Loading...
HomeMy WebLinkAbout06-04-2018 Planning Commission Agenda PacketArticle IV, Section C. J. b. (11) Flow model data s ubmitted to the standards of the COF Water Depa11ment. □NIA IZIAccepted with comments □Revise and Resubmit per comments Comments: A flow model was furnished with tlte app!icatio11for subdivision, however this.flow model is not representative of the fire hydrant that will provide fire protection to subject property. Note the site photos included in the cover letter transmittal related to this checklist for specific comments, as well as mark-ups to the final subdivision plat. The fire hydrant shown in tlte southeast corner of lot 3 011 the preliminary plat (Murphy Oil fuel station) is not existing in the field. Please clar~fy if this fire hydrant is proposed, and if so, please be advised that installation of infrastructure such as fire protection equipment requires the subdivision to be submitted as a major subdivision requiring a preliminary plat a11d subsequently a final plat submittal. See conditions of approval referencing Article IV, sections ''G" and ''H" regarding the utility application required/or thi.5 subdivision that will address the new fire hydrant required for the site. As stated above the flow model included with the avolication is insu{ficient for the site. Article IV, Section C.l .d. Drainage plan prepared by professional engineer, including proposed method of stonn water detention and means of controlling erosion during construction . Any po1tion of the land in the proposed subdivision subject to periodic inundation by stonn drainage, overflow or ponding shall be clearly identified on the plat. Lands lying within the flood plain , V or A Zones shall be clearly identified on the plat. Storm-water detention facilities shall be shown in the plans and calculations provided . □NI A □Accepted IZIRevise and Resubmit per comments Cross Reference: Article V, Section F.3.a., b., and c. Comments: The narrative included with the subdivision application indicates the desire to convey drainage from the subject property into tlte existing drainage system of the Wal-Mart site. Upon advisement of the Public Works Director, st0;ff requests ver(fication that the Wal-Mart site's existing drainage system is as- built as-designed and therefore capable of handling drainage from the subject property. Please provide a narrative stamped by the engineer of record for the Wal-Mart site's drainage system indicating as-built as- designed. See conditio11s of approval for this item. Tile information requested by the Public Works Director has not been furnished. Article IV, Section C.1.h . Traffic Data and Traffic Study: Applications shall include trip ge neration data showin g the projected average daily traffic (ADT) in a 24-hour period and projected peak-hour traffic generated by the development in the subdivision application. □N I A IZIAccepted with comments , □Revise and R esubmit per no response required. comments Comments: Burkhardt Engineering provided a letter stamped by a registered professional engineer in the State of Alabama in lieu of a traffic study. The letter indicates no changes in trip generation are anticipated as a result of the proposed subdivision. Article IV, Section C.5. Pre-Construction Conference 5. Pre-construction Conference -An onsite pre-construction conference with C ity representatives is required prior to initiation of any land disturbance activities. Construction of said improvements shall in no way obligate the Commission to grant Final Approval of the Plat, nor shall it obligate the City Council to accept such improvements for public maintenance. No owner or developer shall proceed with any site work under authority of preliminary plat approval until the completion of the preconstruction conference. IZIN I A with comments, no □Accepted □Revise and Resubmit per response required. co nun en t s Comments: Not applicable at this time. See conditions of approval. At the time of initial review, the application was believed to be a minor subdivision not requiring the installation of infrastructure. However, the installation of a new fire hydrant as well as possible water and sewer mains for lot lcreates a major subdivision requiring infrastructure installation, and as a result a pre-construction meeting is required. 3 SD 18.07 Resubdivision of Lot 4, East Fairhope Plaza -June 4, 2018 Article V Section E.5.a.