to. The preliminary plat was approved at the Jan 3, 2017
Planning Commission meeting (Case number SD 16.27) along with the preliminary approval of Phase 2 which
has already received final plat approval. Excerpts of the site data table is included below:
Comments:
- Baldwin County has provided correspondence that noted there were no deficiencies.
- Final plat must be recorded within 60 days after the date of final approval.
Stormwater Comments:
- The stormwater system for phase 3 was designed to function with the existing stormwater system of
phases 1 and 2. The first phases constructed were designed and built to capture, treat, and release the
stormwater from the undeveloped portions as well as the same portions once developed.
- Staff required a full inspection of the storm water system and the inspection report is included in the
staff packet.
- The report states maintenance is needed but overall, the system is functioning as designed.
o Several items have been corrected as shown in the report but due to the weather a few items
were not able to be corrected and that remaining work is captured as a condition of approval.
2 SD 21.06 Fairhope Falls Ph3 – March 1, 2021
The City of Fairhope Subdivision Regulations contain the following criteria in Article V.B.2. Approval Standards.
“2. Consistency with Plans, Regulations and Laws - The Planning Commission shall not approve the
subdivision of land if the Commission makes a finding that such land is not suitable for platting and
development as proposed, due to any of the following:
a. The proposed subdivision is not consistent with the City’s Comprehensive Plan, and/or the City’s Zoning
ordinance, where applicable;
• Not appliable – subject development is not located within one of the City of Fairhope’s zoning
districts.
b. The proposed subdivision is not consistent with the City’s Comprehensive Plan or any other plan or
program for the physical development of the City including but not limited to a Master Street Plan, a Parks
Plan, a Bicycle Plan, a Pedestrian Plan, or the Capital Improvements Program;
• Not appliable
c. The proposed subdivision is not consistent with these Regulations;
• Meets
d. The proposed subdivision is not consistent with other applicable state or federal laws and regulations;
• Meets
e. The proposed subdivision otherwise endangers the health, safety, welfare or property within the
planning jurisdiction of the City.”
• Meets
Follow‐Up Activities Required by Staff and the Applicant:
• Copy of the recorded plat
• Copy of the recorded O&M Agreement
• Fully-executed copy of the Sub Perf Bond agreement (the mayor does not sign this doc)
• Fully executed performance bond
• Maintenance and Guaranty (M&G) Agreement executed by the developer - the mayor signs this
agreement to fully execute it
o Remember to include the instrument # from the recorded plat
o Please include 30 days in paragraph 3
• A draft copy of the Maintenance Bond
Recommendation:
Staff recommends approval SD 21.06 Fairhope Falls Ph3 final plat with the following conditions:
1. The deficiencies listed in the stormwater Inspection Report dated February 12, 2021 are corrected and
approved by City of Fairhope’s Public Works Director before the City will sign Final Plat for recording.
2. Complete above-mentioned Follow-up Activities.
194
212 216215 217
185
186
187
188
189190
191
192
193
195
196
197
198
199
200201
202
203
204
205
206
207
208
209
210
211
213 214
Common Area 10
Common Area 8Common Area 9C.A. 625353 Friendship Road Daphne, AL 36526
251.990.9950 fax 251.929-9815C.A. 7
B AAMALA
MAGERITOVICRL.NW:\NATHAN\50082843-FAIRHOPE FALLS 2-3\PLN\FINAL PHASE 3\50082843FINAL PH 3_REVISE LOT 212.dwg, 1/7/2021 2:09:34 PM
OPERATION & MAINTENANCE PLAN
AND AGREEMENT
FOR
FAIRHOPE FALLS
PHASE I, II & III
This Instrument Prepared By:
Andrew N. Bobe, P.E.
Project Engineer
Dewberry
25353 Friendship Road
Daphne, Alabama 36526
The owner is responsible for inspecting the storm water system and BMPs according
to the schedule and submitting reports to the Planning Director or his authorized
representative every five (5) years to document that inspections have been
completed and necessary maintenance has been performed. The first inspection
report is due December 31 of the third year after construction has been completed.
Inspection reports are then due by December 31 of every fifth year following submittal
of the first report. The Planning Director or his authorized representative must be
notified of any change in ownership. Failure to file the five-year inspection reports and
perform required maintenance activities could result in enforcement action.
_________________________________________
OWNER’S SIGNATURE
January 12, 2021
INDEX
1. CONTACT INFORMATION
2. VICINITY MAP
3. PHASES I, II, & III OVERALL MAP
4. ENGINEERING CERTIFICATE
5. STORM WATER FACILITY MAINTENANCE AGREEMENT
CITY OF FAIRHOPE, ALABAMA
6. EXHIBIT A - LEGAL DESCRIPTION OF PROPERTY
7. EXHIBIT B – COPY OF PLAT
8. EXHIBIT C – MAINTENANCE PLAN
9. EXHIBIT D – MAINTENANCE CHECKLISTS
CONTACT INFORMATION
OWNER
ENTITY NAME: Fairhope Falls Owners Association INC
CONTACT PERSON:
ADDRESS:25366 Profit Drive, Daphne, AL 36526 &
29891 Woodrow Lane Ste 300 Spanish Fort, AL 36527
TELEPHONE NO.:
ENGINEER
ENTITY NAME: Dewberry
CONTACT PERSON:Andrew N. Bobe P.E.
ADDRESS:25353 Friendship Road, Daphne, Alabama 36526
TELEPHONE NO.:251-990-9950
“ENGINEER’S CERTIFICATE” “I, the undersigned, a Registered Engineer in the State
of Alabama holding Certificate Number 30021, hereby certify that the development was
designed in conformity with applicable codes and laws and with the principals of good
engineering practice, at the time they were developed. I further certify that Dewberry has
observed the construction of the improvements within Phase III, that the same conforms
to the design, that the within is a true and accurate representation of improvements as
installed and that said improvements are hereby recommended for acceptance by the City
of Fairhope, Alabama.
____________________ Project Engineer
____________________ Date
____________________ Name of Project to which the Certificate Applies Plans which
are certified consist of Page 1 thru 19 in Phase III, each of which bears by seal and
signature.”
WSWWWWWWSSSSSSSSSS
SSSSSSSSSSW
WWWWSSSSSSWWW
WWWSSSS
S
SSS
SS
S
S
SSW
WWWWW
W
WWW
W
W
W
WWWSSSSSS
S SW WWSSS FISH RIVERFISH RIVERFISH RIVERCommonArea 2 Common Area 3C.A. 4C.A. 5C.A. 6Common Area 10
C.A. 7Common Area 8Common Area 9Common Area 1 C.A. 6154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170171172
173 175
176 177 178
179
180
181
182
183
184
152
153
151
174
217
185
186
187
188
189190
191
192
193
194
195
196
197
198
199
200201
202
203
204
205
206
207
208
209
210
211
212 213 214 215
216
SSSSSSSS S S S
SSWWSSS96OO1
OO2
WW W W W W
WWWWWWWWWWWWWWWWWWWWWWWWPOND 1
POND 2
POND 3
POND 4
POND 5
City of Fairhope, Alabama
Storm Water Facility Maintenance Agreement
THIS STORM WATER FACILITY MAINTENANCE AGREEMENT (this “Agreement”) is
made, executed and entered into this day of , 2021, by Fairhope Falls
Owners Association INC (hereinafter called “Landowner”), to and for the benefit of the City of
Fairhope, Alabama, a municipal corporation organized under the laws of the State of Alabama (hereinafter
called the “City”).
Recitals:
WHEREAS, Landowner is the owner of that certain real property located in Baldwin County,
Alabama and more particularly described on Exhibit “A” attached hereto and by reference made a part -
hereof (the “Property”);
WHEREAS, Landowner is in the process and constructing and developing a subdivision on the
Property to be known as FAIRHOPE FALLS, PHASE ONE, TWO & THREE (the “Subdivision”);
WHEREAS, Landowner has applied with the City for preliminary plat approval for the plat of the
Subdivision, a copy of which is attached hereto as Exhibit “B” (the “Plat”);
WHEREAS, as a condition to the preliminary approval of the Plat, the City requires the
construction and improvement of certain storm water management facilities as shown and referenced on the
Plat and/or otherwise approved by the City in writing (the “Facilities”);
WHEREAS, as a further condition to the approval of the Plat, the City requires that the Facilities
be constructed and adequately maintained by Landowner, its successors and assigns, including any
homeowners association formed by Landowner for purposes of managing and maintaining any common G
NOW THEREFORE, for and in consideration of the premises and other good and valuable
consideration, the receipt, adequacy and sufficiency of which are hereby acknowledged, Landowner and
6the City, intending to be legally bound, hereby covenant and agree as follows:
1. Landowner shall construct and improve the Facilities strictly in accordance with the plans
and specifications therefor (a) set forth on the Plat and/or (b) otherwise approved by the City in writing.
Landowner acknowledges and agrees that the completion of construction of the Facilities is a condition to
the City’s final approval of the Plat; provided, however, that in the event the City allows Landowner to
provide a bond or other guarantee of completion of the Facilities, the Facilities shall be completed at least
thirty (30) days prior to the expiration of said bond or other guarantee.
2. Landowner shall maintain the Facilities in such condition that the Facilities properly
operate, function and perform (as designed by a professional engineer) for their intended purpose(s), which
maintenance shall include, at a minimum, all maintenance required by all laws and ordinances of the City,
the maintenance plan attached hereto as Exhibit “C”, all items set forth on the Maintenance Checklist
(hereinafter defined), and such other maintenance as is customary in Baldwin County, Alabama with
respect to substantially similar stormwater management facilities. As used herein, the term “Facilities”
shall include, without limitation, all pipes, channels or other conveyances built to convey storm water to the
Facilities, as well as all storm water structures, improvements, and vegetation provided to control the
quantity and quality of storm water that discharges from the Property. In connection with Landowner’s
maintenance of the Facilities, Landowner shall follow and comply with the Storm Water Structural Control
Maintenance Checklists attached hereto as Exhibit “D” and incorporated herein by reference
(“Maintenance Checklist”).
3. Landowner shall inspect the Facilities and submit an inspection report every three years.
Said inspections shall be conducted at the sole expense of Landowner by a professional engineer registered
in the State of Alabama and reasonably acceptable to the City and which inspection report shall be certified
by said engineer to the City, which form of certification shall be reasonably acceptable to the City. The
first inspection report is due by December 31st of the third year after completion of construction of the
Facilities and subsequent inspection reports are due by December 31st of every successive third year
thereafter. Each inspection report shall detail the then-current state of effectiveness of the Facilities and
shall note any deficiencies in the Facilities and/or any portion or component thereof. The purpose of the
inspection reports is to assure safe and proper operation and functioning of the Facilities.
4. Landowner hereby grants an irrevocable license to the City and its authorized agents and
employees to enter upon the Property and to inspect the Facilities whenever the City deems necessary. The
City shall provide Landowner copies of any inspection findings of the City. In the event the City finds any
deficiencies in the Facilities, whether as a result of the inspection reports required under Paragraph 3 hereof
or as a result of a City inspection conducted in accordance with this Paragraph, the City shall have the right,
but not the obligation, to issue a written notice to Landowner of any such deficiencies. In the event the
City issues any such deficiency notice, Landowner shall cure any such deficiencies within the time set forth
for such deficiencies required by applicable law (whether federal, state, local or otherwise) and in any event
within thirty (30) days of its receipt of such notice.
5. In the event Landowner fails to maintain the Facilities in good working condition
acceptable to the City and in accordance with the terms and conditions hereof, the City shall have the right,
but not the obligation, to enter upon the Property and take whatever steps are necessary to correct and bring
the Facilities into good working condition and to charge the costs of such repairs to Landowner; provided,
however, that in no event shall the foregoing be construed as to allow the City to erect any structure of
permanent nature on the Property outside of the easement or other areas for the Facilities as shown on the
Plat. It is expressly understood and agreed that the City is under no obligation to maintain or repair the
Facilities and in no event shall this Agreement be construed to impose any such obligation on the City.
6. In the event the City pursuant to this Agreement, performs work of any nature, or
expends any funds in performance of said work for labor, use of equipment, supplies, materials, and the
like, Landowner shall reimburse the City for all such costs and expenses within thirty (30) days of
Landowner’s receipt of the City’s written demand therefor. Any sums not reimbursed to the City within
said thirty (30) day period shall accrue interest at the rate of twelve percent (12%) per annum.
7. In the event of the employment of an attorney for the collection of any amount due
hereunder or for the institution of any valid suit for the enforcement of any of the terms and conditions
hereof, or on account of or for any other reason in connection herewith, Landowner covenants and agrees to
pay and reimburse the City for its reasonable attorney’s fees incurred in connection therewith.
8. This Agreement imposes no liability of any kind whatsoever on the City and Landowner
covenants and agrees to defend, indemnify and hold the City harmless from and against any and all
liability, loss, cost, damage and expense (including reasonable attorney’s fees) in the event the Facilities
fail to operate properly, whether as a result of improper design, maintenance or otherwise.
9. This Agreement shall be recorded in the records of the Probate Court of Baldwin County,
Alabama and shall constitute a covenant running with the land, and shall be binding on Landowner and its
successors and assigns with regard to any interest in the Property, including, without limitation, the
Association. It is expressly contemplated hereby that Landowner may convey the Facilities to the
Association in which event the Association shall be obligated to perform all duties and obligations of
“Landowner” hereunder.
10. Landowner represents and warrants to the City that Landowner is the sole and absolute
owner of the Property and is properly authorized to enter into this Agreement.
11. This Agreement shall be construed in accordance with the laws of the State of Alabama.
12. This Agreement may be executed in multiple counterparts by original or facsimile
signatures, and each such counterpart shall be considered an original, but all of which together shall
constitute one and the same agreement.
13. In the event of a default by Landowner hereunder, the City shall be entitled to all rights
and remedies provided under applicable state law, including the right of specific performance.
14. This Agreement shall be binding upon and inure to the benefit of the parties hereto and
their respective successors and assigns.
15. This Agreement shall not be construed more strictly against one party than against the
other merely by virtue of the fact that it may have been prepared by counsel for one of the parties, it being
recognized that all parties have contributed substantially and materially to the preparation of this
Agreement.
16. Each notice, request, and communication required under this Agreement shall be in
writing. It will be deemed to have been received: (i) on personal delivery; (ii) on the second business day
after its deposit for overnight delivery with a recognized overnight delivery service; (iii) if by facsimile, on
receipt of electronic confirmation of its receipt (but only if the facsimile is followed by delivery by United
States mail); or (iv) if mailed, on actual receipt (but only if sent by registered or certified mail, with return
receipt requested, addressed to the other party’s address below):
If to the City: City of Fairhope, Alabama
Attn: Planning Director
555 South Section Street
Fairhope, Alabama 36532
If to Landowner: Fairhope Falls Owners Association INC
Attn:
25366 Profit Dr 29891 Woodrow Ln
Daphne, AL 36526 Spanish Fort, AL 36527
Any party hereto may change its address for notice hereunder by giving notice to the other party in
accordance with the foregoing. Any such change in address shall be effective ten (10) days following
receipt of such notice by the receiving party.
17. Time is of the essence with respect to each obligation of the parties hereto under this
Agreement.
18. The foregoing constitutes the entire agreement between the parties with respect to the
subject matter hereof and may not be modified or amended except in a writing signed by all of the parties
hereto. To the extent that this Agreement differs in any manner whatsoever from prior written or oral
agreements regarding the subject matter hereof, or from any documents which are attached hereto, the
terms and conditions of this Agreement shall control.
[Remainder of Page Intentionally Left Blank]
IN WITNESS WHEREOF, Landowner have caused this Agreement to be executed by and
through its duly authorized representatives effective as of the date first set forth above.
LANDOWNER:
[Insert name of Landowner]
By: Fairhope Falls Owners Association INC
Name: ______________________________
As Its:
STATE OF ______________:
COUNTY OF ____________:
I, the undersigned Notary Public in and for said County in said State, hereby certify that
___________________, whose name as ___________ of ____________________________, a
___________________, is signed to the foregoing instrument and who is known to me, acknowledged
before me on this day that, being informed of the contents of the instrument, he/she, as such
_____________ and with full authority, executed the same voluntarily on the day the same bears date for
and as the act of said _________________________.
Given under my hand and official notarial seal this ____ day of __________, 201__.
{SEAL} __________________________________________
NOTARY PUBLIC
My Commission Expires: ___________________
EXHIBIT A
FAIRHOPE FALLS
PHASE I
LEGAL DESCRIPTION
EXHIBIT A
FAIRHOPE FALLS
PHASE II
LEGAL DESCRIPTION
°
EXHIBIT A
FAIRHOPE FALLS
PHASE III
LEGAL DESCRIPTION
EXHIBIT B
FAIRHOPE FALLS
PHASE I
COPY OF PLAT (NOT FINAL RECORDED DOCUMENT)
EXHIBIT B
FAIRHOPE FALLS
PHASE II
COPY OF PLAT (NOT FINAL RECORDED DOCUMENT)
EXHIBIT B
FAIRHOPE FALLS
PHASE III
COPY OF PLAT (NOT FINAL RECORDED DOCUMENT)
194
212 216215 217
185
186
187
188
189190
191
192
193
195
196
197
198
199
200201
202
203
204
205
206
207
208
209
210
211
213 214
Common Area 10
Common Area 8Common Area 9C.A. 625353 Friendship Road Daphne, AL 36526
251.990.9950 fax 251.929-9815C.A. 7
B AAMALA
MAGERITOVICRL.N:?1$7+$1?)$,5+23()$//6?3/1?),1$/3+$6(?),1$/3+B5(9,6(/27GZJ30
EXHIBIT C
FAIRHOPE FALLS
MAINTENANCE PLAN
The following plan outlines the ongoing long-term maintenance activities for the
stormwater management system components at the Fairhope Falls subdivision. Note that
all stormwater facilities located outside of the City of Fairhope’s Right of Way will be
subject to the requirements in this maintenance plan. Access to the detention pond is
located within recorded common areas. Access to these common areas and easements are
from the right-of-way (See Plat for additional information).
STORMWATER MANAGEMENT SYSTEM DESCRIPTION
The purpose of the stormwater management system at the Fairhope Falls, subdivision is
to provide a sustainable approach to managing stormwater runoff from the developed
areas of the site. The stormwater management system at Fairhope Falls utilizes best
management practices (bmp). The purpose of bmp’s is to maintain the original site
hydrology as much as possible by minimizing surface run-off and reducing the
contaminants in the stormwater. The system consists of the following components:
•DETENTION PONDS
The overall development uses existing ponds and wetlands to detain the stormwater
runoff to the pre-developed runoff rate. All the ponds were either existing or
constructed during Phase I and no further enhancements are required. In Phase III the
smaller wetland pond will be used to treat the storm water runoff and then discharge
into the larger pond. The existing pond capacity has been verified through SCS
drainage design.
The primary maintenance objective of the existing ponds is to maintain the side
slopes and prevent siltation of the pond. This is accomplished through regular
landscape maintenance and protection of inlets from runoff with high suspended
solids.
•DRAINAGE STRUCTURES
The proposed drainage system includes pipes, inlets, headwalls, and outfall structures.
The Property Owners Association shall maintain all drainage features that fall outside
of the public right of way. This included drainage features within the alley ways.
The primary maintenance objective is to prevent any obstructions in the flow of water
through the system and maintain the integrity of the structures themselves. This can
be accomplished by routine inspection and cleaning of the structures.
•DRAINAGE DITCHES
The drainage ditches are located behind lots at various locations throughout the
development to route the stormwater to other stormwater collection components. The
dimensions of the swales are 1 foot in depth, a bottom width of 3 feet, 3 to 1 side
slopes and vegetated for stabilization.
The primary maintenance objectives are to maintain the side slopes, bottom width,
vegetation for stabilization, prevent tree and brush growth, and prevent siltation of the
swales. This is accomplished through regular landscape maintenance and protection
of the swales from runoff with high suspended solids, and removal of tree and brush
roots if growth is found.
LOW IMPACT DEVELOPMENT NARRATIVE & MAINTENANCE:
Please find below the list of ten (10) LID techniques that we are incorporating into
our design for Fairhope Falls Phase II & III.
1. WET BASINS/RETENTION BASINS:
•Definition: A retention basin, also called a wet pond or wet detention basin, is used to
manage storm water runoff to prevent flooding and downstream erosion, and improve
water quality in an adjacent river, stream, lake or bay. It is an artificial lake with
vegetation around the perimeter and includes a permanent pool of water in its design.
•Fairhope Falls Design: There are currently four (4) wet ponds that are currently on
site. They are to remain in place during the Phase II & Phase III construction and are
used to manage storm water on-site.
•Maintenance: Maintenance of wet basin to include:
Vegetation inspected periodically.
Weeding and mowing around pond, as required.
Replanting grass, as required.
Sediment removal, as required.
2. GRASS SWALES:
•Definition: A water quality swale is a shallow, open-channel stabilized with grass or
other vegetation design to filter pollutants and convey storm water. Grass Swales are
storm water runoff conveyance systems that provide a less expensive alternative to
storm sewers.
•Fairhope Falls Design: There are four (4) grass swales located throughout the
proposed Phase II and Phase III site. One (1) grass swale is located on the west side of
the property flowing from north to south towards the drainage pond. Three (3) other
grass swales will be installed throughout the site in order to collect and convey storm
water from the back side of properties into the underground drainage system.
•Maintenance:
Routine inspection for debris.
Mow grass and weeds in swale to maintain appearance.
Remove accumulated trash and debris.
3. GRASS BUFFERS:
•Definition: Grass buffers are small areas of land in permanent vegetation, designed to
intercept pollutants and manage other environmental concerns. It typically receives
sheet flow of storm water runoff from a nearby impervious surface in order to reduce
peak discharge rates.
•Fairhope Falls Design: We have included green space around the wetland pond for
active or passive recreation opportunities. The grass buffers will reduce sheet flow and
reduce peak discharge rates.
•Maintenance:
Routine inspection for debris.
Mow grass and weeds in swale to maintain appearance.
Remove accumulated trash and debris.
4. WETLANDS:
•Definition: Wetlands are defined as an artificial ecosystem for the purpose of treating
anthropogenic discharge such as storm water runoff. Physical, chemical, and
biological processes combine in wetlands to remove contaminants from storm water.
•Fairhope Falls Design: According to the wetland delineation by EcoSolutions, there
are currently two (2) wetland areas within our site. We are proposing to leave these
wetlands on-site and incorporate them into our design.
•Maintenance: Wetland maintenance include the following:
Repair of embankments.
Control density of desirable vegetation.
Removal of invasive and/or non-native species that could be a problem
in native habitats.
Replacement of wetland plants.
Repair of pipelines and spillways.
Control of unwanted animals or mosquitos.
5. IN-LINE STORAGE:
•Definition: In-line storage provides attenuation and limits sedimentation. It is designed
to be self-cleaning where possible and clean out access is provided and designed into
the system.
•Fairhope Falls Design: We are providing in-line storage in our underground drainage
system. Collecting the storm water underground will minimize surface flooding. We
are also installing junction boxes/inlets that will be able to collect sedimentation before
discharging. The junction boxes can be cleaned out at any time once sedimentation
builds up in the boxes.
•Maintenance: In-line storage maintenance include the following:
Repair of underground pipes and/or junction boxes.
Eliminate silt/sediment, as required, in junction boxes.
6. SITE DESIGN FOR WETLANDS:
•Definition: This low impact development includes site design that incorporates the
natural features of the property such as wetlands and/or other water bodies on-site.
This can help to minimize erosion and reduce stress on natural water conveyance and
attenuation systems. Using existing natural features decreases the proposed
impervious surfaces which is advantageous to the existing surroundings.
•Fairhope Falls Design: We are proposing to use all existing ponds/wetlands on site.
No additional ponds are proposed. We are incorporating our site design/layout around
the existing features and this will help minimize erosion and reduce stress rather than
install additional systems.
•Maintenance: Site design for wetlands maintenance include the following:
Repair of embankments.
Control density of desirable vegetation.
Removal of invasive and/or non-native species that could be a problem
in native habitats.
Repair of pipelines and spillways.
7. LEVEL SPREADER:
•Definition: Level spreaders are devices that create diffuse or sheet flow that is evenly
distributed or dispersed to decrease flow velocity and discourage erosive forces
associated with concentrated flows. Level spreaders are intended to capture runoff in
small watersheds.
•Fairhope Falls Design: We are proposing to install a Bubble structure at the discharge
into the small wetland pond. This will cause storm water to discharge through the
6’x6’ bubble structure and be evenly distributed rather than discharging from one (1)
pipe at a high discharge rate. Class II riprap will also be installed around the structure
to reduce possibilities of erosion.
•Maintenance for the level spreader include the following:
1. Sediment removal.
2. Erosion inspection.
3. Plant maintenance.
4. Turf maintenance.
5. Plant removal on level spreader.
8. GREENWAYS:
•Definition: Greenways provide beneficial use of LID for potentially active and passive
recreation opportunities. This technique allows for the creative integration that
includes sensitive wetland areas or other natural land forms.
•Fairhope Falls Design: There are multiple grassed common areas and easements
located throughout Phase II and Phase III that are considered grassways.
•Maintenance:
Routine inspection for debris.
Mow grass and weeds in swale to maintain appearance.
Remove accumulated trash and debris.
9. BIO-RETENTION:
•Definition: Bio-retention is the process in which contaminants and sedimentation are
removed from storm water runoff. Storm water is collected into the treatment area
which consists of a grass buffer strip, sand bed, ponding area or an organic layer.
•Fairhope Falls Design: We are proposing to incorporate the small wetland pond as a
bio-retention pond. Treated water will discharge into the larger wetland pond. Once
the storm water elevation overtops the small wetland pond into the larger pond,
sediments will have percolated through the soil.
•Scheduled maintenance tasks include:
Project completion:
As Needed
o Re-mulch void areas
o Mow turf areas
o Treat plant diseases
o Water plants throughout periods of persistent drought.
o Removal of top two to three inches of discolored
planting medium and its replacement with fresh mix,
when ponding of water lasts for more than 48 hours.
•Monthly
o Inspect basin to evaluate condition and problems
needing maintenance attention.
o Remove litter and plant debris.
o Repair eroded areas.
•Twice per year: Remove and replace dead and diseased plants.
•Once per year
o Add new mulch if needed.
o Replace tree stakes and wires if needed.
10. BIO-RETENTION (2):
•Definition: Bio-retention is the process in which contaminants and sedimentation are
removed from storm water runoff. Storm water is collected into the treatment area
which consists of a grass buffer strip, sand bed, ponding area or organic layer.
•Fairhope Falls Design: We are proposing to install a bubble up structure at the small
wetland pond discharge. Stone (#57) will be installed around the under drain pipe and
Class II riprap will be installed around the entire bubble up structure. The stone will
allow sediments to settle out of the storm water before it discharges into the larger
pond. The barrier between the two wetland ponds will also act as a bio-retention as
listed above so there will be two (2) separate ways to act as bio-retention before it
discharges into the large wetland pond.
•Scheduled maintenance tasks include:
Project completion:
As Needed
o Re-mulch void areas
o Mow turf areas
o Treat plant diseases
o Water plants throughout periods of persistent drought.
o Removal of top two to three inches of discolored
planting medium and its replacement with fresh mix,
when ponding of water lasts for more than 48 hours.
•Monthly
o Inspect basin to evaluate condition and problems
needing maintenance attention.
o Remove litter and plant debris.
o Repair eroded areas.
•Twice per year: Remove and replace dead and diseased plants.
•Once per year
o Add new mulch if needed.
o Replace tree stakes and wires if needed.
Be advised that this work is the responsibility of the Home Owners
Association or Property Owners. The Engineer assumes no
responsibility for either performing this work or verifying that it is
being completed. The Homeowners Association or Property Owners
shall review Article V Section F 3 a 3b City of Fairhope Regulations,
which contains the inspection responsibilities and potential
consequences (enforcement action) for not fulfilling the inspection
responsibilities.
EXHIBIT D
FAIRHOPE FALLS
MAINTENANCE CHECKLISTS
Stormwater Pond Inspections and Maintenance Checklist
Site Name: ___________________________________ Owner change since last inspection? Y N
Location: _____________________________________________________________________________
Owner Name: _________________________________________________________________________
Address: _________________________________________ Phone Number: _____________________
Site Status: ___________________________________________________________________________
Date: _____________ Time: ______________ Site conditions: ____________________________
Stormwater Pond Type: Wet Pond Wet ED Pond Micropool Pond
Multiple Pond System Dry Pond
Inspection Frequency Key: A=annual; M=monthly; S=after major storms
Inspection Items Inspection Frequency Inspected? (Yes/No) Maintenance Needed? (Yes/No)Comments/Description
Embankment
Vegetation healthy?A/S
Erosion on embankment?A/S
Animal burrows in embankment?A/S
Cracking, sliding, bulging of dam?A/S
Drains entering pond blocked or not
functioning?A/S
Leaks or seeps on embankment?A/S
Slope protection failure functional?A/S
Other (describe)A/S
Outfall Structure Box
Low-flow orifice functional?A/S
Concrete/masonry condition (Cracks
or displacement? Spalling?)A
Outfall pipe in good condition?A
Rip Rap Filter Bern in good
condition?A
Inspection Items Inspection Frequency Inspected? (Yes/No) Maintenance Needed? (Yes/No)Comments/Description
Outfall channels function, not
eroding?A
Rip Rap at the end of the outfall pipe
in good condition (No signs of
erosion)
A
Other (describe)A
Hazards
Have there been complaints from
residents?
M
Public hazards noted?M
Inspector Comments:
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
_____________________________________________
Overall Condition of Facility: Acceptable Unacceptable
If any of the inspection items above are checked “yes” for “maintenance needed,” list maintenance actions
and the completion dates below:
Maintenance Action Needed Due Date
The next routine inspection is scheduled for approximately: ______________________
(date)
Inspected by: (signature) __________________________________________
Inspected by: (printed) ____________________________________________
Swales / Grass Channels Inspections and Maintenance Checklist
Site Name: __________________________________ Owner change since last inspection? Y N
Location: _____________________________________________________________________________
Owner Name: _________________________________________________________________________
Address: _______________________________________ Phone Number: _______________________
Site Status: ___________________________________________________________________________
Date: __________________ Time: ______________ Inspector: ____________________________
Inspection Frequency Key: A=annual; M=monthly; S=after major storms
Inspection Items Inspection Frequency Inspected? (Yes/No) Maintenance Needed? (Yes/No) Comments/Description
Debris Removal
Facility and adjacent area free of
debris? M
Inlets and outlets free of debris? M
Any dumping of yard wastes into
facility?
Litter (branches) removed? M
Vegetation
Surrounding area fully stabilized?
(no evidence of eroding material
into swale, channel or filter strip)
M
Grass mowed? M
Plan composition according to
approved plan?M
Filtration Capacity
Clogging from oil or grease? M
Facility dewaters between storms? M
Inspection Items Inspection Frequency Inspected? (Yes/No) Maintenance Needed? (Yes/No) Comments/Description
Sediment Deposition
Swale clean of sediments A
Sediment not >20% of swale
design depth A
Outfall Ditch Downstream of Outfall Pipe
In good condition?A
Any evidence of erosion?A
Any evidence of blockages?A
Has facility been filled or blocked
inappropriately?A
Inspector Comments:
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
_____________________________________________
Overall Condition of Facility: Acceptable Unacceptable
If any of the above Inspection Items are checked “yes” for “maintenance needed,” list maintenance actions
and their completion dates below:
Maintenance Action Needed Due Date
The next routine inspection is scheduled for approximately: ______________________
(date)
Inspected by: (signature) __________________________________________
Inspected by: (printed) ____________________________________________
LANDRY LNSTATE HWY 104
LACEY RDYOSEMITEBLVDGULLFOSSSTS
UTHERL
ANDCIRHARE LNI G UAZUFALLSAV
DRESSAG
EWAY MY WAY
BAUGHMAN RD
BABB'S LN
LI NNRIDGEDRKENNETHKINGLNLANGFORD RDCity of FairhopePlanning Commission
March 1, 2021
¯SOPHIE FALLS AVLANDRYLNHATCHETTCREEKAV
GULLFOSS STYOSEMITE BLVDSUTHERLANDCIRDRESSAGE WAY
MY WAYLANGFORD RDSD 21.12 - Fairhope Falls, Phase 6
Legend
COF Planning Jurisdiction
¯
¯
^
Project Name:
Fairhope Falls Ph6Site Data:
30.98 acresProject Type:
70-lot Major Subdivision PreliminaryJurisdiction:
Fairhope Planning JurisdictionZoning District:
UnzonedPPIN Number:
350639, 310029, 350184, 382511General Location:
East side of Langford Rd. just north of
Dressaga Way.Surveyor of Record:
Dewberry EngEngineer of Record:
Dewberry EngOwner / Developer:
Leonard and Sharon Smart; TH Dairhope
Falls 2018, LLC;Fairhope Falls Owners
AssociationSchool District:
Fairhope East, Middle, and High School Recommendation:
Approved w/ ConditionsPrepared by:
Mike Jeffries
1 SD 21.12 Fairhope Falls Ph6– March 1, 2021
Summary of Request:
The owner and applicants are Fairhope Falls Owners Association Inc, TH Fairhope Falls 2018 LLC, and
Leonard and Sharon Smart. Dewberry is the authorized agent and Engineer of Record for the project. This
preliminary plat application is for a 70-lot subdivision located on the east side of Langford Road just north of
Dressage Way. It will connect to a stub out of Yosemite Boulevard in the approved preliminary plat of
Fairhope Falls Subdivision Ph 4. The property is currently unzoned but does have an approved Village
Subdivision that it must be built in substantial conformance to. The Village Subdivision Fairhope Falls West
was approved November 2020.
Comments:
- Review comments from Baldwin County were not submitted.
- Drainage has been reviewed and approved by City of Fairhope’s Public Works Director, Richard Johnson,
P.E. The drainage for phases 4-9 will utilize 3 detention ponds that will discharge through concrete weir
outfalls structures to the immediate pond down stream eventually into a stilling basin before sheet
flowing into existing wetlands.
- The ponds as wet basins achieve the required 80% TSS removal.
- Wetland buffer signs must be in place prior to any land disturbance activities.
- The proposed lot sizes and layout are consistent with the approved Village Subdivision and with
minimum lot size of 8,400 SF.
- Amenities for Phase 6 include a passive recreation area labeled K to include bench seating. Bench details
not included in landscape plans. Amenity K was also in recently approved Phase 5.
- Landscape plans also show a buffer along Langford Road consisting of a 6’ high wooden privacy fence
and evergreen hedge.
- A traffic study was provided for preliminary approval of phases 4 and 5 that included the remaining
phases 4-9 encompassing 391 lots. The study recommended improvements for the intersection of
Langford Road and SR 104 be widened to accommodate northbound left turn lane, an eastbound right
turn lane, and a westbound left turn lane. These improvements shall be installed before application for
Final Plat.
2 SD 21.12 Fairhope Falls Ph6– March 1, 2021
The subdivision regulations contain the following criteria in Article IV.B.2. Approval Standards:
“2. Consistency with Plans, Regulations and Laws - The Planning Commission shall not approve the
subdivision of land if the Commission makes a finding that such land is not suitable for platting and
development as proposed, due to any of the following:
a. The proposed subdivision is not consistent with the City’s Comprehensive Plan, and/or the City’s Zoning
ordinance, where applicable;
• Not applicable
b. The proposed subdivision is not consistent with the City’s Comprehensive Plan or any other plan or
program for the physical development of the City including but not limited to a Master Street Plan, a Parks
Plan, a Bicycle Plan, a Pedestrian Plan, or the Capital Improvements Program;
• Not applicable
c. The proposed subdivision is not consistent with these Regulations;
• Meets
d. The proposed subdivision is not consistent with other applicable state or federal laws and regulations;
or
• Meets
e. The proposed subdivision otherwise endangers the health, safety, welfare or property within the
planning jurisdiction of the City.”
• Meets
- Note that installation of sidewalks and street trees are required before final plat
- Note that approved preliminary plats expire after 2-years
- Note that if approved a pre-construction meeting is required before land disturbance.
Staff Recommendation:
Approve with the following condition:
1. A replat satisfying condition 1 of approval for SD 20.47 Fairhope Falls West Village Subdivision.
2. Recommended traffic improvements as stated in staff report are installed prior to acceptance of
application for final plat. Any deviation will require reapproval from the Planning Commission.