-c. Lot Standards -Utility Access and Easements a. Except where lanes are provided at the rear of lots , easements not less than fifteen feet in width along s ide and rear lot lines as req uired for drainage and utilities. On interior lots , the easement may be designed to lie equally on adjacent lots. On perimeter lots, no pait of the required easement shall lie outside the platted lands. Easement placement and widths shall be approved by the Planning Commission. No half easements will be approved unles s adjacent property owners dedicate the other half of the easement at time of approval. b . W11ere a subdivision is traversed by a watercourse , drainage way, natural channel or stream, there shall be provided an easement conforming substantially to the limits of such water course plus additional width as necessary for maintenance and future construction. c. Lots and easements shall be so arranged as to eliminate unnecessary jogs or off-sets and to facilitate the use of easements for power distribution , telephone service, drainage, water and sewage collection services □NIA □Accepted IZ!Revise and Resubmit per comments Comments: Utility access easements are not shown or noted on the plat. See co11ditio11s of approval. The I 5' drainage and utili(y eas ement is shown Oil lot line dividing lots 1 a11d 2, but not shown 011 the northern side lot Ji11e of lot I and the southern lot line of lot 2, a11d 1101 depicted 011 the rear lot lines of lots 1 and 2. Article VI, Section E.1.-2. Construction Standards-Storm Water □NIA □Accepted IZI Revise and Resubmit per comments Cross Reference : Alabama Department of Transportation Standard Spec ifications for Highway Constructions, current edition Comments: See Article JV, Section C.J.d. Drainage plan for more information. Upon advisement by the Public Works Director staff requests verification that the Wal-Mart site's existing drainage !iJISlem is as-built as-designed and therefore capable of handling drainage from the subject property. See conditions of approval. The letter requested by the Public Works Director !,as not been furnished and i!i' a condition of aooroval. Article V1 Section G. Construction Standards-Fire H)"drants Fire Hydrants shat I be installed along each street at a maximum interval of four hundred fifty ( 450) feet, or at the ends and center of each b lock, or as otherwise required by the fire author ity having jurisdiction. Water supp ly and pressure shall be adequate to provide fire protection and for the future needs of the deve lopment. Blue reflective markers shall be installed at the street line of streets to indicate the location of fire hydrants. □N IA □Accepted IZ!Revise and Resubmit per comments Comments: Please see Article W, Section C.J.b.(11) Flow model data for more information related to the .fire hydrant and.fire flow model for subject property. See conditions of approval. The fire hydrant show11 on tlte plat is located along CR 48 near the existing medical.facility and did not receive a.flow model. Further, this hydrant is more than 450'.from su~;ect property and as a result a new ltydralll must be installed to service the new subdivision . The submitted flow model is 1~l a hydrant located near tlte intersection of HWY 181 and Marf,!aret Drive, more tha11 l,OtJ(J feet away, also not in compliance with this section. Article VI, Section H Construction Standards-Sanita1y Sewerage 4 1. All subdivisions shall have sanitary sewer service . The sewer service shall be prov ided by either the Fairhope Public Utilities or an approved sewer service. 2. All sanita1y sewer systems constructed within a subdivision and all sanitary sewer systems constructed outside of a subdivision but servicing a subdiv-ision shall be consh·ucted in accordance with those certain "Standard Specifications for Constructing Sanitaty Sewer Facilities and Water Facilities " which is on file at the City of Fairhope Water & Sewer Department. 3 . Individual septic ta nk type systems that have been approved by the Baldwin County Health Department and the Fairho e Public Utilities Sewer De aitment ma be utilized. SD 18 .07 Resubdivision of Lot 4, East Fairhope Plaza -June 4, 2018 Looking east toward subject property from west side of State HWY 181 Looking west toward subject property from within ex isting Wal-Mart parking area 6 SD 18.07 Resubdivision of Lot 4, Ea st Fairhope Plaza -June 4, 2018 1) Prior to land disturbance, the following missing items shall be submitted or the following revise and resubmit conditions described previously must be cured: a. Submission of "will serve" letters, and plans/profiles of water and sewer mains to be installed on the subject property as required by Article IV, Section C.l.b.(8). i. Indicate the location of the new fire hydrant on the preliminary plat as required by Article VI, Section G and provide plans and profiles of the new main servicing the new hydrant. b. Article IV, Section C.1 .b.(11) Flow model data submitted to the standards of the COF Water Department . (This will likely be satisfied with the submission of Standard Specifications for Constructing Sanitary Sewer Facilities and Water Facilities as required below. c. Article VI , Section E.1.-8. Submission of a letter from the Engineer of Record (with PE stamp) of the existing dra inage system indicating the existing system is "as -built", "as - designed". d. Article IV, Section C.5 . Pre -Construction Conference e. Article V, Section E.5.a .-c. Indicate the 15 ' drainage and utility easements on the northern lot line of lot 1 and the southern lot line of lot 2, as well as rear lot lines of lots 1 and 2. i. Correctly reflect the drainage and utility easements described above on Plan Note number "7" on the preliminary plat . ii. Edit the "narrative" on the preliminary plat to r eflect a "major" subdivis ion in lieu of a minor subdivision . 1. If a conflict with the Baldwin County subdivision regulations occurs this item may be required to re.main worded as a "minor' subdivision , however, City of Fairhope major subdivision requirements for submission of a final plat will remain i n effect. f . Submit the application entitled Standard Specifications for Constructing Sanitary Sewer Facilities and Water Facilities as required by Article VI , Section H. 8 SD 18 .07 Resubdivision of Lot 4, East Fairhope Plaza -June 4, 2018 Summary of Request: Public Hearing to consider the request of Dewberry Engineers, Inc. for Final Plat approva l of Phase 4 of Golden O ak at Firethorne, a 31-lot subd i vision. The project is located on the north side of Narrow leaf Blvd . and west of Quail Creek Vi llas . The property is owned by Nathan Cox , Ralph Reynolds, Davis Pilot, Billy Stimpson, Sands Stimpson, and Thomas Gross. The app licant's authorized agent is Dewberry, LLC. The subject property is approximate ly 14.48 acres and 31 lots are proposed . The smallest lot is approximately 15,000 sq. ft. and the largest lot is approximately 19,795 sq. ft. This proposed project is being addressed as a major subdiv ision as it consists of more than 4 lots, as per Article II, Definitions in the City of Fairh ope Subdivision Regulations. Site History: The existing PUD development, known as Firethorne was ori gina l ly proposed with 228 lots. The Fi rethorne PUD is a 126.37 acre residential deve lopmen t is located on the east side of Alabama Highway 181, south of Quail Creek Drive and north of North Vi l lage of Stone Creek PUD. The proposed subdivision was a phase that was in the original master plan . The existing Firethorne PUD has had a reduction in the total number of lots and current ly stands at 225 lots. Firethorne Subdivision Cases: I Case Applicant Case Type ' Subdivision N"o. of Location Zonir,g PZ Date PZ Decision Number Name Lots ' SD -1 4-09 Preble -Rish , LLC Prel iminary Firethorne -79 Inside PUD 8/4/2014 Approved Phase lA & 1B SD-15 -21 Preble -Ri sh, LLC Final Firethorne -79 Inside PUD 9/8/2015 Approved / Firethorne Phase 1A & 1B Dev . SD-16 -17 Dewberry/ Preliminary Phas e 2 of 29 Inside PUD 8/1/2016 Approv ed Preb le-Rish, LLC Silverleaf at Firethorne SD-17 -10 Dewberry/ Final Phase 2 of 29 Inside PUD 4/3/2017 Approved Preb le-Rish Silver leaf at Firethorne SD -16 -26 Dewberry/ Preliminary Phase 3 of 30 ,lnside PUD 11/10/2016 Approved Preble -Rish, LLC Greenbriar at Fi rethorne SD-17 -23 Dewberry/ Final Phase 3 of 29 Inside PUD 9/5/2017 Approved Preb le-Rish , LLC Greenbrier at Firethorne -- SD-16-35 Dewberry Preliminary Phase 4 of 31 Inside PUD 12/5/2016 Approved /P reb le-Rish , LLC Go lden Oak at Firethorn e SD -18-15 Dewbe r ry LLC Preliminary Phase 5 of 30 Inside PUD 5/7/2018 Approved Greenbriar at Firethorne SD -18 -16 Dewberry, LLC Pre lim inary Phase 6 of 26 Inside PUD 5/7/2018 Approved Go l den Oak at Firethorne SD -18-22 Dewberry Engir Final Phase 4 of 31 Inside PUD 6/4/2 0 18 TBD Inc. Go l den Oak 2 SD 18.22 Phase 4 of Golden Oak at Firethorne -June 4, 2018 Operations and Maintenance Plan: A copy of the recorded Operations and Maintenance Plan has been submitted. The master Operation s and Maintenance Plan was prepared in Phase 1 of the Firethorne Development and the Operations and Maintenance Plan was a master for entire development and the plan has been previously recorded . LID Requirements: Staff's understanding is that the applicant worked with the previous Director of Planning and it was determined no lid review would be required as the master plan was in process prior to the establishment of the LID ordinance . landscaping: The applicant has submitted a landscape plan which has been approved by Paul Merchant, City of Fairhope Horticulturist. The installed landscaping was inspected on May 16, 2018 by Paul Merchant. The landscaping that has been installed has been approved. With regards to future street trees, no trees shall block site visibility (25' within any intersection). Signage: Per Kim Burmeister, subdivision signs will require separate permitting. Fire hydrants: Fire hydrants shall be placed at every intersection and every 450 feet. Pedestrian Connections and Streets: All sidewalks shall be ADA compliant and tactile strips are required. The Building Official did have final inspection comments regarding pedestrian connections. The applicant has this list and the plat will not be signed until all punch list items are completed . lighting: The applicant has provided proof that the street light invoice ha s been has been paid. If the development wishes for the City of Fairhope to assume the monthly service charges for the roadway lighting, the fixtures to be installed must be L.E.D "acorn style" fixtures. The applicant shall verify the requirements from the Director of Operations, Mr. Richard