3. Amenities are installed prior to acceptance of application for final plat.
4. Add City of Fairhope Gas signature block to the plat.
5. Add 15’ Utility easement along front lot lines per Riviera Utilities to general notes on the plat.
EROSION AND SEDIMENT CONTROL NOTESROADWAY•STA••••UTILITIES
OVERLAPPING ASPHALT
402403404405406407408409410411412413442443444445446447448449450451452453440439438437436435434433432431430429428401400399398397 396395394TORRENT ROADTELUGA AVENUEGRAND RAPIDS ROAD490491492493494495496497498499500501502503504505506507508509 510511 512513515514516517518519520521522523524525526527528529530531532533 534545544543542541540539538537536535489SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S S
SSSS SSSSSSSSS S S S S
S S S S SSSS S S S S
SSSSSSSS S S S SSSSSSS464465466467468469470471472473474475476478477479480481482483484485486487454455456457458459460461462463324325326327 328329330 331332333334335336337338339340341342343344345346347348349350351352353354355356365366367368369370371372373374375376377378379380381382383384385386387388389390391392393363364362361360359358357SHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROADWETLAND BUFFERLINEWETLAND BUFFERLINENON JURISDICTIONALWETLANDWETLAND LINEWETLAND LINEWETLAND LINEWETLAND BUFFERLINE58 57 565554 53525150 49484746 454443 565554535251504948474645FEET2000100
324325326327 328329330 331332333334335336337338377378379380381382383384385386387388389390391392393SHOSHONEY AVENUEVERNAL ROADBURNEY ROADSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S
S S S S S S S S S S
S S
S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S
S S S S S S S S S S
S S
S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S
S S S S S S S S S S
S S
S SSSSSSSSSSSSSSS471472473474475476478477504505506507508509 510511 512513515514516528529530531532533 534545544543542SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S
S S S S S S S S S S
S S
S SSSSSSSSSSSSSSS68 V PAY DIRT, LLC50'0 100'FEETMATCHLINE - SEE SHEET C1C
339340341342343344345346352353354355356365366367368369370371372373374375376363364362361360359358357TELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S S S S S S
S S S S S S S S S
S S SSSSSSSSSSSS S S S S S
S SWETLAND BUFFERLINENON JURISDICTIONALWETLANDWETLAND LINEWETLAND LINEWETLAND LINEWETLAND BUFFERLINE3 494846 454443
565554535251504948474645SSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S S S S S S
S S S S S S S S S S S
S S SSSSSSSSSSSS S S S S S
402403404405406407408409446447448449450451452453437436435434401400399398397 396395394TORRENT ROADSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S S S S S S
S S S S S S S S S S S
S S SSSSSSSSSSSS S S S S S
479480481482483484485486487SSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S S S S S S
S S S S S S S S S S S
S S SSSSSSSSSSSS S S S S S
SSSSSSSSSSSSSSSSSSSS440439438437436433432431430429428427GRAND RAPIDS ROADSSSSSSSSSSSSSSSSSSSS68 V PAY DIRT, LLC50'0100'FEETMATCHLINE - SEE SHEET C1DMATCHLINE - SEE SHEET C1BMATCHLINE - SEE THIS SHEET LEFTMATCHLINE - SEE THIS SHEET RIGHT
343344345346347348349350351352353354SELFOSS ROADS S S S S
S S S S S S S S S S S S
SSSSSSSSW WETLAND BUFFERLINEWETLAND BUFFERLINENON JURISDICTIONALWETLANDWETLAND LINE58 57 565554 53525150 49484746 454443
565554535251504948474645S S S S S
S S S S S S S S S S S S
SSSSSSSSS S S S S
S S S S S S S S S S S S
SSSSSSSS4844854864874544554567S S S S S
S S S S S S S S S S S S
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
S S
25825725625568 V PAY DIRT, LLC50'0100'FEETMATCHLINE - SEE SHEET C1C
SSSSSSSSSS
258257256W W
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S S
SSSS SSSSSSSSS S S S S
S S S S SSSS S S S
SSSSSSSS S S S SSSSSSS402403404405406407408409410411412413442443444445446447448449450451452453440439438437436435434433432431430429428401400399398397 396395394TORRENT ROADTELUGA AVENUEGRAND RAPIDS ROAD498499500501502503504505506507508509 510511 512513515514516517518519520521522523524525526527528529530531532533 534545544543542541540539538537536SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S S
SSSS SSSSSSSSS S S S S
S S S S SSSS S S S
SSSSSSSS S S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S S
SSSS SSSSSSSSS S S S S
S S S S SSSS S S S
SSSSSSSS S S S SSSSSSS465466467468469470471472473474475476478477479480481482483484485486487454455456457458459460461462463324325326327 328329330 331332333334335336337338339340341342343344345346347348349350351352353354355356365366367368369370371372373374375376377378379380381382383384385386387388389390391392393363364362361360359358357SHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROADSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S
SSSS SSSSSSSSS S S S S
S S S S SSSS S S S
SSSSSSSS S S S SSSSSSSSWETLAND BUFFERLINEWETLAND BUFFERLINENON JURISDICTIONALWETLANDWETLAND LINEWETLAND LINEWETLAND LINEWETLAND BUFFERLINE58 57 565554 53525150 49484746 454443 565554535251504948474645PHASE 8 (FUTURE DEVELOPMENT)PHASE 4 EXISTINGPHASE 6PHASE 4 EXISTINGPHASE 9 (FUTURE DEVELOPMENT)PHASE 6PHASE 8 (FUTURE DEVELOPMENT)PHASE 6PHASE 8 (FUTURE DEVELOPMENT)PHASE 6PHASE 9 (FUTURE DEVELOPMENT)PHASE 8 (FUTURE DEVELOPMENT)PHASE 7 (FUTURE DEVELOPMENT)PHASE 6PHASE 7 (FUTURE DEVELOPMENT)PHASE 7 (FUTURE DEVELOPMENT)PHASE 7 (FUTURE DEVELOPMENT)PHASE 6PHASE 6PHASE 9 (FUTURE DEVELOPMENT)PHASE 6FUTURE DRAINAGEFUTURE DRAINAGEFUTURE DRAINAGEFUTURE DRAINAGEFUTURE DRAINAGEFUTURE DRAINAGEFUTURE DRAINAGE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 1000 200FEET
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S
S S S S S S
506507508509 510511 512513514545SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S
S S S S S S
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S
S S S S S S474475
324325326327 328329330 331332333334335336337338377378379380381382383384385386387388389390391392393SHOSHONEY AVENUEVERNAL ROADBURNEY ROADSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S
S S S S S S
PHASE 9 (FUTURE DEVELOPMENT)PHASE 6PHASE 6PHASE 6 X X X X X X X X X X X X X X X X X X X X X X X X X X X PHASE 8(FUTURE DEVELOPMENT) X •••MATCHLINE - SEE SHEET C2CFEET100'050'
SSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S
S S S S
S S SSSSSSSSSSSS S S S S S
402403404405406407408409446447448449450451452453437436435434401400399398397 396395394TORRENT ROADSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S
S S S S
S S SSSSSSSSSSSS S S S S S
SSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S
S S S S
S S SSSSSSSSSSSS S S S S S
482483484339340341342343355356365366367368369370371372373374375376363364362361360359358357TELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S
S S
S S SSSSSSSSSSSS S S S S S
S SLINEWETLAND LINEWETLAND LINEWETLAND BUFFERLINEPHASE 7 (FUTURE DEVELOPMENT)PHASE 6PHASE 7 (FUTURE DEVELOPMENT)PHASE 6 X X X X X X X X X X X X X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X X FUTURE DRAINAGE X MATCHLINE - SEE SHEET C2DMATCHLINE - SEE SHEET C2BFUTURE DRAINAGEFUTURE DRAINAGEFUTURE DRAINAGEFUTURE DRAINAGE50'0 100'FEET
SSSSSSSSSSSSSS
S
S
258257256W W W W
S S S S S S S S S S S S
SSSSSSSS S S S S S S S S S S S
SSSSSSSS S S S S S S S S S S S
SSSSSSS4854864874544556343344345346347348349350351352353354SELFOSS ROADS S S S S S S S S S S S
SSSSSSSNW565554535251504948474645PHASE 6PHASE 4 EXISTINGPHASE 8 (FUTURE DEVELOPMENT)PHASE 6PHASE 6 X X X X X X X X X X X X X MATCHLINE - SEE SHEET C2CEXISTING DRAINAGEFUTURE DRAINAGE50'0 100'FEET
151SSSSSSSSSSSSS
S
218258257256255254253SHOSHONEY AVWETLAND BUFFERLINE490491492493494495496497498499500501502503504505506507508509 510511 512513515514516517518519520521522523524525526527528529530531532533 534545544543542541540539538537536535489488WETLAND BUFFERLINESSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S S
SSSS SSSSSSSSSSS S S S S S SSSS S S S SSSS S S S S
SSSSSSSS S S S SSSSSSS324325326327 328329330 331332333334335336337338339340341342343344345346347348349350351352353354355356365366367368369370371372373374375376377378379380381382383384385386387388389390391392393363364362361360359358357SHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROADSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S
SSSS SSSSSSSSSSS S S S S S S SSSS S S S SSSSS S S S S
SSSSSSSS S S S SSSSSSSSWETLAND BUFFERLINEWETLAND BUFFERLINEWETLAND BUFFERLINENON JURISDICTIONALWETLANDWETLAND LINEWETLAND LINEWETLAND LINEWETLAND BUFFERLINE58 57 565554 53525150 49484746 454443 565554535251504948474645WETLAND LINEWETLAND BUFFERWETLANDSSSSSSSSSSSSSS
S
402403404405406407408409410411412413414415416417418419420421422423441442443444445446447448449450451452453440439438437436435434433432431430429428427426425424401400399398397 396395394TORRENT ROADTELUGA AVENUEGRAND RAPIDS ROAD464465466467468469470471472473474475476478477479480481482483484485486487454455456457458459460461462463WETLAND BUFFERLINEEXISTING DRAINAGE PIPEEXISTING DRAINAGESTRUCTURE2159606137262444454657473678943414211401239132930313214152716171819202122242325263635343337386468656686879789939094919551525354555657587776847885798081828347485049677069719810310759610499114105HW4118HW3631000 200FEET
151402403404405406407408409410445446447448449450451452453439438437436435434433432401400399398397 396395394TORRENT ROADENUE490491492493494495496497498499500501502503504505506507508509 510511 512513515514516517518519520521522523524525526527528529530531532533 534545544543542541540539538537536535489488WETLAND BUFFERLINESSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S S
SSSS SSSSSS S S S
S S S S SSSS S S S S
SSSSSSSS S S S SSSSSSS464465466467468469470471472473474475476478477479480481482483484485486487454455456457458459460461462463SSSSSSSSSSSSS
S
S
218258257256255254253SHOSHONEY AVEWETLAND BUFFERLINEWETLAND BUFFERLINE324325326327 328329330 331332333334335336337338339340341342343344345346347348349350351352353354355356365366367368369370371372373374375376377378379380381382383384385386387388389390391392393363364362361360359358357SHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROADSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S
SSSS SSSSSS S S S
S S S S SSSS S S S S
SSSSSSSS S S S SSSSSSSSWETLAND BUFFERLINEWETLAND BUFFERLINEWETLAND BUFFERLINENON JURISDICTIONALWETLANDWETLAND LINEWETLAND LINEWETLAND LINEWETLAND BUFFERLINE58 57 565554 53525150 49484746 454443 565554535251504948474645SSSSSSSSSSSSS
S
S
B12A11C1W1X1Y1D1Z1A2B2E1C2D2E2F1F2G1H1I1J1G2H2K1I2L1M1J2N1K2L2M2S4U2Y3Z3A4B4C4596061372624444546574736789434142114012391329303132146479808182834771K4L49885PHASE 9 (FUTURE DEVELOPMENT)EXISTING PHASE 4PHASE 8 (FUTURE DEVELOPMENT)PHASE 4 EXISTINGPHASE 6PHASE 4 EXISTINGPHASE 9 (FUTURE DEVELOPMENT)PHASE 6PHASE 8 (FUTURE DEVELOPMENT)PHASE 6PHASE 8 (FUTURE DEVELOPMENT)PHASE 6PHASE 9 (FUTURE DEVELOPMENT)PHASE 8 (FUTURE DEVELOPMENT)PHASE 7 (FUTURE DEVELOPMENT)PHASE 6PHASE 7 (FUTURE DEVELOPMENT)PHASE 6PHASE 6PHASE 9 (FUTURE DEVELOPMENT)PHASE 610V499X4103Y4114105HW2HW4118HW363FUTURE DRAINAGESTRUCTUREFUTURE DRAINAGEFUTURE DRAINAGE PIPEFUTURE DRAINAGEFEET2000100
324325326327 328329330 331332333334335336337338377378379380381382383384385386387388389390391392393SHOSHONEY AVENUEVERNAL ROADBURNEY ROADSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S
S S S S S474475
514545A1B12C1W15960X1Y16164K4L4983D172Z1A262B27141105HW2114Y4V499HW4118HW363PIPE TABLEPIPE NAME123459SIZEINSTALL 24 LF OF 24" RCPINLET ELEV: 87.14OUTLET ELEV: 87.04INSTALL 277 LF OF 24" RCPINLET ELEV: 82.22OUTLET ELEV: 87.04INSTALL 361 LF OF 36" RCPINLET ELEV: 70.22OUTLET ELEV: 78.22INSTALL 272 LF OF 36" RCPINLET ELEV: 60.67OUTLET ELEV: 70.22INSTALL 24 LF OF 36" RCPINLET ELEV: 79.72OUTLET ELEV: 78.22PIPE TABLEPIPE NAME6061626364SIZEINSTALL 31 LF OF 36" RCPINLET ELEV: 79.22OUTLET ELEV: 80.42INSTALL 24 LF OF 18" RCPINLET ELEV: 81.93OUTLET ELEV: 80.42INSTALL 24 LF OF 18" RCPINLET ELEV: 74.55OUTLET ELEV: 74.00INSTALL 31 LF OF 18" RCPINLET ELEV: 72.45OUTLET ELEV: 75.26INSTALL 120 LF OF 30" RCPINLET ELEV: 82.04OUTLET ELEV: 80.42PIPE TABLEPIPE NAME71729899105SIZEINSTALL 117 LF OF 24" RCPINLET ELEV: 72.45OUTLET ELEV: 75.13INSTALL 53 LF OF 30" RCPINLET ELEV: 72.45OUTLET ELEV: 70.22INSTALL 24 LF OF 18" RCPINLET ELEV: 79.57OUTLET ELEV: 79.66INSTALL 204 LF OF 24" RCPINLET ELEV: 87.04OUTLET ELEV: 90.61INSTALL 17 LF OF 18" RCPINLET ELEV: 79.50OUTLET ELEV: 79.57PIPE TABLEPIPE NAME114SIZEINSTALL 17 LF OF 18" RCPINLET ELEV: 79.66OUTLET ELEV: 79.75118INSTALL 84 LF OF 43 3/4" x 26 5/8" ARCPINLET ELEV: 98.11OUTLET ELEV: 98.35STRUCTURE TABLEID NO.A1A2B1B2C1DETAILSINSTALL S1 INLETSTA: 90+49.55 - SHOSHONEY AVETHROAT = 91.04PIPE 1 - INV IN = 87.04PIPE 99 - INV IN = 87.04PIPE 2 - INV OUT = 87.04INSTALL S1 INLETSTA: 64+94.53 - BURNEY ROADTHROAT = 78.45PIPE 63 - INV IN = 72.45PIPE 62 - INV IN = 74.00PIPE 71 - INV IN = 72.45PIPE 72 - INV OUT = 72.45INSTALL S1 INLETSTA: 90+49.64 - SHOSHONEY AVETHROAT = 91.03PIPE 1 - INV OUT = 87.14INSTALL S1 INLETSTA: 64+94.51 - BURNEY ROADTHROAT = 78.45PIPE 62 - INV OUT = 74.55INSTALL S1 INLETSTA: 93+32.61 - SHOSHONEY AVETHROAT = 86.22PIPE 59 - INV IN = 78.22PIPE 3 - INV OUT = 78.22STRUCTURE TABLEID NO.D1HW2HW3HW4K4DETAILSINSTALL S1 INLETSTA: 96+99.92 - SHOSHONEY AVETHROAT = 78.24PIPE 3 - INV IN = 70.22PIPE 72 - INV IN = 70.22PIPE 4 - INV OUT = 70.22INSTALL HEADWALLSTA: 94+11.11 - SHOSHONEY AVETHROAT = 84.08PIPE 105 - INV OUT = 79.50INSTALL HEADWALLSTA: 85+24.49 - SHOSHONEY AVETHROAT = 100.58PIPE 118 - INV OUT = 98.11INSTALL HEADWALLSTA: 85+25.68 - SHOSHONEY AVETHROAT = 100.82PIPE 118 - INV IN = 98.35INSTALL S1 INLETSTA: 42+08.73 - VERNAL ROADTHROAT = 82.64PIPE 98 - INV OUT = 79.66PIPE 114 - INV OUT = 79.66STRUCTURE TABLEID NO.L4V4W1X1Y1DETAILSINSTALL S1 INLETSTA: 42+08.73 - VERNAL ROADTHROAT = 82.64PIPE 98 - INV IN = 79.57PIPE 105 - INV IN = 79.57INSTALL S1 INLETSTA: 88+39.51 - SHOSHONEY AVETHROAT = 94.68PIPE 99 - INV OUT = 90.61INSTALL S1 INLETSTA: 93+32.61 - SHOSHONEY AVETHROAT = 86.22PIPE 60 - INV IN = 79.22PIPE 2 - INV IN = 82.22PIPE 59 - INV OUT = 79.72INSTALL S1 INLETSTA: 44+12.87 - VERNAL ROADTHROAT = 85.93PIPE 61 - INV IN = 80.42PIPE 64 - INV IN = 80.42PIPE 60 - INV OUT = 80.42INSTALL S1 INLETSTA: 44+12.85 - VERNAL ROADTHROAT = 85.93PIPE 61 - INV OUT = 81.93STRUCTURE TABLEID NO.Y4Z1DETAILSINSTALL YARD INLETSTA: 93+38.12 - SHOSHONEY AVETHROAT = 83.75PIPE 114 - INV IN = 79.75INSTALL S1 INLETSTA: 96+57.61 - SHOSHONEY AVETHROAT = 79.27PIPE 63 - INV OUT = 75.26MATCHLINE - SEE SHEET C3DFUTURE DRAINAGEFUTURE DRAINAGEFUTURE DRAINAGEFUTURE DRAINAGE50'0 100'FEET
339340341342343355356365366367368369370371372373374375376363364362361360359358357TELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S
S S
S S SSSSSSSSSSSS S S S S S
S SLINEWETLAND LINEWETLAND LINEWETLAND BUFFERLINE402403404405406407408409446447448449450451452453437436435434401400399398397 396395394TORRENT ROAD482483484E144C245D246E247S45F1F274U26G17H18I19J143G2H241K14211I240L112M139J213N129K230L231M2321410R414STRUCTURE TABLEID NO.C2D2E1E2DETAILSINSTALL S1 INLETSTA: 99+77.26 - SHOSHONEY AVETHROAT = 69.18PIPE 45 - INV IN = 61.68PIPE 44 - INV OUT = 61.68INSTALL S1 INLETSTA: 14+62.95 - TELUGA AVETHROAT = 67.68PIPE 46 - INV IN = 62.18PIPE 47 - INV IN = 62.18PIPE 45 - INV OUT = 62.18INSTALL S1 INLETSTA: 99+77.61 - SHOSHONEY AVETHROAT = 69.17PIPE 4 - INV IN = 60.67PIPE 44 - INV IN = 60.67PIPE 5 - INV OUT = 60.67INSTALL S1 INLETSTA: 14+62.69 - TELUGA AVETHROAT = 67.69PIPE 46 - INV OUT = 63.79STRUCTURE TABLEID NO.F1F2G1G2DETAILSINSTALL S1 INLETSTA: 102+02.26 - SHOSHONEY AVETHROAT = 62.11PIPE 5 - INV IN = 56.11PIPE 73 - INV IN = 56.11PIPE 6 - INV OUT = 56.11INSTALL S1 INLETSTA: 102+01.90 - SHOSHONEY AVETHROAT = 62.12PIPE 74 - INV IN = 58.22PIPE 73 - INV OUT = 58.22INSTALL S1 INLETSTA: 103+16.44 - SHOSHONEY AVETHROAT = 60.40PIPE 6 - INV IN = 55.40PIPE 7 - INV OUT = 55.40INSTALL S1 INLETSTA: 25+54.83 - GRAND RAPIDS ROADTHROAT = 54.95PIPE 43 - INV OUT = 50.95STRUCTURE TABLEID NO.H1H2I1I2DETAILSINSTALL S2 INLETSTA: 103+41.74 - SHOSHONEY AVETHROAT = 60.20PIPE 7 - INV IN = 55.20PIPE 8 - INV OUT = 55.20INSTALL S1 INLETSTA: 23+31.04 - GRAND RAPIDS ROADTHROAT = 52.20PIPE 41 - INV OUT = 48.20INSTALL S1 INLETSTA: 27+44.53 - GRAND RAPIDS ROADTHROAT = 60.24PIPE 8 - INV IN = 55.00PIPE 9 - INV OUT = 52.24INSTALL S2 INLETSTA: 21+66.56 - GRAND RAPIDS ROADTHROAT = 51.10PIPE 40 - INV OUT = 47.10STRUCTURE TABLEID NO.J1J2K1K2DETAILSINSTALL S1 INLETSTA: 25+54.83 - GRAND RAPIDS ROADTHROAT = 54.95PIPE 9 - INV IN = 44.95PIPE 43 - INV IN = 50.85PIPE 10 - INV OUT = 44.95INSTALL YARD INLETSTA: 20+29.49 - GRAND RAPIDS ROADTHROAT = 51.89PIPE 39 - INV OUT = 48.00INSTALL S1 INLETSTA: 23+03.50 - GRAND RAPIDS ROADTHROAT = 51.98PIPE 11 - INV IN = 44.89PIPE 41 - INV IN = 47.50PIPE 42 - INV OUT = 43.00INSTALL S1 INLETSTA: 18+14.51 - GRAND RAPIDS ROADTHROAT = 56.85PIPE 30 - INV IN = 51.80PIPE 29 - INV OUT = 51.80STRUCTURE TABLEID NO.L1L2M1M2DETAILSINSTALL S2 INLETSTA: 21+66.55 - GRAND RAPIDS ROADTHROAT = 51.10PIPE 12 - INV IN = 45.60PIPE 40 - INV IN = 46.59PIPE 11 - INV OUT = 45.60INSTALL S1 INLETSTA: 16+10.31 - TORRENT ROADTHROAT = 55.92PIPE 31 - INV IN = 51.92PIPE 32 - INV IN = 51.92PIPE 30 - INV OUT = 51.92INSTALL S1 INLETSTA: 20+17.55 - GRAND RAPIDS ROADTHROAT = 51.86PIPE 13 - INV IN = 46.86PIPE 39 - INV IN = 46.86PIPE 12 - INV OUT = 46.86INSTALL S1 INLETSTA: 16+10.32 - TORRENT ROADTHROAT = 55.92PIPE 31 - INV OUT = 52.02PIPE TABLEPIPE NAME45678910SIZEINSTALL 272 LF OF 36" RCPINLET ELEV: 60.67OUTLET ELEV: 70.22INSTALL 219 LF OF 42" RCPINLET ELEV: 56.11OUTLET ELEV: 60.67INSTALL 117 LF OF 48" RCPINLET ELEV: 55.40OUTLET ELEV: 56.11INSTALL 33 LF OF 48" RCPINLET ELEV: 55.20OUTLET ELEV: 55.40INSTALL 43 LF OF 48" RCPINLET ELEV: 55.00OUTLET ELEV: 55.20INSTALL 186 LF OF 48" RCPINLET ELEV: 44.95OUTLET ELEV: 52.24INSTALL 129 LF OF 18" RCPINLET ELEV: 52.64OUTLET ELEV: 44.95PIPE TABLEPIPE NAME11121314293031SIZEINSTALL 137 LF OF 48" RCPINLET ELEV: 44.89OUTLET ELEV: 45.60INSTALL 149 LF OF 42" RCPINLET ELEV: 45.60OUTLET ELEV: 46.86INSTALL 174 LF OF 42" RCPINLET ELEV: 46.86OUTLET ELEV: 48.33INSTALL 294 LF OF 42" RCPINLET ELEV: 48.33OUTLET ELEV: 49.32INSTALL 30 LF OF 24" RCPINLET ELEV: 51.68OUTLET ELEV: 51.80INSTALL 31 LF OF 24" RCPINLET ELEV: 51.80OUTLET ELEV: 51.92INSTALL 24 LF OF 18" RCPINLET ELEV: 51.92OUTLET ELEV: 52.02PIPE TABLEPIPE NAME32394041424344SIZEINSTALL 125 LF OF 24" RCPINLET ELEV: 51.92OUTLET ELEV: 53.16INSTALL 42 LF OF 24" RCPINLET ELEV: 46.86OUTLET ELEV: 48.00INSTALL 24 LF OF 18" RCPINLET ELEV: 46.59OUTLET ELEV: 47.10INSTALL 33 LF OF 18" RCPINLET ELEV: 47.50OUTLET ELEV: 48.20INSTALL 116 LF OF 48" RCPINLET ELEV: 44.89OUTLET ELEV: 43.00INSTALL 24 LF OF 18" RCPINLET ELEV: 50.85OUTLET ELEV: 50.95INSTALL 24 LF OF 30" RCPINLET ELEV: 61.68OUTLET ELEV: 60.67STRUCTURE TABLEID NO.N1R4S4DETAILSINSTALL S1 INLETSTA: 18+37.55 - GRAND RAPIDS ROADTHROAT = 56.35PIPE 14 - INV IN = 48.33PIPE 29 - INV IN = 51.68PIPE 13 - INV OUT = 48.33INSTALL JUNTION BOXSTA: 14+73.86 - TORRENT ROADTHROAT = 57.68PIPE 33 - INV IN = 53.16PIPE 32 - INV OUT = 53.16INSTALL YARD INLETSTA: 16+69.16 - TELUGA AVETHROAT = 66.10PIPE 38 - INV OUT = 62.10INSTALL YARD INLETSTA: ??? ???PIPE TABLEPIPE NAME45464774SIZEINSTALL 32 LF OF 24" RCPINLET ELEV: 62.18OUTLET ELEV: 61.68INSTALL 24 LF OF 18" RCPINLET ELEV: 63.79OUTLET ELEV: 62.18INSTALL 117 LF OF 24" RCPINLET ELEV: 64.19OUTLET ELEV: 62.18INSTALL 93 LF OF 24" RCPINLET ELEV: 60.55OUTLET ELEV: 58.22MATCHLINE - SEE SHEET C3EMATCHLINE - SEE SHEET C3CFUTURE DRAINAGEFUTURE DRAINAGEFUTUREDRAINAGEPROPOSED LIFTSTATION50'0 100'FEET
SSSSSSSSSSSSSSSSSSSSSSS
S
S
258257256343344345346347348349350351352353354SELFOSS ROADS S S S S S S S S S S S
SSSSSSSWETLAND BUFFERLINEWETLAND BUFFERLINENON JURISDICTIONALWETLANDWETLAND LINE58 57 565554 53525150 49484746 454443
565554535251504948474645SSSSSSSSSSSSSSSSSSSSSSS
S
S
485486487454455685Z3Y3798081B482C483A4103X4STRUCTURE TABLEID NO.A4B4C4X4DETAILSINSTALL S1 INLETSTA: 108+31.25 - SHOSHONEY AVETHROAT = 62.65PIPE 103 - INV IN = 59.96PIPE 80 - INV OUT = 58.65INSTALL S1 INLETSTA: 107+34.76 - SHOSHONEY AVETHROAT = 62.13PIPE 81 - INV IN = 57.00PIPE 82 - INV OUT = 54.13INSTALL JUNCTION BOXSTA: ??? - ???THROAT = 57.70PIPE 82 - INV IN = 51.71PIPE 83 - INV OUT = 47.71INSTALL YARD INLETSTA: 109+53.05 - SHOSHONEY AVETHROAT = 65.13PIPE 103 - INV OUT = 61.13STRUCTURE TABLEID NO.Y3Z3DETAILSINSTALL S1 INLETSTA: 16+00.77 - SELFOSS ROADTHROAT = 63.99PIPE 85 - INV IN = 57.99PIPE 79 - INV IN = 57.99PIPE 81 - INV OUT = 57.99INSTALL S1 INLETSTA: 16+00.77 - SELFOSS ROADTHROAT = 63.38PIPE 80 - INV IN = 58.53PIPE 79 - INV OUT = 58.53PIPE TABLEPIPE NAME79808182SIZEINSTALL 24 LF OF 30" RCPINLET ELEV: 58.53OUTLET ELEV: 57.99INSTALL 32 LF OF 30" RCPINLET ELEV: 58.65OUTLET ELEV: 58.53INSTALL 62 LF OF 30" RCPINLET ELEV: 57.99OUTLET ELEV: 57.00INSTALL 147 LF OF 30" RCPINLET ELEV: 54.13OUTLET ELEV: 51.71PIPE TABLEPIPE NAME8385103SIZEINSTALL 99 LF OF 30" RCPINLET ELEV: 47.71OUTLET ELEV: 43.00INSTALL 317 LF OF 30" RCPINLET ELEV: 57.99OUTLET ELEV: 67.75INSTALL 118 LF OF 18" RCPINLET ELEV: 61.13OUTLET ELEV: 59.96MATCHLINE - SEE SHEET C3DEXISTING DRAINAGE50'0 100'FEET
402403404405406407408409410411412413442443444445446447448449450451452453440439438437436435434433432431430429428401400399398397 396395394TORRENT ROADTELUGA AVENUEGRAND RAPIDS ROAD498499500501502503504505506507508509 510511 512513515514516517518519520521522523524525526527528529530531532533 534545544543542541540539538537536SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S S
SSSS SSSSSSSSS S S S S
S S S S SSSS S S S
SSSSSSSS S S S SSSSSSS465466467468469470471472473474475476478477479480481482483484485486487454455456457458459460461462463SSSSSSSSSS
258257256324325326327 328329330 331332333334335336337338339340341342343344345346347348349350351352353354355356365366367368369370371372373374375376377378379380381382383384385386387388389390391392393363364362361360359358357SHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROADWETLAND BUFFERLINEWETLAND BUFFERLINENON JURISDICTIONALWETLANDWETLAND LINEWETLAND LINEWETLAND LINEWETLAND BUFFERLINE58 57 565554 53525150 49484746 454443 565554535251504948474645MH 1MH 2MH 3MH 4MH 5MH 6MH 7MH 20MH 19MH 18MH 8MH 9MH 10MH 11MH 13 (DROP)INSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.35% SLOPEINSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.60% SLOPEINSTALL 322 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.97% SLOPEINSTALL 317 LF OF 8" PVC GRAVITYSEWER PIPE @ 3.41% SLOPEINSTALL 168 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.69% SLOPEINSTALL 116 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.60% SLOPEINSTALL 86 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.96% SLOPEINSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPEINSTALL 164 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.23% SLOPEINSTALL 280 LF OF 8" PVC GRAVITYSEWER PIPE @ 4.57% SLOPEINSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.28% SLOPEINSTALL 246 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.34% SLOPEINSTALL 141 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.88% SLOPEINSTALL 122 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.77% SLOPEINSTALL 48 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.40% SLOPEINSTALL 253 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPEINSTALL 354 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPEINSTALL 158 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.43% SLOPEINSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.44% SLOPEINSTALL 343 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.59% SLOPEMH 15MH 16MH 17MH 21MH 12MH 14SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S S
SSSS SSSSSSSSS S S S S
S S S S SSSS S S S
SSSSSSSS S S S SSSSSSSINSTALL 73 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.48% SLOPEINSTALL FIRE HYDRANTASSEMBLYINSTALL FIRE HYDRANTASSEMBLYINSTALL FIRE HYDRANTASSEMBLYINSTALL 6" PVCWATER MAININSTALL 6" PVCWATER MAININSTALL 8" PVCWATER MAININSTALL 6" PVCWATER MAININSTALL 8" PVCWATER MAININSTALL SEWERSERVICE(TYPICAL)INSTALL WATERSERVICE (TYPICAL)INSTALL SEWERSERVICE (TYPICAL)INSTALL SEWER SERVICE(TYPICAL)INSTALL WATER SERVICE(TYPICAL)INSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUGINSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUGINSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUGINSTALL FIRE HYDRANTASSEMBLYINSTALL WATER SERVICE(TYPICAL)INSTALL FIRE HYDRANTASSEMBLYINSTALL FIRE HYDRANTASSEMBLYINSTALL FIRE HYDRANTASSEMBLYINSTALL 6" PVC WATER MAININSTALL 18 L.F. OF 8"DUCTILE IRON PIPE &8" M.J. PLUGINSTALL 8" PVCWATER MAININSTALL 6" PVCWATER MAININSTALL 6" PVCWATER MAININSTALL SEWERSERVICE (TYPICAL)INSTALL 6" PVC WATER MAININSTALL 6" PVC WATER MAININSTALL 6" PVC WATER MAININSTALL 6" PVC WATER MAININSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUGINSTALL 18 L.F. OF 6" DUCTILEIRON PIPE & 6" M.J. PLUGINSTALL WATER SERVICE(TYPICAL)INSTALL SEWER SERVICE(TYPICAL)INSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUGINSTALL 6" PVCWATER MAININSTALL 6" PVCWATER MAININSTALL 6" PVCWATER MAINREMOVE EXISTING 6" M.J. PLUG &CONNECT TO EXISTING6" PVC WATER MAININSTALL FIRE HYDRANTASSEMBLYINSTALL 18 L.F. OF 6" DUCTILEIRON PIPE & 6" M.J. PLUGINSTALL 8" PVCWATER MAININSTALL SEWERSERVICE (TYPICAL)INSTALL SEWERSERVICE (TYPICAL)INSTALL SEWERSERVICE (TYPICAL)INSTALL SEWER SERVICE(TYPICAL)INSTALL SEWER SERVICE(TYPICAL)INSTALL LIFT STATIONINSTALL 4" 45° M.J. BENDINSTALL 4" FORCEMAININSTALL 4" FORCEMAININSTALL 4" FORCEMAININSTALL 4" FORCEMAININSTALL 4" 45° M.J. BENDINSTALL 4" FORCEMAININSTALL 4" 45° M.J. BENDCONNECT 4" FORCEMAINTO EXISTING MANHOLE(LINE MH PER BCSS SPECS)INSTALL 4" FORCEMAININSTALL 12"x8" TAPPING SLEEVE & VALVETIE TO 12" EXISTING WATERMAINEX. 12"WATERMAIN1000 200FEET
471472473474475476478477503504505506507508509 510511 512513515514516528529530531532533 534545544543542324325326327 328329330 331332333334335336337338377378379380381382383384385386387388389390391392393SHOSHONEY AVENUEVERNAL ROADBURNEY ROADSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S
S S S S S S S S S S
S S
S
S SSSSSSSSSSSSSSSMH 1MH 2MH 3MH 4MH 16MH 15INSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.35% SLOPEINSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.60% SLOPEINSTALL 322 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.97% SLOPEINSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.44% SLOPEINSTALL 343 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.59% SLOPEMATCHLINE - SEE SHEET C4CINSTALL 12"x8" TAPPING SLEEVE & VALVETIE TO 12" EXISTING WATERMAININSTALL FIRE HYDRANTASSEMBLYINSTALL FIRE HYDRANTASSEMBLYINSTALL FIRE HYDRANTASSEMBLYINSTALL 8"x6" M.J. TEE,8" M.J. GATE VALVE, &6" M.J. GATE VALVEW/ MEGALUGSINSTALL 6" PVCWATER MAININSTALL 8" M.J. GATE VALVEW/ MEGALUGSINSTALL 8"x6" M.J. CROSS &6" M.J. GATE VALVE W/ MEGALUGSINSTALL 6" PVCWATER MAININSTALL 8" PVCWATER MAININSTALL 6" PVCWATER MAININSTALL 8" PVCWATER MAININSTALL 6" M.J. GATE VALVEW/ MEGALUGSINSTALL SEWER SERVICE(TYPICAL)INSTALL WATER SERVICE(TYPICAL)INSTALL SEWER SERVICE(TYPICAL)INSTALL WATER SERVICE(TYPICAL)INSTALL SEWER SERVICE(TYPICAL)INSTALL WATER SERVICE(TYPICAL)INSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUGTO END PHASE 6CONSTRUCTIONINSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUG TO END PHASE 6CONSTRUCTIONINSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUGTO END PHASE 6CONSTRUCTIONINSTALL 8" PVCWATER MAINEX. 12"WATERMAINFUTURE GRAVITY SEWER50'0 100'FEET
402403404405406407408409446447448449450451452453437436435434401400399398397 396395394TORRENT ROAD479480481482483484485486487339340341342343344345346352353354355356365366367368369370371372373374375376363364362361360359358357TELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S S S S S S
S S S S S S S S S
S S SSSSSSSSSSSS S S S S S
S S
MH 5MH 6MH 7MH 20MH 8MH 9MH 10MH 11MH 13 (DROP)MH 14MH 17INSTALL 317 LF OF 8" PVC GRAVITYSEWER PIPE @ 3.41% SLOPEINSTALL 168 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.69% SLOPEINSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.28% SLOPEINSTALL 116 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.60% SLOPEINSTALL 86 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.96% SLOPEINSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPEINSTALL 246 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.34% SLOPEINSTALL 141 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.88% SLOPEINSTALL 122 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.77% SLOPEINSTALL 48 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.40% SLOPEINSTALL 253 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPEINSTALL 158 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.43% SLOPEINSTALL 354 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPEINSTALL 354 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPE440439438437436433432431430429428427GRAND RAPIDS ROADSSSSSSSSSSMH 12INSTALL 354 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPEMATCHLINE - SEE SHEET C4DMATCHLINE - SEE SHEET C4BINSTALL FIRE HYDRANTASSEMBLY &6" M.J. GATE VALVEW/ MEGALUGSINSTALL WATER SERVICE(TYPICAL)INSTALL FIRE HYDRANT ASSEMBLY,6" M.J. TEE, (2) 6" M.J. GATE VALVES, &6" M.J. 22.5° BEND W/ MEGALUGSINSTALL FIRE HYDRANTASSEMBLYINSTALL 6" M.J. TEE& (2) 6" M.J. GATE VALVESW/ MEGALUGSINSTALL 8" M.J. TEE,8" M.J. GATE VALVE, &(2) 8" M.J. 45° BENDSW/ MEGALUGSINSTALL 6" M.J. GATE VALVEW/ MEGALUGSINSTALL 6" 22.5° M.J. BENDW/ MEGALUGSINSTALL 6" 45° M.J. BENDW/ MEGALUGSINSTALL 6" PVC WATER MAININSTALL 18 L.F. OF 8"DUCTILE IRON PIPE &8" M.J. PLUGTO END PHASE 6CONSTRUCTIONINSTALL 8" PVCWATER MAININSTALL 6" PVCWATER MAININSTALL 8" PVCWATER MAININSTALL 6" PVCWATER MAININSTALL SEWER SERVICE(TYPICAL)INSTALL 6" PVC WATER MAININSTALL (3) 6" 22.5° M.J. BENDSW/ MEGALUGSINSTALL 6" 11.25° M.J. BENDW/ MEGALUGSINSTALL (2) 6" M.J. 45° BENDSW/ MEGALUGSINSTALL 6" PVC WATER MAININSTALL 6" PVC WATER MAININSTALL 6" PVC WATER MAININSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUGTO END PHASE 6CONSTRUCTIONINSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUGTO END PHASE 6CONSTRUCTIONINSTALL 6" M.J. 22.5° BENDW/ MEGALUGSINSTALL FIRE HYDRANT ASSEMBLY &6" M.J. GATE VALVE W/ MEGALUGSINSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUGTO END PHASE 6CONSTRUCTIONINSTALL 6" M.J. TEEW/ MEGALUGSMATCHLINE - SEE THIS SHEET LEFTMATCHLINE - SEE THIS SHEET RIGHTFUTURE SEWER PIPEINSTALL LIFT STATION &ACCESS ROADINSTALL 4" 45° M.J. BENDINSTALL 4" FORCEMAININSTALL 4" FORCEMAININSTALL 4" FORCEMAININSTALL 4" FORCEMAININSTALL (3) 6" 22.5° M.J. BENDSW/ MEGALUGSINSTALL 8" x 6"M.J. REDUCERW/ MEGALUGSINSTALL SEWER SERVICE(TYPICAL)INSTALL SEWER SERVICE(TYPICAL)INSTALL SEWER SERVICE(TYPICAL)INSTALL SEWER SERVICE(TYPICAL)50'0 100'FEET
SSSSSSSSSSSSSS
S
S
2582572562554844854864874544554567343344345346347348349350351352353354SELFOSS ROADS S S S S
S S S S S S S S S S S S
SSSSSSSSMH 19MH 18MH 17MH 21INSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPEINSTALL 164 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.23% SLOPEINSTALL 280 LF OF 8" PVC GRAVITYSEWER PIPE @ 4.57% SLOPEMATCHLINE - SEE SHEET C4CINSTALL WATER SERVICE(TYPICAL)INSTALL SEWER SERVICE(TYPICAL)INSTALL 18 L.F. OF 6"DUCTILE IRON PIPE &6" M.J. PLUG FOR FUTURECONNECTIONINSTALL 6" M.J. TEE &(2) 6" M.J. GATE VALVESW/ MEGALUGSINSTALL 6" PVCWATER MAININSTALL 6" PVCWATER MAININSTALL 6" PVCWATER MAINREMOVE EXISTING PLUG &CONNECT TO EXISTING6" PVC WATER MAININSTALL FIRE HYDRANTASSEMBLYINSTALL 4" FORCEMAININSTALL 4" 45° M.J. BENDINSTALL 4" 45° M.J. BENDTIE 4" FORCEMAINTO EXISTING MANHOLE(LINE MH PER BCSS SPECS)INSTALL 4" FORCEMAIN50'0 100'FEET
498499500501502503504505506507508509 510511 512513515514516517518519520521522523524525526527528529530531532533 534545544543542541540539538537536SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S S
S S S S S
S S S S S S S S
SSSS SSSSSSSSS S S S S
S S S S SSSS S S S
SSSSSSSS S S S SSSSSSS402403404405406407408409410411412413442443444445446447448449450451452453440439438437436435434433432431430429428401400399398397 396395394TORRENT ROADTELUGA AVENUEGRAND RAPIDS ROAD465466467468469470471472473474475476478477479480481482483484485486487454455456457458459460461462463SSSSSSSSSS
258257256324325326327 328329330 331332333334335336337338339340341342343344345346347348349350351352353354355356365366367368369370371372373374375376377378379380381382383384385386387388389390391392393363364362361360359358357SHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROADINSTALL 5' SIDEWALKINSTALL STREET LIGHTINSTALL 5' SIDEWALKINSTALLSTREET LIGHTINSTALL STREET LIGHTINSTALL STREET LIGHTINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL STREET LIGHTINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL STREET LIGHTINSTALL CURB RAMPS(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL STOP SIGN &(2) STREET SIGNSINSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL 5' SIDEWALKINSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL STREET LIGHTINSTALL STREET LIGHTINSTALLSTREET LIGHTINSTALL STREET LIGHTINSTALL STREET LIGHTINSTALL STREET LIGHTINSTALL CURBRAMPS (SEE DETAIL)INSTALL STOPSIGN & (2)STREET SIGNSINSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL STREET LIGHTINSTALL 5' SIDEWALKINSTALL STOP SIGN &(2) STREET SIGNSINSTALL CURB RAMPS(SEE DETAIL)INSTALL STREET LIGHTINSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5'SIDEWALKINSTALL 5' SIDEWALKINSTALL5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL CURB RAMPS(SEE DETAIL)FEET2000100
474475514545324325326327 328329330 331332333334335336337338377378379380381382383384385386387388389390391392393SHOSHONEY AVENUEVERNAL ROADBURNEY ROADSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S
S S S S S MATCHLINE - SEE SHEET C5CINSTALL 5' SIDEWALKINSTALL STREET LIGHTINSTALL 5' SIDEWALKINSTALL STREET LIGHTINSTALL STREET LIGHTINSTALL STREET LIGHTINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL STREET LIGHTINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL STREET LIGHTINSTALL CURB RAMP(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL STOP SIGN &(2) STREET SIGNSINSTALL CURB RAMP (SEE DETAIL)INSTALL CURB RAMP (SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMP(SEE DETAIL)INSTALL CURB RAMP(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL 5' SIDEWALKINSTALL CURB RAMP (SEE DETAIL)INSTALL CURB RAMP(SEE DETAIL)INSTALL CURB RAMP(SEE DETAIL)50'0 100'FEET
402403404405406407408409446447448449450451452453437436435434401400399398397 396395394TORRENT ROAD482483484339340341342355356365366367368369370371372373374375376363364362361360359358357TELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S
S S
S S SSSSSSSSSSSS S S S S S
S SWETLAND LINEWETLAND LINEWETLAND BUFFERLINE402403404405406407408409446447448449450451452453437436435434401400399398397 396395394TORRENT ROAD482483484339340341342355356365366367368369370371372373374375376363364362361360359358357TELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSS S S S S
S S
S S SSSSSSSSSSSS S S S S S
S SWETLAND LINEWETLAND LINEWETLAND BUFFERLINEMATCHLINE - SEE SHEET C5DINSTALL STREET LIGHTINSTALL STREET LIGHTINSTALL STREET LIGHTINSTALL STREET LIGHTINSTALL STREET LIGHTINSTALL STREET LIGHTINSTALL CURB RAMPS(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMP (SEE DETAIL)INSTALL CURB RAMP (SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMPS(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL CURB RAMP (SEE DETAIL)INSTALL CURB RAMP(SEE DETAIL)INSTALL CURB RAMP(SEE DETAIL)INSTALL CURB RAMP(SEE DETAIL)INSTALL STOP SIGN &(2) STREET SIGNSINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL5' SIDEWALKINSTALL 5' SIDEWALKINSTALL CURB RAMPS(SEE DETAIL)INSTALL CURB RAMP(SEE DETAIL)50'0 100'FEET
SSSSSSSSSSSSS
S S
2582572564844854864874544556343344345346347348349350351352353354SELFOSS ROADS S S S S S S S S S S S
SSSSSSSMATCHLINE - SEE SHEET C5D•••••••5'-6"1'-0" CONC. BASEEXISTING GRADENOT TO SCALE1'-0"2'-6" (MIN.)1'-0"x1'-6"x.080" ALUMINUMWETLAND BUFFER BOUNDARYSIGN TO READ "WETLANDBUFFER BOUNDARY PER BOLT TO STEEL TUBE ORWITH 3/8" CADMIUMPLATED BOLTS, NUTSAND WASHERS.2"x2"x.188" STEEL TUBEOR GALVANIZED U CHANNELBASE 2'-0"1'-6"CITY OF FAIRHOPE GALVANIZED U CHANNELEXTEND INTO CONC.••••INSTALL STREET LIGHTINSTALL 5' SIDEWALKINSTALL STOP SIGN &(2) STREET SIGNSINSTALL CURB RAMPS(SEE DETAIL)INSTALL STREET LIGHTINSTALL CURB RAMP(SEE DETAIL)INSTALL CURB RAMP(SEE DETAIL)INSTALL CURB RAMP (SEE DETAIL)INSTALL CURB RAMP(SEE DETAIL)INSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5' SIDEWALKINSTALL 5'SIDEWALKTIE TO EXISTING 5' SIDEWALK50'0 100'FEET
102.06(FIELD VERIFY)101.75(FIELD VERIFY)101.39(FIELD VERIFY)101.40101.41100.83100.59102.09(FIELD VERIFY)86.2585.6885.1085.1085.1685.2285.2285.9086.5786.5886.4286.2585.8485.8486.0578.8678.3477.8378.9679.6079.2378.8678.7268.1067.3566.6068.2069.3968.7468.1068.0069.3966.6067.9967.3568.7466.9867.3667.3668.3860.7160.2559.7860.0860.4360.7960.9059.9960.6963.6063.3563.1163.6363.1862.7363.1362.9256.3756.3755.9656.7955.4357.2056.6056.39LANGFORD ROAD (EXISTING)VERNAL ROADSHOSHONEY AVENUE334335382383SHOSHONEY AVENUEBURNEY RD.379378SHOSHONEY AVENUETELUGA AVE.SHOSHONEY AVENUEGRAND RAPIDS ROADSHOSHONEY AVENUESELFOSS RD.351350GRAND RAPIDS ROADTORRENT ROAD360361362364SHOSHONEYAVENUE20040FEET
60657075808590951001051106065707580859095100105110102.00100.61101.6099.51100.4798.4199.0897.3197.6896.2196.5295.1895.4094.2294.4693.3293.5692.5092.6791.7492.6290.9891.4690.2290.4189.4089.7388.5288.9887.5888.1886.5787.2785.5186.1684.4485.0783.3784.0382.3082.9081.2381.7280.1580.4878.9579.1977.6177.9076.1576.6274.5574.7884+50 85+0086+0087+0088+0089+0090+0091+0092+0093+0094+0095+0096+0097+0098+00 98+50-0.54%-2.20%-1.51%-2.14%HIGH PT STA = 85+35.09HIGH PT ELEV = 101.64PVI STA = 85+59.57PVI ELEV = 101.50AD = -1.67%K = 29.34LENGTH = 49'BVCS: 85+35.09BVCE: 101.64EVCS: 85+84.06EVCE: 100.96HIGH PT STA = 91+25.00HIGH PT ELEV = 90.60PVI STA = 92+50.00PVI ELEV = 88.72AD = -0.63%K = 397.78LENGTH = 250'BVCS: 91+25.00BVCE: 90.60EVCS: 93+75.00EVCE: 86.04HIGH PT STA = 96+25.00HIGH PT ELEV = 80.70PVI STA = 98+00.00PVI ELEV = 76.96AD = -1.85%K = 189.41LENGTH = 350'BVCS: 96+25.00BVCE: 80.70LOW PT STA = 90+25.00LOW PT ELEV = 92.11PVI STA = 89+00.00PVI ELEV = 94.00AD = 0.69%K = 359.79LENGTH = 250'BVCS: 87+75.00BVCE: 96.76EVCS: 90+25.00EVCE: 92.11INSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.35% SLOPESTA 89+97.27RIM = 92.71INV IN = 86.10MH 2INV OUT = 86.00STA 85+97.27RIM = 100.84MH 1INV OUT = 91.50INSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.60% SLOPESTA 93+97.24RIM = 86.05INV IN = 75.60INV IN = 77.50MH 3INV OUT = 75.50STA 97+22.24RIM = 78.72INV IN = 69.10INV IN = 70.00MH 4INV OUT = 69.00INSTALL 322 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.97% SLOPEV4992W1C1Z1D1416072363A1B1324325326327 328329330 3313323333343353363373383377378379380381382383384385386387388389390391392393SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S
SHOSHONEY AVEVERNAL ROADBURNEY ROADSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S
S S S S
MH 1MH 2MH 3MH 4V499A1B112W16059C1X161Y1643D14B2A272Z171629810511463Y4K4L4HW2MATCHLINE STA 98+50 - SEE SHEET P2MATCHLINE STA 98+50 - SEE SHEET P2PHASE 6PHASE 8 (FUTURE DEVELOPMENT)PHASE 9 (FUTURE DEVELOPMENT)EXISTING GROUNDCENTERLINE PROFILEGRADE LINEFUTURE DRAINAGEFUTURE DRAINAGE
4045505560657075808590404550556065707580859074.5574.7872.8272.8368.9969.2366.9967.5465.2365.8763.9364.5662.8663.2261.8462.0561.1661.2160.8960.9061.0260.9561.2961.5261.5662.2261.8462.9262.1163.3762.3863.7562.6563.7062.9263.2863.1963.4063.4664.0063.7364.4464.0764.7264.5464.9864.9265.1598+50 99+00100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00110+35-2.14%0.54%-3.99%HIGH PT STA = 96+25.00HIGH PT ELEV = 80.70PVI STA = 98+00.00PVI ELEV = 76.96AD = -1.85%K = 189.41LENGTH = 350'EVCS: 99+75.00EVCE: 69.98LOW PT STA = 103+57.99LOW PT ELEV = 60.89PVI STA = 103+09.19PVI ELEV = 60.53AD = 2.68%K = 61.20LENGTH = 164'BVCS: 102+27.28BVCE: 62.28EVCS: 103+91.10EVCE: 60.98LOW PT STA = 109+00.00LOW PT ELEV = 63.73PVI STA = 109+50.00PVI ELEV = 64.00AD = 0.54%K = 185.40LENGTH = 100'BVCS: 109+00.00BVCE: 63.73EVCS: 110+00.00EVCE: 64.54LOW PT STA = 101+50.00LOW PT ELEV = 63.93PVI STA = 101+00.00PVI ELEV = 65.00AD = 1.85%K = 54.05LENGTH = 100'BVCS: 100+50.00BVCE: 66.99EVCS: 101+50.00EVCE: 63.93INSTALL 317 LF OF 8" PVC GRAVITYSEWER PIPE @ 3.41% SLOPESTA 100+42.24RIM = 67.72INV IN = 58.10INV IN = 59.10MH 5INV OUT = 58.00INSTALL 168 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.69% SLOPESTA 102+13.29RIM = 62.75INV IN = 55.10MH 6INV OUT = 55.00STA 104+11.99RIM = 61.26INV IN = 54.06MH 20INV OUT = 53.96INSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPESTA 108+11.95RIM = 63.73INV IN = 55.75INV IN = 55.75MH 19INV OUT = 55.65INSTALL 164 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.23% SLOPESTA 109+79.76RIM = 64.50MH 18INV OUT = 59.50INSTALL 116 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.60% SLOPESTA 27+44.69RIM = 60.81INV IN = 53.10INV IN = 53.10MH 7INV OUT = 53.00INSTALL 86 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.96% SLOPEE1F2F16G17H1I18454473981B4Y3Z37980A4103X48582SSSSSSSSSSSSSSS S S S
S S S
TELUGA AVESHOSHONEY AVESSSSSSSSSSSSSSS S S S
S S S
MH 5MH 6MH 7MH 2044C2E1545D246E2F1F274U2G1H1I194767873SSSSSSSSSSSSSS S S S SHOSHONEY AVESELFOSS ROADSSSSSSSSSSSSSMH 19MH 188179Y3Z38580103A4X482B4MATCHLINE STA 98+50 - SEE SHEET P1MATCHLINE STA 104+50MATCHLINE STA 104+50340341342343344345346347348349350351352353354355356AREA 16371372373374375376339PHASE 6PHASE 8 (FUTURE)PHASE 6PHASE 8 (FUTURE)483255MATCHLINE STA 98+50 - SEE SHEET P1EXISTING GROUNDCENTERLINE PROFILEGRADE LINE
303540455055606570758059.0558.6059.1157.8358.4256.7657.3155.4055.7253.9454.3352.8253.0052.3051.7152.0551.1451.8251.0051.8951.1252.2651.2652.6652.0853.0653.0753.4553.7953.8554.2854.4754.9855.5356.1056.8257.2558.1058.2759.3959.4360.6760.68+0018+0019+0020+0021+0022+0023+0024+0025+0026+0027+0028+002.08%0.80%2.57%-2.90%-0.50%LOW PT STA = 20+47.78LOW PT ELEV = 52.31PVI STA = 19+97.78PVI ELEV = 52.56AD = 2.41%K = 41.57LENGTH = 100'BVCS: 19+47.78BVCE: 54.01EVCS: 20+47.78EVCE: 52.31LOW PT STA = 21+65.72LOW PT ELEV = 51.81PVI STA = 21+76.00PVI ELEV = 51.67AD = 1.29%K = 68.83LENGTH = 89'BVCS: 21+31.47BVCE: 51.89EVCS: 22+20.53EVCE: 52.02LOW PT STA = 24+50.00LOW PT ELEV = 53.85PVI STA = 25+00.00PVI ELEV = 54.25AD = 1.77%K = 56.41LENGTH = 100'BVCS: 24+50.00BVCE: 53.85EVCS: 25+50.00EVCE: 55.53INSTALL 354 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPESTA 18+79.11RIM = 56.28INV IN = 45.08INV IN = 49.80MH 13 (DROP)INV OUT = 44.98INSTALL 253 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.40% SLOPESTA 21+38.94RIM = 52.02INV IN = 45.87INV IN = 43.96MH 11INV OUT = 43.86STA 22+08.89RIM = 52.11INV IN = 47.21MH 10INV OUT = 47.11INSTALL 48 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.40% SLOPEINSTALL 122 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.77% SLOPESTA 23+44.16RIM = 53.18INV IN = 48.28MH 9INV OUT = 48.18INSTALL 141 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.88% SLOPESTA 24+94.83RIM = 54.55INV IN = 49.65MH 8INV OUT = 49.55INSTALL 246 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.34% SLOPESTA 27+44.69RIM = 60.81INV IN = 53.10INV IN = 53.10MH 7INV OUT = 53.00HIGH PT STA = 16+74.88HIGH PT ELEV = 59.16PVI STA = 17+80.87PVI ELEV = 58.85AD = -2.61%K = 81.20LENGTH = 212'EVCS: 18+86.85EVCE: 55.78K2N114M11312I2L111K1H241J192939G2PHASE 7(FUTUREDEVELOPMENT)PHASE 6304210GRADE BREAKSTA = 27+50.75ELEV = 60.69S
S S S
S
S
SSSSSSSSSSS S S S
S
WE
GRAND RAPIDS ROADTORRENT ROADS
S S S
S
S
SSSSSSSSSSMH 9MH 13 (DROP)MH 10MH 11MH 1414K2L232M2N1M1J2L1I2R43311121329303139404142SSSSSSSSSSSSSSSSSGRAND RAPIDS ROADSHOSHONEYAVESSSSSSSSSSSSSSSSSMH 6MH 7MH 20MH 8MH 9MH 10L1G1H19G2J1678114041424310364MATCHLINE STA 22+50MATCHLINE STA 22+50PHASE 6PHASE 7 (FUTURE)PHASE 6PHASE 7 (FUTURE)363394362367366365361360359358357366367368369370371EXISTING GROUNDCENTERLINE PROFILEGRADE LINE
5055606570758085909510050556065707580859095100657075808590951001051101156570758085909510010511011583.2184.4884.8585.6585.6686.3986.3287.3187.5688.2988.8089.2689.7590.0141+50 42+0043+0044+0045+00 45+381.64%2.08%-2.08%78.9378.4979.2379.2079.9280.1680.6081.0780.8481.3064+53 65+0066+0066+18STA 93+97.24RIM = 86.05INV IN = 75.60INV IN = 77.50MH 3INV OUT = 75.50INSTALL 343 LF OF 8" PVC GRAVITYSEWER PIPE @ 1.59% SLOPESTA 97+22.24RIM = 78.72INV IN = 69.10INV IN = 70.00MH 4INV OUT = 69.00INSTALL 397 LF OF 8" PVC GRAVITYSEWER PIPE @ 2.44% SLOPEK4L4C159W160Y1X16472A2B271983262S S S S SSSSSSSSSSSSMH 3W16059C1X161Y16498105114Y4K4L4HW2S S S S S SSSSSSSSSSSSSSSMH 4D1B2A272Z1716263363334382335380337338379378EXISTING GROUNDCENTERLINE PROFILEGRADE LINEEXISTING GROUNDCENTERLINE PROFILEGRADE LINE
4550556065707580859095455055606570758085909569.8471.4169.7871.3269.1670.4268.5569.5368.1068.6567.4067.7766.5566.8265.7466.1465.1865.8913+45 14+0015+0016+00 16+912.08%-2.08%-1.69%LOW PT STA = 17+64.32LOW PT ELEV = 64.45PVI STA = 16+91.71PVI ELEV = 65.00AD = 0.94%K = 154.07LENGTH = 145'BVCS: 16+19.10BVCE: 66.23STA 100+42.24RIM = 67.72INV IN = 58.10INV IN = 59.10MH 5INV OUT = 58.0047D2C2E1S4SSSSSSSSSTELUGA AVESHOSHONEY AVESSSSSSSSSMH 544C2E1545D246E247S4341374340375PHASE 6PHASE 8 (FUTURE)PHASE 6PHASE 7 (FUTURE)EXISTING GROUNDCENTERLINE PROFILEGRADE LINE
SWALE E5055606570758050556065707580GRADE BREAKSTA = 10+00.00ELEV = 69.88GRADE BREAKSTA = 10+24.98ELEV = 68.78GRADE BREAKSTA = 10+86.31ELEV = 68.53GRADE BREAKSTA = 13+62.91ELEV = 64.55-1.44%-4.41%-0.41%-1.44%-4.41%-0.41%9+50 10+0011+0012+0013+0014+0015+00U274F273TIE TO EX. GROUND341342343344345346SHOSHONEY AVENUESELFOSS ROAD10+0010+5011+0011+5012+0012+5013+0013+5014+00
14+50
14+94
U274F273F15EXISTING GROUNDBOTTOM OF SWALE
3383384385386387388389390391392393VERNAL ROAD10+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+0018+3610+0010+50K498L4105 Y4114HW2SWALE F72758085909510072758085909510099.9599.9598.7298.7297.3097.3096.5996.5995.8895.8895.1895.1894.4794.4793.7693.7693.0693.0692.6092.6092.1392.1391.6791.6791.2091.2090.7490.7490.2890.2889.8189.8189.3589.3588.8888.8888.3988.3987.8887.8887.3887.3886.9086.9086.5286.5286.1586.1585.7785.7785.4385.4385.1085.1084.7884.7884.4684.4684.1384.1383.8183.819+50 10+0011+0012+0013+0014+0015+0016+0017+0018+00 18+50-5.15%-2.02%-1.86%-2.83%-1.86%-1.51%-1.29%-5.15%-2.02%-1.86%-2.83%-1.86%-1.51%-1.29%98L4K4105114HW1GRADE BREAKSTA = 10+00.00ELEV = 99.95GRADE BREAKSTA = 10+22.59ELEV = 98.79GRADE BREAKSTA = 15+44.07ELEV = 86.99GRADE BREAKSTA = 14+54.63ELEV = 88.80GRADE BREAKSTA = 12+23.61ELEV = 93.09GRADE BREAKSTA = 13+22.49ELEV = 91.25GRADE BREAKSTA = 16+33.35ELEV = 85.64GRADE BREAKSTA = 17+79.71ELEV = 83.75EXISTING GROUNDBOTTOM OF SWALE
374375376377378379380381382383VERNAL ROADTELUGA AVENUE17+5018+0018+36
10+00
10+50
11+00
11+50
12+00
12+50
13+00
13+50
14+00
14+50
15+00
15+50
16+00
16+30 10+0010+50K498L4105S438Y4114HW2SWALE G586065707580855860657075808580.4080.4079.4379.4379.3679.3679.2879.2879.2179.2179.1379.1379.0679.0678.7678.7678.3178.3177.8677.8677.4277.4276.9776.9776.3176.3175.5075.5074.6974.6973.8873.8873.0773.0772.2672.2670.9470.9469.7569.7568.7068.7067.7067.7066.7166.718+50 9+0010+0011+0012+0013+0014+0015+0016+0017+0018+00 18+50-2.33%-4.23%-3.96%-3.24%-6.41%-1.78%-29.98%-0.30%-2.33%-4.23%-3.96%-3.24%-6.41%-1.78%-29.98%-0.30%GRADE BREAKSTA = 10+39.03ELEV = 83.69GRADE BREAKSTA = 16+24.76ELEV = 66.10GRADE BREAKSTA = 15+51.06ELEV = 68.65GRADE BREAKSTA = 16+02.02ELEV = 66.63GRADE BREAKSTA = 14+84.13ELEV = 71.96GRADE BREAKSTA = 15+06.08ELEV = 70.55GRADE BREAKSTA = 13+35.36ELEV = 76.79GRADE BREAKSTA = 10+52.99ELEV = 79.50GRADE BREAKSTA = 12+09.60ELEV = 79.03K498105L4HW2114S438EXISTING GROUNDBOTTOM OF SWALE
365366367368369370372373374363364358357TORRENT ROADTELUGA AVENUE10+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+50GRAND RAPIDS ROADJ239M11312SWALE H424550556065704245505560657065.3865.3863.7863.7862.5362.5361.9161.9161.2861.2860.6660.6660.0360.0359.4159.4158.8358.8358.3758.3757.9057.9057.4457.4456.9756.9756.5156.5156.1956.1955.8755.8755.5555.5555.2355.2354.9154.9154.5954.5954.3054.3054.0954.0953.8853.8853.6553.6553.2353.2352.8252.8252.4152.4152.0052.009+50 10+0011+0012+0013+0014+0015+0016+0017+00 17+50-6.54%-2.50%-1.86%-1.28%-1.65%-0.85%-6.54%-2.50%-1.86%-1.28%-1.65%-0.85%GRADE BREAKSTA = 10+00.00ELEV = 65.38GRADE BREAKSTA = 10+24.30ELEV = 63.80GRADE BREAKSTA = 12+16.96ELEV = 58.98GRADE BREAKSTA = 13+50.16ELEV = 56.50GRADE BREAKSTA = 15+17.74ELEV = 54.36GRADE BREAKSTA = 15+97.37ELEV = 53.69GRADE BREAKSTA = 17+06.29ELEV = 51.89J239EXISTING GROUNDBOTTOM OF SWALE
3035404550556065303540455055606551.050.99+50 10+0011+00 11+50STA 21+38.94RIM = 52.02INV IN = 45.87INV IN = 43.96MH 11INV OUT = 43.86INSTALL 73 LF OF 8" PVC GRAVITYSEWER PIPE @ 0.48% SLOPE1242 '' RCPINV=45.85365SS SSSS SSMH 10MH 11L1I2111240354045505560653540455055606563.362.660.959.959.158.457.556.554.048.29+50 10+0011+0012+0013+0014+0081B482C483345346350351352S S S S S
SSSSSHOSSELFOSS ROADS S S S S10+0011+0012+0012+72MH 198179Y3Z38580050100150050100150
PHASE 6 ENTRANCE92951001059295100105EXISTING GROUNDCENTERLINE PROFILEGRADE LINE
••• CURB INLET PROTECTION DETAIL HAYBALE PROTECTION DETAIL
H12"CONCRETE DEAD ENDANCHOR BLOCKSEE DETAIL THIS SHEETMIN. 18-FT JOINTDI PIPED.I. M.J. CAP OR PLUGM.J. GATE VALVESIZE TO MATCH MAIN DIAMETERFIRE HYDRANT6" D.I. PIPELENGTH AS REQ'D6" M.J. GATE VALVESIZE OF MAIN x 6"D.I. ANCHOR TEE6" FRICTION TYPERESTRAINED FITTINGSSIZE OF MAIN x 6"ANCHOR TEE30" MIN. COVERWATER MAIN“” 3/4",1" AND, 2" SERVICES SHALL BE TYPE KCOPPER TUBING (SEAMLESS WITH NO BENDS,JOINTS OR COMPRESSION COUPLINGS)CORPORATION STOP - FORDBALLCORP FB1000 (SEE NOTE NO.2)SERVICE SADDLE: ROMAC 202NS NYLON COATED DUCTILEIRON SERVICE SADDLE W/STAINLESS STEEL DOUBLESTRAP WITH NEOPRENEGASKET OR EQUAL (IFREQUIRED)
A54321BCDEAPPROVED BYCHECKED BYSHEET NO.TITLEDRAWN BYDATEPROJECT NO.SCALESEALREVISIONSNO.DESCRIPTIONDATED4SEWER DETAILSdaaccbjneJANUARY 202150125554FAIRHOPE FALLSPHASE 6FAIRHOPE, AL68 V PAY DIRT, LLC.25353 FRIENDSHIP ROADDAPHNE, AL 36526251.990.9950N/ABAAMALA ESNN.ESTJASOPRELIMINARY- NOT FOR CONSTRUCTIONMANHOLE FRAME & COVER DETAILWITH EXCEPTION OF DROP CONNECTION,MANHOLE CONSTRUCTION SIMILAR TOSTANDARD SEWER MANHOLE.SEAL FLEXIBLE BOOTRELINER INSIDEDROP BOWLSECURE WITHS.S. BOLTSCONNECTOR TO MANHOLE WITHNON-SHRINK PRECISION GROUT.ONE SECTIONOF PVC PIPEMIN. 48" DIA.*DROP CONNECTIONREQUIRED WHEN THISDIMENSION ISGREATER THAN 24"6"PIPE SUPPORT BRACKETS TOBE PLACED AT 2' O.C.(SEE PIPE SUPPORT DETAILTHIS SHEET)PVC PIPELONG RADIUSELL (PVC)DETAIL OF DROP CONNECTIONOUTSIDE OF MANHOLEN.T.S.VARIES*
EX 36" CPPEX N INV:47.58EX S INV:48.53TO BE REMOVED30+0031+0032+0033+0034+0035+00
36+00
36+93
104+00105+00106+00107+00108+00109+00110+00111+00SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S
W W W W W W W W W
104+00105+00106+00107+00108+00109+00110+00111+0030+0031+0032+0033+0034+0035+00
36+00
36+93
104+00105+00106+00107+00108+00109+00110+00111+0016+43
21+0022+0023+0024+0025+0026+0027+0027+61348349350351352353354355356365366367368369370371GRAND RAPIDS ROADSSSSSSSSSSSSSSSSSSSSSSSSSS S SSSSSSS S S S S S S S SWETLAND BUFFERLINEWETLAND BUFFERLINENON JURISDICTIONALWETLANDWETLAND LINEWETLAND LINEWETLAND LINEWETLAND BUFFERLINE10+0010+5010+7558 57 56
55 54 53
52
51 50 49
48
47 46 45
44 43
5655545352515049484746455351504948474645444342418I19J11043G242H241K111I24012L1B482C483A54321BCDEAPPROVED BYCHECKED BYSHEET NO.TITLEDRAWN BYDATEPROJECT NO.SCALESEALREVISIONSNO.DESCRIPTIONDATED5POND DETAILdaaccbjneJANUARY 202150125554FAIRHOPE FALLSPHASE 6FAIRHOPE, AL68 V PAY DIRT, LLC25353 FRIENDSHIP ROADDAPHNE, AL 36526251.990.9950BAAMALA ESNN.ESTJASOSCALE: 1" = 50'FEET100'050'
SSS S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSSGRAND RAPIDS ROADR=15'R=15'
STA 85+50.00010203040500-10-20-30-40-50STA 86+00.00010203040500-10-20-30-40-50STA 86+50.00010203040500-10-20-30-40-50STA 87+00.00010203040500-10-20-30-40-50STA 87+50.00010203040500-10-20-30-40-50STA 88+00.00010203040500-10-20-30-40-50STA 88+50.00010203040500-10-20-30-40-50STA 89+00.00010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 89+50.00010203040500-10-20-30-40-50STA 90+00.00010203040500-10-20-30-40-50STA 90+50.00010203040500-10-20-30-40-50STA 91+00.00010203040500-10-20-30-40-50STA 91+50.00010203040500-10-20-30-40-50STA 92+00.00010203040500-10-20-30-40-50STA 92+50.00010203040500-10-20-30-40-50STA 93+00.00010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 93+50.00010203040500-10-20-30-40-50STA 94+00.00010203040500-10-20-30-40-50STA 94+50.00010203040500-10-20-30-40-50STA 95+00.00010203040500-10-20-30-40-50STA 95+50.00010203040500-10-20-30-40-50STA 96+00.00010203040500-10-20-30-40-50STA 96+50.00010203040500-10-20-30-40-50STA 97+00.00010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 100+00.00010203040500-10-20-30-40-50STA 97+50.00010203040500-10-20-30-40-50STA 98+00.00010203040500-10-20-30-40-50STA 98+50.00010203040500-10-20-30-40-50STA 99+00.00010203040500-10-20-30-40-50STA 99+50.00010203040500-10-20-30-40-50STA 100+50.00010203040500-10-20-30-40-50STA 101+00.00010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 101+50.00010203040500-10-20-30-40-50STA 102+00.00010203040500-10-20-30-40-50STA 102+50.00010203040500-10-20-30-40-50STA 103+00.00010203040500-10-20-30-40-50STA 103+50.00010203040500-10-20-30-40-50STA 104+00.00010203040500-10-20-30-40-50STA 104+50.00010203040500-10-20-30-40-50STA 105+00.00010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 105+50.00010203040500-10-20-30-40-50STA 106+00.00010203040500-10-20-30-40-50STA 106+50.00010203040500-10-20-30-40-50STA 107+00.00010203040500-10-20-30-40-50STA 107+50.00010203040500-10-20-30-40-50STA 108+00.00010203040500-10-20-30-40-50STA 108+50.00010203040500-10-20-30-40-50STA 109+00.00010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 109+50.00010203040500-10-20-30-40-50STA 110+00.00010203040500-10-20-30-40-50STA 110+34.76010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 42+00.00010203040500-10-20-30-40-50STA 42+50.00010203040500-10-20-30-40-50STA 43+00.00010203040500-10-20-30-40-50STA 43+50.00010203040500-10-20-30-40-50STA 44+00.00010203040500-10-20-30-40-50STA 44+50.00010203040500-10-20-30-40-50STA 45+00.00010203040500-10-20-30-40-50STA 45+30.85010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 64+52.53010203040500-10-20-30-40-50STA 65+00.00010203040500-10-20-30-40-50STA 65+50.00010203040500-10-20-30-40-50STA 66+00.00010203040500-10-20-30-40-50STA 66+12.54010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 13+50.00010203040500-10-20-30-40-50STA 14+00.00010203040500-10-20-30-40-50STA 14+50.00010203040500-10-20-30-40-50STA 15+00.00010203040500-10-20-30-40-50STA 15+50.00010203040500-10-20-30-40-50STA 16+00.00010203040500-10-20-30-40-50STA 16+50.00010203040500-10-20-30-40-50STA 16+91.11010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 17+61.54010203040500-10-20-30-40-50STA 18+00.00010203040500-10-20-30-40-50STA 18+50.00010203040500-10-20-30-40-50STA 19+00.00010203040500-10-20-30-40-50STA 19+50.00010203040500-10-20-30-40-50STA 20+00.00010203040500-10-20-30-40-50STA 20+50.00010203040500-10-20-30-40-50STA 21+00.00010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 21+50.00010203040500-10-20-30-40-50STA 22+00.00010203040500-10-20-30-40-50STA 22+50.00010203040500-10-20-30-40-50STA 23+00.00010203040500-10-20-30-40-50STA 23+50.00010203040500-10-20-30-40-50STA 24+00.00010203040500-10-20-30-40-50STA 24+50.00010203040500-10-20-30-40-50STA 25+00.00010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 25+50.00010203040500-10-20-30-40-50STA 26+00.00010203040500-10-20-30-40-50STA 26+50.00010203040500-10-20-30-40-50STA 27+00.00010203040500-10-20-30-40-50STA 27+50.00010203040500-10-20-30-40-50STA 27+60.75010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 14+92.30010203040500-10-20-30-40-50STA 15+00.00010203040500-10-20-30-40-50STA 15+50.00010203040500-10-20-30-40-50STA 16+00.00010203040500-10-20-30-40-50STA 16+50.00010203040500-10-20-30-40-50STA 16+52.31010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
STA 14+75.00010203040500-10-20-30-40-50STA 15+00.00010203040500-10-20-30-40-50STA 15+50.00010203040500-10-20-30-40-50STA 16+00.00010203040500-10-20-30-40-50STA 16+43.19010203040500-10-20-30-40-50FINISH GRADE(TYP.)EXISTING GRADE(TYP.)FINISH GRADE ELEV. (TYP.)EXISTING GRADE ELEV. (TYP.)
SHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROAD58 57 565554 53525150 49484746 454443 565554535251504948474645254255C.A. 15324325326327328329330331332333334335336337341347349350351352353354355356357358359360361362363364365366367368369370371372373374375376377378379380381382383384385386387388389390391392393338339340342343344345346C.A.1C.A.2C.A.3C.A.5C.A.11C.A.12SHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROAD01002003001.CONTRACTOR SHALL GRADE AND FILL THE LOTS IN ACCORDANCE WITH THE SPECIFICATIONSSHOWN HEREON.2. FILL PLACED WITHIN THE BUILDING PAD OF EACH LOT UP TO AN ELEVATION OF TWO FEET (2')BELOW THE FINAL SUBGRADE ELEVATION SHOULD BE COMPACTED TO AT LEASTNINETY-FIVE PERCENT (95%) OF THE ASTM D-698 STANDARD DENSITY AT MOISTURECONTENTS WITHIN +/- 3% OF THE MATERIAL'S OPTIMAL MOISTURE CONTENT.3. FILL PLACED WITHIN TWO FEET (2') OF THE FINAL SUBGRADE ELEVATION SHOULD BECOMPACTED TO AT LEAST NINETY-EIGHT PERCENT (98%) OF THE ASTM D-698 STANDARDDENSITY AT MOISTURE CONTENTS WITHIN +/- 3% OF THE MATERIAL'S OPTIMAL MOISTURECONTENT.4. ONCE THE SURFACE OF EACH LIFT OF FILL IS READY FOR THE NEXT LIFT, THE EXPOSED SOILSHOULD BE MAINTAINED AT THE REQUIRED MOISTURE CONTENT UNTIL THE NEXT LIFT OFFILL IS PLACED. THE SURFACE OF THE LIFTS SHOULD NOT BE EXPOSED TO WEATHER FOR ANEXTENDED PERIOD OF TIME.5.CONTRACTOR SHALL PROVIDE A LICENSED SOIL ENGINEER'S LETTER CERTIFYING THECOMPACTION AND/OR SOIL BEARING PRESSURE OF EACH LOT.6. CONTRACTOR SHALL PROVIDE A COMPLETE LIST OF LOTS WHERE ANY OFFSITE FILLMATERIAL HAS BEEN USED TO DEVELOP THE LOTS. NOTWITHSTANDING ANYTHINGCONTAINED HEREIN TO THE CONTRARY, THERE SHALL BE NO MUCK, TRASH, CLAY OR OTHERUNSUITABLE SOIL OR UNSUITABLE MATERIAL LOCATED ON OR UNDER ANY OF THE LOTS.7. THE LOTS SHALL BE DEVELOPED WITH BUILDING PADS WITHIN TWO (2) INCHES OF THE PADFINISHED ELEVATIONS REFLECTED ON THE LOT GRADING PLAN, AND THEY WILL SUPPORTMONOLITHIC SLAB FOUNDATIONS (THE “BUILDING PADS”). FFE 67.71FFE 64.21FFE 62.71
SHOSHONEY AVENUEVERNAL ROADBURNEY ROAD324325326327328329330331332333334335336337377378379380381382383384385386387388389390391392393338C.A.11C.A.12FFE 102.826FFE 101.35FFE 99.81FFE 98.27FFE 96.78FFE 95.43FFE 94.22FFE 93.13FFE 92.08FFE 90.97FFE 89.74FFE 92.99FFE 94.90FFE 95.52FFE 97.24FFE 98.76FFE 100.18FFE 101.68FFE 103.13FFE 105.39FFE 105.39FFE 87.95FFE 89.54FFE 86.13FFE 81.56FFE 86.48FFE 84.98FFE 83.48FFE 81.99FFE 80.34FFE 76.28FFE 104.78SHOSHONEY AVENUEVERNAL ROADBURNEY ROAD0501002001. CONTRACTOR SHALL GRADE AND FILL THE LOTS IN ACCORDANCE WITH THE SPECIFICATIONSSHOWN HEREON.2. FILL PLACED WITHIN THE BUILDING PAD OF EACH LOT UP TO AN ELEVATION OF TWO FEET (2')BELOW THE FINAL SUBGRADE ELEVATION SHOULD BE COMPACTED TO AT LEASTNINETY-FIVE PERCENT (95%) OF THE ASTM D-698 STANDARD DENSITY AT MOISTURECONTENTS WITHIN +/- 3% OF THE MATERIAL'S OPTIMAL MOISTURE CONTENT.3. FILL PLACED WITHIN TWO FEET (2') OF THE FINAL SUBGRADE ELEVATION SHOULD BECOMPACTED TO AT LEAST NINETY-EIGHT PERCENT (98%) OF THE ASTM D-698 STANDARDDENSITY AT MOISTURE CONTENTS WITHIN +/- 3% OF THE MATERIAL'S OPTIMAL MOISTURECONTENT.4. ONCE THE SURFACE OF EACH LIFT OF FILL IS READY FOR THE NEXT LIFT, THE EXPOSED SOILSHOULD BE MAINTAINED AT THE REQUIRED MOISTURE CONTENT UNTIL THE NEXT LIFT OFFILL IS PLACED. THE SURFACE OF THE LIFTS SHOULD NOT BE EXPOSED TO WEATHER FOR ANEXTENDED PERIOD OF TIME.5. CONTRACTOR SHALL PROVIDE A LICENSED SOIL ENGINEER'S LETTER CERTIFYING THECOMPACTION AND/OR SOIL BEARING PRESSURE OF EACH LOT.6. CONTRACTOR SHALL PROVIDE A COMPLETE LIST OF LOTS WHERE ANY OFFSITE FILLMATERIAL HAS BEEN USED TO DEVELOP THE LOTS. NOTWITHSTANDING ANYTHINGCONTAINED HEREIN TO THE CONTRARY, THERE SHALL BE NO MUCK, TRASH, CLAY OR OTHERUNSUITABLE SOIL OR UNSUITABLE MATERIAL LOCATED ON OR UNDER ANY OF THE LOTS.7. THE LOTS SHALL BE DEVELOPED WITH BUILDING PADS WITHIN TWO (2) INCHES OF THE PADFINISHED ELEVATIONS REFLECTED ON THE LOT GRADING PLAN, AND THEY WILL SUPPORTMONOLITHIC SLAB FOUNDATIONS (THE “BUILDING PADS”). MATCHLINE - SEE SHEET LG3
TELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADWETLAND BUFFERLINENON JURISDICTIONALWETLANDWETLAND LINEWETLAND LINEWETLAND LINEWETLAND BUFFERLINE3 494846 454443
565554535251504948474645341352353354355356357358359360361362363364365366367368369370371372373374375376339340342343344345346C.A.3C.A.5FFE 79.42FFE 76.92FFE 70.6528FFE 76.28FFE 73.86FFE 67.71FFE 65.73FFE 64.21FFE 63.15FFE 67.57FFE 68.63FFE 69.58FFE 70.36FFE 70.62FFE 64.23FFE 63.85FFE 63.47FFE 63.09FFE 62.71FFE 58.59FFE 57.71FFE 56.87FFE 56.22FFE 56.09FFE 54.85FFE 58.42FFE 58.80FFE 53.96FFE 55.13FFE 56.86FFE 60.07FFE 58.45FFE 59.61TELUGA AVENUEGRAND RAPIDS ROADTORRENT ROAD0501002001. CONTRACTOR SHALL GRADE AND FILL THE LOTS IN ACCORDANCE WITH THE SPECIFICATIONSSHOWN HEREON.2. FILL PLACED WITHIN THE BUILDING PAD OF EACH LOT UP TO AN ELEVATION OF TWO FEET (2')BELOW THE FINAL SUBGRADE ELEVATION SHOULD BE COMPACTED TO AT LEASTNINETY-FIVE PERCENT (95%) OF THE ASTM D-698 STANDARD DENSITY AT MOISTURECONTENTS WITHIN +/- 3% OF THE MATERIAL'S OPTIMAL MOISTURE CONTENT.3. FILL PLACED WITHIN TWO FEET (2') OF THE FINAL SUBGRADE ELEVATION SHOULD BECOMPACTED TO AT LEAST NINETY-EIGHT PERCENT (98%) OF THE ASTM D-698 STANDARDDENSITY AT MOISTURE CONTENTS WITHIN +/- 3% OF THE MATERIAL'S OPTIMAL MOISTURECONTENT.4. ONCE THE SURFACE OF EACH LIFT OF FILL IS READY FOR THE NEXT LIFT, THE EXPOSED SOILSHOULD BE MAINTAINED AT THE REQUIRED MOISTURE CONTENT UNTIL THE NEXT LIFT OFFILL IS PLACED. THE SURFACE OF THE LIFTS SHOULD NOT BE EXPOSED TO WEATHER FOR ANEXTENDED PERIOD OF TIME.5. CONTRACTOR SHALL PROVIDE A LICENSED SOIL ENGINEER'S LETTER CERTIFYING THECOMPACTION AND/OR SOIL BEARING PRESSURE OF EACH LOT.6. CONTRACTOR SHALL PROVIDE A COMPLETE LIST OF LOTS WHERE ANY OFFSITE FILLMATERIAL HAS BEEN USED TO DEVELOP THE LOTS. NOTWITHSTANDING ANYTHINGCONTAINED HEREIN TO THE CONTRARY, THERE SHALL BE NO MUCK, TRASH, CLAY OR OTHERUNSUITABLE SOIL OR UNSUITABLE MATERIAL LOCATED ON OR UNDER ANY OF THE LOTS.7. THE LOTS SHALL BE DEVELOPED WITH BUILDING PADS WITHIN TWO (2) INCHES OF THE PADFINISHED ELEVATIONS REFLECTED ON THE LOT GRADING PLAN, AND THEY WILL SUPPORTMONOLITHIC SLAB FOUNDATIONS (THE “BUILDING PADS”). MATCHLINE - SEE SHEET LG4MATCHLINE - SEE SHEET LG2
SELFOSS ROADNW565554535251504948474645252253254255C.A. 15347349350351352353354355343344345346C.A.1C.A.2FFE 68 63FFE 69.58FFE 70.36FFE 70.62FFE 70.59FFE 65.42FFE 64.98FFE 64.61FFE 64.23FFE 63.85FFE 63.47SELFOSS ROAD0501002001. CONTRACTOR SHALL GRADE AND FILL THE LOTS IN ACCORDANCE WITH THE SPECIFICATIONSSHOWN HEREON.2. FILL PLACED WITHIN THE BUILDING PAD OF EACH LOT UP TO AN ELEVATION OF TWO FEET (2')BELOW THE FINAL SUBGRADE ELEVATION SHOULD BE COMPACTED TO AT LEASTNINETY-FIVE PERCENT (95%) OF THE ASTM D-698 STANDARD DENSITY AT MOISTURECONTENTS WITHIN +/- 3% OF THE MATERIAL'S OPTIMAL MOISTURE CONTENT.3. FILL PLACED WITHIN TWO FEET (2') OF THE FINAL SUBGRADE ELEVATION SHOULD BECOMPACTED TO AT LEAST NINETY-EIGHT PERCENT (98%) OF THE ASTM D-698 STANDARDDENSITY AT MOISTURE CONTENTS WITHIN +/- 3% OF THE MATERIAL'S OPTIMAL MOISTURECONTENT.4. ONCE THE SURFACE OF EACH LIFT OF FILL IS READY FOR THE NEXT LIFT, THE EXPOSED SOILSHOULD BE MAINTAINED AT THE REQUIRED MOISTURE CONTENT UNTIL THE NEXT LIFT OFFILL IS PLACED. THE SURFACE OF THE LIFTS SHOULD NOT BE EXPOSED TO WEATHER FOR ANEXTENDED PERIOD OF TIME.5. CONTRACTOR SHALL PROVIDE A LICENSED SOIL ENGINEER'S LETTER CERTIFYING THECOMPACTION AND/OR SOIL BEARING PRESSURE OF EACH LOT.6. CONTRACTOR SHALL PROVIDE A COMPLETE LIST OF LOTS WHERE ANY OFFSITE FILLMATERIAL HAS BEEN USED TO DEVELOP THE LOTS. NOTWITHSTANDING ANYTHINGCONTAINED HEREIN TO THE CONTRARY, THERE SHALL BE NO MUCK, TRASH, CLAY OR OTHERUNSUITABLE SOIL OR UNSUITABLE MATERIAL LOCATED ON OR UNDER ANY OF THE LOTS.7. THE LOTS SHALL BE DEVELOPED WITH BUILDING PADS WITHIN TWO (2) INCHES OF THE PADFINISHED ELEVATIONS REFLECTED ON THE LOT GRADING PLAN, AND THEY WILL SUPPORTMONOLITHIC SLAB FOUNDATIONS (THE “BUILDING PADS”). MATCHLINE - SEE SHEET LG3
155156LANGFORD ROADTO CO RD 48ZONE X (SHADED)REGULATORYFLOOWAYZONE AESHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROAD53515049484746454443424141403938152151WW
PHASE 9- 48 LOTSPHASE 7- 60 LOTSPHASE 5- 68 LOTSPHASE 4- 38 LOTSPHASE 8- 34 LOTSPHASE 6- 70 LOTSWOMEN'SRESTROOMADA
STORAGE$$
MEN'SRESTROOM$$ADA
STORAGE
Open 00150'300'N O R T HOVERALL SITE REFERENCE PLAN11LH202WOOD FENCE W/TOP RAILELEVATION2
Op
e
n
32-1132-1032-0132 EXTERIOR IMPROVEMENTSSYMBOLDESCRIPTIONQTYPIP Pedestrian Concrete500 sfCrosstie Timber Edging122 lfPlayground Surface, 6" Deep Dark Hardwood Mulch 1,147 sf32-0132-1032-11REFERENCE NOTES SCHEDULE PHASE 7 AMENITY AREA0010'20'N O R T HPHASE 7 AMENITY ENLARGEMENT PLAN1PLAYGROUND VIGNETTE - SYNERGY SY-29682
PAVILLION124356789101118910GENERAL NOTES11234567891011CONTROL JOINTPEDESTRIAN CONCRETE PAVINGTYP. CONC. PAVING SECTIONEXPANSION/CONSTRUCTION JOINTCONCRETE AT WALL/BLDG.2CROSSTIE TIMBER EDGING DETAIL3
TO CO RD 48ZONE X (SHADED)REGULATORYFLOOWAYZONE AESHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROAD53515049484746454443424141403938EX 36" CPPEX N INV:47.58EX S INV:48.53TO BE REMOVEDTORRENT ROADTELUGA AVENUEGRAND RAPIDS ROADPHASE 9- 48 LOTSPHASE 7- 60 LOTSPHASE 8- 34 LOTSPHASE 6- 70 LOTSWOMEN'SRESTROOMADASTORAGE$$MEN'SRESTROOM$$ADASTORAGEOpen 6440135C1
119C1
139C2139C1159C2159C1 115C1115C2111C1
TO CO RD 48ZONE X (SHADED)REGULATORYFLOOWAYZONE AESHOSHONEY AVENUEVERNAL ROADBURNEY ROADTELUGA AVENUEGRAND RAPIDS ROADTORRENT ROADSELFOSS ROAD53515049484746454443424141403938EX 36" CPPEX N INV:47.58EX S INV:48.53TO BE REMOVEDTORRENT ROADTELUGA AVENUEGRAND RAPIDS ROADPHASE 9- 48 LOTSPHASE 7- 60 LOTSPHASE 8- 34 LOTSPHASE 6- 70 LOTSWOMEN'SRESTROOMADASTORAGE$$MEN'SRESTROOM$$ADASTORAGEOpen 6440135C1
119C1
139C2139C1159C2159C1 115C1115C2111C1 00100'200'N O R T HLANDSCAPE PLANTING PLAN1GENERAL NOTESLANGFORD ROAD LANDSCAPE BUFFER PROFILE2
TREESCODEQTYBOTANICAL NAMECOMMON NAMECONTCALHTREMARKSLN2 53 Lagerstroemia indica `Natchez` `Natchez` Crape Myrtle 30 gal 2"Cal 12`Standard, full headCP 27 Pistacia chinensisChinese Pistache 30 gal 2"Cal 10`QN 92 Quercus nuttalliiNuttall Oak30 gal 2"Cal 10`Full head, specimen qualityQV 96 Quercus virginianaSouthern Live Oak 30 gal 2"Cal 10`Full head, specimen qualitySHRUBSCODEQTYBOTANICAL NAMECOMMON NAMECONTHTWSPACINGREMARKSSB 47 Viburnum odoratissimum Sweet Viburnum 3 gal72" o.c.PLANT SCHEDULESHRUB PLANTING3MULTI-TRUNK TREE STAKING••2PLANTING ATSHRUB AREAS.STAKING DETAILPLANTING ATTURF AREAS.PLANT PIT DETAILTREE PLANTING - GUY STRAP6AABBTYPICAL PLANT SPACING4GENERAL PLANTING NOTES••••••••••••••••••••1GROUNDCOVER PLANTING5
Page 2 of 11
Table of Contents
General Information ......................................................................................................................3
Location .........................................................................................................................................
Existing Conditions .......................................................................................................................
Proposed Conditions .....................................................................................................................
Drainage Design ...............................................................................................................................
Soil Conditions .............................................................................................................................3
Pond Design ................................................................................................................................4
Closed System Design .................................................................................................................4
Water Quality Calculations ........................................................................................................5
Summary of Results ...................................................................................................................6
Appendix A .....................................................................................................................................7
Vicinity Map ..................................................................................................................................
Pre-Developed Drainage Map ........................................................................................................
Post-Developed Drainage Map ......................................................................................................
Appendix B .....................................................................................................................................8
Web Soil Survey Data .....................................................................................................................
Appendix C .....................................................................................................................................9
Detention Pond Design (PondPack)................................................................................................
Appendix D ...................................................................................................................................10
Closed System Analysis (StormCad) .............................................................................................
Appendix E ...................................................................................................................................11
Drainage Swale Analysis (Flowmaster) .........................................................................................
Page 3 of 11
General Information
Location
The subject property is located on the east side of Langford Road and on the south side of Hwy
104. The property lies within Baldwin County and in the City of Fairhope’s extra-territorial
jurisdiction. A vicinity map has been included in Appendix A. The overall development is
proposed to consist of 9 phases for a total of 545 lots. Three of those phases are existing.
Phases 4 & 5 are currently under review by the City of Fairhope and Baldwin County for
preliminary plat approval. The portion that is the subject of this report consists of 4 Phases
totaling 222 single family lots The property has access to Highway 104 and Langford Road.
Existing Conditions
The terrain of the proposed development site generally falls in a west to east/southeast direction
with elevations ranging from 118 ft. to 25 ft. A small portion of the site sheet flows west to the
ditch on the east side of Langford Road. The site is mostly open pasture with the wetland area to
the extreme south/southeast being wooded. Existing runoff enters a draw that begins north of
the site and runs into existing manmade ponds that outfall to each other and eventually to the
wetlands to the south and then offsite. Phases 1-3 of the development are existing. Other than a
small area in Phase 2, the rest of Phases 1-3 utilize stormwater ponds that discharge to the east
that do not tie to the drainage system that is the subject of this narrative. Maps showing the
vicinity and the pre-developed drainage basin may be seen in Appendix A.
Proposed Conditions
Phases 4 & 5, currently under review and approval by the City of Fairhope and Baldwin County
consists of 106 lots. The proposed development consists of 4 Phases totaling 222 single family
lots with associated roads, drainage, and utility infrastructure.
The proposed site will collect storm water runoff utilizing open ditches, yard inlets, and curb
inlets spaced appropriately for their contributing drainage area. The system is designed for a 25
year post developed event.
The detention basins were sized to have both the required detention volume and the required
treatment volume to comply with the storm water quality requirement per the more stringent
of Baldwin County & the City of Fairhope’s subdivision regulations. Pond 4 is an existing wet
pond. Ponds 5 & 7 are proposed to be built with Phases 4 & 5 and Pond 6 will be constructed
with Phase 6. A map showing the post-developed drainage basin may be found in Appendix A.
Page 4 of 11
Drainage Design
Soil Conditions
The lakes were designed using SCS method. Tables shown in Appendix B show the pre-
development and post-development soil information used in the process. The soil information
was obtained from the Web Soil Survey (USDA).
Pond Design
Fairhope Falls, Phases 4-9, will utilize three (3) detention ponds to regulate the runoff rate from
the site. These ponds will discharge through concrete weir outfall structures to the immediate
pond downstream and eventually into a stilling basin before sheet flowing south to existing
wetlands.
Bentley’s PondPack utilizes the composite runoff curve number and the area of the drainage
basin to determine the outflow of the drainage basin. A twenty-four-hour rainfall intensity for a
two, five, ten, twenty-five, fifty, and one-hundred-year return storm event was applied to the
drainage areas to determine the flow. The software was used to determine the flow exiting the
drainage basin and entering the proposed detention pond for pre- and post-development
scenarios. According to our calculations, the proposed pond is adequate to accommodate the
proposed development and the report can be seen in Appendix C.
Closed System Design
StormCAD was used to analyze the closed drainage systems for the proposed project. Curbs and
gutters channel storm water from the roadways; the storm water is then collected into wing
inlets and yard inlets, which eventually is piped to the proposed detention ponds. Weir
structures were installed in each pond and discharge into the wetlands at a controlled rate less
than the pre-developed rate. A 25-year storm was analyzed with StormCAD and the report can
be seen in Appendix D.
Drainage Swales
Drainage swales are located throughout the development behind interior lots inside a common
area. The swales will route runoff into yard inlets and to the proposed ponds. A bottom width of
3.0 ft. was used for all with side slopes of 3:1. Bentley’s FlowMaster was used to analyze the
channels. FlowMaster utilized the Manning’s equation for open channel flow to check the design
inside the channel. Please see Appendix E for calculations.
Page 5 of 11
Wet Basin (Water Quality Calculations)
The Wet Basin has been designed to achieve the goal of removing at least 80% of the average annual post
construction total suspended solids (TSS) load.
The stormwater quality treatment goal is designed to capture 85% of the annual storm water runoff.
WQv=P x RV x
Where: WQv=Water quality Treatment volume (acre-feet)
P=rainfall for the 85% storm event (1.8”)
Rv=runoff coefficient (Rv=0.015+.0092I)
I=drainage area impervious cover in percentage (50% impervious would be 50)
A=drainage area (acres)
WET POND 4 (EXISTING POND)
Total Drainage Basin=6.23 acres
Impervious Area=6.022 acres
I=100 (6.022/28.5) = 21.13
Rv=0.015 + 0.0092(21.13) = .21
WQv=1.8 x .21 x (28.5/12) = 0.90 acre-ft
Pond has a wet volume of 14.04 acre-ft, therefore the volume of the first flush will be adequately treated.
WET POND 5 (PHASE 4 POND)
Total Drainage Basin=28.5 acres
Impervious Area=6.022 acres
I=100 (6.022/28.5) = 21.13
Rv=0.015 + 0.0092(21.13) = .21
WQv=1.8 x .21 x (28.5/12) = 0.90 acre-ft
Pond has a wet volume of 14.04 acre-ft, therefore the volume of the first flush will be adequately treated.
WET POND 6 (FUTURE PHASES)
Total Drainage Basin=76.6 acres
Impervious Area=27.44 acres
I=100 (27.44/76.6) = 35.82
Rv=0.015 + 0.0092(35.82) = .35
WQv=1.8 x .35 x (76.6/12) = 4.02 acre-ft
Pond has a wet volume of 18.95 acre-ft, therefore the volume of the first flush will be adequately treated.
WET POND 7 (PHASE 5 POND)
Total Drainage Basin=18.70 acres
Impervious Area=5.97 acres
I=100 (27.44/76.6) = 31.91
Rv=0.015 + 0.0092(35.82) = .31
WQv=1.8 x .31 x (18.70/12) = 0.87 acre-ft
Pond has a wet volume of 1.53 acre-ft, therefore the volume of the first flush will be adequately treated.
Page 6 of 11
SUMMARY OF RESULTS:
FAIRHOPE FALLS, PHASES 4-9
2 Year 5 Year 10 Year 25 Year 50 Year 100 Year
Pre to Pond(cfs) 44.17 77.28 112.54 173.22 228.85 292.97
Post from pond 6 (cfs) 5.20 26.21 56.93 95.95 165.54 275.73
Difference (cfs) 38.97 51.07 55.61 77.27 63.31 17.24
Pre- Direct runoff
South(cfs) 44.11 94.50 151.78 255.30 352.91 465.94
Post- Direct runoff
South(cfs) 35.65 64.79 96.51 151.24 201.54 258.75
Difference (cfs) 8.46 29.71 55.27 104.06 151.37 207.19
Pre- Direct runoff
West (cfs) 9.33 17.09 25.39 39.71 52.87 67.83
Post- Direct runoff
West (cfs) 9.95 15.34 20.83 29.82 37.78 46.60
Difference (cfs) (0.62) 1.75 4.56 9.89 15.09 21.23
Pond 4 Max Water
Elev (ft) 57.06 57.62 58.23 59.21 59.65 60.01
Freeboard (ft) 3.94 3.38 2.77 1.79 1.35 0.99
Pond 5 Max Water
Elev (ft) 53.74 54.09 54.45 55.02 55.51 56.11
Freeboard (ft) 3.26 2.91 2.55 1.98 1.49 0.89
Pond 6 Max Water
Elev (ft) 47.34 49.23 49.61 49.95 50.41 51.00
Freeboard (ft) 3.66 1.77 1.39 1.05 0.59 0.00
Pond 7 Max Water
Elev (ft) 64.44 65.10 65.35 65.68 65.92 66.17
Freeboard (ft) 2.56 5.20 1.65 1.32 1.08 0.83
Page 7 of 11
APPENDIX A
VICINITY MAP
PRE-DEVELOPED DRAINAGE MAP
POST-DEVELOPED DRAINAGE MAP
VICINITY
MAP
CommonArea 2Common Area 3C.A. 4C.A. 5C.A. 6Common Area 10C.A. 7Common Area 8Common Area 9Common Area 1C.A. 615415515615715815916016116216316416516616716816917017117217317517617717817918018118218318415215315117421718518618718818919019119219319419519619719819920020120220320420520620720820921021121221321421521632-03
32-0
513-04
13-0
1
13-0
5
13-0
3
12-08
13-0
4
32-05
32-0
1
32-0
2
12-0632-02
12-0
7
12-05 32-10
32-09
32-0
8
12-02
12-0112-04
12-0
332-0632-12
32-0
7
32-0
7
32-1332-14 32-14
13-0
5ZONE X (SHADED)REGULATORYFLOOWAYZONE AEPRE-9.029 AcPRE-2.412 AcPRE-6.078 AcPRE-148.40 AcPRE-84.95 AcPRE (DIRECT WEST)-13.50 Ac25353 FRIENDSHIP ROADDAPHNE, AL 36526251.990.9950
CommonArea 2Common Area 3C.A. 4C.A. 5C.A. 6Common Area 10C.A. 7Common Area 8Common Area 9Common Area 1C.A. 615415515615715815916016116216316416516616716816917017117217317517617717817918018118218318415215315117421718518618718818919019119219319419519619719819920020120220320420520620720820921021121221321421521632-03
96OO1
OO2
32-0
513-04
13-0
1
13-0
5
13-0
3
12-08
13-0
4
32-05
32-0
1
32-0
2
12-0632-02
12-0
7
12-05 32-10
32-09
32-0
8
12-02
12-0112-04
12-0
332-0632-12
32-0
7
32-0
7
32-1332-14 32-14
13-0
5
LANGFORD ROAD TO HWY 104TO CO RD 48
ZONE X (SHADED)REGULATORYFLOOWAYZONE AEPOST- 6.226 AcPOST-18.709 AcPOST-19.054 AcPOST-9.486 AcPOST- 76.626 AcDIRECT-5.789 Ac
D
I
R
E
C
T
-
3
8
.