Peterson. Completion of Improvements: A final inspection was held on May 9th , 2018 for the Phase 4 of Golden Oak at Firethorne subdivision. The applicant was provided with a copy of the punch list items and shall call the City of Fairhope for a re-inspection when the punch list items are completed. Financial Guaranty's: The applicant has submitted a maintenance agreement and bond for improvements in the right of way and a subdivision agreement and bond for sidewalks and street trees. The engineer has provided the signed sealed schedule of values for the bonds. Staff provided a copy of the schedule of values to the Public Works Director (Mr. Richard Johnson , PE) and to the Director of Operations (Mr. Richard Peterson, PE). No changes were received by staff. Recording: As per Article 7, Section D.7 of the City of Fairhope Subdivision Regulations: Applicant is responsible for recording of Plat and approval shall be null and void if the Plat is not recorded within sixty days after the date of final approval; provided, however, that the Commission may, on finding of good cause, extend that sixty-day period. The applicant shall provide a copy of the recorded plat; failure to do so shall result in the denial of the issuance of the building permits within the subdivision. Other: Any applicable outside agency permits shall be obtained. Approval Standards: The subdivision regulations contain the following criteria in Article V.B.2. Approval Standards: "2. Consistency with Plans, Regulations and laws -The Planning Commission shall 5 SD 18.22 Pha se 4 of Gold en Oak at Firethorne -June 4, 2018 not approve the subdivision of land if the Commission makes a finding that such land is not suitable for platting and development as proposed, due to any of the following: a . The proposed subdivision is not consistent with the City's Comprehensive Plan, and/or the City's Zoning ordinance, where applicable; b. The proposed subdivision is not consistent with the City's Comprehensive Plan or any other plan or program for the physical development of the City including but not limited to a Master Street Plan, a Parks Plan, a Bicycle Plan, a Pedestrian Plan, or the Capital Improvements Program; c. The proposed subdivision is not consistent with these Regulations; d. The proposed subdivision is not consistent with other applicable state or federal laws and regulations; or e. The proposed subdivision otherwise endangers the health, safety, welfare or property within the planning jurisdiction of the City." The project does not appear to be inconsistent with the applicable criteria of the City of Fairhope. Recommendation: Staff recommends approval contingent upon the following conditions: 6 1) The final punch list shall be completed to the sat isfaction of the City of Fairhope Department Supervisors prior to plat recording. 2) Mr. Richard Peterson's approval of the sanitary sewer video. 3) As per Article 7, Section D.7 of the City of Fairhope Subdivision Regulations Applicant is responsible for recording of Plat and approval shall be null and void if the Plat is not recorded within sixty days after the date of final approval. SD 18.22 Pha se 4 of Golden Oak at Firethorne -June 4, 2018 Summary of Request: Request of AT&T/ Deviney for an 11.52.11 Utility Review and approval of the proposed underground installation of approximately 670 lin ear feet of PVC conduit within Phase 3 of Old Battles Village, consisting of various street crossings within Phase 3. The conduit installations are necessary for providing new AT&T service to Phase 3. All other work above and beyond the ROW will occur in the utility easement. Comments: The proposed utility construction falls within the Corporate limits of the City of Fairhope. The comments below are typical general comments for City of Fairhope right-of-way projects. Any portions of the project affecting public right-of-way (ROW) maintained by Baldwin County or the Alabama Department of Transportation (ALDOT) shall require permits through the Baldwin County Highway Department or ALDOT. AT&T/ Deviney proposes construction of the project utilizing directional boring. Various directional bores will occur as street cross ings beginning near the intersection of Garrison BLVD and Craftsman Ave, terminating near the intersection of Bloomsbury AVE and Garrison BLVD. Street crossings occur in various locations along Garrison BLVD and crossings also occur on Burnside AVE, MacArthur LN, Dunker AVE, and Bloomsbury AVE. No hand holes are requested for this project and conduit sizes vary form 1- 1/2" to 4" in size. Conduit depth shall be a minimum of 36" and clearance around storm drainage structures is shown on the utility drawings. No homes are current ly located in the area affected by this application. GENERAL COMMENTS No open trenches shall be allowed. Directional boring shall be used in sensitive areas, such as under roads, in proximity to trees, on finished lots, etc. SUPERINTENDENT AND DEPARTMENT HEAD COMMENTS The applicant shall contact Alabama One