4
0
A
c POST-9.029 AcPOST-2.412 AcPOST-6.078 AcPOST-71.10 Ac25353 FRIENDSHIP ROADDAPHNE, AL 36526251.990.9950
Page 8 of 11
APPENDIX B
Web Soil Survey Data
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Baldwin County,
Alabama
PRE-WEST OFFSITE POND
NORTH
Natural
Resources
Conservation
Service
October 15, 2020
16
Custom Soil Resource Report
Map—Hydrologic Soil Group (WEST OFFSITE-POND NORTH)3379050337907033790903379110337913033791503379170337919033790503379070337909033791103379130337915033791703379190422070 422090 422110 422130 422150 422170 422190 422210 422230 422250 422270 422290
422070 422090 422110 422130 422150 422170 422190 422210 422230 422250 422270 422290
30° 32' 33'' N 87° 48' 45'' W30° 32' 33'' N87° 48' 35'' W30° 32' 28'' N
87° 48' 45'' W30° 32' 28'' N
87° 48' 35'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300Feet
0 15 30 60 90Meters
Map Scale: 1:1,110 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Baldwin County, Alabama
Survey Area Data: Version 12, May 29, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Nov 16, 2018—Dec
18, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
17
Table—Hydrologic Soil Group (WEST OFFSITE-POND NORTH)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
FaA Faceville fine sandy
loam, 0 to 2 percent
slopes
A 0.8 34.2%
MrB2 Marlboro very fine sandy
loam, 2 to 5 percent
slopes, eroded
B 0.3 11.7%
SuD2 Sunsweet fine sandy
loam, 8 to 17 percent
slopes, eroded
C 1.3 54.1%
Totals for Area of Interest 2.4 100.0%
Rating Options—Hydrologic Soil Group (WEST OFFSITE-POND
NORTH)
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Custom Soil Resource Report
18
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Baldwin County,
Alabama
PRE-WEST OFFSITE POND
SOUTH
Natural
Resources
Conservation
Service
October 15, 2020
16
Custom Soil Resource Report
Map—Hydrologic Soil Group (WEST OFFSITE- POND SOUTH)337892033789503378980337901033790403379070337910033791303378920337895033789803379010337904033790703379100422030 422060 422090 422120 422150 422180 422210 422240 422270 422300 422330
422030 422060 422090 422120 422150 422180 422210 422240 422270 422300 422330
30° 32' 31'' N 87° 48' 46'' W30° 32' 31'' N87° 48' 34'' W30° 32' 24'' N
87° 48' 46'' W30° 32' 24'' N
87° 48' 34'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300Feet
0 20 40 80 120Meters
Map Scale: 1:1,490 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Baldwin County, Alabama
Survey Area Data: Version 12, May 29, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Nov 16, 2018—Dec
18, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
17
Table—Hydrologic Soil Group (WEST OFFSITE- POND SOUTH)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
FaA Faceville fine sandy
loam, 0 to 2 percent
slopes
A 3.0 48.6%
MrB2 Marlboro very fine sandy
loam, 2 to 5 percent
slopes, eroded
B 1.0 16.0%
SuD2 Sunsweet fine sandy
loam, 8 to 17 percent
slopes, eroded
C 2.2 35.5%
Totals for Area of Interest 6.1 100.0%
Rating Options—Hydrologic Soil Group (WEST OFFSITE- POND
SOUTH)
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Custom Soil Resource Report
18
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Baldwin County,
Alabama
PRE-WEST OFFSITE
Natural
Resources
Conservation
Service
October 14, 2020
17
Custom Soil Resource Report
Map—Hydrologic Soil Group (OFFSITE WEST)337887033789403379010337908033791503379220337929033793603379430337887033789403379010337908033791503379220337929033793603379430421980 422050 422120 422190 422260 422330 422400
421980 422050 422120 422190 422260 422330 422400
30° 32' 41'' N 87° 48' 48'' W30° 32' 41'' N87° 48' 31'' W30° 32' 22'' N
87° 48' 48'' W30° 32' 22'' N
87° 48' 31'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 100 200 400 600Feet
0 40 80 160 240Meters
Map Scale: 1:2,940 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Baldwin County, Alabama
Survey Area Data: Version 12, May 29, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Nov 16, 2018—Dec
18, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
18
Table—Hydrologic Soil Group (OFFSITE WEST)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
FaA Faceville fine sandy
loam, 0 to 2 percent
slopes
A 10.1 57.9%
FaB Faceville fine sandy
loam, 2 to 5 percent
slopes
A 0.2 1.2%
MrB2 Marlboro very fine sandy
loam, 2 to 5 percent
slopes, eroded
B 2.1 11.9%
SuD2 Sunsweet fine sandy
loam, 8 to 17 percent
slopes, eroded
C 5.1 29.0%
Totals for Area of Interest 17.5 100.0%
Rating Options—Hydrologic Soil Group (OFFSITE WEST)
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Custom Soil Resource Report
19
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Baldwin County,
Alabama
FAIRHOPE FALLS, PH 4-9 PRE-
DIRECT SOUTH TO WETLANDS
Natural
Resources
Conservation
Service
December 14, 2020
24
Custom Soil Resource Report
Map—Hydrologic Soil Group (PRE-DIRECT SOUTH TO WETLANDS)337790033780003378100337820033783003378400337850033786003378700337790033780003378100337820033783003378400337850033786003378700422100 422200 422300 422400 422500 422600 422700 422800 422900 423000 423100 423200 423300
422100 422200 422300 422400 422500 422600 422700 422800 422900 423000 423100 423200 423300
30° 32' 17'' N 87° 48' 47'' W30° 32' 17'' N87° 47' 55'' W30° 31' 48'' N
87° 48' 47'' W30° 31' 48'' N
87° 47' 55'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 300 600 1200 1800Feet
0 50 100 200 300Meters
Map Scale: 1:6,240 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Baldwin County, Alabama
Survey Area Data: Version 12, May 29, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Nov 16, 2018—Dec
18, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
25
Table—Hydrologic Soil Group (PRE-DIRECT SOUTH TO
WETLANDS)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
Bb Bibb and Mantachie
soils, local alluvium
B/D 0.3 0.4%
BoC Bowie fine sandy loam, 5
to 8 percent slopes
C 10.7 12.5%
EuB Eustis loamy fine sand, 0
to 5 percent slopes
A 21.8 25.5%
LaB Lakeland loamy fine
sand, 0 to 5 percent
slopes
A 36.1 42.3%
LaC Lakeland loamy fine
sand, 5 to 8 percent
slopes
A 1.2 1.4%
MrB2 Marlboro very fine sandy
loam, 2 to 5 percent
slopes, eroded
B 2.9 3.4%
NoB Norfolk fine sandy loam,
2 to 5 percent slopes
B 8.9 10.4%
Ok Okenee soils C/D 2.6 3.0%
RuA Ruston fine sandy loam,
0 to 2 percent slopes
B 0.9 1.0%
Totals for Area of Interest 85.5 100.0%
Rating Options—Hydrologic Soil Group (PRE-DIRECT SOUTH TO
WETLANDS)
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Custom Soil Resource Report
26
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
&XVWRP6RLO5HVRXUFH
5HSRUWIRU
%DOGZLQ&RXQW\
$ODEDPD
)$,5+23()$//63+35(
($6772321'
Natural
Resources
Conservation
Service
December 14, 2020
28
Custom Soil Resource Report
Map—Hydrologic Soil Group (PRE-EAST TO POND)
0$3/(*(1'0$3,1)250$7,21$UHDRI,QWHUHVW$2,
7DEOH²+\GURORJLF6RLO*URXS35(($6772321'
0DSXQLWV\PERO 0DSXQLWQDPH 5DWLQJ $FUHVLQ$2,3HUFHQWRI$2,
Bb Bibb and Mantachie
soils, local alluvium
B/D 9.9 6.7%
BoC Bowie fine sandy loam, 5
to 8 percent slopes
C 5.2 3.5%
EuB Eustis loamy fine sand, 0
to 5 percent slopes
A 34.2 23.0%
FaA Faceville fine sandy
loam, 0 to 2 percent
slopes
A 8.4 5.7%
FaB Faceville fine sandy
loam, 2 to 5 percent
slopes
A 4.9 3.3%
LaB Lakeland loamy fine
sand, 0 to 5 percent
slopes
A 17.2 11.6%
LaD Lakeland loamy fine
sand, 8 to 12 percent
slopes
A 5.3 3.5%
MrB2 Marlboro very fine sandy
loam, 2 to 5 percent
slopes, eroded
B 25.0 16.8%
NoA Norfolk fine sandy loam,
0 to 2 percent slopes
B 2.6 1.7%
NoB Norfolk fine sandy loam,
2 to 5 percent slopes
B 15.0 10.1%
RuA Ruston fine sandy loam,
0 to 2 percent slopes
B 0.8 0.5%
SuD2 Sunsweet fine sandy
loam, 8 to 17 percent
slopes, eroded
C 13.2 8.9%
W Water 6.7 4.5%
7RWDOVIRU$UHDRI,QWHUHVW
5DWLQJ2SWLRQV²+\GURORJLF6RLO*URXS35(($6772321'
$JJUHJDWLRQ0HWKRGDominant Condition
&RPSRQHQW3HUFHQW&XWRII1RQH6SHFLILHG
7LHEUHDN5XOHHigher
Custom Soil Resource Report
30
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
&XVWRP6RLO5HVRXUFH
5HSRUWIRU
%DOGZLQ&RXQW\
$ODEDPD
)$,5+23()$//63+3267
',5(&7:(67
Natural
Resources
Conservation
Service
December 14, 2020
17
Custom Soil Resource Report
Map—Hydrologic Soil Group (POST- DIRECT WEST)
0$3/(*(1'0$3,1)250$7,21$UHDRI,QWHUHVW$2,
7DEOH²+\GURORJLF6RLO*URXS3267',5(&7:(67
0DSXQLWV\PERO 0DSXQLWQDPH 5DWLQJ $FUHVLQ$2,3HUFHQWRI$2,
FaA Faceville fine sandy
loam, 0 to 2 percent
slopes
A 2.2 37.9%
GvA Greenville loam, 0 to 2
percent slopes
B 2.4 41.3%
MrB2 Marlboro very fine sandy
loam, 2 to 5 percent
slopes, eroded
B 0.8 14.4%
RuA Ruston fine sandy loam,
0 to 2 percent slopes
B 0.4 6.4%
7RWDOVIRU$UHDRI,QWHUHVW
5DWLQJ2SWLRQV²+\GURORJLF6RLO*URXS3267',5(&7:(67
$JJUHJDWLRQ0HWKRGDominant Condition
&RPSRQHQW3HUFHQW&XWRII1RQH6SHFLILHG
7LHEUHDN5XOHHigher
Custom Soil Resource Report
19
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Baldwin County,
Alabama
PRE-POND NORTH OFFSITE
Natural
Resources
Conservation
Service
October 14, 2020
27
Custom Soil Resource Report
Map—Hydrologic Soil Group (OFFSITE-NORTH)337880033789003379000337910033792003379300337940033795003379600337880033789003379000337910033792003379300337940033795003379600422300 422400 422500 422600 422700 422800 422900
422300 422400 422500 422600 422700 422800 422900
30° 32' 48'' N 87° 48' 38'' W30° 32' 48'' N87° 48' 12'' W30° 32' 18'' N
87° 48' 38'' W30° 32' 18'' N
87° 48' 12'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 200 400 800 1200Feet
0 50 100 200 300Meters
Map Scale: 1:4,500 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Baldwin County, Alabama
Survey Area Data: Version 12, May 29, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Nov 16, 2018—Dec
18, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
28
Table—Hydrologic Soil Group (OFFSITE-NORTH)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
Bb Bibb and Mantachie
soils, local alluvium
B/D 4.9 7.0%
BoC Bowie fine sandy loam, 5
to 8 percent slopes
C 0.4 0.6%
EuB Eustis loamy fine sand, 0
to 5 percent slopes
A 10.5 14.8%
FaA Faceville fine sandy
loam, 0 to 2 percent
slopes
A 8.4 11.9%
FaB Faceville fine sandy
loam, 2 to 5 percent
slopes
A 4.9 7.0%
LaB Lakeland loamy fine
sand, 0 to 5 percent
slopes
A 2.4 3.4%
LaD Lakeland loamy fine
sand, 8 to 12 percent
slopes
A 1.6 2.3%
MrB2 Marlboro very fine sandy
loam, 2 to 5 percent
slopes, eroded
B 15.9 22.4%
NoA Norfolk fine sandy loam,
0 to 2 percent slopes
B 2.6 3.6%
NoB Norfolk fine sandy loam,
2 to 5 percent slopes
B 4.8 6.7%
SuD2 Sunsweet fine sandy
loam, 8 to 17 percent
slopes, eroded
C 13.2 18.5%
W Water 1.4 2.0%
Totals for Area of Interest 71.1 100.0%
Rating Options—Hydrologic Soil Group (OFFSITE-NORTH)
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Custom Soil Resource Report
29
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Baldwin County,
Alabama
PRE-POND 4
Natural
Resources
Conservation
Service
October 14, 2020
16
Custom Soil Resource Report
Map—Hydrologic Soil Group (POND 4)3378730337876033787903378820337885033788803378910337894033787303378760337879033788203378850337888033789103378940422860 422890 422920 422950 422980 423010 423040 423070 423100 423130 423160 423190
422860 422890 422920 422950 422980 423010 423040 423070 423100 423130 423160 423190
30° 32' 25'' N 87° 48' 15'' W30° 32' 25'' N87° 48' 2'' W30° 32' 18'' N
87° 48' 15'' W30° 32' 18'' N
87° 48' 2'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300Feet
0 20 40 80 120Meters
Map Scale: 1:1,640 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Baldwin County, Alabama
Survey Area Data: Version 12, May 29, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Nov 16, 2018—Dec
18, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
17
Table—Hydrologic Soil Group (POND 4)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
LaB Lakeland loamy fine
sand, 0 to 5 percent
slopes
A 5.4 86.4%
LaD Lakeland loamy fine
sand, 8 to 12 percent
slopes
A 0.1 1.1%
RuA Ruston fine sandy loam,
0 to 2 percent slopes
B 0.8 12.5%
Totals for Area of Interest 6.2 100.0%
Rating Options—Hydrologic Soil Group (POND 4)
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Custom Soil Resource Report
18
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Baldwin County,
Alabama
POST- POND 5
Natural
Resources
Conservation
Service
October 15, 2020
22
Custom Soil Resource Report
Map—Hydrologic Soil Group (POST-POND 5)3378460337855033786403378730337882033789103379000337846033785503378640337873033788203378910422360 422450 422540 422630 422720 422810 422900 422990 423080 423170
422360 422450 422540 422630 422720 422810 422900 422990 423080 423170
30° 32' 27'' N 87° 48' 34'' W30° 32' 27'' N87° 48' 2'' W30° 32' 9'' N
87° 48' 34'' W30° 32' 9'' N
87° 48' 2'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 150 300 600 900Feet
0 50 100 200 300Meters
Map Scale: 1:3,860 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Baldwin County, Alabama
Survey Area Data: Version 12, May 29, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Nov 16, 2018—Dec
18, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
23
Table—Hydrologic Soil Group (POST-POND 5)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
Bb Bibb and Mantachie
soils, local alluvium
B/D 0.9 3.2%
BoC Bowie fine sandy loam, 5
to 8 percent slopes
C 1.2 4.3%
EuB Eustis loamy fine sand, 0
to 5 percent slopes
A 8.5 29.6%
LaB Lakeland loamy fine
sand, 0 to 5 percent
slopes
A 3.6 12.5%
LaD Lakeland loamy fine
sand, 8 to 12 percent
slopes
A 0.7 2.6%
MrB2 Marlboro very fine sandy
loam, 2 to 5 percent
slopes, eroded
B 5.1 18.0%
NoB Norfolk fine sandy loam,
2 to 5 percent slopes
B 4.3 15.0%
W Water 4.2 14.8%
Totals for Area of Interest 28.5 100.0%
Rating Options—Hydrologic Soil Group (POST-POND 5)
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Custom Soil Resource Report
24
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Baldwin County,
Alabama
POST-POND 6
Natural
Resources
Conservation
Service
October 15, 2020
23
Custom Soil Resource Report
Map—Hydrologic Soil Group (POST-POND 6)337790033780003378100337820033783003378400337850033786003378700337790033780003378100337820033783003378400337850033786003378700422100 422200 422300 422400 422500 422600 422700 422800 422900 423000 423100 423200 423300
422000 422100 422200 422300 422400 422500 422600 422700 422800 422900 423000 423100 423200 423300
30° 32' 20'' N 87° 48' 47'' W30° 32' 20'' N87° 47' 55'' W30° 31' 50'' N
87° 48' 47'' W30° 31' 50'' N
87° 47' 55'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 300 600 1200 1800Feet
0 50 100 200 300Meters
Map Scale: 1:6,360 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Baldwin County, Alabama
Survey Area Data: Version 12, May 29, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Nov 16, 2018—Dec
18, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
24
Table—Hydrologic Soil Group (POST-POND 6)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
Bb Bibb and Mantachie
soils, local alluvium
B/D 2.5 3.0%
BoC Bowie fine sandy loam, 5
to 8 percent slopes
C 3.9 4.8%
EuB Eustis loamy fine sand, 0
to 5 percent slopes
A 26.7 32.6%
GvA Greenville loam, 0 to 2
percent slopes
B 0.4 0.5%
LaB Lakeland loamy fine
sand, 0 to 5 percent
slopes
A 27.9 34.1%
LaD Lakeland loamy fine
sand, 8 to 12 percent
slopes
A 2.2 2.6%
MrB2 Marlboro very fine sandy
loam, 2 to 5 percent
slopes, eroded
B 7.5 9.2%
NoB Norfolk fine sandy loam,
2 to 5 percent slopes
B 9.5 11.7%
RuA Ruston fine sandy loam,
0 to 2 percent slopes
B 1.1 1.4%
Totals for Area of Interest 81.7 100.0%
Rating Options—Hydrologic Soil Group (POST-POND 6)
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Custom Soil Resource Report
25
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Baldwin County,
Alabama
POST-POND NORTH
Natural
Resources
Conservation
Service
October 15, 2020
24
Custom Soil Resource Report
Map—Hydrologic Soil Group (POST-POND NORTH ONSITE)33787103378780337885033789203378990337906033791303378710337878033788503378920337899033790603379130422280 422350 422420 422490 422560 422630 422700 422770 422840 422910 422980
422280 422350 422420 422490 422560 422630 422700 422770 422840 422910
30° 32' 31'' N 87° 48' 36'' W30° 32' 31'' N87° 48' 10'' W30° 32' 17'' N
87° 48' 36'' W30° 32' 17'' N
87° 48' 10'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 150 300 600 900Feet
0 45 90 180 270Meters
Map Scale: 1:3,210 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Baldwin County, Alabama
Survey Area Data: Version 12, May 29, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Nov 16, 2018—Dec
18, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
25
Table—Hydrologic Soil Group (POST-POND NORTH ONSITE)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
Bb Bibb and Mantachie
soils, local alluvium
B/D 1.5 8.2%
BoC Bowie fine sandy loam, 5
to 8 percent slopes
C 1.3 6.8%
EuB Eustis loamy fine sand, 0
to 5 percent slopes
A 4.0 21.2%
FaA Faceville fine sandy
loam, 0 to 2 percent
slopes
A 1.4 7.5%
LaB Lakeland loamy fine
sand, 0 to 5 percent
slopes
A 3.5 18.7%
LaD Lakeland loamy fine
sand, 8 to 12 percent
slopes
A 0.7 3.6%
MrB2 Marlboro very fine sandy
loam, 2 to 5 percent
slopes, eroded
B 2.2 11.7%
NoB Norfolk fine sandy loam,
2 to 5 percent slopes
B 3.1 16.5%
W Water 1.1 5.9%
Totals for Area of Interest 18.7 100.0%
Rating Options—Hydrologic Soil Group (POST-POND NORTH
ONSITE)
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Custom Soil Resource Report
26
Page 9 of 11
APPENDIX C
Detention Pond Design
44Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr)
42Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr)
CM-WEST OFFSITE NORTH
40Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr)
38Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr)
CM-OFFSITE WEST -SOUTH
36Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr)
34Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr)
CM-OFFSITE WEST MIDDLE
32Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr)
CM-EAST ALL
30Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr)
28Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr)
CM-DIRECT WEST
26Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr)
24Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr)
CM-DIRECT SOUTH
21Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr)
CM-9
19Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr)
CM-8
15Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr)
CM-7
12Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr)
CM-11
10Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr)
CM-10
8Time-Depth Curve, 100 years (Pre-Development 100 year, 24
hr)
6Time-Depth Curve, 100 years (Post-Development 100 year, 24
hr)
SCS NOAA ATLAS 14 (TYPE III)
2Master Network Summary
Table of Contents
66Unit Hydrograph Summary, 100 years (Post-Development 100
year, 24 hr)
CM-DIRECT WEST
64Unit Hydrograph Summary, 100 years (Pre-Development 100
year, 24 hr)
62Unit Hydrograph Summary, 100 years (Post-Development 100
year, 24 hr)
CM-DIRECT SOUTH
61Runoff CN-Area, 100 years (Pre-Development 100 year, 24 hr)
60Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr)
CM-WEST OFFSITE NORTH
59Runoff CN-Area, 100 years (Pre-Development 100 year, 24 hr)
58Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr)
CM-OFFSITE WEST -SOUTH
57Runoff CN-Area, 100 years (Pre-Development 100 year, 24 hr)
56Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr)
CM-OFFSITE WEST MIDDLE
55Runoff CN-Area, 100 years (Pre-Development 100 year, 24 hr)
CM-EAST ALL
54Runoff CN-Area, 100 years (Pre-Development 100 year, 24 hr)
53Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr)
CM-DIRECT WEST
52Runoff CN-Area, 100 years (Pre-Development 100 year, 24 hr)
51Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr)
CM-DIRECT SOUTH
50Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr)
CM-9
49Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr)
CM-8
48Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr)
CM-7
47Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr)
CM-11
46Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr)
CM-10
Table of Contents
Table of Contents
122Level Pool Pond Routing Summary, 100 years (Post-
Development 100 year, 24 hr)
POND 7 (EX NORTH) (IN)
121Interconnected Pond Routing Summary, 100 years (Post-
Development 100 year, 24 hr)
POND 6
120Interconnected Pond Routing Summary, 100 years (Post-
Development 100 year, 24 hr)
POND 5
119Interconnected Pond Routing Summary, 100 years (Post-
Development 100 year, 24 hr)
POND 4
118Composite Rating Curve, 100 years (Post-Development 100
year, 24 hr)
POND NORTH
117Composite Rating Curve, 100 years (Post-Development 100
year, 24 hr)
POND 6 OUTFALL
82Composite Rating Curve, 100 years (Post-Development 100
year, 24 hr)
Pond 5
72Composite Rating Curve, 100 years (Post-Development 100
year, 24 hr)
POND 4- CONCRETE FLUME
70Unit Hydrograph Summary, 100 years (Pre-Development 100
year, 24 hr)
CM-EAST ALL
68Unit Hydrograph Summary, 100 years (Pre-Development 100
year, 24 hr)
Subsection: Master Network Summary
Catchments Summary
Peak Flow
(ft³/s)
Time to Peak
(hours)
Hydrograph
Volume
(ac-ft)
Return
Event
(years)
ScenarioLabel
292.9713.900109.511100Pre-Development 100
year, 24 hr
CM-EAST ALL
34.2412.6505.895100Pre-Development 100
year, 24 hr
CM-WEST OFFSITE
NORTH
34.2412.6505.895100Post-Development
100 year, 24 hr
CM-WEST OFFSITE
NORTH
49.1512.2005.211100Pre-Development 100
year, 24 hr
CM-OFFSITE WEST -
SOUTH
49.1512.2005.211100Post-Development
100 year, 24 hr
CM-OFFSITE WEST -
SOUTH
23.4812.1502.293100Pre-Development 100
year, 24 hr
CM-OFFSITE WEST
MIDDLE
23.4812.1502.293100Post-Development
100 year, 24 hr
CM-OFFSITE WEST
MIDDLE
621.7812.25073.129100Post-Development
100 year, 24 hr
CM-7
106.0215.75057.001100Post-Development
100 year, 24 hr
CM-8
133.8612.35017.043100Post-Development
100 year, 24 hr
CM-9
43.6712.1503.844100Post-Development
100 year, 24 hr
CM-10
316.3212.10026.866100Post-Development
100 year, 24 hr
CM-11
67.8312.5009.851100Pre-Development 100
year, 24 hr
CM-DIRECT WEST
46.6012.2505.282100Post-Development
100 year, 24 hr
CM-DIRECT WEST
465.9412.30053.758100Pre-Development 100
year, 24 hr
CM-DIRECT SOUTH
258.7512.25028.113100Post-Development
100 year, 24 hr
CM-DIRECT SOUTH
Node Summary
Peak Flow
(ft³/s)
Time to Peak
(hours)
Hydrograph
Volume
(ac-ft)
Return
Event
(years)
ScenarioLabel
61.0112.75010.118100Pre-Development 100
year, 24 hr
J-2
61.0112.75010.118100Post-Development
100 year, 24 hr
J-2
58.8512.80010.066100Pre-Development 100
year, 24 hr
O-OFFSITE NORTH
58.8512.80010.066100Post-Development
100 year, 24 hr
O-OFFSITE NORTH
61.8412.70010.150100Pre-Development 100
year, 24 hr
J-1
Page 2 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Subsection: Master Network Summary
Node Summary
Peak Flow
(ft³/s)
Time to Peak
(hours)
Hydrograph
Volume
(ac-ft)
Return
Event
(years)
ScenarioLabel
61.8412.70010.150100Post-Development
100 year, 24 hr
J-1
292.9713.900109.511100Pre-Development 100
year, 24 hr
O-POND 6
275.7312.950126.974100Post-Development
100 year, 24 hr
O-POND 6
67.8312.5009.851100Pre-Development 100
year, 24 hr
O-DIRECT WEST
46.6012.2505.282100Post-Development
100 year, 24 hr
O-DIRECT WEST
465.9412.30053.758100Pre-Development 100
year, 24 hr
O-DIRECT SOUTH
258.7512.25028.113100Post-Development
100 year, 24 hr
O-DIRECT SOUTH
Pond Summary
Maximum
Pond Storage
(ac-ft)
Maximum
Water
Surface
Elevation
(ft)
Peak Flow
(ft³/s)
Time to Peak
(hours)
Hydrograph
Volume
(ac-ft)
Return
Event
(years)
ScenarioLabel
(N/A)(N/A)361.8612.10097.893100Post-
Development
100 year, 24
hr
POND 5 (IN)
14.32356.11145.7312.50093.276100Post-
Development
100 year, 24
hr
POND 5
(OUT)
(N/A)(N/A)43.6712.1503.844100Post-
Development
100 year, 24
hr
POND 4 (IN)
1.28760.0122.5312.4003.785100Post-
Development
100 year, 24
hr
POND 4
(OUT)
(N/A)(N/A)133.8612.35068.458100Post-
Development
100 year, 24
hr
POND 7 (EX
NORTH) (IN)
2.44966.17123.5312.45067.243100Post-
Development
100 year, 24
hr
POND 7 (EX
NORTH)
(OUT)
Page 3 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Subsection: Master Network Summary
Pond Summary
Maximum
Pond Storage
(ac-ft)
Maximum
Water
Surface
Elevation
(ft)
Peak Flow
(ft³/s)
Time to Peak
(hours)
Hydrograph
Volume
(ac-ft)
Return
Event
(years)
ScenarioLabel
(N/A)(N/A)106.0215.75057.001100Post-
Development
100 year, 24
hr
POND-
OFFSITE
NORTH (IN)
5.91875.97105.9815.80051.415100Post-
Development
100 year, 24
hr
POND-
OFFSITE
NORTH
(OUT)
(N/A)(N/A)49.1512.2005.211100Pre-
Development
100 year, 24
hr
POND
OFFSITE
WEST-
SOUTH (IN)
2.462109.7824.7012.5502.962100Pre-
Development
100 year, 24
hr
POND
OFFSITE
WEST-
SOUTH
(OUT)
(N/A)(N/A)49.1512.2005.211100Post-
Development
100 year, 24
hr
POND
OFFSITE
WEST-
SOUTH (IN)
2.462109.7824.7012.5502.962100Post-
Development
100 year, 24
hr
POND
OFFSITE
WEST-
SOUTH
(OUT)
(N/A)(N/A)33.5012.5005.255100Pre-
Development
100 year, 24
hr
POND
OFFSITE
WEST
NORTH (IN)
0.817106.4733.2212.5504.511100Pre-
Development
100 year, 24
hr
POND
OFFSITE
WEST
NORTH
(OUT)
(N/A)(N/A)33.5012.5005.255100Post-
Development
100 year, 24
hr
POND
OFFSITE
WEST
NORTH (IN)
0.817106.4733.2212.5504.511100Post-
Development
100 year, 24
hr
POND
OFFSITE
WEST
NORTH
(OUT)
(N/A)(N/A)66.4512.55010.407100Pre-
Development
100 year, 24
hr
PO-OFFSITE
WEST (IN)
Page 4 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Subsection: Master Network Summary
Pond Summary
Maximum
Pond Storage
(ac-ft)
Maximum
Water
Surface
Elevation
(ft)
Peak Flow
(ft³/s)
Time to Peak
(hours)
Hydrograph
Volume
(ac-ft)
Return
Event
(years)
ScenarioLabel
1.356107.3161.8412.70010.150100Pre-
Development
100 year, 24
hr
PO-OFFSITE
WEST (OUT)
(N/A)(N/A)66.4512.55010.407100Post-
Development
100 year, 24
hr
PO-OFFSITE
WEST (IN)
1.356107.3161.8412.70010.150100Post-
Development
100 year, 24
hr
PO-OFFSITE
WEST (OUT)
(N/A)(N/A)744.7912.300166.404100Post-
Development
100 year, 24
hr
POND 6 (IN)
48.87951.00275.7312.950126.974100Post-
Development
100 year, 24
hr
POND 6
(OUT)
Page 5 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: SCS NOAA ATLAS 14 (TYPE III)
Return Event: 100 yearsSubsection: Time-Depth Curve
Time-Depth Curve: 24 hr (15.84")
24 hr (15.84") Label
hours0.000Start Time
hours0.100Increment
hours24.000End Time
years100Return Event
CUMULATIVE RAINFALL (in)
Output Time Increment = 0.100 hours
Time on left represents time for first value in each row.
Depth
(in)
Depth
(in)
Depth
(in)
Depth
(in)
Depth
(in)
Time
(hours)
0.10.00.00.00.00.000
0.10.10.10.10.10.500
0.20.20.20.20.21.000
0.30.30.30.30.21.500
0.40.40.30.30.32.000
0.50.50.40.40.42.500
0.60.50.50.50.53.000
0.70.60.60.60.63.500
0.80.70.70.70.74.000
0.90.90.80.80.84.500
1.01.00.90.90.95.000
1.11.11.11.01.05.500
1.21.21.21.21.16.000
1.41.41.31.31.36.500
1.61.51.51.51.47.000
1.81.71.71.61.67.500
2.01.91.91.81.88.000
2.32.22.12.12.08.500
2.62.52.42.42.39.000
2.92.82.82.72.69.500
3.33.23.23.13.010.000
3.83.73.63.53.410.500
4.54.44.24.14.011.000
6.65.95.45.04.711.500
10.910.59.99.37.912.000
11.811.611.511.311.112.500
12.312.212.112.011.913.000
12.812.712.612.512.413.500
13.113.113.012.912.814.000
13.513.413.313.313.214.500
13.813.713.613.613.515.000
14.013.913.913.913.815.500
14.214.214.114.114.016.000
14.414.314.314.314.216.500
14.514.514.514.414.417.000
Page 6 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: SCS NOAA ATLAS 14 (TYPE III)
Return Event: 100 yearsSubsection: Time-Depth Curve
CUMULATIVE RAINFALL (in)
Output Time Increment = 0.100 hours
Time on left represents time for first value in each row.
Depth
(in)
Depth
(in)
Depth
(in)
Depth
(in)
Depth
(in)
Time
(hours)
14.714.614.614.614.617.500
14.814.814.714.714.718.000
14.914.914.914.814.818.500
15.015.015.015.014.919.000
15.115.115.115.115.119.500
15.215.215.215.215.220.000
15.315.315.315.315.320.500
15.415.415.415.415.421.000
15.515.515.515.515.421.500
15.615.615.615.615.522.000
15.715.715.615.615.622.500
15.815.715.715.715.723.000
15.815.815.815.815.823.500
(N/A)(N/A)(N/A)(N/A)15.824.000
Page 7 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: SCS NOAA ATLAS 14 (TYPE III)
Return Event: 100 yearsSubsection: Time-Depth Curve
Time-Depth Curve: 24 hr (15.84")
24 hr (15.84") Label
hours0.000Start Time
hours0.100Increment
hours24.000End Time
years100Return Event
CUMULATIVE RAINFALL (in)
Output Time Increment = 0.100 hours
Time on left represents time for first value in each row.
Depth
(in)
Depth
(in)
Depth
(in)
Depth
(in)
Depth
(in)
Time
(hours)
0.10.00.00.00.00.000
0.10.10.10.10.10.500
0.20.20.20.20.21.000
0.30.30.30.30.21.500
0.40.40.30.30.32.000
0.50.50.40.40.42.500
0.60.50.50.50.53.000
0.70.60.60.60.63.500
0.80.70.70.70.74.000
0.90.90.80.80.84.500
1.01.00.90.90.95.000
1.11.11.11.01.05.500
1.21.21.21.21.16.000
1.41.41.31.31.36.500
1.61.51.51.51.47.000
1.81.71.71.61.67.500
2.01.91.91.81.88.000
2.32.22.12.12.08.500
2.62.52.42.42.39.000
2.92.82.82.72.69.500
3.33.23.23.13.010.000
3.83.73.63.53.410.500
4.54.44.24.14.011.000
6.65.95.45.04.711.500
10.910.59.99.37.912.000
11.811.611.511.311.112.500
12.312.212.112.011.913.000
12.812.712.612.512.413.500
13.113.113.012.912.814.000
13.513.413.313.313.214.500
13.813.713.613.613.515.000
14.013.913.913.913.815.500
14.214.214.114.114.016.000
14.414.314.314.314.216.500
14.514.514.514.414.417.000
Page 8 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: SCS NOAA ATLAS 14 (TYPE III)
Return Event: 100 yearsSubsection: Time-Depth Curve
CUMULATIVE RAINFALL (in)
Output Time Increment = 0.100 hours
Time on left represents time for first value in each row.
Depth
(in)
Depth
(in)
Depth
(in)
Depth
(in)
Depth
(in)
Time
(hours)
14.714.614.614.614.617.500
14.814.814.714.714.718.000
14.914.914.914.814.818.500
15.015.015.015.014.919.000
15.115.115.115.115.119.500
15.215.215.215.215.220.000
15.315.315.315.315.320.500
15.415.415.415.415.421.000
15.515.515.515.515.421.500
15.615.615.615.615.522.000
15.715.715.615.615.622.500
15.815.715.715.715.723.000
15.815.815.815.815.823.500
(N/A)(N/A)(N/A)(N/A)15.824.000
Page 9 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-10
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: User Defined Tc
hours0.167Time of Concentration
Time of Concentration (Composite)
hours0.167Time of Concentration
(Composite)
Page 10 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-10
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== User Defined
Value entered by userTc =
Tc= Time of concentration, hoursWhere:
Page 11 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-11
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: TR-55 Sheet Flow
ft75.00Hydraulic Length
0.013Manning's n
ft/ft0.006Slope
in5.92 Year 24 Hour Depth
ft/s0.95Average Velocity
hours0.022Segment Time of
Concentration
Segment #2: TR-55 Shallow Concentrated Flow
ft215.50Hydraulic Length
FalseIs Paved?
ft/ft0.005Slope
ft/s1.14Average Velocity
hours0.052Segment Time of
Concentration
Segment #3: TR-55 Channel Flow
ft²1.8Flow Area
ft304.00Hydraulic Length
0.013Manning's n
ft/ft0.015Slope
ft4.71Wetted Perimeter
ft/s7.25Average Velocity
hours0.012Segment Time of
Concentration
Segment #4: TR-55 Channel Flow
ft²3.1Flow Area
ft330.00Hydraulic Length
0.013Manning's n
ft/ft0.036Slope
ft6.28Wetted Perimeter
ft/s13.78Average Velocity
hours0.007Segment Time of
Concentration
Segment #5: TR-55 Channel Flow
ft²4.9Flow Area
ft704.00Hydraulic Length
0.013Manning's n
ft/ft0.038Slope
Page 12 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-11
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Segment #5: TR-55 Channel Flow
ft7.85Wetted Perimeter
ft/s16.42Average Velocity
hours0.012Segment Time of
Concentration
Segment #6: TR-55 Channel Flow
ft²7.1Flow Area
ft114.00Hydraulic Length
0.013Manning's n
ft/ft0.005Slope
ft9.43Wetted Perimeter
ft/s6.69Average Velocity
hours0.005Segment Time of
Concentration
Segment #7: TR-55 Channel Flow
ft²7.1Flow Area
ft56.00Hydraulic Length
0.013Manning's n
ft/ft0.330Slope
ft9.42Wetted Perimeter
ft/s54.35Average Velocity
hours0.000Segment Time of
Concentration
Time of Concentration (Composite)
hours0.110Time of Concentration
(Composite)
Page 13 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-11
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Channel Flow
R = Qa / Wp
V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n
(Lf / V) / 3600
Tc =
R= Hydraulic radius
Aq= Flow area, square feet
Wp= Wetted perimeter, feet
V= Velocity, ft/sec
Sf= Slope, ft/ft
n= Manning's n
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
==== SCS TR-55 Shallow Concentration Flow
Unpaved surface:
V = 16.1345 * (Sf**0.5)
Paved Surface:
V = 20.3282 * (Sf**0.5)
(Lf / V) / 3600
Tc =
V= Velocity, ft/sec
Sf= Slope, ft/ft
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
==== SCS TR-55 Sheet Flow
(0.007 * ((n * Lf)**0.8)) / ((P**0.5) * (Sf**0.4))Tc =
Tc= Time of concentration, hours
n= Manning's n
Lf= Flow length, feet
P= 2yr, 24hr Rain depth, inches
Sf= Slope, %
Where:
Page 14 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-7
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: TR-55 Sheet Flow
ft103.00Hydraulic Length
0.240Manning's n
ft/ft0.015Slope
in5.92 Year 24 Hour Depth
ft/s0.14Average Velocity
hours0.203Segment Time of
Concentration
Segment #2: TR-55 Shallow Concentrated Flow
ft803.00Hydraulic Length
FalseIs Paved?
ft/ft0.019Slope
ft/s2.21Average Velocity
hours0.101Segment Time of
Concentration
Segment #3: TR-55 Channel Flow
ft²1.8Flow Area
ft50.00Hydraulic Length
0.013Manning's n
ft/ft0.080Slope
ft4.71Wetted Perimeter
ft/s16.86Average Velocity
hours0.001Segment Time of
Concentration
Segment #4: TR-55 Shallow Concentrated Flow
ft577.00Hydraulic Length
FalseIs Paved?
ft/ft0.056Slope
ft/s3.82Average Velocity
hours0.042Segment Time of
Concentration
Segment #5: TR-55 Channel Flow
ft²1.8Flow Area
ft168.00Hydraulic Length
0.013Manning's n
ft/ft0.012Slope
ft4.71Wetted Perimeter
ft/s6.53Average Velocity
Page 15 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-7
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Segment #5: TR-55 Channel Flow
hours0.007Segment Time of
Concentration
Segment #6: TR-55 Channel Flow
ft²3.1Flow Area
ft619.00Hydraulic Length
0.013Manning's n
ft/ft0.010Slope
ft6.28Wetted Perimeter
ft/s7.11Average Velocity
hours0.024Segment Time of
Concentration
Segment #7: TR-55 Channel Flow
ft²4.9Flow Area
ft80.00Hydraulic Length
0.013Manning's n
ft/ft0.005Slope
ft7.85Wetted Perimeter
ft/s5.92Average Velocity
hours0.004Segment Time of
Concentration
Segment #8: TR-55 Channel Flow
ft²7.1Flow Area
ft480.00Hydraulic Length
0.013Manning's n
ft/ft0.011Slope
ft9.43Wetted Perimeter
ft/s9.92Average Velocity
hours0.013Segment Time of
Concentration
Segment #9: TR-55 Channel Flow
ft²9.6Flow Area
ft120.00Hydraulic Length
0.013Manning's n
ft/ft0.025Slope
ft11.00Wetted Perimeter
ft/s16.58Average Velocity
hours0.002Segment Time of
Concentration
Page 16 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-7
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Segment #10: TR-55 Channel Flow
ft²9.6Flow Area
ft25.00Hydraulic Length
0.013Manning's n
ft/ft0.333Slope
ft11.00Wetted Perimeter
ft/s60.51Average Velocity
hours0.000Segment Time of
Concentration
Time of Concentration (Composite)
hours0.398Time of Concentration
(Composite)
Page 17 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-7
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Channel Flow
R = Qa / Wp
V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n
(Lf / V) / 3600
Tc =
R= Hydraulic radius
Aq= Flow area, square feet
Wp= Wetted perimeter, feet
V= Velocity, ft/sec
Sf= Slope, ft/ft
n= Manning's n
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
==== SCS TR-55 Shallow Concentration Flow
Unpaved surface:
V = 16.1345 * (Sf**0.5)
Paved Surface:
V = 20.3282 * (Sf**0.5)
(Lf / V) / 3600
Tc =
V= Velocity, ft/sec
Sf= Slope, ft/ft
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
==== SCS TR-55 Sheet Flow
(0.007 * ((n * Lf)**0.8)) / ((P**0.5) * (Sf**0.4))Tc =
Tc= Time of concentration, hours
n= Manning's n
Lf= Flow length, feet
P= 2yr, 24hr Rain depth, inches
Sf= Slope, %
Where:
Page 18 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-8
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: User Defined Tc
hours0.083Time of Concentration
Segment #2: Kirpich (TN)
ft21,626.00Hydraulic Length
ft/ft0.003Slope
2.000Tc Multiplier
ft/s1.13Average Velocity
hours5.299Segment Time of
Concentration
Time of Concentration (Composite)
hours5.383Time of Concentration
(Composite)
Page 19 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-8
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== User Defined
Value entered by userTc =
Tc= Time of concentration, hoursWhere:
==== Kirpich (TN)
0.00013 * (Lf**0.77) * (Sf**-0.385) * MtTc =
Tc= Time of concentration, hours
Lf= Flow length, feet
Sf= Slope, ft/ft
Mt= Tc Multiplier (Tc adjustment)
Where:
Page 20 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-9
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: TR-55 Sheet Flow
ft132.00Hydraulic Length
0.240Manning's n
ft/ft0.005Slope
in5.92 Year 24 Hour Depth
ft/s0.10Average Velocity
hours0.381Segment Time of
Concentration
Segment #2: TR-55 Shallow Concentrated Flow
ft434.00Hydraulic Length
TrueIs Paved?
ft/ft0.005Slope
ft/s1.44Average Velocity
hours0.084Segment Time of
Concentration
Segment #3: TR-55 Channel Flow
ft²1.8Flow Area
ft346.00Hydraulic Length
0.013Manning's n
ft/ft0.046Slope
ft6.28Wetted Perimeter
ft/s10.55Average Velocity
hours0.009Segment Time of
Concentration
Segment #4: TR-55 Channel Flow
ft²3.1Flow Area
ft346.00Hydraulic Length
0.013Manning's n
ft/ft0.046Slope
ft6.28Wetted Perimeter
ft/s15.49Average Velocity
hours0.006Segment Time of
Concentration
Segment #5: TR-55 Channel Flow
ft²4.9Flow Area
ft520.00Hydraulic Length
0.013Manning's n
ft/ft0.031Slope
Page 21 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-9
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Segment #5: TR-55 Channel Flow
ft7.85Wetted Perimeter
ft/s14.70Average Velocity
hours0.010Segment Time of
Concentration
Segment #6: TR-55 Channel Flow
ft²7.1Flow Area
ft233.00Hydraulic Length
0.013Manning's n
ft/ft0.043Slope
ft9.43Wetted Perimeter
ft/s19.60Average Velocity
hours0.003Segment Time of
Concentration
Segment #7: TR-55 Channel Flow
ft²7.1Flow Area
ft15.00Hydraulic Length
0.013Manning's n
ft/ft0.333Slope
ft9.40Wetted Perimeter
ft/s54.69Average Velocity
hours0.000Segment Time of
Concentration
Time of Concentration (Composite)
hours0.493Time of Concentration
(Composite)
Page 22 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-9
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Channel Flow
R = Qa / Wp
V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n
(Lf / V) / 3600
Tc =
R= Hydraulic radius
Aq= Flow area, square feet
Wp= Wetted perimeter, feet
V= Velocity, ft/sec
Sf= Slope, ft/ft
n= Manning's n
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
==== SCS TR-55 Shallow Concentration Flow
Unpaved surface:
V = 16.1345 * (Sf**0.5)
Paved Surface:
V = 20.3282 * (Sf**0.5)
(Lf / V) / 3600
Tc =
V= Velocity, ft/sec
Sf= Slope, ft/ft
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
==== SCS TR-55 Sheet Flow
(0.007 * ((n * Lf)**0.8)) / ((P**0.5) * (Sf**0.4))Tc =
Tc= Time of concentration, hours
n= Manning's n
Lf= Flow length, feet
P= 2yr, 24hr Rain depth, inches
Sf= Slope, %
Where:
Page 23 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT SOUTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: TR-55 Sheet Flow
ft100.00Hydraulic Length
0.240Manning's n
ft/ft0.040Slope
in5.92 Year 24 Hour Depth
ft/s0.21Average Velocity
hours0.133Segment Time of
Concentration
Segment #2: TR-55 Shallow Concentrated Flow
ft1,521.00Hydraulic Length
FalseIs Paved?
ft/ft0.024Slope
ft/s2.50Average Velocity
hours0.169Segment Time of
Concentration
Segment #3: TR-55 Shallow Concentrated Flow
ft433.00Hydraulic Length
FalseIs Paved?
ft/ft0.042Slope
ft/s3.29Average Velocity
hours0.037Segment Time of
Concentration
Time of Concentration (Composite)
hours0.338Time of Concentration
(Composite)
Page 24 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT SOUTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Channel Flow
R = Qa / Wp
V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n
(Lf / V) / 3600
Tc =
R= Hydraulic radius
Aq= Flow area, square feet
Wp= Wetted perimeter, feet
V= Velocity, ft/sec
Sf= Slope, ft/ft
n= Manning's n
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
==== SCS TR-55 Shallow Concentration Flow
Unpaved surface:
V = 16.1345 * (Sf**0.5)
Paved Surface:
V = 20.3282 * (Sf**0.5)
(Lf / V) / 3600
Tc =
V= Velocity, ft/sec
Sf= Slope, ft/ft
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
Page 25 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT SOUTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: TR-55 Sheet Flow
ft100.00Hydraulic Length
0.240Manning's n
ft/ft0.035Slope
in5.92 Year 24 Hour Depth
ft/s0.20Average Velocity
hours0.140Segment Time of
Concentration
Segment #2: TR-55 Shallow Concentrated Flow
ft2,041.00Hydraulic Length
FalseIs Paved?
ft/ft0.024Slope
ft/s2.52Average Velocity
hours0.225Segment Time of
Concentration
Segment #3: TR-55 Shallow Concentrated Flow
ft442.00Hydraulic Length
FalseIs Paved?
ft/ft0.072Slope
ft/s4.33Average Velocity
hours0.028Segment Time of
Concentration
Time of Concentration (Composite)
hours0.393Time of Concentration
(Composite)
Page 26 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT SOUTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Channel Flow
R = Qa / Wp
V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n
(Lf / V) / 3600
Tc =
R= Hydraulic radius
Aq= Flow area, square feet
Wp= Wetted perimeter, feet
V= Velocity, ft/sec
Sf= Slope, ft/ft
n= Manning's n
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
==== SCS TR-55 Shallow Concentration Flow
Unpaved surface:
V = 16.1345 * (Sf**0.5)
Paved Surface:
V = 20.3282 * (Sf**0.5)
(Lf / V) / 3600
Tc =
V= Velocity, ft/sec
Sf= Slope, ft/ft
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
Page 27 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT WEST
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: TR-55 Sheet Flow
ft100.00Hydraulic Length
0.240Manning's n
ft/ft0.005Slope
in5.92 Year 24 Hour Depth
ft/s0.09Average Velocity
hours0.305Segment Time of
Concentration
Segment #2: TR-55 Shallow Concentrated Flow
ft50.00Hydraulic Length
FalseIs Paved?
ft/ft0.005Slope
ft/s1.14Average Velocity
hours0.012Segment Time of
Concentration
Segment #3: TR-55 Shallow Concentrated Flow
ft378.00Hydraulic Length
TrueIs Paved?
ft/ft0.008Slope
ft/s1.82Average Velocity
hours0.058Segment Time of
Concentration
Time of Concentration (Composite)
hours0.375Time of Concentration
(Composite)
Page 28 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT WEST
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Channel Flow
R = Qa / Wp
V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n
(Lf / V) / 3600
Tc =
R= Hydraulic radius
Aq= Flow area, square feet
Wp= Wetted perimeter, feet
V= Velocity, ft/sec
Sf= Slope, ft/ft
n= Manning's n
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
==== SCS TR-55 Shallow Concentration Flow
Unpaved surface:
V = 16.1345 * (Sf**0.5)
Paved Surface:
V = 20.3282 * (Sf**0.5)
(Lf / V) / 3600
Tc =
V= Velocity, ft/sec
Sf= Slope, ft/ft
Tc= Time of concentration, hours
Lf= Flow length, feet
Where:
Page 29 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT WEST
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: SCS Lag
ft750.00Hydraulic Length
54.000CN
ft/ft0.016Slope
ft/s0.31Average Velocity
hours0.670Segment Time of
Concentration
Time of Concentration (Composite)
hours0.670Time of Concentration
(Composite)
Page 30 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT WEST
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Lag
0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5)Tc =
Tc= Time of concentration, hours
Lf= Flow length, feet
CN= SCS Curve Number
Sf= Slope, ft/ft
Where:
Page 31 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-EAST ALL
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: SCS Lag
ft4,678.00Hydraulic Length
56.000CN
ft/ft0.013Slope
ft/s0.43Average Velocity
hours3.056Segment Time of
Concentration
Time of Concentration (Composite)
hours3.056Time of Concentration
(Composite)
Page 32 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-EAST ALL
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Lag
0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5)Tc =
Tc= Time of concentration, hours
Lf= Flow length, feet
CN= SCS Curve Number
Sf= Slope, ft/ft
Where:
Page 33 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST MIDDLE
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: SCS Lag
ft444.00Hydraulic Length
69.000CN
ft/ft0.027Slope
ft/s0.53Average Velocity
hours0.231Segment Time of
Concentration
Time of Concentration (Composite)
hours0.231Time of Concentration
(Composite)
Page 34 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST MIDDLE
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Lag
0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5)Tc =
Tc= Time of concentration, hours
Lf= Flow length, feet
CN= SCS Curve Number
Sf= Slope, ft/ft
Where:
Page 35 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST MIDDLE
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: SCS Lag
ft444.00Hydraulic Length
69.000CN
ft/ft0.027Slope
ft/s0.53Average Velocity
hours0.231Segment Time of
Concentration
Time of Concentration (Composite)
hours0.231Time of Concentration
(Composite)
Page 36 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST MIDDLE
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Lag
0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5)Tc =
Tc= Time of concentration, hours
Lf= Flow length, feet
CN= SCS Curve Number
Sf= Slope, ft/ft
Where:
Page 37 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST -SOUTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: SCS Lag
ft442.00Hydraulic Length
61.000CN
ft/ft0.023Slope
ft/s0.40Average Velocity
hours0.309Segment Time of
Concentration
Time of Concentration (Composite)
hours0.309Time of Concentration
(Composite)
Page 38 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST -SOUTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Lag
0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5)Tc =
Tc= Time of concentration, hours
Lf= Flow length, feet
CN= SCS Curve Number
Sf= Slope, ft/ft
Where:
Page 39 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST -SOUTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: SCS Lag
ft442.00Hydraulic Length
61.000CN
ft/ft0.023Slope
ft/s0.40Average Velocity
hours0.309Segment Time of
Concentration
Time of Concentration (Composite)
hours0.309Time of Concentration
(Composite)
Page 40 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST -SOUTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Lag
0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5)Tc =
Tc= Time of concentration, hours
Lf= Flow length, feet
CN= SCS Curve Number
Sf= Slope, ft/ft
Where:
Page 41 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-WEST OFFSITE NORTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: SCS Lag
ft897.00Hydraulic Length
50.000CN
ft/ft0.014Slope
ft/s0.27Average Velocity
hours0.919Segment Time of
Concentration
Time of Concentration (Composite)
hours0.919Time of Concentration
(Composite)
Page 42 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-WEST OFFSITE NORTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Lag
0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5)Tc =
Tc= Time of concentration, hours
Lf= Flow length, feet
CN= SCS Curve Number
Sf= Slope, ft/ft
Where:
Page 43 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-WEST OFFSITE NORTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: SCS Lag
ft897.00Hydraulic Length
50.000CN
ft/ft0.014Slope
ft/s0.27Average Velocity
hours0.919Segment Time of
Concentration
Time of Concentration (Composite)
hours0.919Time of Concentration
(Composite)
Page 44 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-WEST OFFSITE NORTH
Return Event: 100 yearsSubsection: Time of Concentration Calculations
==== SCS Lag
0.000877 * (Lf**0.8) * ((1000/CN)-9)**0.7) * (Sf**-0.5)Tc =
Tc= Time of concentration, hours
Lf= Flow length, feet
CN= SCS Curve Number
Sf= Slope, ft/ft
Where:
Page 45 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-10
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
98.0000.00.01.04598.000LOTS 13 @ 3500 SF
10.0000.00.00.50510.000POND
39.0000.00.04.67639.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil A
46.551(N/A)(N/A)6.226(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 46 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-11
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
98.0000.00.02.68898.000Roads, Curbs, Sidewalk
98.0000.00.03.33498.000Lots- 41.5 @ 3,500 sf ea
100.0000.00.04.988100.000Pond
39.0000.00.010.89339.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil A
61.0000.00.05.63861.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil B
74.0000.00.00.41274.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil C
80.0000.00.00.54780.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil D
67.788(N/A)(N/A)28.500(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 47 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-7
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
98.0000.00.09.27898.000Roads, Curbs & SW
98.0000.00.018.16098.000Lots- 226 @ 3,500 sq ea
100.0000.00.04.980100.000Pond
39.0000.00.030.86839.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil A
61.0000.00.09.85861.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil B
74.0000.00.02.12074.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil C
80.0000.00.01.36280.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil D
68.618(N/A)(N/A)76.626(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 48 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-8
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
39.0000.00.024.07039.000Pasture, grassland, or range - good - Soil
A
61.0000.00.023.30061.000Pasture, grassland, or range - good - Soil
B
86.0000.00.013.60086.000Pasture, grassland, or range - poor - Soil C
89.0000.00.04.90089.000Pasture, grassland, or range - poor - Soil D
100.0000.00.01.400100.000Pond
98.0000.00.03.73098.000Impervious Areas - Paved parking lots,
roofs, driveways, Streets and roads - Soil
A
62.976(N/A)(N/A)71.000(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 49 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-9
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
98.0000.00.03.41598.000LOTS= 42.5 AT 3M500 SF EA
98.0000.00.01.45398.000ROADS, CURBS, SW
100.0000.00.01.100100.000POND
39.0000.00.07.23239.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil A
61.0000.00.03.59061.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil B
74.0000.00.00.86674.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil C
80.0000.00.01.04480.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil D
66.081(N/A)(N/A)18.700(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 50 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT SOUTH
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
98.0000.00.01.40698.000Lots- 17.5 @ 3,500 sf ea
39.0000.00.022.78039.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil A
74.0000.00.09.90374.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil C
80.0000.00.01.52580.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil D
98.0000.00.00.25098.000Offsite- impervious
61.0000.00.02.53561.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil B
53.651(N/A)(N/A)38.399(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 51 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT SOUTH
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
39.0000.00.059.10039.000Pasture, grassland, or range - good - Soil
A
74.0000.00.012.00074.000Pasture, grassland, or range - good - Soil
C
80.0000.00.01.45080.000Pasture, grassland, or range - good - Soil
D
61.0000.00.012.40061.000Pasture, grassland, or range - good - Soil
B
47.855(N/A)(N/A)84.950(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 52 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT WEST
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
98.0000.00.00.43898.000Roads, Curbs, SW
98.0000.00.01.45898.000Lots- 22 lots @3,500 sq ea
39.0000.00.02.00039.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil A
61.0000.00.01.89361.000Open space (Lawns,parks etc.) - Good
condition; grass cover > 75% - Soil B
65.518(N/A)(N/A)5.789(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 53 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT WEST
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
39.0000.00.04.40039.000Pasture, grassland, or range - good - Soil
A
61.0000.00.09.10061.000Pasture, grassland, or range - good - Soil
B
53.830(N/A)(N/A)13.500(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 54 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-EAST ALL
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
39.0000.00.070.00039.000Pasture, grassland, or range - good - Soil
A
61.0000.00.048.35061.000Pasture, grassland, or range - good - Soil
B
86.0000.00.018.40086.000Pasture, grassland, or range - poor - Soil C
89.0000.00.04.95089.000Pasture, grassland, or range - poor - Soil D
100.0000.00.06.700100.000Water
56.417(N/A)(N/A)148.400(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 55 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST MIDDLE
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
39.0000.00.00.80039.000Pasture, grassland, or range - good - Soil
A
61.0000.00.00.30061.000Pasture, grassland, or range - good - Soil
B
86.0000.00.00.98086.000Pasture, grassland, or range - poor - Soil C
100.0000.00.00.320100.000Pond
69.074(N/A)(N/A)2.400(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 56 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST MIDDLE
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
39.0000.00.00.80039.000Pasture, grassland, or range - good - Soil
A
61.0000.00.00.30061.000Pasture, grassland, or range - good - Soil
B
86.0000.00.00.98086.000Pasture, grassland, or range - poor - Soil C
100.0000.00.00.320100.000Pond
69.074(N/A)(N/A)2.400(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 57 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST -SOUTH
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
39.0000.00.03.00039.000Pasture, grassland, or range - good - Soil
A
61.0000.00.01.00061.000Pasture, grassland, or range - good - Soil
B
86.0000.00.01.38986.000Pasture, grassland, or range - poor - Soil C
100.0000.00.00.810100.000Pond
61.051(N/A)(N/A)6.199(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 58 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-OFFSITE WEST -SOUTH
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
39.0000.00.03.00039.000Pasture, grassland, or range - good - Soil
A
61.0000.00.01.00061.000Pasture, grassland, or range - good - Soil
B
86.0000.00.01.38986.000Pasture, grassland, or range - poor - Soil C
100.0000.00.00.810100.000Pond
61.051(N/A)(N/A)6.199(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 59 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-WEST OFFSITE NORTH
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
39.0000.00.06.50039.000Pasture, grassland, or range - good - Soil
A
61.0000.00.00.80061.000Pasture, grassland, or range - good - Soil
B
89.0000.00.01.60089.000Pasture, grassland, or range - poor - Soil D
49.966(N/A)(N/A)8.900(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 60 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-WEST OFFSITE NORTH
Return Event: 100 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC
(%)
C
(%)
Area
(acres)
CNSoil/Surface Description
39.0000.00.06.50039.000Pasture, grassland, or range - good - Soil
A
61.0000.00.00.80061.000Pasture, grassland, or range - good - Soil
B
89.0000.00.01.60089.000Pasture, grassland, or range - poor - Soil D
49.966(N/A)(N/A)8.900(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 61 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT SOUTH
Return Event: 100 yearsSubsection: Unit Hydrograph Summary
24 hr (15.84")Storm Event
years100Return Event
hours24.000Duration
in15.8Depth
hours0.338Time of Concentration
(Composite)
acres38.399Area (User Defined)
hours0.045Computational Time
Increment
hours12.223Time to Peak (Computed)
ft³/s259.57Flow (Peak, Computed)
hours0.050Output Increment
hours12.250Time to Flow (Peak
Interpolated Output)
ft³/s258.75Flow (Peak Interpolated
Output)
Drainage Area
54.000SCS CN (Composite)
acres38.399Area (User Defined)
in8.5Maximum Retention
(Pervious)
in1.7Maximum Retention
(Pervious, 20 percent)
Cumulative Runoff
in8.8Cumulative Runoff Depth
(Pervious)
ac-ft28.226Runoff Volume (Pervious)
Hydrograph Volume (Area under Hydrograph curve)
ac-ft28.113Volume
SCS Unit Hydrograph Parameters
hours0.338Time of Concentration
(Composite)
hours0.045Computational Time
Increment
483.432Unit Hydrograph Shape
Factor
0.749K Factor
1.670Receding/Rising, Tr/Tp
ft³/s128.61Unit peak, qp
Page 62 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT SOUTH
Return Event: 100 yearsSubsection: Unit Hydrograph Summary
SCS Unit Hydrograph Parameters
hours0.226Unit peak time, Tp
hours0.902Unit receding limb, Tr
hours1.128Total unit time, Tb
Page 63 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT SOUTH
Return Event: 100 yearsSubsection: Unit Hydrograph Summary
24 hr (15.84")Storm Event
years100Return Event
hours24.000Duration
in15.8Depth
hours0.393Time of Concentration
(Composite)
acres84.950Area (User Defined)
hours0.052Computational Time
Increment
hours12.259Time to Peak (Computed)
ft³/s466.17Flow (Peak, Computed)
hours0.050Output Increment
hours12.300Time to Flow (Peak
Interpolated Output)
ft³/s465.94Flow (Peak Interpolated
Output)
Drainage Area
48.000SCS CN (Composite)
acres84.950Area (User Defined)
in10.8Maximum Retention
(Pervious)
in2.2Maximum Retention
(Pervious, 20 percent)
Cumulative Runoff
in7.6Cumulative Runoff Depth
(Pervious)
ac-ft54.007Runoff Volume (Pervious)
Hydrograph Volume (Area under Hydrograph curve)
ac-ft53.758Volume
SCS Unit Hydrograph Parameters
hours0.393Time of Concentration
(Composite)
hours0.052Computational Time
Increment
483.432Unit Hydrograph Shape
Factor
0.749K Factor
1.670Receding/Rising, Tr/Tp
ft³/s244.96Unit peak, qp
Page 64 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT SOUTH
Return Event: 100 yearsSubsection: Unit Hydrograph Summary
SCS Unit Hydrograph Parameters
hours0.262Unit peak time, Tp
hours1.048Unit receding limb, Tr
hours1.310Total unit time, Tb
Page 65 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT WEST
Return Event: 100 yearsSubsection: Unit Hydrograph Summary
24 hr (15.84")Storm Event
years100Return Event
hours24.000Duration
in15.8Depth
hours0.375Time of Concentration
(Composite)
acres5.789Area (User Defined)
hours0.050Computational Time
Increment
hours12.246Time to Peak (Computed)
ft³/s46.65Flow (Peak, Computed)
hours0.050Output Increment
hours12.250Time to Flow (Peak
Interpolated Output)
ft³/s46.60Flow (Peak Interpolated
Output)
Drainage Area
66.000SCS CN (Composite)
acres5.789Area (User Defined)
in5.2Maximum Retention
(Pervious)
in1.0Maximum Retention
(Pervious, 20 percent)
Cumulative Runoff
in11.0Cumulative Runoff Depth
(Pervious)
ac-ft5.301Runoff Volume (Pervious)
Hydrograph Volume (Area under Hydrograph curve)
ac-ft5.282Volume
SCS Unit Hydrograph Parameters
hours0.375Time of Concentration
(Composite)
hours0.050Computational Time
Increment
483.432Unit Hydrograph Shape
Factor
0.749K Factor
1.670Receding/Rising, Tr/Tp
ft³/s17.50Unit peak, qp
Page 66 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT WEST
Return Event: 100 yearsSubsection: Unit Hydrograph Summary
SCS Unit Hydrograph Parameters
hours0.250Unit peak time, Tp
hours1.000Unit receding limb, Tr
hours1.250Total unit time, Tb
Page 67 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT WEST
Return Event: 100 yearsSubsection: Unit Hydrograph Summary
24 hr (15.84")Storm Event
years100Return Event
hours24.000Duration
in15.8Depth
hours0.670Time of Concentration
(Composite)
acres13.500Area (User Defined)
hours0.089Computational Time
Increment
hours12.504Time to Peak (Computed)
ft³/s67.86Flow (Peak, Computed)
hours0.050Output Increment
hours12.500Time to Flow (Peak
Interpolated Output)
ft³/s67.83Flow (Peak Interpolated
Output)
Drainage Area
54.000SCS CN (Composite)
acres13.500Area (User Defined)
in8.5Maximum Retention
(Pervious)
in1.7Maximum Retention
(Pervious, 20 percent)
Cumulative Runoff
in8.8Cumulative Runoff Depth
(Pervious)
ac-ft9.923Runoff Volume (Pervious)
Hydrograph Volume (Area under Hydrograph curve)
ac-ft9.851Volume
SCS Unit Hydrograph Parameters
hours0.670Time of Concentration
(Composite)
hours0.089Computational Time
Increment
483.432Unit Hydrograph Shape
Factor
0.749K Factor
1.670Receding/Rising, Tr/Tp
ft³/s22.83Unit peak, qp
Page 68 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-DIRECT WEST
Return Event: 100 yearsSubsection: Unit Hydrograph Summary
SCS Unit Hydrograph Parameters
hours0.447Unit peak time, Tp
hours1.786Unit receding limb, Tr
hours2.233Total unit time, Tb
Page 69 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-EAST ALL
Return Event: 100 yearsSubsection: Unit Hydrograph Summary
24 hr (15.84")Storm Event
years100Return Event
hours24.000Duration
in15.8Depth
hours3.056Time of Concentration
(Composite)
acres148.400Area (User Defined)
hours0.407Computational Time
Increment
hours13.855Time to Peak (Computed)
ft³/s293.08Flow (Peak, Computed)
hours0.050Output Increment
hours13.900Time to Flow (Peak
Interpolated Output)
ft³/s292.97Flow (Peak Interpolated
Output)
Drainage Area
56.000SCS CN (Composite)
acres148.400Area (User Defined)
in7.9Maximum Retention
(Pervious)
in1.6Maximum Retention
(Pervious, 20 percent)
Cumulative Runoff
in9.2Cumulative Runoff Depth
(Pervious)
ac-ft113.793Runoff Volume (Pervious)
Hydrograph Volume (Area under Hydrograph curve)
ac-ft109.511Volume
SCS Unit Hydrograph Parameters
hours3.056Time of Concentration
(Composite)
hours0.407Computational Time
Increment
483.432Unit Hydrograph Shape
Factor
0.749K Factor
1.670Receding/Rising, Tr/Tp
ft³/s55.02Unit peak, qp
Page 70 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Pre-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: CM-EAST ALL
Return Event: 100 yearsSubsection: Unit Hydrograph Summary
SCS Unit Hydrograph Parameters
hours2.037Unit peak time, Tp
hours8.150Unit receding limb, Tr
hours10.187Total unit time, Tb
Page 71 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4- CONCRETE FLUME
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0053.000.0055.00
0.0053.000.0055.50
0.0053.000.0056.00
0.0053.000.0056.30
0.0053.000.0956.50
0.0053.000.5957.00
0.0053.001.3157.50
0.0053.002.2158.00
0.0053.003.2658.50
0.0053.004.4359.00
0.0053.004.9359.20
0.0053.008.8659.50
0.0053.0022.1460.00
0.0053.0042.5160.50
0.0053.0069.9661.00
Contributing Structures
None Contributing
None Contributing
None Contributing
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
Page 72 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4- CONCRETE FLUME
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0053.500.0055.00
0.0053.500.0055.50
0.0053.500.0056.00
0.0053.500.0056.30
0.0053.500.0956.50
0.0053.500.5957.00
0.0053.501.3157.50
0.0053.502.2158.00
0.0053.503.2658.50
0.0053.504.4359.00
0.0053.504.9359.20
0.0053.508.8659.50
0.0053.5022.1460.00
0.0053.5042.5160.50
0.0053.5069.9661.00
Contributing Structures
None Contributing
None Contributing
None Contributing
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
Page 73 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4- CONCRETE FLUME
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0054.000.0055.00
0.0054.000.0055.50
0.0054.000.0056.00
0.0054.000.0056.30
0.0054.000.0956.50
0.0054.000.5957.00
0.0054.001.3157.50
0.0054.002.2158.00
0.0054.003.2658.50
0.0054.004.4359.00
0.0054.004.9359.20
0.0054.008.8659.50
0.0054.0022.1460.00
0.0054.0042.5160.50
0.0054.0069.9661.00
Contributing Structures
None Contributing
None Contributing
None Contributing
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
Page 74 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4- CONCRETE FLUME
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0054.500.0055.00
0.0054.500.0055.50
0.0054.500.0056.00
0.0054.500.0056.30
0.0054.500.0956.50
0.0054.500.5957.00
0.0054.501.3157.50
0.0054.502.2158.00
0.0054.503.2658.50
0.0054.504.4359.00
0.0054.504.9359.20
0.0054.508.8659.50
0.0054.5022.1460.00
0.0054.5042.5160.50
0.0054.5069.9661.00
Contributing Structures
None Contributing
None Contributing
None Contributing
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
Page 75 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4- CONCRETE FLUME
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0055.000.0055.00
0.0055.000.0055.50
0.0055.000.0056.00
0.0055.000.0056.30
0.0055.000.0956.50
0.0055.000.5957.00
0.0055.001.3157.50
0.0055.002.2158.00
0.0055.003.2658.50
0.0055.004.4359.00
0.0055.004.9359.20
0.0055.008.8659.50
0.0055.0022.1460.00
0.0055.0042.5160.50
0.0055.0069.9661.00
Contributing Structures
None Contributing
None Contributing
None Contributing
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
Page 76 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4- CONCRETE FLUME
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0055.500.0055.00
0.0055.500.0055.50
0.0055.500.0056.00
0.0055.500.0056.30
0.0055.500.0956.50
0.0055.500.5957.00
0.0055.501.3157.50
0.0055.502.2158.00
0.0055.503.2658.50
0.0055.504.4359.00
0.0055.504.9359.20
0.0055.508.8659.50
0.0055.5022.1460.00
0.0055.5042.5160.50
0.0055.5069.9661.00
Contributing Structures
SMALL PORTION
None Contributing
None Contributing
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
Page 77 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4- CONCRETE FLUME
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0056.000.0055.00
0.0056.000.0055.50
0.0056.000.0056.00
0.0056.000.0056.30
0.0056.000.0956.50
0.0056.000.5957.00
0.0056.001.3157.50
0.0056.002.2158.00
0.0056.003.2658.50
0.0056.004.4359.00
0.0056.004.9359.20
0.0056.008.8659.50
0.0056.0022.1460.00
0.0056.0042.5160.50
0.0056.0069.9661.00
Contributing Structures
SMALL PORTION
SMALL PORTION
None Contributing
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
Page 78 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4- CONCRETE FLUME
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0056.300.0055.00
0.0056.300.0055.50
0.0056.300.0056.00
0.0056.300.0056.30
0.0056.300.0956.50
0.0056.300.5957.00
0.0056.301.3157.50
0.0056.302.2158.00
0.0056.303.2658.50
0.0056.304.4359.00
0.0056.304.9359.20
0.0056.308.8659.50
0.0056.3022.1460.00
0.0056.3042.5160.50
0.0056.3069.9661.00
Contributing Structures
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
Page 79 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4- CONCRETE FLUME
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0056.500.0055.00
0.0056.500.0055.50
0.0056.500.0056.00
0.0056.500.0056.30
0.0056.500.0056.50
0.0056.500.5557.00
0.0056.501.2857.50
0.0056.502.1858.00
0.0056.503.2358.50
0.0056.504.4059.00
0.0056.504.9059.20
0.0056.508.8359.50
0.0056.5022.1060.00
0.0056.5042.4760.50
0.0056.5069.9261.00
Contributing Structures
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
Page 80 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4- CONCRETE FLUME
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0057.000.0055.00
0.0057.000.0055.50
0.0057.000.0056.00
0.0057.000.0056.30
0.0057.000.0056.50
0.0057.000.0057.00
0.0057.001.0557.50
0.0057.001.9758.00
0.0057.003.0258.50
0.0057.004.2059.00
0.0057.004.7059.20
0.0057.008.6359.50
0.0057.0021.9160.00
0.0057.0042.2860.50
0.0057.0069.7361.00
Contributing Structures
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
SMALL PORTION + V-
NOTCH SLOPED + LARGE
PORTION
Page 81 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0043.000.0053.00
0.0043.0010.6153.50
0.0043.0029.9854.00
0.0043.0055.1154.50
0.0043.0084.8355.00
0.0043.00118.5955.50
0.0043.00152.7156.00
0.0043.00177.2956.50
0.0043.00194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 82 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0043.250.0053.00
0.0043.2510.6153.50
0.0043.2529.9854.00
0.0043.2555.1154.50
0.0043.2584.8355.00
0.0043.25118.5955.50
0.0043.25152.7156.00
0.0043.25177.2956.50
0.0043.25194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 83 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0043.500.0053.00
0.0043.5010.6153.50
0.0043.5029.9854.00
0.0043.5055.1154.50
0.0043.5084.8355.00
0.0043.50118.5955.50
0.0043.50152.7156.00
0.0043.50177.2956.50
0.0043.50194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 84 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0043.750.0053.00
0.0043.7510.6153.50
0.0043.7529.9854.00
0.0043.7555.1154.50
0.0043.7584.8355.00
0.0043.75118.5955.50
0.0043.75152.7156.00
0.0043.75177.2956.50
0.0043.75194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 85 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0044.000.0053.00
0.0044.0010.6153.50
0.0044.0029.9854.00
0.0044.0055.1154.50
0.0044.0084.8355.00
0.0044.00118.5955.50
0.0044.00152.7156.00
0.0044.00177.2956.50
0.0044.00194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 86 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0044.250.0053.00
0.0044.2510.6153.50
0.0044.2529.9854.00
0.0044.2555.1154.50
0.0044.2584.8355.00
0.0044.25118.5955.50
0.0044.25152.7156.00
0.0044.25177.2956.50
0.0044.25194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 87 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0044.500.0053.00
0.0044.5010.6153.50
0.0044.5029.9854.00
0.0044.5055.1154.50
0.0044.5084.8355.00
0.0044.50118.5955.50
0.0044.50152.7156.00
0.0044.50177.2956.50
0.0044.50194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 88 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0044.750.0053.00
0.0044.7510.6153.50
0.0044.7529.9854.00
0.0044.7555.1154.50
0.0044.7584.8355.00
0.0044.75118.5955.50
0.0044.75152.7156.00
0.0044.75177.2956.50
0.0044.75194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 89 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0045.000.0053.00
0.0045.0010.6153.50
0.0045.0029.9854.00
0.0045.0055.1154.50
0.0045.0084.8355.00
0.0045.00118.5955.50
0.0045.00152.7156.00
0.0045.00177.2956.50
0.0045.00194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 90 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0045.250.0053.00
0.0045.2510.6153.50
0.0045.2529.9854.00
0.0045.2555.1154.50
0.0045.2584.8355.00
0.0045.25118.5955.50
0.0045.25152.7156.00
0.0045.25177.2956.50
0.0045.25194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 91 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0045.500.0053.00
0.0045.5010.6153.50
0.0045.5029.9854.00
0.0045.5055.1154.50
0.0045.5084.8355.00
0.0045.50118.5955.50
0.0045.50152.7156.00
0.0045.50177.2956.50
0.0045.50194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 92 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0045.750.0053.00
0.0045.7510.6153.50
0.0045.7529.9854.00
0.0045.7555.1154.50
0.0045.7584.8355.00
0.0045.75118.5955.50
0.0045.75152.7156.00
0.0045.75177.2956.50
0.0045.75194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 93 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0046.000.0053.00
0.0046.0010.6153.50
0.0046.0029.9854.00
0.0046.0055.1154.50
0.0046.0084.8355.00
0.0046.00118.5955.50
0.0046.00152.7156.00
0.0046.00177.2956.50
0.0046.00194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 94 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0046.250.0053.00
0.0046.2510.6153.50
0.0046.2529.9854.00
0.0046.2555.1154.50
0.0046.2584.8355.00
0.0046.25118.5955.50
0.0046.25152.7156.00
0.0046.25177.2956.50
0.0046.25194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 95 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0046.500.0053.00
0.0046.5010.6153.50
0.0046.5029.9854.00
0.0046.5055.1154.50
0.0046.5084.8355.00
0.0046.50118.5955.50
0.0046.50152.7156.00
0.0046.50177.2956.50
0.0046.50194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 96 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0046.750.0053.00
0.0046.7510.6153.50
0.0046.7529.9854.00
0.0046.7555.1154.50
0.0046.7584.8355.00
0.0046.75118.5955.50
0.0046.75152.7156.00
0.0046.75177.2956.50
0.0046.75194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 97 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0047.000.0053.00
0.0047.0010.6153.50
0.0047.0029.9854.00
0.0047.0055.1154.50
0.0047.0084.8355.00
0.0047.00118.5955.50
0.0047.00152.7156.00
0.0047.00177.2956.50
0.0047.00194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 98 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0047.250.0053.00
0.0047.2510.6153.50
0.0047.2529.9854.00
0.0047.2555.1154.50
0.0047.2584.8355.00
0.0047.25118.5955.50
0.0047.25152.7156.00
0.0047.25177.2956.50
0.0047.25194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 99 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0047.500.0053.00
0.0047.5010.6153.50
0.0047.5029.9854.00
0.0047.5055.1154.50
0.0047.5084.8355.00
0.0047.50118.5955.50
0.0047.50152.7156.00
0.0047.50177.2956.50
0.0047.50194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 100 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0047.750.0053.00
0.0047.7510.6153.50
0.0047.7529.9854.00
0.0047.7555.1154.50
0.0047.7584.8355.00
0.0047.75118.5955.50
0.0047.75152.6856.00
0.0047.75177.2956.50
0.0047.75194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 101 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0048.000.0053.00
0.0048.0010.6153.50
0.0048.0030.0054.00
0.0048.0055.1154.50
0.0048.0084.8355.00
0.0048.00118.5955.50
0.0048.00152.6856.00
0.0048.00177.2956.50
0.0048.00194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 102 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0048.250.0053.00
0.0048.2510.6153.50
0.0048.2530.0054.00
0.0048.2555.1154.50
0.0048.2584.8355.00
0.0048.25118.5955.50
0.0048.25152.6856.00
0.0048.25177.2956.50
0.0048.25194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 103 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0048.500.0053.00
0.0048.5010.6153.50
0.0048.5030.3154.00
0.0048.5055.1154.50
0.0048.5084.8355.00
0.0048.50118.5955.50
0.0048.50152.6656.00
0.0048.50177.2956.50
0.0048.50194.3357.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 104 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0048.750.0053.00
0.0048.7510.6153.50
0.0048.7530.0054.00
0.0048.7555.1254.50
0.0048.7584.8355.00
0.0048.75118.5955.50
0.0048.75152.7156.00
0.0048.75177.2956.50
0.0048.75194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 105 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0049.000.0053.00
0.0049.0010.6153.50
0.0049.0030.0054.00
0.0049.0055.1554.50
0.0049.0084.8555.00
0.0049.00118.5955.50
0.0049.00152.7156.00
0.0049.00177.2956.50
0.0049.00194.3657.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 106 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0049.250.0053.00
0.0049.2510.6153.50
0.0049.2530.3754.00
0.0049.2555.1354.50
0.0049.2584.8655.00
0.0049.25118.5955.50
0.0049.25151.4956.00
0.0049.25176.8756.50
0.0049.25194.3357.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 107 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0049.500.0053.00
0.0049.5010.6153.50
0.0049.5030.0054.00
0.0049.5055.0754.50
0.0049.5084.8455.00
0.0049.50118.6155.50
0.0049.50149.5356.00
0.0049.50174.1756.50
0.0049.50191.9457.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 108 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0049.750.0053.00
0.0049.7510.6153.50
0.0049.7530.0054.00
0.0049.7555.1354.50
0.0049.7584.8455.00
0.0049.75118.5955.50
0.0049.75147.4056.00
0.0049.75171.3856.50
0.0049.75188.8157.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 109 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0050.000.0053.00
0.0050.0010.6153.50
0.0050.0030.0054.00
0.0050.0055.1254.50
0.0050.0084.8755.00
0.0050.00118.5955.50
0.0050.00145.1656.00
0.0050.00168.5456.50
0.0050.00185.6857.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 110 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0050.250.0053.00
0.0050.2510.6153.50
0.0050.2530.0054.00
0.0050.2555.1254.50
0.0050.2584.8555.00
0.0050.25118.5955.50
0.0050.25142.7756.00
0.0050.25165.6256.50
0.0050.25182.4357.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 111 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0050.500.0053.00
0.0050.5010.6153.50
0.0050.5030.0054.00
0.0050.5055.1054.50
0.0050.5084.8555.00
0.0050.50118.2255.50
0.0050.50140.2756.00
0.0050.50162.6256.50
0.0050.50179.1557.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 112 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0050.750.0053.00
0.0050.7511.3853.50
0.0050.7530.0054.00
0.0050.7555.1354.50
0.0050.7584.8755.00
0.0050.75116.7955.50
0.0050.75137.6556.00
0.0050.75159.5456.50
0.0050.75175.7857.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 113 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0051.000.0053.00
0.0051.0010.6153.50
0.0051.0030.0354.00
0.0051.0055.0854.50
0.0051.0084.8755.00
0.0051.00114.9455.50
0.0051.00134.9156.00
0.0051.00156.4056.50
0.0051.00172.3357.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 114 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0053.000.0053.00
0.0053.0010.8353.50
0.0053.0029.2554.00
0.0053.0051.0054.50
0.0053.0072.3855.00
0.0053.0091.4555.50
0.0053.00108.0056.00
0.0053.00127.2756.50
0.0053.00141.4857.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Culvert - 2
(no Q: Weir -
Throat,OVERFLOW
CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 115 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: Pond 5
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.0056.500.0053.00
0.0056.500.0053.50
0.0056.500.0054.00
0.0056.500.0054.50
0.0056.500.0055.00
0.0056.500.0055.50
0.0056.500.0056.00
0.0056.500.0056.50
0.0056.5050.8357.00
Contributing Structures
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
(no Q: Weir - Slot,Weir -
Throat,Culvert -
2,OVERFLOW CULVERTS)
Weir - Slot,Weir -
Throat,Culvert - 2 (no Q:
OVERFLOW CULVERTS)
Page 116 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 6 OUTFALL
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.00(N/A)0.0043.00
0.00(N/A)0.6843.50
0.00(N/A)2.0044.00
0.00(N/A)2.7344.50
0.00(N/A)3.3045.00
0.00(N/A)3.7945.50
0.00(N/A)4.2246.00
0.00(N/A)4.6146.50
0.00(N/A)4.9747.00
0.00(N/A)5.3047.50
0.00(N/A)6.6848.00
0.00(N/A)8.9248.50
0.00(N/A)11.7149.00
0.00(N/A)43.8249.50
0.00(N/A)102.3450.00
0.00(N/A)180.3250.50
0.00(N/A)275.7351.00
Contributing Structures
None Contributing
Orifice - 1
Orifice - 1
Orifice - 1
Orifice - 1
Orifice - 1
Orifice - 1
Orifice - 1
Orifice - 1
Orifice - 1 + Weir - SLOT
Orifice - 1 + Weir - SLOT
Orifice - 1 + Weir - SLOT
Orifice - 1 + Weir - SLOT
+ Weir - OVERFLOW
Orifice - 1 + Weir - SLOT
+ Weir - OVERFLOW
Orifice - 1 + Weir - SLOT
+ Weir - OVERFLOW
Orifice - 1 + Weir - SLOT
+ Weir - OVERFLOW
Orifice - 1 + Weir - SLOT
+ Weir - OVERFLOW
Page 117 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND NORTH
Return Event: 100 yearsSubsection: Composite Rating Curve
Composite Outflow Summary
Convergence Error
(ft)
Tailwater Elevation
(ft)
Flow
(ft³/s)
Water Surface
Elevation
(ft)
0.00(N/A)0.0063.00
0.00(N/A)3.1863.50
0.00(N/A)9.0064.00
0.00(N/A)16.5364.50
0.00(N/A)18.3964.61
0.00(N/A)27.1965.00
0.00(N/A)57.8565.50
0.00(N/A)104.8466.00
0.00(N/A)133.0566.26
0.00(N/A)168.7166.50
0.00(N/A)267.5667.00
Contributing Structures
Weir -SLOT
Weir -SLOT
Weir -SLOT
Weir -SLOT
Weir -SLOT
Weir -SLOT + EXISTING
CULVERTS + PROPOSED
WEIR OVERFLOW
Weir -SLOT + EXISTING
CULVERTS + PROPOSED
WEIR OVERFLOW
Weir -SLOT + EXISTING
CULVERTS + PROPOSED
WEIR OVERFLOW
Weir -SLOT + EXISTING
CULVERTS + PROPOSED
WEIR OVERFLOW +
EXISTING GRASS
OVERFLOW
Weir -SLOT + EXISTING
CULVERTS + PROPOSED
WEIR OVERFLOW +
EXISTING GRASS
OVERFLOW
Weir -SLOT + EXISTING
CULVERTS + PROPOSED
WEIR OVERFLOW +
EXISTING GRASS
OVERFLOW
Page 118 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 4
Return Event: 100 yearsSubsection: Interconnected Pond Routing Summary
Infiltration
No InfiltrationInfiltration Method
(Computed)
Initial Conditions Calculation Tolerances
ft57.00Elevation (Starting Water
Surface Computed)
ft³/s0.000Flow Tolerance (Minimum)
ac-ft0.320Volume (Starting)35Maximum Iterations
ft³/s0.59Outflow (Starting)hours0.050ICPM Time Step
1.28760.0112.400
Volume
(ac-ft)
Elevation
(ft)
Time to
Peak
(hours)
Maximum Storage
0.000.000
0.000.000
Flow (Peak)
(ft³/s)
Time to Peak
(hours)
Reverse Flow Peaks
22.5312.400Pond Outflow...
43.6712.150Pond Inflow....
Flow (Peak)
(ft³/s)
Time to Peak
(hours)
Forward Flow Peaks
Forward3.785
Reverse0.000
DirectionVolume
(ac-ft)
Total Volume Out
Reverse0.000Pond Outflow...
Forward3.844Pond Inflow....
DirectionVolume
(ac-ft)
Total Volume In
Mass Balance (ac-ft)
ac-ft0.320Volume (Initial ICPM)
ac-ft3.844Volume (Total In ICPM)
ac-ft3.785Volume (Total Out ICPM)
ac-ft0.378Volume (Ending)
ft57.22Elevation (Ending)
ac-ft0.001Difference
%0.0
Percent of Inflow Volume
(Interconnected Pond Mass
Balance)
Page 119 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 5
Return Event: 100 yearsSubsection: Interconnected Pond Routing Summary
Infiltration
No InfiltrationInfiltration Method
(Computed)
Initial Conditions Calculation Tolerances
ft53.00Elevation (Starting Water
Surface Computed)
ft³/s0.000Flow Tolerance (Minimum)
ac-ft0.000Volume (Starting)35Maximum Iterations
ft³/s0.00Outflow (Starting)hours0.050ICPM Time Step
14.32356.1112.750
Volume
(ac-ft)
Elevation
(ft)
Time to
Peak
(hours)
Maximum Storage
0.000.000
0.000.000
Flow (Peak)
(ft³/s)
Time to Peak
(hours)
Reverse Flow Peaks
145.7312.500Pond Outflow...
361.8612.100Pond Inflow....
Flow (Peak)
(ft³/s)
Time to Peak
(hours)
Forward Flow Peaks
Forward93.276
Reverse0.000
DirectionVolume
(ac-ft)
Total Volume Out
Reverse0.000Pond Outflow...
Forward97.893Pond Inflow....
DirectionVolume
(ac-ft)
Total Volume In
Mass Balance (ac-ft)
ac-ft0.000Volume (Initial ICPM)
ac-ft97.893Volume (Total In ICPM)
ac-ft93.276Volume (Total Out ICPM)
ac-ft4.483Volume (Ending)
ft54.05Elevation (Ending)
ac-ft0.135Difference
%0.1
Percent of Inflow Volume
(Interconnected Pond Mass
Balance)
Page 120 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 6
Return Event: 100 yearsSubsection: Interconnected Pond Routing Summary
Infiltration
No InfiltrationInfiltration Method
(Computed)
Initial Conditions Calculation Tolerances
ft43.00Elevation (Starting Water
Surface Computed)
ft³/s0.000Flow Tolerance (Minimum)
ac-ft0.000Volume (Starting)35Maximum Iterations
ft³/s0.00Outflow (Starting)hours0.050ICPM Time Step
48.87951.0012.950
Volume
(ac-ft)
Elevation
(ft)
Time to
Peak
(hours)
Maximum Storage
0.000.000
0.000.000
Flow (Peak)
(ft³/s)
Time to Peak
(hours)
Reverse Flow Peaks
275.7312.950Pond Outflow...
744.7912.300Pond Inflow....
Flow (Peak)
(ft³/s)
Time to Peak
(hours)
Forward Flow Peaks
Forward126.974
Reverse0.000
DirectionVolume
(ac-ft)
Total Volume Out
Reverse0.000Pond Outflow...
Forward166.404Pond Inflow....
DirectionVolume
(ac-ft)
Total Volume In
Mass Balance (ac-ft)
ac-ft0.000Volume (Initial ICPM)
ac-ft166.404Volume (Total In ICPM)
ac-ft126.974Volume (Total Out ICPM)
ac-ft39.289Volume (Ending)
ft49.53Elevation (Ending)
ac-ft0.141Difference
%0.1
Percent of Inflow Volume
(Interconnected Pond Mass
Balance)
Page 121 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Scenario: Post-Development 100 year, 24 hr
Storm Event: 24 hr (15.84")Label: POND 7 (EX NORTH) (IN)
Return Event: 100 yearsSubsection: Level Pool Pond Routing Summary
Infiltration
No InfiltrationInfiltration Method
(Computed)
Initial Conditions
ft63.00Elevation (Water Surface,
Initial)
ac-ft0.000Volume (Initial)
ft³/s0.00Flow (Initial Outlet)
ft³/s0.00Flow (Initial Infiltration)
ft³/s0.00Flow (Initial, Total)
hours0.050Time Increment
Inflow/Outflow Hydrograph Summary
ft³/s133.86Flow (Peak In)hours12.350Time to Peak (Flow, In)
ft³/s123.53Flow (Peak Outlet)hours12.450Time to Peak (Flow, Outlet)
ft66.17Elevation (Water Surface,
Peak)
ac-ft2.449Volume (Peak)
Mass Balance (ac-ft)
ac-ft0.000Volume (Initial)
ac-ft68.458Volume (Total Inflow)
ac-ft0.000Volume (Total Infiltration)
ac-ft67.243Volume (Total Outlet
Outflow)
ac-ft1.129Volume (Retained)
ac-ft-0.087Volume (Unrouted)
%0.1Error (Mass Balance)
Page 122 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
CM-OFFSITE WEST MIDDLE (Runoff CN-Area, 100 years (Pre-Development 100
year, 24 hr))...57
CM-OFFSITE WEST MIDDLE (Runoff CN-Area, 100 years (Post-Development 100
year, 24 hr))...56
CM-EAST ALL (Unit Hydrograph Summary, 100 years (Pre-Development 100 year,
24 hr))...70, 71
CM-EAST ALL (Time of Concentration Calculations, 100 years (Pre-Development
100 year, 24 hr))...32, 33
CM-EAST ALL (Runoff CN-Area, 100 years (Pre-Development 100 year, 24 hr))...55
CM-DIRECT WEST (Unit Hydrograph Summary, 100 years (Pre-Development 100
year, 24 hr))...68, 69
CM-DIRECT WEST (Unit Hydrograph Summary, 100 years (Post-Development 100
year, 24 hr))...66, 67
CM-DIRECT WEST (Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr))...30, 31
CM-DIRECT WEST (Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr))...28, 29
CM-DIRECT WEST (Runoff CN-Area, 100 years (Pre-Development 100 year, 24
hr))...54
CM-DIRECT WEST (Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr))...53
CM-DIRECT SOUTH (Unit Hydrograph Summary, 100 years (Pre-Development 100
year, 24 hr))...64, 65
CM-DIRECT SOUTH (Unit Hydrograph Summary, 100 years (Post-Development 100
year, 24 hr))...62, 63
CM-DIRECT SOUTH (Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr))...26, 27
CM-DIRECT SOUTH (Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr))...24, 25
CM-DIRECT SOUTH (Runoff CN-Area, 100 years (Pre-Development 100 year, 24
hr))...52
CM-DIRECT SOUTH (Runoff CN-Area, 100 years (Post-Development 100 year, 24
hr))...51
CM-9 (Time of Concentration Calculations, 100 years (Post-Development 100 year,
24 hr))...21, 22, 23
CM-9 (Runoff CN-Area, 100 years (Post-Development 100 year, 24 hr))...50
CM-8 (Time of Concentration Calculations, 100 years (Post-Development 100 year,
24 hr))...19, 20
CM-8 (Runoff CN-Area, 100 years (Post-Development 100 year, 24 hr))...49
CM-7 (Time of Concentration Calculations, 100 years (Post-Development 100 year,
24 hr))...15, 16, 17, 18
CM-7 (Runoff CN-Area, 100 years (Post-Development 100 year, 24 hr))...48
CM-11 (Time of Concentration Calculations, 100 years (Post-Development 100
year, 24 hr))...12, 13, 14
CM-11 (Runoff CN-Area, 100 years (Post-Development 100 year, 24 hr))...47
CM-10 (Time of Concentration Calculations, 100 years (Post-Development 100
year, 24 hr))...10, 11
CM-10 (Runoff CN-Area, 100 years (Post-Development 100 year, 24 hr))...46
C
Index
Page 123 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
SCS NOAA ATLAS 14 (TYPE III) (Time-Depth Curve, 100 years (Pre-Development
100 year, 24 hr))...8, 9
SCS NOAA ATLAS 14 (TYPE III) (Time-Depth Curve, 100 years (Post-Development
100 year, 24 hr))...6, 7
S
POND NORTH (Composite Rating Curve, 100 years (Post-Development 100 year,
24 hr))...118
POND 7 (EX NORTH) (IN) (Level Pool Pond Routing Summary, 100 years (Post-
Development 100 year, 24 hr))...122
POND 6 OUTFALL (Composite Rating Curve, 100 years (Post-Development 100
year, 24 hr))...117
POND 6 (Interconnected Pond Routing Summary, 100 years (Post-Development
100 year, 24 hr))...121
POND 5 (Interconnected Pond Routing Summary, 100 years (Post-Development
100 year, 24 hr))...120
Pond 5 (Composite Rating Curve, 100 years (Post-Development 100 year, 24
hr))...82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, 100,
101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116
POND 4- CONCRETE FLUME (Composite Rating Curve, 100 years (Post-
Development 100 year, 24 hr))...72, 73, 74, 75, 76, 77, 78, 79, 80, 81
POND 4 (Interconnected Pond Routing Summary, 100 years (Post-Development
100 year, 24 hr))...119
P
Master Network Summary...2, 3, 4, 5
M
CM-WEST OFFSITE NORTH (Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr))...44, 45
CM-WEST OFFSITE NORTH (Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr))...42, 43
CM-WEST OFFSITE NORTH (Runoff CN-Area, 100 years (Pre-Development 100
year, 24 hr))...61
CM-WEST OFFSITE NORTH (Runoff CN-Area, 100 years (Post-Development 100
year, 24 hr))...60
CM-OFFSITE WEST -SOUTH (Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr))...40, 41
CM-OFFSITE WEST -SOUTH (Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr))...38, 39
CM-OFFSITE WEST -SOUTH (Runoff CN-Area, 100 years (Pre-Development 100
year, 24 hr))...59
CM-OFFSITE WEST -SOUTH (Runoff CN-Area, 100 years (Post-Development 100
year, 24 hr))...58
CM-OFFSITE WEST MIDDLE (Time of Concentration Calculations, 100 years (Pre-
Development 100 year, 24 hr))...36, 37
CM-OFFSITE WEST MIDDLE (Time of Concentration Calculations, 100 years (Post-
Development 100 year, 24 hr))...34, 35
Page 124 of 12427 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
Bentley PondPack CONNECT Edition
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.ppc
Page 10 of 11
APPENDIX D
Closed System Analysis
FlexTable: Catch Basin Table
Spread / Top
Width
(ft)
Hydraulic Grade
Line (Out)
(ft)
Hydraulic Grade
Line (In)
(ft)
Elevation
(Invert)
(ft)
Elevation (Rim)
(ft)
InletLabel
4.4109.39109.39108.45112.45S1A1
5.169.5669.5668.5073.50YIA2
6.088.7888.7887.7091.70S1A3
5.4109.37109.37108.35112.45S1B1
5.766.7366.7363.7967.79S1B2
6.288.8088.8086.7091.70S1B3
5.1102.45102.45100.20106.63S1C1
5.356.1056.1055.0559.05S1C2
5.780.3980.3979.5983.59S1C3
3.650.1850.1849.0559.05S1D2
4.689.2289.2286.8794.68S1E1
3.978.8478.8476.4581.95S1G1
4.964.7264.7262.2267.72S1I1
7.163.7763.7760.7366.23S1J1
6.167.6267.6266.8170.81S1J2
7.558.7958.7956.0466.04S1K1
7.0113.80113.80113.00117.00S1L2
4.0103.24103.24102.60106.61S1M1
5.3113.69113.69112.70116.70S1M2
6.0108.30108.30107.00112.00YIN1
5.0112.72112.72111.38115.44S1N2
3.9104.00104.00102.32109.52S1O2
8.0104.11104.11100.76105.76S1P1
3.688.7088.7086.5893.46S1P2
4.7102.96102.96100.35105.10S1Q1
5.480.0380.0377.7883.28S1Q2
5.6104.12104.12101.76105.76S1R1
4.5102.96102.96101.10105.10S1S1
5.972.7872.7870.4876.48S1S2
4.391.2891.2890.6394.63S1T1
6.072.0672.0669.6775.67S1T2
5.294.6194.6193.5097.50YIU1
7.2112.77112.77111.48115.48S1V2
3.389.2489.2487.0092.65S1W1
3.9103.99103.99103.51107.51S1W2
4.089.2189.2188.6592.65S1X1
5.0104.04104.04102.52107.52S1X2
4.578.8678.8677.4881.48S1Y1
5.1104.02104.02102.40109.50S1Y2
6.564.6064.6063.7267.72S1Z1
5.288.9888.9888.2392.23S1Z2
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
12/14/2020
StormCAD CONNECT Edition
[10.02.01.04]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.stsw
FlexTable: Catch Basin Table
Spread / Top
Width
(ft)
Hydraulic Grade
Line (Out)
(ft)
Hydraulic Grade
Line (In)
(ft)
Elevation
(Invert)
(ft)
Elevation (Rim)
(ft)
InletLabel
488.4888.4887.0491.04S1A1
173.9373.9372.4978.49S1A2
076.9176.9175.8081.80YIA3
488.5188.5187.1491.03S1B1
175.0175.0174.5978.49S1B2
582.2782.2781.1585.15YIB3
180.7380.7378.2286.22S1C1
164.1264.1262.1669.18S1C2
185.7685.7685.2989.29S1C3
0105.94105.94104.89109.32<None>CB-46
291.6191.6190.6894.68S1CB-48
174.0274.0271.2779.27S1D1
164.0664.0662.7868.28S1D2
184.5184.5182.2989.29S1D3
164.1564.1561.1769.17S1E1
164.7664.7664.3868.28S1E2
185.1185.1183.6189.61S1E3
159.1259.1256.1162.11S1F1
159.4259.4258.2262.12S1F2
790.3490.3488.8892.62YIF3
158.7658.7655.4060.40S1G1
152.4852.4851.6155.51S1G2
4106.86106.86105.41109.31S1G3
358.6158.6155.2060.20S2H1
3106.83106.83105.31109.31S1H3
555.3455.3452.2460.24S1I1
3101.79101.79100.50104.40S1I3
150.7450.7445.5155.51S1J1
1101.74101.74100.40104.40S1J3
193.5893.5891.8797.87S1K3
696.1796.1794.8298.72YIL3
087.8387.8385.9791.97<None>M3
188.8588.8586.9993.99S1N3
489.6089.6088.4393.99S1O3
189.6489.6488.5593.55S1P3
189.9389.9389.5593.55S1Q3
561.5361.5360.5564.55YIU2
466.6766.6765.6071.60YIU4
166.5666.5665.9669.96S1V2
482.2182.2179.7286.22S1W1
366.1666.1664.9669.96S1W2
182.6382.6380.4286.92S1X1
573.0673.0672.0576.05YIX2
183.3583.3582.9286.92S1Y1
176.8476.8476.2480.24S1Y2
173.7973.7972.3779.27S1Z1
576.5276.5275.2480.24S1Z2
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/9/2021
StormCAD CONNECT Edition
[10.02.01.04]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS POND 6 MIDDLE BASIN.stsw
FlexTable: Catch Basin Table
Spread / Top
Width
(ft)
Hydraulic Grade
Line (Out)
(ft)
Hydraulic Grade
Line (In)
(ft)
Elevation
(Invert)
(ft)
Elevation (Rim)
(ft)
InletLabel
260.3160.3158.6562.65S1A4
257.0257.0254.6662.66S1B4
051.8551.8547.7157.71<None>C4
662.7362.7361.1365.13YICB-19
096.1996.1994.8999.89<None>F4
198.5598.5597.25102.60S1G4
298.6598.6597.35102.59S1H4
198.6998.6997.47101.47S1I4
198.6998.6997.57101.47S1J4
293.7593.7592.0696.06S1R3
193.5093.5091.9495.94S1S3
382.1482.1479.7585.25S1T3
687.0687.0685.2191.21YIT4
282.4782.4781.6585.65S1U3
077.6377.6375.6583.65<None>V3
173.3273.3272.6776.67S1W3
169.8069.8067.7375.73S1X3
159.2659.2656.9164.91S1Y3
160.2160.2158.5364.91S1Z3
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/9/2021
StormCAD CONNECT Edition
[10.02.01.04]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS POND 6 NORTH BASIN.stsw
FlexTable: Catch Basin Table
Spread / Top
Width
(ft)
Hydraulic Grade
Line (Out)
(ft)
Hydraulic Grade
Line (In)
(ft)
Elevation
(Invert)
(ft)
Elevation (Rim)
(ft)
InletLabel
250.3650.3647.6951.69S1H2
350.7150.7147.1051.10S2I2
551.4251.4248.0051.89YIJ2
150.3050.3044.8951.29S1K1
254.5554.5552.1756.84S1K2
182.2882.2879.1983.07S1K4
350.6550.6545.6051.10S2L1
155.0555.0552.2956.29S1L2
181.5581.5579.0983.07S1L4
151.3551.3546.8651.86S1M1
155.0855.0852.3956.29S1M2
062.9362.9360.5764.47S1M4
152.0052.0048.3356.41S1N1
062.2862.2860.4864.48S1N4
152.3652.3649.2358.68S1O1
354.1254.1252.7456.74S2O2
060.8460.8459.4263.42<None>O4
352.6152.6149.9556.74S2P1
357.3557.3555.9460.94S1P2
157.3057.3054.0558.36S1P4
052.7252.7250.3957.01<None>Q1
560.1260.1259.2963.29YIQ2
257.3757.3754.1558.15S1Q4
052.8352.8350.7559.43<None>R1
157.5757.5757.0461.04S1R2
056.1656.1653.1957.19<None>R4
052.9152.9150.9459.86<None>S1
459.3859.3858.3562.35S1S2
066.1966.1962.2166.21S1S4
052.9752.9751.3659.00<None>T1
259.4059.4058.4562.45S1T2
253.1753.1751.6856.00S1U1
153.2053.2052.0056.00S1V1
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/10/2021
StormCAD CONNECT Edition
[10.02.01.04]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS POND 6 SOUTH BASIN.stsw
FlexTable: Manhole Table
Hydraulic Grade
Line (In)
(ft)
Hydraulic Grade
Line (Out)
(ft)
Elevation (Invert
in 1)
(ft)
Elevation (Rim)
(ft)
Label
97.5797.5795.63100.63D1
87.5287.5285.1790.67F1
69.0969.0966.7172.21H1
77.2577.2575.0080.77R2
104.29104.29103.00108.00O1
89.4189.4187.4592.45V1
66.8566.8564.9668.96K2
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
12/14/2020
StormCAD CONNECT Edition
[10.02.01.04]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.stsw
FlexTable: Conduit Table
Slope
(%)
Invert Out
(ft)
Invert In
(ft)
Diameter
(in)
Length
(ft)
Pipe
-0.385108.45108.3518.026.01
4.970100.20108.3518.0164.02
2.67395.63100.2024.0171.03
5.65286.8795.6324.0155.04
1.88985.1786.8730.090.05
4.07576.4585.1730.0214.06
3.76166.7176.4530.0259.07
3.45462.2266.7130.0130.08
4.02760.7362.2230.037.09
0.69760.5060.7336.033.010
6.49550.0056.0436.093.011
0.385102.50102.6018.026.012
3.030103.00107.0024.0132.013
11.200100.76103.0024.020.014
0.304100.35100.7624.0135.015
0.405100.20100.3524.037.016
3.846100.76101.7618.026.017
2.885100.35101.1018.026.018
0.50090.5090.6318.026.019
4.58387.4593.5018.0132.020
0.33687.0087.4524.0134.021
0.31786.8787.0030.041.022
6.34687.0088.6518.026.023
3.81576.4577.4812.027.024
5.76962.2263.7218.026.025
2.77163.7968.5018.0170.026
1.71960.7363.7918.0178.027
1.62563.7964.9618.072.028
0.38554.9555.0518.026.029
1.41948.0049.0518.074.030
0.600112.70113.0018.050.035
1.119111.38112.7018.0118.036
3.190102.32111.3818.0284.037
4.58986.58102.3230.0343.038
3.16577.7886.5830.0278.039
2.69975.0077.7830.0103.040
3.47770.4875.0030.0130.041
1.76169.6770.4836.046.042
4.56160.0069.6736.0212.043
0.323111.38111.4818.031.044
3.808102.52103.5118.026.045
0.316102.40102.5224.038.046
0.308102.32102.4030.026.048
3.84686.7087.7018.026.049
0.31686.5886.7024.038.050
4.02486.5888.2318.041.051
6.46477.7879.5918.028.052
1.25964.9666.8118.0147.053
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
12/14/2020
StormCAD CONNECT Edition
[10.02.01.04]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS WEST.stsw
FlexTable: Conduit Table
MaterialSlope
(ft/ft)
Invert Out
(ft)
Invert In
(ft)
Diameter
(in)
Length
(ft)
Pipe
Concrete0.00387.0487.1424.0291
Concrete0.01782.2287.0424.02832
Concrete0.02171.2778.2236.03253
Concrete0.03261.1771.2736.03204
Concrete0.02356.1161.1742.02255
Concrete0.00655.4056.1148.01236
Concrete0.00555.2055.4048.0407
Concrete0.00455.0055.2048.0518
Concrete0.03545.5152.2448.01929
Concrete0.01943.0045.5148.013210
Concrete0.00351.5151.6118.02943
Concrete0.03461.1762.1630.02944
Concrete0.01662.1662.7824.03945
Concrete0.05562.7864.3818.02946
Concrete0.01862.7864.9624.012347
Concrete0.03464.9665.9618.02948
Concrete0.03964.9665.6018.01749
Concrete0.05065.6072.0518.012950
Concrete0.05278.2279.7236.02959
Concrete0.01879.7280.4236.03960
Concrete0.08780.4282.9218.02961
Concrete0.07272.4974.5918.02962
Concrete0.00372.3772.4930.03963
Concrete0.01580.4282.2930.012664
Concrete0.08082.2983.6124.01765
Concrete0.03983.6188.8824.013766
Concrete0.04175.8081.1518.013267
Concrete0.04484.0085.2924.02968
Concrete0.03475.2476.2418.02969
Concrete0.03475.2475.8018.01770
Concrete0.02272.4975.2424.012371
Concrete0.03871.2772.3730.02972
Concrete0.07356.1158.2218.02973
Concrete0.02458.2260.5524.09974
Concrete0.02682.2985.9730.014286
Concrete0.02685.9786.9930.03987
Concrete0.05086.9988.4318.02988
Concrete0.00388.4388.5518.03989
Concrete0.02193.8794.8218.04690
Concrete0.003100.40100.5018.02991
Concrete0.004105.31105.4118.02692
Concrete0.03986.9991.8724.012693
Concrete0.03491.87100.4018.024894
Concrete0.003104.89105.3118.014095
Concrete0.03488.5589.5518.02997
Concrete0.021100.40104.8918.0219CO-1
Concrete0.01887.0490.6818.0208CO-5
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/9/2021
StormCAD CONNECT Edition
[10.02.01.04]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS POND 6 MIDDLE BASIN.stsw
FlexTable: Conduit Table
MaterialSlope
(ft/ft)
Invert Out
(ft)
Invert In
(ft)
Diameter
(in)
Length
(ft)
Pipe
Concrete0.00397.4797.5718.02951
Concrete0.00397.3597.4718.03952
Concrete0.00397.2597.3524.02953
Concrete0.06094.8997.2524.03954
Concrete0.01492.0694.8924.020355
Concrete0.00491.9492.0624.03056
Concrete0.04585.2191.9424.014857
Concrete0.03779.7585.2124.014858
Concrete0.00479.5079.7530.06476
Concrete0.01081.2581.6518.04077
Concrete0.02371.7372.6718.04078
Concrete0.00458.4058.5330.02979
Concrete0.00358.5358.6530.03980
Concrete0.03254.6656.9130.06981
Concrete0.01951.7154.6630.015282
Concrete0.04743.0047.7130.010183
Concrete0.03467.7375.6530.023684
Concrete0.02260.7067.7330.032385
Concrete-0.02061.1358.6518.0121CO-2
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/9/2021
StormCAD CONNECT Edition
[10.02.01.04]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS POND 6 NORTH BASIN.stsw
FlexTable: Conduit Table
MaterialSlope
(ft/ft)
Invert Out
(ft)
Invert In
(ft)
Diameter
(in)
Length
(ft)
Pipe
Concrete0.00544.8945.6048.014511
Concrete0.00845.6046.8642.015512
Concrete0.00846.8648.3342.018013
Concrete0.00348.3349.2342.029814
Concrete0.00349.2349.9542.023815
Concrete0.00349.9550.3936.014616
Concrete0.00350.3950.7536.012017
Concrete0.00350.7550.9436.06318
Concrete0.00350.9451.3630.013919
Concrete0.00351.3651.6824.010520
Concrete0.00351.6852.0018.010521
Concrete0.03950.9455.9424.012922
Concrete0.02255.9459.2918.014923
Concrete0.03255.9457.0418.03424
Concrete0.01055.9458.3518.024025
Concrete0.00358.3558.4518.03426
Concrete0.02652.0052.7418.02927
Concrete0.00552.0052.1724.03729
Concrete0.00352.1752.2924.03930
Concrete0.00352.2952.3918.02931
Concrete0.00752.2953.1924.013132
Concrete0.00753.1954.0524.012933
Concrete0.00354.0554.1518.03334
Concrete0.01854.0559.4224.029735
Concrete-0.01760.4859.4218.06336
Concrete0.00360.4860.5718.02937
Concrete0.01260.5762.2118.014138
Concrete0.02446.8648.0024.04839
Concrete0.01846.5947.1018.02940
Concrete0.00547.5047.6918.04041
Concrete0.01643.0044.8948.011842
Concrete0.00379.0979.1918.02998
Concrete0.18679.1982.1718.016CO-3
Concrete0.00679.0079.0918.016CO-4
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/10/2021
StormCAD CONNECT Edition
[10.02.01.04]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS POND 6 SOUTH BASIN.stsw
Page 11 of 11
APPENDIX E
Drainage Swales Analysis
Trapezoidal Channel (FAIRHOPE FALLS PH 5 SWALES.fm8)
Normal Depth
(in)
Channel Slope
(ft/ft)
Roughness
Coefficient
Friction MethodSolve ForLabel
7.30.0250.030Manning FormulaNormal DepthSWALE A
11.00.0050.030Manning FormulaNormal DepthSWALE B
9.90.0030.030Manning FormulaNormal DepthSWALE C
5.80.0200.030Manning FormulaNormal DepthSWALE D
Wetted
Perimeter
(ft)
Flow Area
(ft²)
Discharge
(cfs)
Bottom Width
(ft)
Right Side Slope
(H:V)
Left Side Slope
(H:V)
6.82.913.013.003.0003.000
8.85.313.013.003.0003.000
8.24.58.143.003.0003.000
6.02.17.533.003.0003.000
Velocity Head
(ft)
Velocity
(ft/s)
Critical Slope
(ft/ft)
Critical Depth
(in)
Top Width
(ft)
Hydraulic Radius
(in)
0.314.440.0178.06.655.1
0.092.460.0178.08.517.2
0.051.820.0196.17.936.6
0.193.520.0195.95.894.3
MessagesNotesFlow TypeFroude NumberSpecific Energy
(ft)
Supercritical1.1780.91
Subcritical0.5521.01
Subcritical0.4250.87
Supercritical1.0280.67
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
FlowMaster
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS PH 5 SWALES.fm8
FAIRHOPE FALLS PH 6-9 SWALES
Normal Depth
(in)
Channel Slope
(ft/ft)
Roughness
Coefficient
Friction MethodSolve ForLabel
6.60.0120.030Manning FormulaNormal DepthSWALE E
8.20.0220.030Manning FormulaNormal DepthSWALE F
8.20.0290.030Manning FormulaNormal DepthSWALE G
6.10.0230.030Manning FormulaNormal DepthSWALE H
5.50.0110.030Manning FormulaNormal DepthSWALE I
7.80.0150.030Manning FormulaNormal DepthSWALE J
6.40.0170.030Manning FormulaNormal DepthSWALE K
5.70.0260.030Manning FormulaNormal DepthSWALE L
1.50.0260.030Manning FormulaNormal DepthSWALE M
6.00.0150.030Manning FormulaNormal DepthSWALE N
4.70.0360.030Manning FormulaNormal DepthSWALE O
1.50.0360.030Manning FormulaNormal DepthSWALE P
3.70.4200.030Manning FormulaNormal DepthSWALE Q
6.90.0300.030Manning FormulaNormal DepthSWALE R
8.00.0280.030Manning FormulaNormal DepthSWALE S
2.00.0220.030Manning FormulaNormal DepthSWALE T
Wetted
Perimeter
(ft)
Flow Area
(ft²)
Discharge
(cfs)
Bottom Width
(ft)
Right Side Slope
(H:V)
Left Side Slope
(H:V)
6.52.67.533.003.0003.000
7.33.415.323.003.0003.000
7.33.517.753.003.0003.000
6.22.38.833.003.0003.000
5.92.05.033.003.0003.000
7.13.211.453.003.0003.000
6.42.48.333.003.0003.000
6.02.18.333.003.0003.000
3.80.40.783.003.0003.000
6.22.26.843.003.0003.000
5.51.66.843.003.0003.000
3.80.40.873.003.0003.000
4.91.214.853.003.0003.000
6.72.713.053.003.0003.000
7.23.316.343.003.0003.000
4.10.61.213.003.0003.000
Velocity Head
(ft)
Velocity
(ft/s)
Critical Slope
(ft/ft)
Critical Depth
(in)
Top Width
(ft)
Hydraulic Radius
(in)
0.132.940.0195.96.314.7
0.314.450.0178.77.105.7
0.415.120.0179.57.125.7
0.233.840.0196.46.054.4
0.102.530.0204.65.734.1
0.203.580.0187.46.885.4
0.183.420.0196.26.184.6
0.243.940.0196.25.864.2
0.051.840.0281.53.751.3
0.143.050.0195.65.994.4
0.274.190.0195.65.353.6
0.072.130.0271.63.731.3
Page 1 of 227 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
FlowMaster
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS PH 6-9 SWALES.fm8
FAIRHOPE FALLS PH 6-9 SWALES
Velocity Head
(ft)
Velocity
(ft/s)
Critical Slope
(ft/ft)
Critical Depth
(in)
Top Width
(ft)
Hydraulic Radius
(in)
2.4112.450.0178.64.832.9
0.354.760.0178.06.474.9
0.384.930.0179.06.985.5
0.062.040.0261.94.011.7
MessagesNotesFlow TypeFroude NumberSpecific Energy
(ft)
Subcritical0.8120.69
Supercritical1.1250.99
Supercritical1.2921.09
Supercritical1.0990.74
Subcritical0.7590.55
Subcritical0.9260.85
Subcritical0.9600.71
Supercritical1.1560.72
Subcritical0.9620.18
Subcritical0.8800.64
Supercritical1.3380.66
Supercritical1.1330.19
Supercritical4.4172.71
Supercritical1.2900.93
Supercritical1.2621.04
Subcritical0.9350.23
Page 2 of 227 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
1/13/2021
FlowMaster
[10.00.00.02]
Bentley Systems, Inc. Haestad Methods Solution
CenterFAIRHOPE FALLS PH 6-9 SWALES.fm8
INDEX
1. CONTACT INFORMATION
2. VICINITY MAP
3. STORM WATER FACILITY MAINTENANCE AGREEMENT
CITY OF FAIRHOPE, ALABAMA
4. EXHIBIT A - LEGAL DESCRIPTION OF PROPERTY
5. EXHIBIT B – COPY OF PLAT
6. EXHIBIT C – MAINTINANCE PLAN
7. EXHIBIT D – MAINTENANCE CHECKLISTS
CONTACT INFORMATION
OWNER
ENTITY NAME: 68V Paydirt, LLC.
CONTACT PERSON: Nathan Cox
ADDRESS: 29891 Woodrow Lane, Spanish Fort, AL 36527
TELEPHONE NO.: 251-625-1198
ENGINEER
ENTITY NAME: Dewberry Engineers, Inc.
CONTACT PERSON: Jason Estes, P.E.
ADDRESS: 25353 Friendship Road, Daphne, Alabama 36526
TELEPHONE NO.: 251-929-9789
VICINITY
MAP
City of Fairhope, Alabama
Storm Water Facility Maintenance Agreement
THIS STORM WATER FACILITY MAINTENANCE AGREEMENT (this “Agreement”) is
made, executed and entered into this _____ day of _________________, 2020, by
______________________________ (hereinafter called “Landowner”), to and for the benefit of the City of
Fairhope, Alabama, a municipal corporation organized under the laws of the State of Alabama (hereinafter
called the “City”).
Recitals:
WHEREAS, Landowner is the owner of that certain real property located in Baldwin County,
Alabama and more particularly described on Exhibit “A” attached hereto and by reference made a part
hereof (the “Property”);
WHEREAS, Landowner is in the process and constructing and developing a subdivision on the
Property to be known as Fairhope Falls, Phase 6 (the “Subdivision”);
WHEREAS, Landowner has applied with the City for preliminary plat approval for the plat of the
Subdivision, a copy of which is attached hereto as Exhibit “B” (the “Plat”);
WHEREAS, as a condition to the preliminary approval of the Plat, the City requires the
construction and improvement of certain storm water management facilities as shown and referenced on the
Plat and/or otherwise approved by the City in writing (the “Facilities”);
WHEREAS, as a further condition to the approval of the Plat, the City requires that the Facilities
be constructed and adequately maintained by Landowner, its successors and assigns, including any
homeowners association formed by Landowner for purposes of managing and maintaining any common
areas of the Subdivision (the “Association”);
Agreement:
NOW THEREFORE, for and in consideration of the premises and other good and valuable
consideration, the receipt, adequacy and sufficiency of which are hereby acknowledged, Landowner and
the City, intending to be legally bound, hereby covenant and agree as follows:
1. Landowner shall construct and improve the Facilities strictly in accordance with the plans
and specifications therefor (a) set forth on the Plat and/or (b) otherwise approved by the City in writing.
Landowner acknowledges and agrees that the completion of construction of the Facilities is a condition to
the City’s final approval of the Plat; provided, however, that in the event the City allows Landowner to
provide a bond or other guarantee of completion of the Facilities, the Facilities shall be completed at least
thirty (30) days prior to the expiration of said bond or other guarantee.
2. Landowner shall maintain the Facilities in such condition that the Facilities properly
operate, function and perform (as designed by a professional engineer) for their intended purpose(s), which
maintenance shall include, at a minimum, all maintenance required by all laws and ordinances of the City,
the maintenance plan attached hereto as Exhibit “C”, all items set forth on the Maintenance Checklist
(hereinafter defined), and such other maintenance as is customary in Baldwin County, Alabama with
respect to substantially similar stormwater management facilities. As used herein, the term “Facilities”
shall include, without limitation, all pipes, channels or other conveyances built to convey storm water to the
Facilities, as well as all storm water structures, improvements, and vegetation provided to control the
quantity and quality of storm water that discharges from the Property. In connection with Landowner’s
maintenance of the Facilities, Landowner shall follow and comply with the Storm Water Structural Control
Maintenance Checklists attached hereto as Exhibit “D” and incorporated herein by reference
(“Maintenance Checklist”).
3. Landowner shall inspect the Facilities and submit an inspection report every five years.
Said inspections shall be conducted at the sole expense of Landowner by a professional engineer registered
in the State of Alabama and reasonably acceptable to the City and which inspection report shall be certified
by said engineer to the City, which form of certification shall be reasonably acceptable to the City. The
first inspection report is due by December 31st of the fifth year after completion of construction of the
Facilities and subsequent inspection reports are due by December 31st of every successive fifth year
thereafter. Each inspection report shall detail the then-current state of effectiveness of the Facilities and
shall note any deficiencies in the Facilities and/or any portion or component thereof. The purpose of the
inspection reports is to assure safe and proper operation and functioning of the Facilities.
4. Landowner hereby grants an irrevocable license to the City and its authorized agents and
employees to enter upon the Property and to inspect the Facilities whenever the City deems necessary. The
City shall provide Landowner copies of any inspection findings of the City. In the event the City finds any
deficiencies in the Facilities, whether as a result of the inspection reports required under Paragraph 3 hereof
or as a result of a City inspection conducted in accordance with this Paragraph, the City shall have the right,
but not the obligation, to issue a written notice to Landowner of any such deficiencies. In the event the
City issues any such deficiency notice, Landowner shall cure any such deficiencies within the time set forth
for such deficiencies required by applicable law (whether federal, state, local or otherwise) and in any event
within thirty (30) days of its receipt of such notice.
5. In the event Landowner fails to maintain the Facilities in good working condition
acceptable to the City and in accordance with the terms and conditions hereof, the City shall have the right,
but not the obligation, to enter upon the Property and take whatever steps are necessary to correct and bring
the Facilities into good working condition and to charge the costs of such repairs to Landowner; provided,
however, that in no event shall the foregoing be construed as to allow the City to erect any structure of
permanent nature on the Property outside of the easement or other areas for the Facilities as shown on the
Plat. It is expressly understood and agreed that the City is under no obligation to maintain or repair the
Facilities and in no event shall this Agreement be construed to impose any such obligation on the City.
6. In the event the City pursuant to this Agreement, performs work of any nature, or
expends any funds in performance of said work for labor, use of equipment, supplies, materials, and the
like, Landowner shall reimburse the City for all such costs and expenses within thirty (30) days of
Landowner’s receipt of the City’s written demand therefor. Any sums not reimbursed to the City within
said thirty (30) day period shall accrue interest at the rate of twelve percent (12%) per annum.
7. In the event of the employment of an attorney for the collection of any amount due
hereunder or for the institution of any valid suit for the enforcement of any of the terms and conditions
hereof, or on account of or for any other reason in connection herewith, Landowner covenants and agrees to
pay and reimburse the City for its reasonable attorney’s fees incurred in connection therewith.
8. This Agreement imposes no liability of any kind whatsoever on the City and Landowner
covenants and agrees to defend, indemnify and hold the City harmless from and against any and all
liability, loss, cost, damage and expense (including reasonable attorney’s fees) in the event the Facilities
fail to operate properly, whether as a result of improper design, maintenance or otherwise.
9. This Agreement shall be recorded in the records of the Probate Court of Baldwin County,
Alabama and shall constitute a covenant running with the land and shall be binding on Landowner and its
successors and assigns with regard to any interest in the Property, including, without limitation, the
Association. It is expressly contemplated hereby that Landowner may convey the Facilities to the
Association in which event the Association shall be obligated to perform all duties and obligations of
“Landowner” hereunder.
10. Landowner represents and warrants to the City that Landowner is the sole and absolute
owner of the Property and is properly authorized to enter into this Agreement.
11. This Agreement shall be construed in accordance with the laws of the State of Alabama.
12. This Agreement may be executed in multiple counterparts by original or facsimile
signatures, and each such counterpart shall be considered an original, but all of which together shall
constitute one and the same agreement.
13. In the event of a default by Landowner hereunder, the City shall be entitled to all rights
and remedies provided under applicable state law, including the right of specific performance.
14. This Agreement shall be binding upon and inure to the benefit of the parties hereto and
their respective successors and assigns.
15. This Agreement shall not be construed more strictly against one party than against the
other merely by virtue of the fact that it may have been prepared by counsel for one of the parties, it being
recognized that all parties have contributed substantially and materially to the preparation of this
Agreement.
16. Each notice, request, and communication required under this Agreement shall be in
writing. It will be deemed to have been received: (i) on personal delivery; (ii) on the second business day
after its deposit for overnight delivery with a recognized overnight delivery service; (iii) if by facsimile, on
receipt of electronic confirmation of its receipt (but only if the facsimile is followed by delivery by United
States mail); or (iv) if mailed, on actual receipt (but only if sent by registered or certified mail, with return
receipt requested, addressed to the other party’s address below):
If to the City: City of Fairhope, Alabama
Attn: Planning Director
555 South Section Street
Fairhope, Alabama 36532
If to Landowner: __________________________
Attn:_____________________
__________________________
__________________________
Any party hereto may change its address for notice hereunder by giving notice to the other party in
accordance with the foregoing. Any such change in address shall be effective ten (10) days following
receipt of such notice by the receiving party.
17. Time is of the essence with respect to each obligation of the parties hereto under this
Agreement.
18. The foregoing constitutes the entire agreement between the parties with respect to the
subject matter hereof and may not be modified or amended except in a writing signed by all of the parties
hereto. To the extent that this Agreement differs in any manner whatsoever from prior written or oral
agreements regarding the subject matter hereof, or from any documents which are attached hereto, the
terms and conditions of this Agreement shall control.
[Remainder of Page Intentionally Left Blank]
IN WITNESS WHEREOF, Landowner have caused this Agreement to be executed by and
through its duly authorized representatives effective as of the date first set forth above.
LANDOWNER:
[Insert name of Landowner]
By:______________________________________
Name:______________________________
As Its:_____________________________
STATE OF ______________:
COUNTY OF ____________:
I, the undersigned Notary Public in and for said County in said State, hereby certify that
___________________, whose name as ___________ of ____________________________, a
___________________, is signed to the foregoing instrument and who is known to me, acknowledged
before me on this day that, being informed of the contents of the instrument, he/she, as such
_____________ and with full authority, executed the same voluntarily on the day the same bears date for
and as the act of said _________________________.
Given under my hand and official notarial seal this ____ day of __________, 2020.
{SEAL} __________________________________________
NOTARY PUBLIC
My Commission Expires:___________________
EXHIBIT A
FAIRHOPE FALLS, PHASE 6
LEGAL DESCRIPTION
FAIRHOPE FALLS, PHASE 6
PROPERTY DESCRIPTION
COMMENCE AT A 5/8" CAPPED REBAR (PLS 10675) AT THE SOUTHEAST CORNER OF SECTION 7,
TOWNSHIP 6 SOUTH, RANGE 3 EAST AND RUN THENCE NORTH 89°57'23" WEST, A DISTANCE OF
1330.56 FEET TO A 1/2" A CAPPED REBAR (CA-0089-LS); THENCE RUN NORTH 00°29'27" EAST, A
DISTANCE OF 1321.10 FEET TO A 1/2" CAPPED REBAR FOR THE POINT OF BEGINNING: THENCE RUN
NORTH 89°50'29" WEST, A DISTANCE OF 1303.79 FEET TO A 5/8" REBAR ON THE EAST RIGHT-OF-
WAY OF LANGFORD ROAD; THENCE RUN NORTH 00°31'02" EAST, ALONG SAID EAST RIGHT OF
WAY OF LANGFORD ROAD, A DISTANCE OF 209.54 FEET; THENCE RUN NORTH 89°42'28" EAST, A
DISTANCE OF 25.00 FEET; THENCE RUN NORTH 00°31'02" EAST, A DISTANCE OF 135.01 FEET;
THENCE RUN NORTH 89°42'28" EAST, A DISTANCE OF 1484.77 FEET; THENCE RUN SOUTH 00°17'32"
EAST, A DISTANCE OF 47.50 FEET; THENCE RUN NORTH 89°42'28" EAST, A DISTANCE OF 130.00
FEET; THENCE RUN NORTH 00°17'32" WEST, A DISTANCE OF 417.50 FEET; THENCE RUN NORTH
89°42'28" EAST, A DISTANCE OF 55.00 FEET; THENCE RUN NORTH 00°17'32" WEST, A DISTANCE OF
130.00 FEET; THENCE RUN NORTH 32°42'28" EAST, A DISTANCE OF 20.99 FEET; THENCE RUN NORTH
16°33'17" EAST, A DISTANCE OF 140.00 FEET; THENCE RUN ALONG A CURVE TO THE LEFT, HAVING
A RADIUS OF 650.00 FEET, AN ARC DISTANCE OF 21.73 FEET, (CHORD BEARS SOUTH 74°24'12" EAST,
21.73 FEET); THENCE RUN ALONG A REVERSE CURVE TO THE RIGHT, HAVING A RADIUS OF 25.00
FEET, AN ARC DISTANCE OF 33.05 FEET, (CHORD BEARS SOUTH 37°29'13" EAST, 30.70 FEET);
THENCE RUN SOUTH 00°23'13" WEST, A DISTANCE OF 120.06 FEET; THENCE RUN SOUTH 89°36'47"
EAST, A DISTANCE OF 50.00 FEET; THENCE RUN NORTH 00°23'13" EAST, A DISTANCE OF 102.53
FEET; THENCE RUN ALONG A CURVE TO THE RIGHT, HAVING A RADIUS OF 25.00 FEET, AN ARC
DISTANCE OF 41.72 FEET, (CHORD BEARS NORTH 48°12'00" EAST, 37.05 FEET); THENCE RUN ALONG
A REVERSE CURVE TO THE LEFT, HAVING A RADIUS OF 650.00 FEET, AN ARC DISTANCE OF 10.31
FEET, (CHORD BEARS SOUTH 84°26'29" EAST, 10.31 FEET); THENCE RUN SOUTH 84°53'45" EAST, A
DISTANCE OF 102.63 FEET; THENCE RUN SOUTH 00°23'13" WEST, A DISTANCE OF 562.17 FEET;
THENCE RUN SOUTH 37°13'17" EAST, A DISTANCE OF 214.89 FEET; THENCE RUN NORTH 48°17'12"
EAST, A DISTANCE OF 139.74 FEET; THENCE RUN SOUTH 41°41'57" EAST, A DISTANCE OF 631.73
FEET; THENCE RUN SOUTH 00°11'12" WEST, A DISTANCE OF 297.32 FEET; THENCE RUN NORTH
89°48'48" WEST, A DISTANCE OF 454.34 FEET; THENCE RUN NORTH 50°21'50" WEST, A DISTANCE OF
140.00 FEET; THENCE RUN SOUTH 39°38'10" WEST, A DISTANCE OF 16.06 FEET; THENCE RUN NORTH
50°21'50" WEST, A DISTANCE OF 180.00 FEET; THENCE RUN NORTH 39°38'10" EAST, A DISTANCE OF
68.10 FEET; THENCE RUN NORTH 28°26'11" EAST, A DISTANCE OF 50.00 FEET; THENCE RUN ALONG
A CURVE TO THE RIGHT, HAVING A RADIUS OF 150.00 FEET, AN ARC DISTANCE OF 12.50 FEET,
(CHORD BEARS SOUTH 59°10'31" EAST, 12.50 FEET); THENCE RUN NORTH 33°12'47" EAST, A
DISTANCE OF 140.00 FEET; THENCE RUN ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF
290.00 FEET, AN ARC DISTANCE OF 166.49 FEET, (CHORD BEARS NORTH 73°14'02" WEST, 164.21
FEET); THENCE RUN NORTH 89°40'48" WEST, A DISTANCE OF 401.70 FEET; THENCE RUN SOUTH
02°31'00" WEST, A DISTANCE OF 6.29 FEET; THENCE RUN NORTH 89°40'50" WEST, A DISTANCE OF
195.75 FEET; THENCE RUN SOUTH 45°31'53" WEST, A DISTANCE OF 15.19 FEET TO THE POINT OF
BEGINNING. TRACT CONTAINS 28.42 ACRES, MORE OR LESS, AND LIES IN SECTION 7, TOWNSHIP 6
SOUTH, RANGE 3 EAST, BALDWIN COUNTY, ALABAMA.
EXHIBIT B
FAIRHOPE FALLS, PHASE 6
COPY OF PLAT (NOT FINAL RECORDED DOCUMENT)
PHASE 6
FAIRHOPE FALLS WEST
25353 Friendship Road Daphne, AL 36526
251.990.9950 fax 251.929-9815
37
101
102
103
SOP
H
I
E
F
A
L
L
S
A
V
E
N
U
E
154
155
156
157
158
159
160
161
152
153
151
37
101
102
103
SOP
H
I
E
F
A
L
L
S
A
V
E
N
U
E
154
155
156
157
158
159
160
161
152
153
151
237 238 239 240 241 242 243 244 245 246 247 248
249
250
251
252
253
254
255
LEGEND:
ZONE X (SHADED)
REGULATORY
FLOOWAY
ZONE AE
B AAMALA
MAG E RIT
OVI
C
R L.NC.A. 2POINT OF COMMENCEMENTLANGFORD ROAD (60' R/W)YOSEMI
T
E
B
O
U
L
E
V
A
R
DC.A. 8C.A. 12C.A. 10C.A. 14
C.A. 15
PHASE 4 (APPROVED)
POINT OF BEGINNING
EXHIBIT C
FAIRHOPE FALLS, PHASE 6
MAINTENANCE PLAN
The following plan outlines the ongoing long-term maintenance activities for the stormwater
management system components at the Fairhope Falls, Phase 6 subdivision. Note that all
stormwater facilities located outside of the City of Fairhope’s Right of Way will be subject to the
requirements in this maintenance plan. Access to the detention pond is located within recorded
common areas. Access to these common areas and easements are from the right-of-way (See Plat
for additional information).
STORMWATER MANAGEMENT SYSTEM DESCRIPTION
The purpose of the stormwater management system in Fairhope Falls, Phase 6 is to provide a
sustainable approach to managing stormwater runoff from the developed areas of the site. The
stormwater management system at Fairhope Falls, Phase 6 utilizes best management practices
(BMP). The purposes of BMP’s are to maintain the original site hydrology as much as possible
by minimizing surface run-off and reducing the contaminants in the stormwater. The system
consists of the following components:
· RETENTION POND
Fairhope Falls, Phase 6, uses one retention pond to detain the stormwater runoff to the pre-
developed runoff rate. The pond is wet pond with a 100-yr release rate totaling 275.73 cfs
that discharges to existing wetlands to the south. In addition to detaining runoff the pond is
designed to perform a water quality function as well.
The pond will discharge through a concrete outlet structure to release the pre-developed flow
for the 2, 5, 10, 25, 50, and 100-year storm events. The discharge from the pond will be
released to the south of the property where it will continue its original path. The release for
Fairhope Falls, Phase 6 will have no adverse effects downstream.
The primary maintenance objective is to maintain the side slopes and prevent siltation of the
pond. This is accomplished through regular landscape maintenance and protection of inlets
from runoff with high suspended solids.
· DRAINAGE STRUCTURES
The drainage system of Fairhope Falls, Phase 6 also includes pipes, inlets, headwalls, and
an outfall structure. The Property Owners Association shall maintain all drainage features
that fall outside of the public right of way.
The primary maintenance objective is to prevent any obstructions in the flow of water
through the system and maintain the integrity of the structures themselves. This can be
accomplished by routine inspection and cleaning of the structures.
· GRASS SWALES
The drainage system incorporates the use of drainage swales behind lots. The Property
Owners Association shall maintain all drainage features that fall outside of the public right of
way.
The primary maintenance objective is to prevent any obstructions in the flow of water
through the swales and maintain the integrity of the swales themselves. This can be
accomplished by routine inspection for debris and periodic mowing.
Be advised that this work is the responsibility of the Home Owners Association or Property
Owners. The Engineer assumes no responsibility for either performing this work or
verifying that it is being completed. The Homeowners Association or Property Owners
shall review Article V Section F 3 a 3b City of Fairhope Regulations, which contains the
inspection responsibilities and potential consequences (enforcement action) for not
fulfilling the inspection responsibilities.
EXHIBIT D
FAIRHOPE FALLS, PHASE 6
MAINTENANCE CHECKLISTS
Stormwater Pond Inspections and Maintenance Checklist
Site Name: ___________________________________ Owner change since last inspection? Y N
Location: _____________________________________________________________________________
Owner Name: _________________________________________________________________________
Address: _________________________________________ Phone Number: _____________________
Site Status: ___________________________________________________________________________
Date: _____________ Time: ______________ Site conditions: ____________________________
Stormwater Pond Type: Wet Pond Wet ED Pond Micropool Pond
Multiple Pond System Dry Pond
Inspection Frequency Key: A=annual; M=monthly; S=after major storms
Inspection Items Inspection Frequency Inspected? (Yes/No) Maintenance Needed? (Yes/No) Comments/Description
Embankment
Vegetation healthy? A/S
Erosion on embankment? A/S
Animal burrows in embankment? A/S
Cracking, sliding, bulging of dam? A/S
Drains entering pond blocked or not
functioning? A/S
Leaks or seeps on embankment? A/S
Slope protection failure functional? A/S
Other (describe) A/S
Outfall Structure Box
Low-flow orifice functional? A/S
Concrete/masonry condition (Cracks
or displacement? Spalling?) A
Outfall pipe in good condition? A
Rip Rap Filter Bern in good
condition? A
Inspection Items Inspection Frequency Inspected? (Yes/No) Maintenance Needed? (Yes/No) Comments/Description
Outfall channels function, not
eroding? A
Rip Rap at the end of the outfall pipe
in good condition (No signs of
erosion)
A
Other (describe) A
Hazards
Have there been complaints from
residents?
M
Public hazards noted? M
Inspector Comments:
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
__________
Overall Condition of Facility: Acceptable Unacceptable
If any of the inspection items above are checked “yes” for “maintenance needed,” list maintenance actions and the
completion dates below:
Maintenance Action Needed Due Date
The next routine inspection is scheduled for approximately: ______________________
(date)
Inspected by: (signature) __________________________________________
Inspected by: (printed) ____________________________________________
Swales / Grass Channels Inspections and Maintenance Checklist
Site Name: __________________________________ Owner change since last inspection? Y N
Location: _____________________________________________________________________________
Owner Name: _________________________________________________________________________
Address: _______________________________________ Phone Number: _______________________
Site Status: ___________________________________________________________________________
Date: __________________ Time: ______________ Inspector: ____________________________
Inspection Frequency Key: A=annual; M=monthly; S=after major storms
Inspection Items Inspection Frequency Inspected? (Yes/No) Maintenance Needed? (Yes/No) Comments/Description
Debris Removal
Facility and adjacent area free of
debris? M
Inlets and outlets free of debris? M
Any dumping of yard wastes into
facility?
Litter (branches) removed? M
Vegetation
Surrounding area fully stabilized?
(no evidence of eroding material
into swale, channel or filter strip)
M
Grass mowed? M
Plan composition according to
approved plan? M
Filtration Capacity
Clogging from oil or grease? M
Facility dewaters between storms? M
Inspection Items Inspection Frequency Inspected? (Yes/No) Maintenance Needed? (Yes/No) Comments/Description
Sediment Deposition
Swale clean of sediments A
Sediment not >20% of swale
design depth A
Outfall Ditch Downstream of Outfall Pipe
In good condition? A
Any evidence of erosion? A
Any evidence of blockages? A
Has facility been filled or blocked
inappropriately? A
Inspector Comments:
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
__________
Overall Condition of Facility: Acceptable Unacceptable
If any of the above Inspection Items are checked “yes” for “maintenance needed,” list maintenance actions and their
completion dates below:
Maintenance Action Needed Due Date
The next routine inspection is scheduled for approximately: ______________________
(date)
Inspected by: (signature) __________________________________________
Inspected by: (printed) ____________________________________________
Level Spreader Inspections and Maintenance Checklist
Site Name: ___________________________________ Owner change since last inspection? Y N
Location: _____________________________________________________________________________
Owner Name: _________________________________________________________________________
Address: _________________________________________ Phone Number: _____________________
Site Status: ___________________________________________________________________________
Date: _____________ Time: ______________ Site conditions: ____________________________
Inspection Frequency Key: A=annual; M=monthly; S=after major storms
Inspection Items Inspection Frequency Inspected? (Yes/No) Maintenance Needed? (Yes/No) Comments/Description
Sediment Removal
Is there an accumulation of sediment? A
Is it functioning properly? A
Erosion Inspection
Evidence of erosion at or around
spreader? A
Vegetation Removal
Is vegetation present on level
spreader? M
Is vegetation adversely affecting
spreader? M
Inspector Comments:
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
Overall Condition of Facility: Acceptable Unacceptable
If any of the inspection items above are checked “yes” for “maintenance needed,” list maintenance actions and the
completion dates below:
TRAFFIC IMPACT ANALYSIS
for
Fairhope Falls West
Final Report
April 2020
Prepared by:
FAIRHOPE FALLS WEST SILVERHILL, AL
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec1_intro.doc
TABLE OF CONTENTS
Section ....................................................................................................................................................... Page No.
Section 1 Introduction ...................................................................................................1 - 1
Figure 1.1 Project Location Map ........................................................................1 - 2
Section 2 Existing Conditions .........................................................................................2 - 1
2.1 Langford Road............................................................................................................2 -1
2.2 AL Highway 104.........................................................................................................2 - 1
2.3 Intersection of AL Highway 104 and Langford Road...................................................2 - 1
2.4 Intersection of AL Highway 104 and Yosemite Boulevard...........................................2 - 1
Section 3 Evaluation of Existing Conditions ...................................................................3 - 1
3.1 Existing Traffic Volumes.............................................................................................3 - 1
Table 3.1 Historical Daily Traffic Volumes........................................................3 - 1
Figure 3.1 Existing Traffic Volumes....................................................................3 - 2
3.2 Basis of Analysis........................................................................................................3 -3
3.3 AL Highway 104 and Langford Road..........................................................................3 - 3
Figure 3.2 Existing Intersection Level-of-Service ...............................................3 - 3
3.4 AL Highway 104 and Yosemite Boulevard..................................................................3 - 4
Figure 3.3 Existing Intersection Level-of-Service ...............................................3 - 4
Section 4 Proposed Development ..................................................................................4 - 1
4.1 Proposed Site.............................................................................................................4 -1
Figure 4.1 Proposed Site Plan..............................................................................4 - 2
4.2 Trip Generation ..........................................................................................................4 -3
Table 4.1 Trip Generation ...................................................................................4 - 3
Figure 4.2 Site Traffic Assignment........................................................................4 - 4
4.3 Non-Site Traffic Forecast............................................................................................4 - 5
4.4 Year 2027 Total Traffic...............................................................................................4 - 5
Figure 4.3 2027 Non-Site Traffic...........................................................................4 - 6
Figure 4.4 2027 Total Traffic ................................................................................4 - 7
4.5 Year 2027 Traffic Analysis..........................................................................................4 - 8
Table 4.3 Year 2027 Non-Site Traffic Level-of-Service........................................4 - 8
Table 4.4 Year 2027 Total Traffic Level-of-Service..............................................4 - 8
Section 5 Recommendations and Conclusions ...............................................................5-1
5.1 Auxiliary Lane Warrants .............................................................................................5 - 1
Table 5.1 Improved Level-of-Service..........................................................................5 - 1
5.3 Conclusions................................................................................................................5-1
Figure 5.1 Recommended Improvements.............................................................5 - 2
FAIRHOPE FALLS WEST SILVERHILL, AL
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec1_intro.doc
Appendix
Year 2020 Existing Traffic Volumes
Peak Hour Volumes and Trip Distribution
Year 2020 HCS Analysis
Year 2027 HCS Analysis
Auxiliary Lane Warrant Worksheets
FAIRHOPE FALLS WEST SILVERHILL, AL
1 - 1
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec1_intro.doc
Section 1 Introduction
This report summarizes the findings of the traffic analysis performed by Neel-Schaffer, Inc. as
requested by 68V Development Services, LLC for the construction of Fairhope Falls West. The
project site is located along Langford Road, south of AL Highway 104 in Silverhill, Alabama.
Development of the site is planned to include the construction of a 391-lot single family
subdivision.
The purpose of this analysis is to estimate the trip generation potential for the project site and
evaluate the impact of the site traffic on adjacent roadways and intersections. Based on these
impacts, recommended improvements were evaluated to mitigate traffic concerns as they relate
to the site development. To analyze the related impact to the surrounding area, existing
roadway capacity and non-site traffic levels-of-service were also evaluated.
FAIRHOPE FALLS WEST SILVERHILL, AL
2 - 1
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec2_Xconditions.doc
Section 2 Existing Conditions
The project site is located southeast of the intersection of AL Highway 104 and Langford Road.
Currently, the site is a mix of agricultural land and wooded areas. Direct access to the property is
limited to Langford Road and through the existing Fairhope Falls subdivision.
The study area is comprised of four intersections: AL Highway 104 with Langford Road, AL Highway
104 with Yosemite Boulevard, Langford Road with North Driveway and Langford Road with South
Driveway.
2.1 Langford Road
Langford Road is an undivided two-lane roadway. Langford Road has a typical section that consists
of two 12-foot travel lanes with an open drainage system. Langford Road is not a functionally
classified roadway and has a posted speed of 45 miles per hour in the vicinity of the project site.
Langford Road appears to be a partial cut through for those traveling west and avoiding traffic near St.
Michael’s High School and AL Highway 181.
2.2 AL Highway 104
AL Highway 104 is an undivided two-lane highway. AL Highway 104 has a typical section that
consists of two 12-foot travel lanes and two-foot paved shoulders in each direction with an open
drainage system. AL Highway 104 is functionally classified as a minor arterial and has a posted
speed limit of 55 miles per hour in the vicinity of the project site.
2.4 Intersection of AL Highway 104 and Langford Road
The intersection of AL Highway 104 and Langford Road is an unsignalized “T” intersection. All
approaches to the intersection are single lane approaches. The northbound approach is currently
stop controlled.
2.5 Intersection of AL Highway 104 and Yosemite Boulevard
The intersection of AL Highway 104 and Yosemite Boulevard is an unsignalized intersection. AL
Highway 104 widens to provide an eastbound right turn and a westbound left turn auxiliary lane. The
northbound approach is a divided two-lane roadway. The southbound approach is a driveway. The
northbound and southbound approaches are currently stop controlled.
FAIRHOPE FALLS WEST SILVERHILL, AL
3 - 1
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec3_Xanalysis.doc
Section 3 Evaluation of Existing Conditions
3.1 Existing Traffic Volumes
The project area for this analysis includes the unsignalized intersections of AL Highway 104 with
Langford Road and AL Highway 104 with Yosemite Boulevard along with the future one-way
stop-controlled intersections of Langford Road with the new North Residential Entrance Road
and South Residential Entrance Road. Turning movement counts conducted on March 12,
2020 were utilized for this study. These counts were conducted before the local restrictions for
COVID-19 were put into place. A review of the historical 24-hour daily traffic volumes from
ALDOT traffic counts was conducted to see the historical impacts of traffic growth on the
roadways adjacent to the project site. The comparison of traffic volumes is provided in Table
3.1.
Table 3.1 – Historical Daily Traffic Volumes
Year Location
AL Hwy 104 S of Langford Rd
CR48 W of Lanford Rd
2018 10,195 3,475
2017 10,030 3,440
2016 10,360 3,510
2015 7,460 4,870
2014 7,180 4,770
2013 5,270 3,990
2012 2,890
2011 813
2010 5,410
2009 5,400
Annual Growth Factor 7.31%-2.73%
A review of the historical traffic counts in the area seem to show a flattening of the growth or a
decrease in volume of the last three years. Based on this data, a 2.00% compounded annual
growth rate was used to forecast non-site traffic from Year 2020 to Year 2027. Figure 3.1
illustrates the Year 2020 Existing Traffic Volumes.
FAIRHOPE FALLS WEST SILVERHILL, AL
3 - 3
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec3_Xanalysis.doc
3.2 Basis of Analysis
From a performance perspective, the effective operation of an intersection is evaluated based
on the delay, turning movement volumes, traffic composition and roadway geometrics. The
methodology utilized in this analysis is based on the Highway Capacity Manual, 6
th Edition.
Intersection level-of-service is based on delay per vehicle (in seconds). The level-of-service, as
outlined in the Manual, is reported as a letter designation of LOS A through F (A is the least
delay and F is the most delay). The delay range for signalized intersections and unsignalized
intersections (roundabouts, all-way and two-way) is as follows:
Signalized Intersections Unsignalized Intersections
LOS Delay (s/veh) LOS Delay (s/veh)
A ≤ 10 A ≤ 10
B > 10 – 20 B > 10 – 15
C > 20 – 35 C > 15 – 25
D > 35 – 55 D > 25 – 35
E> 55–80 E>35–50
F> 80 F> 50
The Highway Capacity Software was used to evaluate the existing peak hour traffic volumes at
the unsignalized intersections. Analysis was not complete for the new intersections since they
are not in existence.
3.3 AL Highway 104 and Langford Road
AL Highway 104 and Langford Road intersection levels-of-service, based on the Year 2020
traffic volumes, are illustrated in Figure 3.2. This analysis is based on a unsignalized
intersection.
Figure 3.2 – Existing Intersection Level-of-Service
AL Highway 104 and Langford Road
The intersection of currently operating at acceptable levels-of-service.
FAIRHOPE FALLS WEST SILVERHILL, AL
3 - 4
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec3_Xanalysis.doc
3.4 AL Highway 104 and Yosemite Boulevard
AL Highway 104 and Yosemite Boulevard intersection levels-of-service, based on the Year
2020 traffic volumes, are illustrated in Figure 3.3. This analysis is based on a unsignalized
intersection.
Figure 3.3 – Existing Intersection Level-of-Service
AL Highway 104 and Yosemite Boulevard
The intersection of currently operating at acceptable levels-of-service.
FAIRHOPE FALLS WEST SILVERHILL, AL
4 - 1
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec4_Panalysis.doc
Section 4 Proposed Development
4.1 Proposed Site
The site is currently planned to be developed with 391 single family lots. The proposed
residential lots are planned to have two new accesses to Langford Road and tie to the existing
Fairhope Falls to the east.
Figure 4-1 illustrates the proposed site plan for this development.
FAIRHOPE FALLS WEST SILVERHILL, AL
4 - 3
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec4_Panalysis.doc
4.2 Trip Generation
The trip generation of the single-family detached housing was developed using the trip rates
contained in the Institute of Transportation Engineers Trip Generation, 10
th Edition. The site
traffic was assigned based on the demographic distribution in the study area and on the
roadways that provide access to the project site. The trip generation calculation for the
proposed site traffic are shown in Table 4.1.
Table 4. 1 – Trip Generation
Daily
Trips
AM Peak Hour PM Peak Hour
Land Use Intensity Total In Out Total In Out
Single-Family Detached
Housing 391 Dwelling
Units 3,645 282 71 211 376 237 139
Daily Traffic Generation
Single-Family Detached Housing [ITE 210] =
Ln(T)=0.92*Ln(X) + 2.71;
(50%in/50%out)
AM Peak Hour Traffic Generation
Single-Family Detached Housing [ITE 210] =
T=0.71(x) + 4.80;
(25%in/75%out)
PM Peak Hour Traffic Generation
Single-Family Detached Housing [ITE 210]=
Ln(T)=0.96*Ln(X) + 0.20;
(63%in/37%out)
Source: ITE Trip Generation, 10th Edition
The estimated site traffic volumes are illustrated in Figure 4.2.
FAIRHOPE FALLS WEST SILVERHILL, AL
4 - 5
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec4_Panalysis.doc
4.3 Non-Site Traffic Forecast
A 2.00% compounded annual growth rate was used to forecast non-site traffic from Year 2020
to Year 2027 for the study intersections as discussed previously in Section 3.1. Figure 4.3
illustrates the Year 2027 Non-Site Traffic Volumes.
4.4 Year 2027 Total Traffic
Site generated traffic volumes were added to non-site traffic volumes to arrive at total (Year
2027) traffic volumes. Figure 4.4 illustrates the Year 2027 total traffic volumes.
FAIRHOPE FALLS WEST SILVERHILL, AL
4 - 8
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec4_Panalysis.doc
4.5 Year 2027 Traffic Analysis
An analysis of the Year 2027 Non-Site and Total traffic volumes was conducted using the
information provided in the Highway Capacity Manual, Sixth Edition. The lane geometry and
traffic control for the total traffic analysis includes the existing roadway geometrics. The results
of the analysis are shown in Table 4.3 and Table 4.4.
Table 4.3 – Year 2027 Non-Site Traffic Level-of-Service
Unsignalized
Intersection
Peak
Hour
Level-of-Service – Delay (sec/veh)
Northbound Southbound Eastbound Westbound Total
AL Hwy 104 /
Langford Rd
AM E–35 - A–1 A–4 -
PM C – 17 -A – 1 A – 2 -
AL Hwy 104 /
Yosemite Blvd
AM C–18 C–18 A–1 A–1 -
PM B–15 B–11 A–1 A-1 -
Table 4.4 – Year 2027 Total Traffic Level-of-Service
Unsignalized
Intersection
Peak
Hour
Level-of-Service – Delay (sec/veh)
Northbound Southbound Eastbound Westbound Total
AL Hwy 104 /
Langford Rd
AM F – 363 - A – 1 A – 4 -
PM F – 75 -A – 1 A – 4 -
AL Hwy 104 /
Yosemite Blvd
AM C–19 C–19 A–1 A–1 -
PM C–15 B–12 A–1 A–1 -
Langford Rd /
North Driveway
AM A–1 A–1 - B–11 -
PM A–1 A–3 - B–11 -
Langford Rd /
South Driveway
AM A–1 A–1 - B–10 -
PM A–1 A–3 - B–11 -
The northbound approach of the intersection of AL Highway 104 and Langford Road is
anticipated to operate at capacity/failing levels-of-service due to the heavy volumes on AL
Highway 104. All other intersections are anticipated to operate at acceptable levels-of-service
in Year 2027 with the construction of the subdivision.
FAIRHOPE FALLS WEST SILVERHILL, AL
5 - 1
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec5_Precom.doc
Section 5 Recommendations and Conclusions
5.1 Auxiliary Lane Warrants
The traffic volumes at the intersections of AL Highway 104 with Langford Road, Langford Road
and North Driveway, and Langford Road and South Driveway were evaluated to determine if
auxiliary lane warrants are met utilizing the ALDOT Access Management Manual and the
National Cooperative Highway Research Program (NCHRP) Report 457, Evaluating Intersection
Improvements: An Engineering Study Guide. The intersection of AL Highway 104 and Langford
Road does meet the requirements for both a westbound left turn lane and an eastbound right
turn lane as established in the ALDOT Access Management Manual. The traffic counts
collected in March 2020 show that both auxiliary lanes are warranted with the existing traffic.
The new planned driveways onto Langford Road do not meet the requirements for auxiliary
lanes as established in NCHRP Report 457.
The Highway Capacity Software was utilized to analyze the levels-of-service for the intersection
of AL Highway 104 and Langford Road with the construction of an eastbound right turn lane, a
westbound left turn lane, and a northbound left turn lane. The analysis was performed on the
Total Year 2027 traffic volumes. The results of the analysis are shown in Table 5.1.
Table 5.1 – Improved Level-of-Service
Unsignalized
Intersection
Peak
Hour
Level-of-Service – Delay (sec/veh)
Northbound Southbound Eastbound Westbound Total
AL Hwy 104 /
Langford Rd
AM D – 32 - A – 1 A – 2 -
PM C – 15 -A – 1 A – 2 -
5.2 Conclusions
Development of the project site with a 391-single family lot subdivision is not anticipated to
create additional capacity related deficiencies along the existing roadways that cannot be
mitigated. The northbound approach of Langford Road to AL Highway 104 is anticipated to
operate at capacity/failing levels-of-service during Year 2027 with and without the development.
Construction of auxiliary turn lanes at this intersection will mitigate the failing levels-of-service.
It is recommended that the intersection of AL Highway 104 and Langford Road be widened to
accommodate a northbound left turn lane, an eastbound right turn lane, and a westbound left
turn lane. Figure 5.1 illustrates the recommended improvements.
FAIRHOPE FALLS WEST SILVERHILL, AL
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec5_Precom.doc
Appendix
Year 2020 Existing Traffic Volumes
Peak Hour Volumes and Trip Distribution
Year 2020 HCS Analysis
Year 2027 HCS Analysis
Auxiliary Lane Warrant Worksheets
FAIRHOPE FALLS WEST SILVERHILL, AL
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec5_Precom.doc
Year 2020 Existing Traffic Volumes
ĂůĚǁŝŶŽƵŶƚLJ͕>
Classified Turn Movement Count
^ŝƚĞϮŽĨϮ
Langford Rd
Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)
>Ăƚͬ>ŽŶŐ
30.545487°, -87.810012°
ĂƚĞ
Thursday, March 12, 2020
tĞĂƚŚĞƌ
Mostly Cloudy
67°F
0600 - 0900 (Weekday 3h Session) (12-03-2020)
All vehicles 1 23 456 78 9
1234 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West) AL-104 (East)
Left Right U-Turn App Thru Right U-Turn App Left Thru U-Turn App Int
TIME 2.1 2.2 2.3 Total 2.4 2.5 2.6 Total 2.7 2.8 2.9 Total Total
0600 - 0615 4 3 0 7 30 1 0 31 7 44 0 51 89
0615 - 0630 15 4 0 19 25 1 0 26 8 44 0 52 97
0630 - 0645 8 8 0 16 34 3 0 37 10 74 0 84 137
0645 - 0700 10 15 0 25 37 2 0 39 25 82 0 107 171
Hourly Total 37 30 0 ϲϳ 126 7 0 ϭϯϯ 50 244 0 Ϯϵϰ ϰϵϰ
0700 - 0715 15 9 0 24 40 3 0 43 32 121 0 153 220
0715 - 0730 14 9 0 23 51 5 0 56 45 138 0 183 262
0730 - 0745 8 19 0 27 77 7 0 84 53 138 0 191 302
0745 - 0800 4 12 0 16 54 2 0 56 44 95 0 139 211
Hourly Total 41 49 0 ϵϬ 222 17 0 Ϯϯϵ 174 492 0 ϲϲϲ ϵϵϱ
0800 - 0815 8 15 0 23 53 5 0 58 23 93 0 116 197
0815 - 0830 5 6 0 11 45 2 0 47 19 77 0 96 154
0830 - 0845 5 10 0 15 60 1 0 61 17 79 0 96 172
0845 - 0900 7 5 0 12 51 6 0 57 14 77 0 91 160
Hourly Total 25 36 0 ϲϭ 209 14 0 ϮϮϯ 73 326 0 ϯϵϵ ϲϴϯ
Grand Total 103 115 0 Ϯϭϴ 557 38 0 ϱϵϱ 297 1062 0 ϭϯϱϵ ϮϭϳϮ
Approach % 47.25 52.75 0.00 - 93.61 6.39 0.00 - 21.85 78.15 0.00 -
Intersection % 4.74 5.29 0.00 10.04 25.64 1.75 0.00 27.39 13.67 48.90 0.00 62.57
1500 - 1800 (Weekday 3h Session) (12-03-2020)
All vehicles
1234 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West) AL-104 (East)
Left Right U-Turn App Thru Right U-Turn App Left Thru U-Turn App Int
TIME 2.1 2.2 2.3 Total 2.4 2.5 2.6 Total 2.7 2.8 2.9 Total Total
1500 - 1515 7 10 0 17 69 2 0 71 18 78 0 96 184
1515 - 1530 8 25 0 33 90 9 0 99 16 89 0 105 237
1530 - 1545 4 23 0 27 98 6 0 104 16 75 0 91 222
1545 - 1600 3 16 0 19 84 8 0 92 19 79 0 98 209
Hourly Total 22 74 0 ϵϲ 341 25 0 ϯϲϲ 69 321 0 ϯϵϬ ϴϱϮ
1600 - 1615 8 27 0 35 107 9 0 116 12 74 0 86 237
1615 - 1630 6 22 0 28 100 13 0 113 20 68 0 88 229
1630 - 1645 3 18 0 21 81 9 0 90 16 87 0 103 214
1645 - 1700 5 13 0 18 85 9 0 94 11 74 0 85 197
Hourly Total 22 80 0 ϭϬϮ 373 40 0 ϰϭϯ 59 303 0 ϯϲϮ ϴϳϳ
1700 - 1715 7 15 0 22 88 9 0 97 16 75 0 91 210
1715 - 1730 7 27 0 34 110 11 0 121 20 77 0 97 252
1730 - 1745 4 25 0 29 96 11 0 107 17 75 0 92 228
1745 - 1800 3 14 0 17 89 9 0 98 14 59 0 73 188
Hourly Total 21 81 0 ϭϬϮ 383 40 0 ϰϮϯ 67 286 0 ϯϱϯ ϴϳϴ
Grand Total 65 235 0 ϯϬϬ 1097 105 0 ϭϮϬϮ 195 910 0 ϭϭϬϱ ϮϲϬϳ
Approach % 21.67 78.33 0.00 - 91.26 8.74 0.00 - 17.65 82.35 0.00 -
Intersection % 2.49 9.01 0.00 11.51 42.08 4.03 0.00 46.11 7.48 34.91 0.00 42.39
ĂůĚǁŝŶŽƵŶƚLJ͕>
Classified Turn Movement Count
^ŝƚĞϮŽĨϮ
Langford Rd
Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)
>Ăƚͬ>ŽŶŐ
30.545487°, -87.810012°
ĂƚĞ
Thursday, March 12, 2020
tĞĂƚŚĞƌ
Mostly Cloudy
67°F
0600 - 0900 (Weekday 3h Session) (12-03-2020)
Bikes 1 23 456 78 9
1234 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West) AL-104 (East)
Left Right U-Turn App Thru Right U-Turn App Left Thru U-Turn App Int
TIME 2.1 2.2 2.3 Total 2.4 2.5 2.6 Total 2.7 2.8 2.9 Total Total
0600 - 0615 0 0 0 0 000000 000
0615 - 0630 0 0 0 0 000000 000
0630 - 0645 0 0 0 0 000000 000
0645 - 0700 0 0 0 0 000000 000
Hourly Total 0 0 0 Ϭ 000Ϭ 00 0ϬϬ
0700 - 0715 0 0 0 0 000000 000
0715 - 0730 0 0 0 0 000000 000
0730 - 0745 0 0 0 0 000000 000
0745 - 0800 0 0 0 0 000000 000
Hourly Total 0 0 0 Ϭ 000Ϭ 00 0ϬϬ
0800 - 0815 0 0 0 0 000000 000
0815 - 0830 0 0 0 0 000000 000
0830 - 0845 0 0 0 0 000000 000
0845 - 0900 0 0 0 0 000000 000
Hourly Total 0 0 0 Ϭ 000Ϭ 00 0ϬϬ
Grand Total 0 0 0 Ϭ 000Ϭ 00 0ϬϬ
Approach % 0.00 0.00 0.00 - 0.00 0.00 0.00 - 0.00 0.00 0.00 -
Intersection % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1500 - 1800 (Weekday 3h Session) (12-03-2020)
Bikes
1234 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West) AL-104 (East)
Left Right U-Turn App Thru Right U-Turn App Left Thru U-Turn App Int
TIME 2.1 2.2 2.3 Total 2.4 2.5 2.6 Total 2.7 2.8 2.9 Total Total
1500 - 1515 0 0 0 0 000000 000
1515 - 1530 0 0 0 0 000000 000
1530 - 1545 0 0 0 0 000000 000
1545 - 1600 0 0 0 0 000000 000
Hourly Total 0 0 0 Ϭ 000Ϭ 00 0ϬϬ
1600 - 1615 0 0 0 0 000000 000
1615 - 1630 0 0 0 0 000000 000
1630 - 1645 0 0 0 0 000000 000
1645 - 1700 0 0 0 0 000000 000
Hourly Total 0 0 0 Ϭ 000Ϭ 00 0ϬϬ
1700 - 1715 0 0 0 0 000000 000
1715 - 1730 0 0 0 0 000000 000
1730 - 1745 0 0 0 0 000000 000
1745 - 1800 0 0 0 0 000000 000
Hourly Total 0 0 0 Ϭ 000Ϭ 00 0ϬϬ
Grand Total 0 0 0 Ϭ 000Ϭ 00 0ϬϬ
Approach %0.00 0.00 0.00 -0.00 0.00 0.00 - 0.00 0.00 0.00 -
Intersection %0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ĂůĚǁŝŶŽƵŶƚLJ͕>
Classified Turn Movement Count
^ŝƚĞϮŽĨϮ
Langford Rd
Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)
>Ăƚͬ>ŽŶŐ
30.545487°, -87.810012°
ĂƚĞ
Thursday, March 12, 2020
tĞĂƚŚĞƌ
Mostly Cloudy
67°F
0600 - 0900 (Weekday 3h Session) (12-03-2020)
Passenger Vehicles (1-3)1 23 456 78 9
1234 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West) AL-104 (East)
Left Right U-Turn App Thru Right U-Turn App Left Thru U-Turn App Int
TIME 2.1 2.2 2.3 Total 2.4 2.5 2.6 Total 2.7 2.8 2.9 Total Total
0600 - 0615 4 3 0 7 29 1 0 30 7 43 0 50 87
0615 - 0630 15 4 0 19 25 1 0 26 7 43 0 50 95
0630 - 0645 8 8 0 16 33 3 0 36 10 72 0 82 134
0645 - 0700 10 15 0 25 35 2 0 37 24 82 0 106 168
Hourly Total 37 30 0 ϲϳ 122 7 0 ϭϮϵ 48 240 0 Ϯϴϴ ϰϴϰ
0700 - 0715 15 8 0 23 38 3 0 41 31 120 0 151 215
0715 - 0730 14 9 0 23 49 5 0 54 42 134 0 176 253
0730 - 0745 8 19 0 27 73 6 0 79 52 135 0 187 293
0745 - 0800 4 11 0 15 53 2 0 55 42 91 0 133 203
Hourly Total 41 47 0 ϴϴ 213 16 0 ϮϮϵ 167 480 0 ϲϰϳ ϵϲϰ
0800 - 0815 8 14 0 22 52 5 0 57 21 92 0 113 192
0815 - 0830 5 4 0 9 43 2 0 45 16 76 0 92 146
0830 - 0845 5 10 0 15 58 1 0 59 16 76 0 92 166
0845 - 0900 7 4 0 11 49 5 0 54 14 74 0 88 153
Hourly Total 25 32 0 ϱϳ 202 13 0 Ϯϭϱ 67 318 0 ϯϴϱ ϲϱϳ
Grand Total 103 109 0 ϮϭϮ 537 36 0 ϱϳϯ 282 1038 0 ϭϯϮϬ ϮϭϬϱ
Approach % 48.58 51.42 0.00 - 93.72 6.28 0.00 - 21.36 78.64 0.00 -
Intersection % 4.89 5.18 0.00 10.07 25.51 1.71 0.00 27.22 13.40 49.31 0.00 62.71
1500 - 1800 (Weekday 3h Session) (12-03-2020)
Passenger Vehicles (1-3)
1234 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West) AL-104 (East)
Left Right U-Turn App Thru Right U-Turn App Left Thru U-Turn App Int
TIME 2.1 2.2 2.3 Total 2.4 2.5 2.6 Total 2.7 2.8 2.9 Total Total
1500 - 1515 6 10 0 16 68 2 0 70 17 76 0 93 179
1515 - 1530 8 23 0 31 88 9 0 97 16 87 0 103 231
1530 - 1545 3 22 0 25 94 6 0 100 16 73 0 89 214
1545 - 1600 3 16 0 19 80 8 0 88 18 77 0 95 202
Hourly Total 20 71 0 ϵϭ 330 25 0 ϯϱϱ 67 313 0 ϯϴϬ ϴϮϲ
1600 - 1615 8 26 0 34 98 8 0 106 11 71 0 82 222
1615 - 1630 6 22 0 28 99 12 0 111 20 66 0 86 225
1630 - 1645 3 17 0 20 80 9 0 89 16 83 0 99 208
1645 - 1700 5 13 0 18 84 9 0 93 11 73 0 84 195
Hourly Total 22 78 0 ϭϬϬ 361 38 0 ϯϵϵ 58 293 0 ϯϱϭ ϴϱϬ
1700 - 1715 7 15 0 22 82 9 0 91 16 75 0 91 204
1715 - 1730 7 27 0 34 107 11 0 118 19 77 0 96 248
1730 - 1745 4 25 0 29 94 11 0 105 17 75 0 92 226
1745 - 1800 3 13 0 16 86 9 0 95 14 59 0 73 184
Hourly Total 21 80 0 ϭϬϭ 369 40 0 ϰϬϵ 66 286 0 ϯϱϮ ϴϲϮ
Grand Total 63 229 0 ϮϵϮ 1060 103 0 ϭϭϲϯ 191 892 0 ϭϬϴϯ Ϯϱϯϴ
Approach % 21.58 78.42 0.00 - 91.14 8.86 0.00 - 17.64 82.36 0.00 -
Intersection % 2.48 9.02 0.00 11.51 41.77 4.06 0.00 45.82 7.53 35.15 0.00 42.67
ĂůĚǁŝŶŽƵŶƚLJ͕>
Classified Turn Movement Count
^ŝƚĞϮŽĨϮ
Langford Rd
Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)
>Ăƚͬ>ŽŶŐ
30.545487°, -87.810012°
ĂƚĞ
Thursday, March 12, 2020
tĞĂƚŚĞƌ
Mostly Cloudy
67°F
0600 - 0900 (Weekday 3h Session) (12-03-2020)
Single Unit Trucks (4-7)1 23 456 78 9
1234 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West) AL-104 (East)
Left Right U-Turn App Thru Right U-Turn App Left Thru U-Turn App Int
TIME 2.1 2.2 2.3 Total 2.4 2.5 2.6 Total 2.7 2.8 2.9 Total Total
0600 - 0615 0 0 0 0 100101 012
0615 - 0630 0 0 0 0 000011 022
0630 - 0645 0 0 0 0 100101 012
0645 - 0700 0 0 0 0 100110 012
Hourly Total 0 0 0 Ϭ 300ϯ 23 0ϱϴ
0700 - 0715 0 1 0 1 200211 025
0715 - 0730 0 0 0 0 200224 068
0730 - 0745 0 0 0 0 400411 026
0745 - 0800 0 1 0 1 100123 057
Hourly Total 0 2 0 Ϯ 900ϵ 69 0ϭϱ Ϯϲ
0800 - 0815 0 1 0 1 100111 024
0815 - 0830 0 2 0 2 200220 026
0830 - 0845 0 0 0 0 200211 024
0845 - 0900 0 1 0 1 010102 024
Hourly Total 0 4 0 ϰ 510ϲ 44 0ϴϭϴ
Grand Total 0 6 0 ϲ 17 1 0 ϭϴ 12 16 0 Ϯϴ ϱϮ
Approach % 0.00 100.00 0.00 - 94.44 5.56 0.00 - 42.86 57.14 0.00 -
Intersection % 0.00 11.54 0.00 11.54 32.69 1.92 0.00 34.62 23.08 30.77 0.00 53.85
1500 - 1800 (Weekday 3h Session) (12-03-2020)
Single Unit Trucks (4-7)
1234 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West)AL-104 (East)
Left Right U-Turn App Thru Right U-Turn App Left Thru U-Turn App Int
TIME 2.1 2.2 2.3 Total 2.4 2.5 2.6 Total 2.7 2.8 2.9 Total Total
1500 - 1515 1 0 0 1 100112 035
1515 - 1530 0 2 0 2 200202 026
1530 - 1545 1 1 0 2 100101 014
1545 - 1600 0 0 0 0 400412 037
Hourly Total 2 3 0 ϱ 800ϴ 27 0ϵϮϮ
1600 - 1615 0 1 0 1 610713 0412
1615 - 1630 0 0 0 0 010102 023
1630 - 1645 0 1 0 1 100104 046
1645 - 1700 0 0 0 0 100100 001
Hourly Total 0 2 0 Ϯ 820ϭϬ 19 0ϭϬ ϮϮ
1700 - 1715 0 0 0 0 600600 006
1715 - 1730 0 0 0 0 200210 013
1730 - 1745 0 0 0 0 200200 002
1745 - 1800 0 1 0 1 300300 004
Hourly Total 0 1 0 ϭ 13 0 0 ϭϯ 10 0ϭϭϱ
Grand Total 2 6 0 ϴ 29 2 0 ϯϭ 416 0ϮϬ ϱϵ
Approach %25.00 75.00 0.00 -93.55 6.45 0.00 - 20.00 80.00 0.00 -
Intersection %3.39 10.17 0.00 13.56 49.15 3.39 0.00 52.54 6.78 27.12 0.00 33.90
ĂůĚǁŝŶŽƵŶƚLJ͕>
Classified Turn Movement Count
^ŝƚĞϮŽĨϮ
Langford Rd
Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)
>Ăƚͬ>ŽŶŐ
30.545487°, -87.810012°
ĂƚĞ
Thursday, March 12, 2020
tĞĂƚŚĞƌ
Mostly Cloudy
67°F
0600 - 0900 (Weekday 3h Session) (12-03-2020)
Combination Trucks (8-13)1 23 456 78 9
1234 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West) AL-104 (East)
Left Right U-Turn App Thru Right U-Turn App Left Thru U-Turn App Int
TIME 2.1 2.2 2.3 Total 2.4 2.5 2.6 Total 2.7 2.8 2.9 Total Total
0600 - 0615 0 0 0 0 000000 000
0615 - 0630 0 0 0 0 000000 000
0630 - 0645 0 0 0 0 000001 011
0645 - 0700 0 0 0 0 100100 001
Hourly Total 0 0 0 Ϭ 100ϭ 01 0ϭϮ
0700 - 0715 0 0 0 0 000000 000
0715 - 0730 0 0 0 0 000010 011
0730 - 0745 0 0 0 0 010102 023
0745 - 0800 0 0 0 0 000001 011
Hourly Total 0 0 0 Ϭ 010ϭ 13 0ϰϱ
0800 - 0815 0 0 0 0 000010 011
0815 - 0830 0 0 0 0 000011 022
0830 - 0845 0 0 0 0 000002 022
0845 - 0900 0 0 0 0 200201 013
Hourly Total 0 0 0 Ϭ 200Ϯ 24 0ϲϴ
Grand Total 0 0 0 Ϭ 310ϰ 38 0ϭϭ ϭϱ
Approach % 0.00 0.00 0.00 - 75.00 25.00 0.00 - 27.27 72.73 0.00 -
Intersection % 0.00 0.00 0.00 0.00 20.00 6.67 0.00 26.67 20.00 53.33 0.00 73.33
1500 - 1800 (Weekday 3h Session) (12-03-2020)
Combination Trucks (8-13)
1234 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West)AL-104 (East)
Left Right U-Turn App Thru Right U-Turn App Left Thru U-Turn App Int
TIME 2.1 2.2 2.3 Total 2.4 2.5 2.6 Total 2.7 2.8 2.9 Total Total
1500 - 1515 0 0 0 0 000000 000
1515 - 1530 0 0 0 0 000000 000
1530 - 1545 0 0 0 0 300301 014
1545 - 1600 0 0 0 0 000000 000
Hourly Total 0 0 0 Ϭ 300ϯ 01 0ϭϰ
1600 - 1615 0 0 0 0 300300 003
1615 - 1630 0 0 0 0 100100 001
1630 - 1645 0 0 0 0 000000 000
1645 - 1700 0 0 0 0 000001 011
Hourly Total 0 0 0 Ϭ 400ϰ 01 0ϭϱ
1700 - 1715 0 0 0 0 000000 000
1715 - 1730 0 0 0 0 100100 001
1730 - 1745 0 0 0 0 000000 000
1745 - 1800 0 0 0 0 000000 000
Hourly Total 0 0 0 Ϭ 100ϭ 00 0Ϭϭ
Grand Total 0 0 0 Ϭ 800ϴ 02 0ϮϭϬ
Approach %0.00 0.00 0.00 -100.00 0.00 0.00 - 0.00 100.00 0.00 -
Intersection %0.00 0.00 0.00 0.00 80.00 0.00 0.00 80.00 0.00 20.00 0.00 20.00
ĂůĚǁŝŶŽƵŶƚLJ͕>
Pedestrian Count
^ŝƚĞϮŽĨϮ
Langford Rd
Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)2f 2h
>Ăƚͬ>ŽŶŐ
30.545487°, -87.810012°
ĂƚĞ
Thursday, March 12, 2020
2e 2g
tĞĂƚŚĞƌ
Mostly Cloudy 2a
67°F
2b
0600 - 0900 (Weekday 3h Session) (12-03-2020)
Pedestrians ab cd ef gh
1234 6789 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West)AL-104 (East)
EB WB App NB SB App NB SB App Int
TIME 2a 2b Total 2e 2f Total 2g 2h Total Total
0600 - 0615 0 0 0 0 0 0 0 0 0 0
0615 - 0630 0 0 0 0 0 0 0 0 0 0
0630 - 0645 0 0 0 0 0 0 0 0 0 0
0645 - 0700 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 ϬϬ
0700 - 0715 0 0 0 0 0 0 0 0 0 0
0715 - 0730 0 0 0 0 0 0 0 0 0 0
0730 - 0745 0 0 0 0 0 0 0 0 0 0
0745 - 0800 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 ϬϬ
0800 - 0815 0 0 0 0 0 0 0 0 0 0
0815 - 0830 0 0 0 0 0 0 0 0 0 0
0830 - 0845 0 0 0 0 0 0 0 0 0 0
0845 - 0900 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 ϬϬ
Grand Total 0 0 Ϭ 00 Ϭ 00 ϬϬ
Approach %0.00 0.00 -0.00 0.00 - 0.00 0.00 -
Intersection %0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1500 - 1800 (Weekday 3h Session) (12-03-2020)
Pedestrians
1234 6789 11121314 16171819
Northbound Eastbound Westbound
Langford Rd AL-104 (West)AL-104 (East)
EB WB App NB SB App NB SB App Int
TIME 2a 2b Total 2e 2f Total 2g 2h Total Total
1500 - 1515 0 0 0 0 0 0 0 0 0 0
1515 - 1530 0 0 0 0 0 0 0 0 0 0
1530 - 1545 0 0 0 0 0 0 0 0 0 0
1545 - 1600 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 ϬϬ
1600 - 1615 0 0 0 0 0 0 0 0 0 0
1615 - 1630 0 0 0 0 0 0 0 0 0 0
1630 - 1645 0 0 0 0 0 0 0 0 0 0
1645 - 1700 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 ϬϬ
1700 - 1715 0 0 0 0 0 0 0 0 0 0
1715 - 1730 0 0 0 0 0 0 0 0 0 0
1730 - 1745 0 0 0 0 0 0 0 0 0 0
1745 - 1800 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 ϬϬ
Grand Total 0 0 Ϭ 00 Ϭ 00 ϬϬ
Approach %0.00 0.00 -0.00 0.00 - 0.00 0.00 -
Intersection %0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
>ĂŶŐĨŽƌĚZĚ>ͲϭϬϰ;tĞƐƚͿ>ͲϭϬϰ;ĂƐƚͿEB WB
NB
Marr Traffic Inc
www.marrtraffic.com
ession) (1
(1-3) (4-7) (8-13) Total Total (8-13) (4-7) (1-3)
521 9 3 533
492 3 9 480
0 (1-3) (4-7) (8-13) Total 0 174 1 6 167
0 0 0 0 964 26 5 995 0 0 0 0
0 0.823 0.813 0.667 0.8225 0
213 9 0 222
16 0 1 17 271 0 11 260
(1-3) (4-7) (8-13) Total Total (8-13) (4-7) (1-3)
0
0
Total 191 0 41 49 Total
(8-13) 2 0 0 0 (8-13)
(4-7) 6 0 0 2 (4-7)
(1-3) 183 0 41 47 (1-3)
Northbound
>ĂŶŐĨŽƌĚZĚ
Volume
>ͲϭϬϰ;tĞƐƚͿEastboundPeak Hour 0700 - 0800 Peak Hour
Westbound>ͲϭϬϰ;ĂƐƚͿClasses
Volume
PHF
ĂůĚǁŝŶŽƵŶƚLJ͕>
Peak Hour Turning Movement Count
Thursday, March 12, 2020 Session Parameters
Period 0600 - 0900 (Drop Down Menu)
Marr Traffic Inc
www.marrtraffic.com
ession) (1
(1-3) (4-7) (8-13) Total Total (8-13) (4-7) (1-3)
330 9 1 340
317 1 8 308
0 (1-3) (4-7) (8-13) Total 0 63 0 2 61
0 0 0 0 869 29 7 905 0 0 0 0
0 0.880 0.604 0.500 0.88 0
360 13 6 379
31 1 0 32 470 6 17 447
(1-3) (4-7) (8-13) Total Total (8-13) (4-7) (1-3)
0
0
Total 95 0 23 91 Total
(8-13) 0 0 0 0 (8-13)
(4-7) 3 0 1 4 (4-7)
(1-3) 92 0 22 87 (1-3)
>ĂŶŐĨŽƌĚZĚ Westbound>ͲϭϬϰ;ĂƐƚͿClasses
Volume
PHF
Northbound
Peak Hour 1515 - 1615 Peak Hour
Volume
>ͲϭϬϰ;tĞƐƚͿEastboundĂůĚǁŝŶŽƵŶƚLJ͕>
Peak Hour Turning Movement Count
Thursday, March 12, 2020 Session Parameters
Period 1500 - 1800 (Drop Down Menu)
ĂůĚǁŝŶŽƵŶƚLJ͕>
Classified Turn Movement Count
^ŝƚĞϭŽĨϮ
Yosemite Blvd
Local Access Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)
>Ăƚͬ>ŽŶŐ
30.545485°, -87.800972°
ĂƚĞ
Thursday, March 12, 2020
tĞĂƚŚĞƌ
Mostly Cloudy
67°F
0600 - 0900 (Weekday 3h Session) (12-03-2020)
All vehicles 1234 5678 9101112 13141516
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West) AL-104 (East)
Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Int
TIME 1.1 1.2 1.3 1.4 Total 1.5 1.6 1.7 1.8 Total 1.9 1.10 1.11 1.12 Total 1.13 1.14 1.15 1.16 Total Total
0600 - 0615 20103000000321033054005490
0615 - 0630 20204000000271028047004779
0630 - 0645 202150000013700381850086129
0645 - 0700 6020800000050205219900100160
Hourly Total 12071ϮϬ 0000Ϭ 1 146 4 0 ϭϱϭ 2 285 0 0 Ϯϴϳ ϰϱϴ
0700 - 0715 14 0 5 0 19 010011472050014500145215
0715 - 0730 18 0 4 0 22 000000580058016800168248
0730 - 0745 803011100012816089017500175276
0745 - 0800 70108001010669075112810130214
Hourly Total 470130ϲϬ 1110ϯ 3 252 17 0 ϮϳϮ 1 616 1 0 ϲϭϴ ϵϱϯ
0800 - 0815 30306001011615067210600108182
0815 - 0830 303060010114520481930094149
0830 - 0845 301040010106840721901092169
0845 - 0900 603091000115140560830083149
Hourly Total 150100Ϯϱ 1030ϰ 3 225 15 0 Ϯϰϯ 4 372 1 0 ϯϳϳ ϲϰϵ
Grand Total 740301ϭϬϱ 2140ϳ 7 623 36 0 ϲϲϲ 7 1273 2 0 ϭϮϴϮ ϮϬϲϬ
Approach %70.48 0.00 28.57 0.95 - 28.57 14.29 57.14 0.00 - 1.05 93.54 5.41 0.00 - 0.55 99.30 0.16 0.00 -
Intersection %3.59 0.00 1.46 0.05 5.10 0.10 0.05 0.19 0.00 0.34 0.34 30.24 1.75 0.00 32.33 0.34 61.80 0.10 0.00 62.23
1500 - 1800 (Weekday 3h Session) (12-03-2020)
All vehicles
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West)AL-104 (East)
Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Int
TIME 1.1 1.2 1.3 1.4 Total 1.5 1.6 1.7 1.8 Total 1.9 1.10 1.11 1.12 Total 1.13 1.14 1.15 1.16 Total Total
1500 - 1515 400040000007330761910092172
1515 - 1530 503080000001128012039800101229
1530 - 1545 101020000001126011819900100220
1545 - 1600 3010400101196601033900093201
Hourly Total 13050ϭϴ 0010ϭ 1 393 23 0 ϰϭϳ 8 378 0 0 ϯϴϲ ϴϮϮ
1600 - 1615 30306000000125201272830085218
1615 - 1630 30104000000119501240830083211
1630 - 1645 501060010109930102410200106215
1645 - 1700 50005000000971001075750080192
Hourly Total 16050Ϯϭ 0010ϭ 0 440 20 0 ϰϲϬ 11 343 0 0 ϯϱϰ ϴϯϲ
1700 - 1715 7020900000095501005810086195
1715 - 1730 20103000000129601352950097235
1730 - 1745 50207000000120901293850088224
1745 - 1800 4000400000097501022670069175
Hourly Total 18050Ϯϯ 0000Ϭ 0 441 25 0 ϰϲϲ 12 328 0 0 ϯϰϬ ϴϮϵ
Grand Total 470150ϲϮ 0020Ϯ 1 1274 68 0 ϭϯϰϯ 31 1049 0 0 ϭϬϴϬ Ϯϰϴϳ
Approach %75.81 0.00 24.19 0.00 - 0.00 0.00 100.00 0.00 - 0.07 94.86 5.06 0.00 - 2.87 97.13 0.00 0.00 -
Intersection %1.89 0.00 0.60 0.00 2.49 0.00 0.00 0.08 0.00 0.08 0.04 51.23 2.73 0.00 54.00 1.25 42.18 0.00 0.00 43.43
ĂůĚǁŝŶŽƵŶƚLJ͕>
Classified Turn Movement Count
^ŝƚĞϭŽĨϮ
Yosemite Blvd
Local Access Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)
>Ăƚͬ>ŽŶŐ
30.545485°, -87.800972°
ĂƚĞ
Thursday, March 12, 2020
tĞĂƚŚĞƌ
Mostly Cloudy
67°F
0600 - 0900 (Weekday 3h Session) (12-03-2020)
Bikes 1234 5678 9101112 13141516
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West) AL-104 (East)
Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Int
TIME 1.1 1.2 1.3 1.4 Total 1.5 1.6 1.7 1.8 Total 1.9 1.10 1.11 1.12 Total 1.13 1.14 1.15 1.16 Total Total
0600 - 0615 000000000000000000000
0615 - 0630 000000000000000000000
0630 - 0645 000000000000000000000
0645 - 0700 000000000000000000000
Hourly Total 0000Ϭ 0000Ϭ 0000Ϭ 0000ϬϬ
0700 - 0715 000000000000000000000
0715 - 0730 000000000000000000000
0730 - 0745 000000000000000000000
0745 - 0800 000000000000000000000
Hourly Total 0000Ϭ 0000Ϭ 0000Ϭ 0000ϬϬ
0800 - 0815 000000000000000000000
0815 - 0830 000000000000000000000
0830 - 0845 000000000000000000000
0845 - 0900 000000000000000000000
Hourly Total 0000Ϭ 0000Ϭ 0000Ϭ 0000ϬϬ
Grand Total 0000Ϭ 0000Ϭ 0000Ϭ 0000ϬϬ
Approach %0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 -
Intersection %0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.000.000.000.000.000.000.00
1500 - 1800 (Weekday 3h Session) (12-03-2020)
Bikes
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West)AL-104 (East)
Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Int
TIME 1.1 1.2 1.3 1.4 Total 1.5 1.6 1.7 1.8 Total 1.9 1.10 1.11 1.12 Total 1.13 1.14 1.15 1.16 Total Total
1500 - 1515 000000000000000000000
1515 - 1530 000000000000000000000
1530 - 1545 000000000000000000000
1545 - 1600 000000000000000000000
Hourly Total 0000Ϭ 0000Ϭ 0000Ϭ 0000ϬϬ
1600 - 1615 000000000000000000000
1615 - 1630 000000000000000000000
1630 - 1645 000000000000000000000
1645 - 1700 000000000000000000000
Hourly Total 0000Ϭ 0000Ϭ 0000Ϭ 0000ϬϬ
1700 - 1715 000000000000000000000
1715 - 1730 000000000000000000000
1730 - 1745 000000000000000000000
1745 - 1800 000000000000000000000
Hourly Total 0000Ϭ 0000Ϭ 0000Ϭ 0000ϬϬ
Grand Total 0000Ϭ 0000Ϭ 0000Ϭ 0000ϬϬ
Approach %0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 -
Intersection %0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.000.000.000.000.000.000.00
ĂůĚǁŝŶŽƵŶƚLJ͕>
Classified Turn Movement Count
^ŝƚĞϭŽĨϮ
Yosemite Blvd
Local Access Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)
>Ăƚͬ>ŽŶŐ
30.545485°, -87.800972°
ĂƚĞ
Thursday, March 12, 2020
tĞĂƚŚĞƌ
Mostly Cloudy
67°F
0600 - 0900 (Weekday 3h Session) (12-03-2020)
Passenger Vehicles (1-3)1234 5678 9101112 13141516
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West) AL-104 (East)
Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Int
TIME 1.1 1.2 1.3 1.4 Total 1.5 1.6 1.7 1.8 Total 1.9 1.10 1.11 1.12 Total 1.13 1.14 1.15 1.16 Total Total
0600 - 0615 20103000000321033053005389
0615 - 0630 20204000000271028047004779
0630 - 0645 202150000013600371830084126
0645 - 0700 502070000004810491970098154
Hourly Total 11071ϭϵ 0000Ϭ 1 143 3 0 ϭϰϳ 2 280 0 0 ϮϴϮ ϰϰϴ
0700 - 0715 12 0 5 0 17 010011460047014000140205
0715 - 0730 18 0 4 0 22 000000560056016400164242
0730 - 0745 803011000000786084017300173268
0745 - 0800 70108000000659074112310125207
Hourly Total 450130ϱϴ 0100ϭ 1 245 15 0 Ϯϲϭ 1 600 1 0 ϲϬϮ ϵϮϮ
0800 - 0815 30306000000601061210400106173
0815 - 0830 303060000004520471900091144
0830 - 0845 301040000006740711861088163
0845 - 0900 503080000005030530820082143
Hourly Total 140100Ϯϰ 0000Ϭ 0 222 10 0 ϮϯϮ 4 362 1 0 ϯϲϳ ϲϮϯ
Grand Total 700301ϭϬϭ 0100ϭ 2 610 28 0 ϲϰϬ 7 1242 2 0 ϭϮϱϭ ϭϵϵϯ
Approach %69.31 0.00 29.70 0.99 - 0.00 100.00 0.00 0.00 - 0.31 95.31 4.38 0.00 - 0.56 99.28 0.16 0.00 -
Intersection %3.51 0.00 1.51 0.05 5.07 0.00 0.05 0.00 0.00 0.05 0.10 30.61 1.40 0.00 32.11 0.35 62.32 0.10 0.00 62.77
1500 - 1800 (Weekday 3h Session) (12-03-2020)
Passenger Vehicles (1-3)
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West)AL-104 (East)
Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Int
TIME 1.1 1.2 1.3 1.4 Total 1.5 1.6 1.7 1.8 Total 1.9 1.10 1.11 1.12 Total 1.13 1.14 1.15 1.16 Total Total
1500 - 1515 400040000007130741890090168
1515 - 1530 403070000001107011739700100224
1530 - 1545 10102000000106601121950096210
1545 - 1600 3010400000095501003890092196
Hourly Total 12050ϭϳ 0000Ϭ 0 382 21 0 ϰϬϯ 8 370 0 0 ϯϳϴ ϳϵϴ
1600 - 1615 20305000000118201202810083208
1615 - 1630 30104000000116501210820082207
1630 - 1645 50106001010973010049700101208
1645 - 1700 50005000000951001055730078188
Hourly Total 15050ϮϬ 0010ϭ 0 426 20 0 ϰϰϲ 11 333 0 0 ϯϰϰ ϴϭϭ
1700 - 1715 701080000009140955810086189
1715 - 1730 20103000000123601292950097229
1730 - 1745 50106000000118901273840087220
1745 - 1800 4000400000095501002670069173
Hourly Total 18030Ϯϭ 0000Ϭ 0 427 24 0 ϰϱϭ 12 327 0 0 ϯϯϵ ϴϭϭ
Grand Total 450130ϱϴ 0010ϭ 0 1235 65 0 ϭϯϬϬ 31 1030 0 0 ϭϬϲϭ ϮϰϮϬ
Approach %77.59 0.00 22.41 0.00 - 0.00 0.00 100.00 0.00 - 0.00 95.00 5.00 0.00 - 2.92 97.08 0.00 0.00 -
Intersection %1.86 0.00 0.54 0.00 2.40 0.00 0.00 0.04 0.00 0.04 0.00 51.03 2.69 0.00 53.72 1.28 42.56 0.00 0.00 43.84
ĂůĚǁŝŶŽƵŶƚLJ͕>
Classified Turn Movement Count
^ŝƚĞϭŽĨϮ
Yosemite Blvd
Local Access Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)
>Ăƚͬ>ŽŶŐ
30.545485°, -87.800972°
ĂƚĞ
Thursday, March 12, 2020
tĞĂƚŚĞƌ
Mostly Cloudy
67°F
0600 - 0900 (Weekday 3h Session) (12-03-2020)
Single Unit Trucks (4-7)1234 5678 9101112 13141516
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West) AL-104 (East)
Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Int
TIME 1.1 1.2 1.3 1.4 Total 1.5 1.6 1.7 1.8 Total 1.9 1.10 1.11 1.12 Total 1.13 1.14 1.15 1.16 Total Total
0600 - 0615 000000000000000010011
0615 - 0630 000000000000000000000
0630 - 0645 000000000001001010012
0645 - 0700 100010000001102020025
Hourly Total 1000ϭ 0000Ϭ 0210ϯ 0400ϰϴ
0700 - 0715 200020000001203040049
0715 - 0730 000000000002002040046
0730 - 0745 000001000123005010017
0745 - 0800 000000010101001030035
Hourly Total 2000Ϯ 1010Ϯ 2720ϭϭ 0120 0ϭϮ Ϯϳ
0800 - 0815 000000010111406020029
0815 - 0830 000000010110001020024
0830 - 0845 000000010100000000001
0845 - 0900 000001000111002010014
Hourly Total 0000Ϭ 1030ϰ 3240ϵ 0500ϱϭϴ
Grand Total 3000ϯ 2040ϲ 5117 0Ϯϯ 0210 0Ϯϭ ϱϯ
Approach %100.00 0.00 0.00 0.00 - 33.33 0.00 66.67 0.00 - 21.74 47.83 30.43 0.00 - 0.00 100.00 0.00 0.00 -
Intersection %5.66 0.00 0.00 0.00 5.66 3.77 0.00 7.55 0.00 11.32 9.43 20.75 13.21 0.00 43.40 0.00 39.62 0.00 0.00 39.62
1500 - 1800 (Weekday 3h Session) (12-03-2020)
Single Unit Trucks (4-7)
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West)AL-104 (East)
Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Int
TIME 1.1 1.2 1.3 1.4 Total 1.5 1.6 1.7 1.8 Total 1.9 1.10 1.11 1.12 Total 1.13 1.14 1.15 1.16 Total Total
1500 - 1515 000000000002002020024
1515 - 1530 100010000002103010015
1530 - 1545 000000000003003030036
1545 - 1600 000000010111103010015
Hourly Total 1000ϭ 0010ϭ 1820ϭϭ 0700ϳϮϬ
1600 - 1615 100010000006006020029
1615 - 1630 000000000002002010013
1630 - 1645 000000000001001050056
1645 - 1700 000000000001001010012
Hourly Total 1000ϭ 0000Ϭ 0100 0ϭϬ 0900ϵϮϬ
1700 - 1715 001010000004105000006
1715 - 1730 000000000005005000005
1730 - 1745 001010000002002010014
1745 - 1800 000000000002002000002
Hourly Total 0020Ϯ 0000Ϭ 0131 0ϭϰ 0100ϭϭϳ
Grand Total 2020ϰ 0010ϭ 1313 0ϯϱ 0170 0ϭϳ ϱϳ
Approach %50.00 0.00 50.00 0.00 - 0.00 0.00 100.00 0.00 - 2.86 88.57 8.57 0.00 - 0.00 100.00 0.00 0.00 -
Intersection %3.51 0.00 3.51 0.00 7.02 0.00 0.00 1.75 0.00 1.75 1.75 54.39 5.26 0.00 61.40 0.00 29.82 0.00 0.00 29.82
ĂůĚǁŝŶŽƵŶƚLJ͕>
Classified Turn Movement Count
^ŝƚĞϭŽĨϮ
Yosemite Blvd
Local Access Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)
>Ăƚͬ>ŽŶŐ
30.545485°, -87.800972°
ĂƚĞ
Thursday, March 12, 2020
tĞĂƚŚĞƌ
Mostly Cloudy
67°F
0600 - 0900 (Weekday 3h Session) (12-03-2020)
Combination Trucks (8-13)1234 5678 9101112 13141516
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West) AL-104 (East)
Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Int
TIME 1.1 1.2 1.3 1.4 Total 1.5 1.6 1.7 1.8 Total 1.9 1.10 1.11 1.12 Total 1.13 1.14 1.15 1.16 Total Total
0600 - 0615 000000000000000000000
0615 - 0630 000000000000000000000
0630 - 0645 000000000000000010011
0645 - 0700 000000000001001000001
Hourly Total 0000Ϭ 0000Ϭ 0100ϭ 0100ϭϮ
0700 - 0715 000000000000000010011
0715 - 0730 000000000000000000000
0730 - 0745 000000000000000010011
0745 - 0800 000000000000000020022
Hourly Total 0000Ϭ 0000Ϭ 0000Ϭ 0400ϰϰ
0800 - 0815 000000000000000000000
0815 - 0830 000000000000000010011
0830 - 0845 000000000001001040045
0845 - 0900 100010000000101000002
Hourly Total 1000ϭ 0000Ϭ 0110Ϯ 0500ϱϴ
Grand Total 1000ϭ 0000Ϭ 0210ϯ 0100 0ϭϬ ϭϰ
Approach %100.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 66.67 33.33 0.00 - 0.00 100.00 0.00 0.00 -
Intersection %7.14 0.00 0.00 0.00 7.14 0.00 0.00 0.00 0.00 0.00 0.00 14.29 7.14 0.00 21.43 0.00 71.43 0.00 0.00 71.43
1500 - 1800 (Weekday 3h Session) (12-03-2020)
Combination Trucks (8-13)
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West)AL-104 (East)
Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Left Thru Right U-Turn App Int
TIME 1.1 1.2 1.3 1.4 Total 1.5 1.6 1.7 1.8 Total 1.9 1.10 1.11 1.12 Total 1.13 1.14 1.15 1.16 Total Total
1500 - 1515 000000000000000000000
1515 - 1530 000000000000000000000
1530 - 1545 000000000003003010014
1545 - 1600 000000000000000000000
Hourly Total 0000Ϭ 0000Ϭ 0300ϯ 0100ϭϰ
1600 - 1615 000000000001001000001
1615 - 1630 000000000001001000001
1630 - 1645 000000000001001000001
1645 - 1700 000000000001001010012
Hourly Total 0000Ϭ 0000Ϭ 0400ϰ 0100ϭϱ
1700 - 1715 000000000000000000000
1715 - 1730 000000000001001000001
1730 - 1745 000000000000000000000
1745 - 1800 000000000000000000000
Hourly Total 0000Ϭ 0000Ϭ 0100ϭ 0000Ϭϭ
Grand Total 0000Ϭ 0000Ϭ 0800ϴ 0200ϮϭϬ
Approach %0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 - 0.00 100.00 0.00 0.00 - 0.00 100.00 0.00 0.00 -
Intersection %0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80.00 0.00 0.00 80.00 0.00 20.00 0.00 0.00 20.00
ĂůĚǁŝŶŽƵŶƚLJ͕>
Pedestrian Count
^ŝƚĞϭŽĨϮ 1c
Yosemite Blvd
Local Access 1d Marr Traffic Inc
AL-104 (West)www.marrtraffic.com
AL-104 (East)1f 1h
>Ăƚͬ>ŽŶŐ
30.545485°, -87.800972°
ĂƚĞ
Thursday, March 12, 2020
1e 1g
tĞĂƚŚĞƌ
Mostly Cloudy 1a
67°F
1b
0600 - 0900 (Weekday 3h Session) (12-03-2020)
Pedestrians ab cd ef gh
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West)AL-104 (East)
EB WB App EB WB App NB SB App NB SB App Int
TIME 1a 1b Total 1c 1d Total 1e 1f Total 1g 1h Total Total
0600 - 0615 0 0 0 0 0 0 0 0 0 0 0 0 0
0615 - 0630 0 0 0 0 0 0 0 0 0 0 0 0 0
0630 - 0645 0 0 0 0 0 0 0 0 0 0 0 0 0
0645 - 0700 0 0 0 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 Ϭ 00 ϬϬ
0700 - 0715 0 0 0 0 0 0 0 0 0 0 0 0 0
0715 - 0730 0 0 0 0 0 0 0 0 0 0 0 0 0
0730 - 0745 0 0 0 0 0 0 0 0 0 0 0 0 0
0745 - 0800 0 0 0 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 Ϭ 00 ϬϬ
0800 - 0815 0 0 0 0 0 0 0 0 0 0 0 0 0
0815 - 0830 0 0 0 0 0 0 0 0 0 0 0 0 0
0830 - 0845 0 0 0 0 0 0 0 0 0 0 0 0 0
0845 - 0900 0 0 0 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 Ϭ 00 ϬϬ
Grand Total 0 0 Ϭ 00 Ϭ 00 Ϭ 00 ϬϬ
Approach %0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 0.00 0.00 -
Intersection %0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1500 - 1800 (Weekday 3h Session) (12-03-2020)
Pedestrians
1234 6789 11121314 16171819
Northbound Southbound Eastbound Westbound
Yosemite Blvd Local Access AL-104 (West)AL-104 (East)
EB WB App EB WB App NB SB App NB SB App Int
TIME 1a 1b Total 1c 1d Total 1e 1f Total 1g 1h Total Total
1500 - 1515 0 0 0 0 0 0 0 0 0 0 0 0 0
1515 - 1530 0 0 0 0 0 0 0 0 0 0 0 0 0
1530 - 1545 0 0 0 0 0 0 0 0 0 0 0 0 0
1545 - 1600 0 0 0 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 Ϭ 00 ϬϬ
1600 - 1615 0 0 0 0 0 0 0 0 0 0 0 0 0
1615 - 1630 0 0 0 0 0 0 0 0 0 0 0 0 0
1630 - 1645 0 0 0 0 0 0 0 0 0 0 0 0 0
1645 - 1700 0 0 0 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 Ϭ 00 ϬϬ
1700 - 1715 0 0 0 0 0 0 0 0 0 0 0 0 0
1715 - 1730 0 0 0 0 0 0 0 0 0 0 0 0 0
1730 - 1745 0 0 0 0 0 0 0 0 0 0 0 0 0
1745 - 1800 0 0 0 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 Ϭ 00 Ϭ 00 Ϭ 00 ϬϬ
Grand Total 0 0 Ϭ 00 Ϭ 00 Ϭ 00 ϬϬ
Approach %0.00 0.00 - 0.00 0.00 - 0.00 0.00 - 0.00 0.00 -
Intersection %0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
zŽƐĞŵŝƚĞůǀĚ
>ŽĐĂůĐĐĞƐƐ
>ͲϭϬϰ;tĞƐƚͿ>ͲϭϬϰ;ĂƐƚͿSB
EB WB
NB
Right Thru Left U-Turn Marr Traffic Inc
www.marrtraffic.com
(1-3)0100 2(1-3)
ession) (1 (4-7)1010 2(4-7)
(8-13)0000 0(8-13)
Total1110 4Total
0
0
(1-3) (4-7) (8-13) Total Total (8-13) (4-7) (1-3)
645 15 4 664 1 001
616 4 12 600
0 (1-3) (4-7) (8-13) Total 0 1 0 0 1
0 0 0 0 922 27 4 953 0 0 0 0
1 2 0 3 0 0.860 0.750 0.400 0.8601 0
245 7 0 252
15 2 0 17 266 0 8 258
(1-3) (4-7) (8-13) Total Total (8-13) (4-7) (1-3)
0
0
Total 19 0 47 0 13 Total
(8-13)0 0000(8-13)
(4-7)2 0200(4-7)
(1-3) 17 0 45 0 13 (1-3)
Northbound
zŽƐĞŵŝƚĞůǀĚ
Volume
>ͲϭϬϰ;tĞƐƚͿEastboundWestbound>ͲϭϬϰ;ĂƐƚͿClasses
Volume
PHF
Thursday, March 12, 2020
Period 0600 - 0900 (Drop Down Menu)
Peak Hour 0700 - 0800 Peak Hour
Session Parameters
ĂůĚǁŝŶŽƵŶƚLJ͕>
Peak Hour Turning Movement Count
>ŽĐĂůĐĐĞƐƐ
Southbound
Right Thru Left U-Turn Marr Traffic Inc
www.marrtraffic.com
(1-3)0000 0(1-3)
ession) (1 (4-7)1000 1(4-7)
(8-13)0000 0(8-13)
Total1000 1Total
0
0
(1-3) (4-7) (8-13) Total Total (8-13) (4-7) (1-3)
372 10 1 383 0 000
370 1 7 362
0 (1-3) (4-7) (8-13) Total 0 9 0 0 9
0 0 0 0 838 25 5 868 0 0 0 0
0 1 0 1 0 0.915 0.694 0.375 0.9148 0
429 12 4 445
20 2 0 22 453 4 12 437
(1-3) (4-7) (8-13) Total Total (8-13) (4-7) (1-3)
0
0
Total 31 0 12 0 8 Total
(8-13)0 0000(8-13)
(4-7)2 0200(4-7)
(1-3) 29 0 10 0 8 (1-3)
Northbound
zŽƐĞŵŝƚĞůǀĚ
Volume
>ͲϭϬϰ;tĞƐƚͿEastboundWestbound>ͲϭϬϰ;ĂƐƚͿClasses
Volume
PHF
Thursday, March 12, 2020
Period 1500 - 1800 (Drop Down Menu)
Peak Hour 1515 - 1615 Peak Hour
Session Parameters
ĂůĚǁŝŶŽƵŶƚLJ͕>
Peak Hour Turning Movement Count
>ŽĐĂůĐĐĞƐƐ
Southbound
FAIRHOPE FALLS WEST SILVERHILL, AL
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec5_Precom.doc
Peak Hour Volumes and Trip Distribution
$/+Z\/DQJIRUG5GSeasonal Adjustment Factor1Annual Growth Factor 2.00%Base Year2020Horizon Year2027StartTimeLeft Thru Right Left Thru Right Left Thru Right Left Thru Right Total$03HDN+RXU2020 Existing Traffic 4104900002221717449209952027 Non-Site Traffic 4705600002552020056501143Site Traffic Total106043000003614001992027 Non-Site Traffic 47056000025520200565011432027 Total Traffic15309900002555621456501342303HDN+RXU2020 Existing Traffic 230910000379326331709052027 Non-Site Traffic 2601050000435377236401039Site Traffic Total700280000011949002662027 Non-Site Traffic 26010500004353772364010392027 Total Traffic960133000043515612136401305NorthboundSouthboundEastboundWestbound
$/+Z\<RVHPLWH%RXOHYDUGSeasonal Adjustment Factor1Annual Growth Factor2.00%Base Year2020Horizon Year2027StartTimeLeft Thru Right Left Thru Right Left Thru Right Left Thru Right Total$03HDN+RXU2020 Existing Traffic 47013111325217161619532027 Non-Site Traffic 54015111328920170811094Site Traffic Total001100004304140722027 Non-Site Traffic 540151113289201708110942027 Total Traffic54026111333220572211166303HDN+RXU2020 Existing Traffic 1208001144522937008682027 Non-Site Traffic 1409001151125104250996Site Traffic Total007000028012490962027 Non-Site Traffic 14090011511251042509962027 Total Traffic140160011539252247401092NorthboundSouthboundEastboundWestbound
/DQJIRUG5RDG1RUWK'ULYHZD\Seasonal Adjustment Factor1Annual Growth Factor 2.00%Base Year2020Horizon Year2027StartTimeLeft Thru Right Left Thru Right Left Thru Right Left Thru Right Total$03HDN+RXU2020 Existing Traffic0 90 0 0 191 0 0 0 0 0 0 0 2812027 Non-Site Traffic0 103 0 0 219 0 0 0 0 0 0 0 322Site Traffic Total0 70 9 27 23 0 0 0 0 27 0 79 2352027 Non-Site Traffic0 103 0 0 219 0 0 0 0 0 0 0 3222027 Total Traffic0 173 9 27 242 0 0 0 0 27 0 79 557303HDN+RXU2020 Existing Traffic0 114 0 0 95 0 0 0 0 0 0 0 2092027 Non-Site Traffic0 131 0 0 109 0 0 0 0 0 0 0 240Site Traffic Total0 46 30 89 79 0 0 0 0 18 0 52 3142027 Non-Site Traffic0 131 0 0 109 0 0 0 0 0 0 0 2402027 Total Traffic0 177 30 89 188 0 0 0 0 18 0 52 554NorthboundSouthboundEastboundWestbound
/DQJIRUG5RDG6RXWK'ULYHZD\Seasonal Adjustment Factor1Annual Growth Factor2.00%Base Year2020Horizon Year2027StartTimeLeft Thru Right Left Thru Right Left Thru Right Left Thru Right Total$03HDN+RXU2020 Existing Traffic0 90 0 0 191 0 0 0 0 0 0 0 2812027 Non-Site Traffic0 103 0 0 219 0 0 0 0 0 0 0 322Site Traffic Total0 9 8 23 27 0 0 0 0 24 0 70 1612027 Non-Site Traffic0 103 0 0 219 0 0 0 0 0 0 0 3222027 Total Traffic0 112 8 23 246 0 0 0 0 24 0 70 483303HDN+RXU2020 Existing Traffic0 114 0 0 95 0 0 0 0 0 0 0 2092027 Non-Site Traffic0 131 0 0 109 0 0 0 0 0 0 0 240Site Traffic Total0 30 27 79 18 0 0 0 0 16 0 46 2162027 Non-Site Traffic0 131 0 0 109 0 0 0 0 0 0 0 2402027 Total Traffic0 161 27 79 127 0 0 0 0 16 0 46 456NorthboundSouthboundEastboundWestbound
FAIRHOPE FALLS WEST SILVERHILL, AL
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec5_Precom.doc
Year 2020 HCS Analysis
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $//DQJIRUG
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW /DQJIRUG5RDG
7LPH$QDO\]HG ([LVWLQJ$03HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ 75 /7 /5
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG
0HGLDQ7\SH_6WRUDJH 8QGLYLGHG
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$&
$SSURDFK'HOD\VYHK
$SSURDFK/26 &
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG+&6ྖ 7:6&9HUVLRQ*HQHUDWHG$0
/DQJIRUG([LVWLQJ$03HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $//DQJIRUG
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW /DQJIRUG5RDG
7LPH$QDO\]HG ([LVWLQJ303HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ 75 /7 /5
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG
0HGLDQ7\SH_6WRUDJH 8QGLYLGHG
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$%
$SSURDFK'HOD\VYHK
$SSURDFK/26 %
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG+&6ྖ 7:6&9HUVLRQ*HQHUDWHG$0
/DQJIRUG([LVWLQJ303HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $/<RVHPLWH
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW <RVHPLWH5G
7LPH$QDO\]HG ([LVWLQJ$03HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ /7 5 /75 /75 /75
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG 1R
0HGLDQ7\SH_6WRUDJH /HIW2QO\
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$$&&
$SSURDFK'HOD\VYHK
$SSURDFK/26 &&
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG +&6ྖ 7:6&9HUVLRQ *HQHUDWHG$0
<RVHPLWH([LVWLQJ$03HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $/<RVHPLWH
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW <RVHPLWH5G
7LPH$QDO\]HG ([LVWLQJ303HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ /7 5 /75 /75 /75
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG 1R
0HGLDQ7\SH_6WRUDJH /HIW2QO\
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$$%%
$SSURDFK'HOD\VYHK
$SSURDFK/26 %%
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG +&6ྖ 7:6&9HUVLRQ *HQHUDWHG$0
<RVHPLWH([LVWLQJ303HDN[WZ
FAIRHOPE FALLS WEST SILVERHILL, AL
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec5_Precom.doc
Year 2027 HCS Analysis
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $//DQJIRUG
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW /DQJIRUG5RDG
7LPH$QDO\]HG 1RQ6LWH$03HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ 75 /7 /5
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG
0HGLDQ7\SH_6WRUDJH 8QGLYLGHG
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$(
$SSURDFK'HOD\VYHK
$SSURDFK/26 (
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG+&6ྖ 7:6&9HUVLRQ*HQHUDWHG$0
/DQJIRUG1RQ6LWH$03HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $//DQJIRUG
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW /DQJIRUG5RDG
7LPH$QDO\]HG 1RQ6LWH303HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ 75 /7 /5
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG
0HGLDQ7\SH_6WRUDJH 8QGLYLGHG
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$&
$SSURDFK'HOD\VYHK
$SSURDFK/26 &
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG+&6ྖ 7:6&9HUVLRQ*HQHUDWHG$0
/DQJIRUG1RQ6LWH303HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $/<RVHPLWH
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW <RVHPLWH5G
7LPH$QDO\]HG 1RQ6LWH$03HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ /7 5 /75 /75 /75
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG 1R
0HGLDQ7\SH_6WRUDJH /HIW2QO\
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$$&&
$SSURDFK'HOD\VYHK
$SSURDFK/26 &&
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG +&6ྖ 7:6&9HUVLRQ *HQHUDWHG$0
<RVHPLWH1RQ6LWH$03HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $/<RVHPLWH
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW <RVHPLWH5G
7LPH$QDO\]HG 1RQ6LWH303HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ /7 5 /75 /75 /75
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG 1R
0HGLDQ7\SH_6WRUDJH /HIW2QO\
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$$%%
$SSURDFK'HOD\VYHK
$SSURDFK/26 %%
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG +&6ྖ 7:6&9HUVLRQ *HQHUDWHG$0
<RVHPLWH1RQ6LWH303HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $//DQJIRUG
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW /DQJIRUG5RDG
7LPH$QDO\]HG 7RWDO$03HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ 75 /7 /5
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG
0HGLDQ7\SH_6WRUDJH 8QGLYLGHG
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$)
$SSURDFK'HOD\VYHK
$SSURDFK/26 )
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG+&6ྖ 7:6&9HUVLRQ*HQHUDWHG$0
/DQJIRUG7RWDO$03HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $//DQJIRUG
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW /DQJIRUG5RDG
7LPH$QDO\]HG 7RWDO303HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ 75 /7 /5
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG
0HGLDQ7\SH_6WRUDJH 8QGLYLGHG
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$)
$SSURDFK'HOD\VYHK
$SSURDFK/26 )
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG+&6ྖ 7:6&9HUVLRQ*HQHUDWHG$0
/DQJIRUG7RWDO303HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $/<RVHPLWH
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW <RVHPLWH5G
7LPH$QDO\]HG 7RWDO$03HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ /7 5 /75 /75 /75
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG 1R
0HGLDQ7\SH_6WRUDJH /HIW2QO\
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$$&&
$SSURDFK'HOD\VYHK
$SSURDFK/26 &&
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG +&6ྖ 7:6&9HUVLRQ *HQHUDWHG$0
<RVHPLWH7RWDO$03HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $/<RVHPLWH
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW <RVHPLWH5G
7LPH$QDO\]HG 7RWDO303HDN 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ /7 5 /75 /75 /75
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG 1R
0HGLDQ7\SH_6WRUDJH /HIW2QO\
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$$&%
$SSURDFK'HOD\VYHK
$SSURDFK/26 &%
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG +&6ྖ 7:6&9HUVLRQ *HQHUDWHG$0
<RVHPLWH7RWDO303HDN[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $//DQJIRUG
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW /DQJIRUG5RDG
7LPH$QDO\]HG 7RWDO$03HDN,PSURYHG 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ 7 5 /7 /5
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG 1R 1R
0HGLDQ7\SH_6WRUDJH /HIW2QO\
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$(%
$SSURDFK'HOD\VYHK
$SSURDFK/26 '
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG+&6ྖ 7:6&9HUVLRQ*HQHUDWHG$0
/DQJIRUG7RWDO$03HDN,PSURYHG[WZ
+&67ZR:D\6WRS&RQWURO5HSRUW
*HQHUDO,QIRUPDWLRQ 6LWH,QIRUPDWLRQ
$QDO\VW 6%HUJLQ ,QWHUVHFWLRQ $//DQJIRUG
$JHQF\&R1HHO6FKDIIHU -XULVGLFWLRQ $/'27
'DWH3HUIRUPHG (DVW:HVW6WUHHW $/+Z\
$QDO\VLV<HDU 1RUWK6RXWK6WUHHW /DQJIRUG5RDG
7LPH$QDO\]HG 7RWDO303HDN,PSURYHG 3HDN+RXU)DFWRU
,QWHUVHFWLRQ2ULHQWDWLRQ (DVW:HVW $QDO\VLV7LPH3HULRGKUV
3URMHFW'HVFULSWLRQ )DLUKRSH)DOOV:HVW
/DQHV
0DMRU6WUHHW(DVW:HVW
9HKLFOH9ROXPHVDQG$GMXVWPHQWV
$SSURDFK (DVWERXQG :HVWERXQG 1RUWKERXQG 6RXWKERXQG
0RYHPHQW 8 /7 5 8 /7 5 8 /7 5 8 /7 5
3ULRULW\8 8
1XPEHURI/DQHV
&RQILJXUDWLRQ 7 5 /7 /5
9ROXPHYHKK
3HUFHQW+HDY\9HKLFOHV
3URSRUWLRQ7LPH%ORFNHG
3HUFHQW*UDGH
5LJKW7XUQ&KDQQHOL]HG 1R 1R
0HGLDQ7\SH_6WRUDJH /HIW2QO\
&ULWLFDODQG)ROORZXS+HDGZD\V
%DVH&ULWLFDO+HDGZD\VHF
&ULWLFDO+HDGZD\VHF
%DVH)ROORZ8S+HDGZD\VHF
)ROORZ8S+HDGZD\VHF
'HOD\4XHXH/HQJWKDQG/HYHORI6HUYLFH
)ORZ5DWHYYHKK
&DSDFLW\FYHKK
YF5DWLR
4XHXH/HQJWK4ࢮࢪYHK
&RQWURO'HOD\VYHK
/HYHORI6HUYLFH/26$&%
$SSURDFK'HOD\VYHK
$SSURDFK/26 &
&RS\ULJKW8QLYHUVLW\RI)ORULGD$OO5LJKWV5HVHUYHG+&6ྖ 7:6&9HUVLRQ*HQHUDWHG$0
/DQJIRUG7RWDO303HDN,PSURYHG[WZ
FAIRHOPE FALLS WEST SILVERHILL, AL
Neel-Schaffer, Inc.
Mobile, Alabama M:\Projects\NS-15681 - Fairhope Falls West\Report\Sec5_Precom.doc
Auxiliary Lane Warrant Worksheets
)LJXUH*XLGHOLQHIRUGHWHUPLQLQJWKHQHHGIRUDPDMRUURDGOHIWWXUQED\DWDWZRZD\VWRSFRQWUROOHGLQWHUVHFWLRQODQHURDGZD\(QJOLVKINPUTValue4530%188177OUTPUTValue288CALIBRATION CONSTANTSValue3.05.01.9Critical headway, s:Average time for left-turn vehicle to clear the advancing lane, s:Limiting advancing volume (VA), veh/h:*XLGDQFHIRUGHWHUPLQLQJWKHQHHGIRUDPDMRUURDGOHIWWXUQED\/HIWWXUQWUHDWPHQW127ZDUUDQWHGAverage time for making left-turn, s:Advancing volume (VA), veh/h:Opposing volume (VO), veh/h:VariableVariableVariable85th percentile speed, mph:Percent of left-turns in advancing volume (VA), %:01002003004005006007008000 100 200 300 400 500 600 7002SSRVLQJ9ROXPH92YHKK$GYDQFLQJ9ROXPH9$YHKKLeft-turn treatment warranted.Left-turn treatment not warranted.North Driveway
INPUTCOMPUTATIONSSpeed: 45 mph rho 0.018LT_percent: 30% f = 0.79Time_tw 0.7 sVolume_Vo: 177 veh/h serv_rate: 1063 veh/hVolume_Va: 288 veh/hVo Time_tw Vo Serv_rate0 0.0 0 1200100 0.4 100 1121200 0.8 200 1046300 1.2 300 976400 1.7 400 910500 2.2 500 848600 2.8 600 789700 3.5 700 735800 4.2 800 683Time_t1: 3.0 sCriticalGap_Gc 5.0 s % LT veh. 30% 10% 15% 20% 40%Time_te: 1.9 s VoVAVAVAVAVA0 355 543 456 407 332100 315 481 404 360 294200 280 428 360 321 262300 251 383 322 287 235400 225 344 289 258 211500 203 310 260 232 190600 183 280 235 210 171700 166 253 213 190 155800 150 229 193 172 140
)LJXUH*XLGHOLQHIRUGHWHUPLQLQJWKHQHHGIRUDPDMRUURDGULJKWWXUQED\DWDWZRZD\VWRSFRQWUROOHGLQWHUVHFWLRQINPUTValue4520030OUTPUTValue231ULJKWWXUQED\IRUDODQHURDGZD\'R127DGGULJKWWXUQED\Roadway geometry:VariableVariable*XLGDQFHIRUGHWHUPLQLQJWKHQHHGIRUDPDMRUURDGMajor-road speed, mph:Major-road volume (one direction), veh/h:Right-turn volume, veh/h:Limiting right-turn volume, veh/h:2-lane roadway020406080100120140200 400 600 800 1000 1200 1400 165LJKW7XUQ9ROXPHYHKK0DMRU5RDG9ROXPHRQHGLUHFWLRQYHKKAdd right - turn bayNorth Driveway
600
2-lane road4-lane road
dwaydway2-lane roadwayMajor road speed (accounts for speeds greater than 100)Speed: 72.405 km/hVol_MJ: 200Vol_RT: 30R_type: 1 (1= 2-lane, 2=4-lane)RTV = EXP(B) * Volume^CB_parm: 15.15 B = bo + b1*Speed + b2*Speed^2C_parm: -1.83 C = c0 + c1*Speed + c2*Speed^2RTV_given231Major VolRTVcalc200 231.4400 65.0600 30.9800 18.21000 12.11200 8.71400 6.51600 5.1ln (a) bb1b2b0c1 c2 co2 - lane1 -2.088 0.010 113.618 0.298 -0.001 -15.8474 - lane2 -1.107 0.005 71.429 0.150 -0.001 -9.257234567Values used:-2.088 0.010 113.618 0.298 -0.001 -15.847
Waterline Narrative and Calculations
Fairhope Falls Phases 4 - 9
PREPARED BY:
October 2020
Table of Contents
Introduction ........................................................................................................................1
Site Description ..................................................................................................................1
Existing Water Distribution System.................................................................................1
Proposed Water Distribution System...............................................................................2
Water System Demands ....................................................................................................2
Water Model Analysis .......................................................................................................3
Summary .............................................................................................................................3
Appendix A .........................................................................................................................4
Vicinity Map ......................................................................................................................
Appendix B .........................................................................................................................5
WaterCad Results ...............................................................................................................
1
INTRODUCTION
The purpose of this report is to provide an analysis of the proposed water distribution system for
Fairhope Falls Phases 4 - 9 (a residential development). This report also includes analysis for the
existing phases of Fairhope Falls (Phases 1, 2, and 3). The system was designed to provide
sufficient domestic demand during average daily flows, while providing adequate fire flow demand
to each hydrant. The system was analyzed using Bentley’s computer modeling software,
WaterCAD V8i.
SITE DESCRIPTION
Fairhope Falls Phases 4 – 9 is a proposed development located on the south side of Highway
104 approximately 3 miles east of 181 in Baldwin County, Alabama. The development connects
to Langford Road (in two locations), and it also connects to the existing phases of Fairhope Falls
through Yosemite Blvd. Phases 4 - 9 of the development consists of 110 ± acres with a total of
328 lots, while the existing phases 1, 2, and 3 consist of 214 lots. A vicinity map of the site can be
found in Appendix A.
EXISTING WATER DISTRIBUTION SYSTEM
There is an existing 6-inch water main located along Highway 104, an existing 12-inch water main
located along Langford Road, and an existing 10-inch water main located through the middle of
the proposed development. The water mains are maintained by the City of Fairhope. Phase One,
Two, and Three of Fairhope Falls are existing and currently have existing homes. It has been
included in this water model. Fire hydrants, one located at the corner of Bridalwood Lane and
Langford Road and the other located approximately 500 feet south on Langford Road, were
tested in order to obtain the available flow and pressure. The resulting flow and pressure from the
flow test are as follows:
Fire Hydrant Flow, Qf = 1,036 gallons per minute
Static Pressure, Ps = 59 psi
Residual Pressure, Pr = 45 psi
2
PROPOSED WATER DISTRIBUTION SYSTEM
The proposed water distribution system will tie (in two places) to the existing 12" water main
located on Langford Road. It will also tie (in multiple locations) to the existing 10" water main that
runs through the proposed development. Domestic water services for each lot and fire hydrant
are connected to the mains throughout the development. The proposed water pipe network can
be seen in Appendix B.
WATER SYSTEM DEMANDS
The following design parameters were used to determine the demands for the proposed water
distribution system.
1. Average Daily Residential Demand per Lot = 350 gallons/day/residential lot = 0.24 gpm/lot
2. Peak Factor = 3
3. Fire Flow Demand = 1000 gallons/minute
4. All while maintaining a minimum of 20 psi
The required fire flow demand was obtained through the latest edition of the International Fire
Code for Group R-2 buildings without an automatic sprinkler system. Once the full development
is complete the demand on the proposed water main was determined as follows:
Average Daily Residential Demand
= 0.24 gpm/lot * 3 (Peak Factor) * 542 lots
= 390.24 gallons per minute
Total Fire Flow Demand
= 1000 gallons per minute
Total Demand
= 390.24 gpm + 1000 gpm
= 1390 gallons per minute
3
WATER MODEL ANALYSIS
WaterCAD V8i was used to model the proposed water distribution system. A Hazen Williams
roughness factor “C” of 150 for PVC pipes was used. The elevations for the water main and
various hydrants were obtained utilizing survey data and GIS contours. The proposed pipe sizes
in the distribution system were obtained from the required flows and pressures throughout the
system.
The water source for the development was modeled in WaterCAD as a pump and reservoir
located at the corner of Bridalwood Lane and Langford Road. A pump curve was determined
using the flow test information shown below.
Hydrant located approximately 500 south of Bridalwood Lane on Langford Road:
Qr = Available Fire Flow
Actual Flow, Qf = 1,036 gpm
Static Pressure, Ps = 59 psi
Residual Flow, Pr = 45 psi
Desired Pressure, Pd = 20 psi
Q = Q P − P .
P − P . = 1036
59 − 20 .
59 − 45 .
Qr = 1,801 gpm @ 20 psi
A water model was developed to analyze Fairhope Falls Phases 1 through 9. A steady state
analysis was performed to determine the fire flow at each hydrant with a minimum pressure of 20
psi. The fire flow for the 37 fire hydrants in the future development ranged from 1,095 gpm to
1,308 gpm. The domestic demand was also included in the steady state analysis for each hydrant
to ensure the domestic demands were being met. The water model data can be found in
Appendix B.
SUMMARY
Based on the water model, the proposed water distribution system will provide the required
average daily demand and a fire flow demand, while maintaining a pressure above 20 psi. For
more detailed information refer to the computer model in the Appendices.
4
Appendix A
(Maps)
5
Appendix B
(WaterCad Results)
Scenario: Base
P-66 P-65
P-113
P-110
P-109
P-102
P-101
P-95
P-94
P-92
P-91P-90
P-89
P-88P-87
P-84
P-81 P-74P-71P-70P-69
P-68P-125 P-124
P-123
P-127 P-126
P-67
P-128P-62
J-37
J-35
J-26
J-31
J-28
J-20
J-25
J-19
J-23
J-22
J-21
J-16
J-17
J-33
J-27
PMP-1
R-1
H-72
H-71
H-70
H-69
H-68
H-67
H-66H-65
H-64
H-63
H-62
H-61H-60
H-59 H-58
H-57H-56
H-55
H-54 H-53
H-52
H-51
H-50 H-49
H-48
H-47
H-46H-45
H-44
H-43
H-42 H-41
H-38
H-14
Page 1 of 127 Siemon Company Drive Suite 200 W Watertown,
CT 06795 USA +1-203-755-1666
10/16/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]
Bentley Systems, Inc. Haestad Methods Solution
Center
WaterCAD Fairhope Falls - updated to include Fairhope
Falls West.wtg
EX 12"
EX 10"
PROPOSED 8" (MINIMUM)
PROPOSED 6" (MINIMUM)
FlexTable: Hydrant Table
Pressure
(Residual Lower
Limit)
(psi)
Flow (Total
Needed)
(gpm)
Fire Flow (Available)
(gpm)
Pressure
(psi)
Demand
(gpm)
Elevation
(ft)
LabelID
20.01,0021,30877.2266.00H-125
20.01,0031,30881.5356.00H-226
20.01,0041,30885.4447.00H-327
20.01,0031,30885.8346.00H-428
20.01,0031,30886.7344.00H-529
20.01,0041,30887.1443.00H-630
20.01,0051,30883.3552.00H-731
20.01,0051,30888.4540.00H-832
20.01,0041,30891.0434.00H-933
20.01,0041,30888.0441.00H-1034
20.01,0041,30881.5456.00H-1135
20.01,0051,30877.6565.00H-1236
20.01,0041,30877.7465.00H-1337
20.01,0021,30879.6260.53H-1438
20.01,0041,30875.9469.00H-1539
20.01,0041,30874.2473.00H-1640
20.01,0031,30880.2359.00H-1741
20.01,0051,30874.2573.00H-1842
20.01,0041,30874.2473.00H-1943
20.01,0061,30872.0678.00H-2044
20.01,0041,30873.7474.00H-2145
20.01,0031,30876.3368.00H-2246
20.01,0041,30875.5470.00H-2347
20.01,0041,30879.8460.00H-2448
20.01,0041,30877.2466.00H-2549
20.01,0041,30875.5470.00H-2650
20.01,0041,30872.9476.00H-2751
20.01,0041,30873.3475.00H-2852
20.01,0031,30870.7381.00H-2953
20.01,0031,30870.7381.00H-3054
20.01,0041,30872.4477.00H-3155
20.01,0031,30874.6372.00H-3256
Page 1 of 327 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA
+1-203-755-1666
10/19/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]Bentley Systems, Inc. Haestad Methods Solution Center
WaterCAD Fairhope Falls - updated to include Fairhope Falls
West.wtg
FlexTable: Hydrant Table
Pressure
(Residual Lower
Limit)
(psi)
Flow (Total
Needed)
(gpm)
Fire Flow (Available)
(gpm)
Pressure
(psi)
Demand
(gpm)
Elevation
(ft)
LabelID
20.01,0041,30669.8483.00H-3357
20.01,0021,29166.8290.00H-3458
20.01,0031,27963.8397.00H-3559
20.01,0031,29865.5393.00H-3660
20.01,0041,30872.9476.00H-37121
20.01,0051,30871.6579.18H-38163
20.01,0061,31659.56107.33H-41172
20.01,0061,34854.86118.34H-42175
20.01,0061,09554.36119.21H-43178
20.01,0061,18554.76118.17H-44179
20.01,0061,25959.96106.17H-45180
20.01,0061,29065.4693.49H-46181
20.01,0071,29770.7781.27H-47182
20.01,0071,30374.2773.03H-48183
20.01,0051,31378.8562.53H-49184
20.01,0071,31572.5777.04H-50185
20.01,0051,31567.4588.76H-51186
20.01,0051,31266.3591.47H-52187
20.01,0071,23560.47105.09H-53188
20.01,0071,11056.07115.39H-54189
20.01,0071,12557.97110.95H-55190
20.01,0071,18460.17105.69H-56191
20.01,0071,25065.2793.91H-57192
20.01,0061,33267.7688.32H-58193
20.01,0071,35764.8795.18H-59194
20.01,0061,31970.9680.70H-60195
20.01,0061,31675.4670.31H-61196
20.01,0051,31579.9559.90H-62197
20.01,0041,31583.2452.21H-63198
20.01,0071,31581.0757.24H-64199
20.01,0051,31578.1563.97H-65200
20.01,0071,31579.9759.80H-66201
Page 2 of 327 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA
+1-203-755-1666
10/19/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]Bentley Systems, Inc. Haestad Methods Solution Center
WaterCAD Fairhope Falls - updated to include Fairhope Falls
West.wtg
FlexTable: Hydrant Table
Pressure
(Residual Lower
Limit)
(psi)
Flow (Total
Needed)
(gpm)
Fire Flow (Available)
(gpm)
Pressure
(psi)
Demand
(gpm)
Elevation
(ft)
LabelID
20.01,0051,31578.8562.43H-67202
20.01,0071,31580.5758.57H-68203
20.01,0051,31579.7560.36H-69204
20.01,0051,26082.2554.60H-70205
20.01,0051,30665.4593.58H-71206
20.01,0041,30876.5467.81H-72213
Page 3 of 327 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA
+1-203-755-1666
10/19/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]Bentley Systems, Inc. Haestad Methods Solution Center
WaterCAD Fairhope Falls - updated to include Fairhope Falls
West.wtg
FlexTable: Junction Table
Flow (Total
Needed)
(gpm)
Fire Flow
(Available)
(gpm)
Pressure
(psi)
Demand
(gpm)
Elevation
(ft)
LabelID
1,0001,30877.2066.00J-165
1,0001,30877.2066.00J-280
1,0001,30875.0071.00J-383
1,0001,30872.9076.00J-486
1,0001,30874.2073.00J-595
1,0001,30878.1064.00J-6100
1,0001,30872.0078.00J-7108
1,0001,30870.3082.00J-8110
1,0001,30870.3082.00J-9112
1,0001,30872.0078.00J-10114
1,0001,30873.7074.00J-11124
1,0001,30874.2073.00J-12130
1,0001,30877.2066.00J-13142
1,0001,38757.70111.63J-16157
1,0001,30876.8067.00J-17160
1,0001,30966.1092.00J-19208
1,0001,31568.6086.00J-20211
1,0001,31379.0062.00J-21212
1,0001,32071.2080.00J-22214
1,0001,31675.5070.00J-23215
1,0001,32168.2087.00J-25217
1,0001,25660.00106.00J-26218
1,0001,28865.6093.00J-27219
1,0001,31160.00106.00J-28220
1,0001,31572.5077.00J-31225
1,0001,31675.5070.00J-33227
1,0001,37962.30101.00J-35249
1,0001,30877.3066.00J-37281
Page 1 of 127 Siemon Company Drive Suite 200 W Watertown,
CT 06795 USA +1-203-755-1666
10/16/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]
Bentley Systems, Inc. Haestad Methods Solution
Center
WaterCAD Fairhope Falls - updated to include Fairhope
Falls West.wtg
FlexTable: Pipe Table
Hazen-Williams
C
Manning's nMaterialDiameter
(in)
Length
(ft)
Length (User
Defined)
(ft)
Has User Defined
Length?
Stop NodeStart NodeLabelID
150.00.010PVC10.0207.430.00FalseH-1J-13P-264
150.00.010PVC10.047.020.00FalseJ-1H-1P-366
150.00.010PVC8.0274.720.00FalseH-2J-1P-467
150.00.010PVC8.0388.840.00FalseH-3H-2P-568
150.00.010PVC8.0321.720.00FalseH-4H-3P-669
150.00.010PVC8.0299.540.00FalseH-5H-4P-770
150.00.010PVC8.0234.400.00FalseH-6H-5P-871
150.00.010PVC8.0324.680.00FalseH-7H-6P-972
150.00.010PVC8.0396.600.00FalseH-8H-7P-1073
150.00.010PVC8.0317.760.00FalseH-9H-8P-1174
150.00.010PVC8.0294.620.00FalseH-10H-9P-1275
150.00.010PVC8.0243.640.00FalseH-11H-10P-1376
150.00.010PVC10.0444.120.00FalseH-23H-11P-1477
150.00.010PVC10.0281.020.00FalseH-24H-23P-1578
150.00.010PVC10.0260.520.00FalseH-25H-24P-1679
150.00.010PVC10.053.440.00FalseJ-2H-25P-1781
150.00.010PVC10.0386.530.00FalseH-26J-2P-1882
150.00.010PVC10.045.270.00FalseJ-3H-26P-1984
150.00.010PVC10.0282.340.00FalseH-27J-3P-2085
150.00.010PVC8.045.400.00FalseJ-4H-27P-2187
150.00.010PVC10.0307.770.00FalseJ-1J-4P-2288
150.00.010PVC8.0252.520.00FalseH-28J-1P-2389
150.00.010PVC8.0363.210.00FalseH-35H-36P-2591
150.00.010PVC8.0301.900.00FalseH-34H-35P-2692
150.00.010PVC8.0375.300.00FalseH-33H-34P-2793
150.00.010PVC8.0360.570.00FalseH-20H-33P-2894
150.00.010PVC8.0329.780.00FalseJ-5H-20P-2996
150.00.010PVC8.045.940.00FalseH-18J-5P-3097
150.00.010PVC8.0368.760.00FalseH-17H-18P-3198
150.00.010PVC8.0329.000.00FalseH-15H-17P-3299
150.00.010PVC8.0334.970.00FalseJ-6H-15P-33101
150.00.010PVC10.050.170.00FalseH-12J-6P-34102
150.00.010PVC10.0327.910.00FalseH-13H-12P-35103
150.00.010PVC10.0348.070.00FalseH-14H-13P-36104
150.00.010PVC10.0337.840.00FalseH-11J-6P-37105
150.00.010PVC8.0303.070.00FalseH-32J-2P-38106
150.00.010PVC8.0397.580.00FalseH-31H-32P-39107
Page 1 of 427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-
755-1666
10/16/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]Bentley Systems, Inc. Haestad Methods Solution CenterWaterCAD Fairhope Falls - updated to include Fairhope Falls West.wtg
FlexTable: Pipe Table
Hazen-Williams
C
Manning's nMaterialDiameter
(in)
Length
(ft)
Length (User
Defined)
(ft)
Has User Defined
Length?
Stop NodeStart NodeLabelID
150.00.010PVC8.055.660.00FalseJ-7H-31P-40109
150.00.010PVC8.0337.860.00FalseJ-8J-7P-41111
150.00.010PVC8.0331.450.00FalseJ-9J-8P-42113
150.00.010PVC8.056.720.00FalseJ-10H-28P-43115
150.00.010PVC8.0339.890.00FalseH-36J-10P-44116
150.00.010PVC8.0287.310.00FalseJ-10J-9P-45117
150.00.010PVC8.056.870.00FalseH-29J-9P-46118
150.00.010PVC8.0388.040.00FalseJ-4H-29P-47119
150.00.010PVC8.056.150.00FalseH-30J-8P-48120
150.00.010PVC8.0249.180.00FalseH-37H-30P-49122
150.00.010PVC8.0289.990.00FalseJ-3H-37P-50123
150.00.010PVC8.0341.170.00FalseJ-11J-7P-51125
150.00.010PVC8.056.220.00FalseH-21J-11P-52126
150.00.010PVC8.0379.600.00FalseH-22H-21P-53127
150.00.010PVC8.0375.000.00FalseH-32H-22P-54128
150.00.010PVC8.0266.980.00FalseH-19H-22P-55129
150.00.010PVC8.0245.560.00FalseJ-12H-19P-56131
150.00.010PVC8.049.090.00FalseH-16J-12P-57132
150.00.010PVC8.0277.090.00FalseH-15H-16P-58133
150.00.010PVC8.0625.300.00FalseJ-5J-12P-59134
150.00.010PVC8.0340.940.00FalseJ-11H-20P-60135
150.00.010PVC60.01.001.00TrueR-1PMP-1P-62139
150.00.010PVC10.030.290.00FalsePMP-1J-16P-128159
150.00.010PVC10.0310.520.00FalseH-38J-17P-67164
150.00.010PVC10.0401.290.00FalseH-42H-41P-126176
150.00.010PVC10.0401.410.00FalseJ-16H-42P-127177
150.00.010PVC10.0373.980.00FalseJ-19H-38P-123209
150.00.010PVC10.0288.100.00FalseJ-28J-19P-124221
150.00.010PVC10.067.230.00FalseH-41J-28P-125222
150.00.010PVC8.0551.710.00FalseH-44H-43P-68230
150.00.010PVC8.0348.950.00FalseJ-26H-44P-69231
150.00.010PVC6.0284.450.00FalseJ-27J-26P-70232
150.00.010PVC6.0383.320.00FalseH-47J-27P-71233
150.00.010PVC6.0397.060.00FalseH-48H-47P-72234
150.00.010PVC6.0383.820.00FalseH-72H-48P-73235
150.00.010PVC6.048.950.00FalseJ-17H-72P-74236
150.00.010PVC8.041.740.00FalseH-45J-26P-75237
Page 2 of 427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-
755-1666
10/16/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]Bentley Systems, Inc. Haestad Methods Solution CenterWaterCAD Fairhope Falls - updated to include Fairhope Falls West.wtg
FlexTable: Pipe Table
Hazen-Williams
C
Manning's nMaterialDiameter
(in)
Length
(ft)
Length (User
Defined)
(ft)
Has User Defined
Length?
Stop NodeStart NodeLabelID
150.00.010PVC8.0417.710.00FalseJ-28H-45P-76238
150.00.010PVC6.044.110.00FalseH-46J-27P-77239
150.00.010PVC6.0393.340.00FalseH-71H-46P-78240
150.00.010PVC6.038.690.00FalseJ-19H-71P-79241
150.00.010PVC6.0416.790.00FalseH-53H-41P-80242
150.00.010PVC6.0455.250.00FalseH-54H-53P-81243
150.00.010PVC6.0365.580.00FalseH-55H-54P-82244
150.00.010PVC6.0376.560.00FalseH-56H-55P-83245
150.00.010PVC6.0455.950.00FalseH-57H-56P-84246
150.00.010PVC6.0349.160.00FalseJ-25H-57P-85247
150.00.010PVC6.0420.090.00FalseH-57H-53P-86248
150.00.010PVC6.0352.540.00FalseH-59J-35P-87250
150.00.010PVC6.0420.410.00FalseH-58H-59P-88251
150.00.010PVC6.095.130.00FalseJ-25H-58P-89252
150.00.010PVC6.0325.630.00FalseJ-22J-25P-90253
150.00.010PVC6.0318.030.00FalseJ-23J-22P-91254
150.00.010PVC6.040.870.00FalseJ-33J-23P-92255
150.00.010PVC6.0356.390.00FalseH-65J-33P-93256
150.00.010PVC6.0257.270.00FalseH-66H-65P-94257
150.00.010PVC6.0377.010.00FalseH-64H-66P-95258
150.00.010PVC6.0414.700.00FalseH-68H-64P-96259
150.00.010PVC6.0417.260.00FalseH-69H-68P-97260
150.00.010PVC6.0275.430.00FalseH-70H-69P-98261
150.00.010PVC6.0271.260.00FalseH-67H-65P-99262
150.00.010PVC6.0378.290.00FalseH-69H-67P-100263
150.00.010PVC6.0360.220.00FalseH-62J-33P-101264
150.00.010PVC6.0408.410.00FalseH-63H-62P-102265
150.00.010PVC6.0528.750.00FalseH-64H-63P-103266
150.00.010PVC6.0340.480.00FalseH-52J-19P-104267
150.00.010PVC6.0314.120.00FalseJ-20H-52P-105268
150.00.010PVC6.035.400.00FalseH-51J-20P-106269
150.00.010PVC6.0416.620.00FalseH-60H-51P-107270
150.00.010PVC6.051.900.00FalseJ-22H-60P-108271
150.00.010PVC6.0276.290.00FalseH-50J-20P-109272
150.00.010PVC6.043.400.00FalseJ-31H-50P-110273
150.00.010PVC6.0451.390.00FalseH-61J-31P-111274
150.00.010PVC6.052.440.00FalseJ-23H-61P-112275
Page 3 of 427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-
755-1666
10/16/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]Bentley Systems, Inc. Haestad Methods Solution CenterWaterCAD Fairhope Falls - updated to include Fairhope Falls West.wtg
FlexTable: Pipe Table
Hazen-Williams
C
Manning's nMaterialDiameter
(in)
Length
(ft)
Length (User
Defined)
(ft)
Has User Defined
Length?
Stop NodeStart NodeLabelID
150.00.010PVC6.0362.390.00FalseJ-21J-31P-113276
150.00.010PVC6.0409.600.00FalseH-62J-21P-114277
150.00.010PVC10.0560.720.00FalseJ-37H-14P-65282
150.00.010PVC10.074.410.00FalseJ-17J-37P-66283
150.00.010PVC6.0328.450.00FalseH-49J-37P-117284
150.00.010PVC6.035.300.00FalseJ-21H-49P-119286
150.00.010PVC12.01,182.470.00FalseJ-16J-35P-120287
Page 4 of 427 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-
755-1666
10/16/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]Bentley Systems, Inc. Haestad Methods Solution CenterWaterCAD Fairhope Falls - updated to include Fairhope Falls West.wtg
FlexTable: Reservoir Table
Elevation
(ft)
LabelID
113.00R-1138
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
10/15/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]
Bentley Systems, Inc. Haestad Methods Solution
Center
WaterCAD Fairhope Falls - updated to include
Fairhope Falls West.wtg
Pump Definition Detailed Report: Pump Definition - 1
Element Details
143ID Notes
Pump
Definition - 1Label
Pump Definition Type
Standard (3
Point)Pump Definition Type ft103.80Design Head
gpm0Shutoff Flow gpm1,801Maximum Operating Flow
ft136.10Shutoff Head ft46.13Maximum Operating Head
gpm1,036Design Flow
Pump Efficiency Type
Best
Efficiency
Point
Pump Efficiency Type
%100.0Motor Efficiency
%100.0BEP Efficiency FalseIs Variable Speed Drive?
gpm0BEP Flow
Transient (Physical)
lb·ft²0.000Inertia (Pump and Motor)SI=25,
US=1280Specific Speed
rpm0Speed (Full)TrueReverse Spin Allowed?
Page 1 of 127 Siemon Company Drive Suite 200 W Watertown,
CT 06795 USA +1-203-755-1666
10/16/2020
WaterCAD CONNECT Edition Update 1
[10.01.01.04]
Bentley Systems, Inc. Haestad Methods Solution
Center
WaterCAD Fairhope Falls - updated to include Fairhope
Falls West.wtg