Call to locate all existing utilities. Public Works Standard Comments: 2 • Hand holes shall not be located within driplines of Heritage Trees (as defined by the Tree Ordinance). o No handholes requested for this project • Any proposed trenching shall not be within the dripline of trees. o No trenching is proposed for this application. • If within a tree dripline, consult with the City of Fairhope Horticulturist before proceeding with earth work. o Not expected to occur on this project • Trees shall not be negatively impacted. o Not expected to occur on this project • The applicant sha ll provide drawings locating their utilities with other utilities and the sidewa l ks. Any bo xes/hand holes cannot be placed in sidewalks. The applicant shall review the sidewalk plan to determine if there are any confl icts . The applicant shall coordinate work with Richard D. Johnson, PE, Public Works Director, to resolve any potential conflicts. o No sidewalks are expected to be impacted by this project • All conduit/cable shal l be placed at a depth from existing grade per industry and/or County Standards. A minimum horizontal and/or vertical clearance (separation) of 36" must be maintained from stormwater and utility infrastructures. No handholes, boxes, or other above ground infrastructure shall be installed within drainage easements. Pedestals sha ll be placed in a manner as to avoid obstructing visibility of motorists and to allow veh icles to exit the roadway during an emergency. No grad e change shall result from the utility installation . o Utility drawings indicate the depth of bore/conduit installation shall be at least 3' and clearance around existing drainage structures is shown. See "Conditions of Approval" for corrections to details on various drawings. UR 18.03 AT&T -June 2-2018 • The material under the sidewalk shall be compacted and the repai r work shall be to the satisfaction of the Building Official or his designated representative . The applicant shall contact the Building Department for inspection prior to placing concrete. o No sidewalks are expected to be impacted by this project Code Enforcement Officer's Standard Comments: • The applicant, or subcontractor, shall obtain a ROW permit from the City of Fai r hope Building Department prior to beginning work. • Subcontractors shall have a current business license with the City of Fairhope and shall have a copy of the ROW permit available for review at all times, and shall be posted on site or in the window of contractor's vehicles. • Any ROW cuts shall be stabilized {covered) at the end of each day and disturbed areas shall be re-vegetated with sod within ten {10) days of completion of the project. • Mulch/ seed shall only be acceptable as temporary cover. • Sod shall be watered as needed to ensure survival. • Inlets shall be protected. • If site is within 100' of a critical area {wetland, etc.), no red soils/clay are allowed as fill material, per the City's Red Clay/Soil Ordinance. Building Official's Standard Comments: • BM P's shall be installed at boring sites and trench locations. • Ground conditions in the ROW's shall be returned to original preconstruction condition(s) or better. • All plans and permits shall be available for review at all times along with th e City of Fairhope permit application. • If required, appropriate ALDOT or Baldwin County Highway Department permits shall be obtained prior to the issuance of a right-of-way (ROW) permit. • Contractor is advised to review and comply with the Building Official's best practices flyer. o A copy of the flier is attached. The Building Official may provide supplements to the flier at the time of ROW permit issuance for which the applicant shall comply. Water and Sewer Standard Comments: • All existing utilities must be located, and proper separation shall be ma intained between utilities. • All mechanical equipment shall be screened by painting the equipment Munsell Green. o Not expected to occur on this project Natural Gas Standard Comments: • Contractor shall provide proper separation from the gas main and all other utilities. Additional Review Comments: The applicant is advised of the following: • No work shall begin until a ROW permit is issued by the City of Fairhope Building Department or other applicable jurisdiction {permit not valid until paid for and picked up by contractor). • The ROW permit shall be kept with the contractor or subcontractor at all times during site work. The ROW permit shall be posted on the job site or in the window of contractor(s) vehicle . • All contra ctors/subcontractors are subject to City of Fairhope Business Licen se p roced ures. This site shall comply with all State, Federal and local requirements, including, but not limited to the following City of Fairhop e Ordinances: 1. City of Fairhope Wetland Ordinance {#1370), which regulates activity within 20' of wetlands. 3 UR 18.03 AT&T -June 2-2018 2. City of Fairhope Red Soil & Clay Ordinance (#1423), which prohibits the use of red soil/ clay within 100 1 of critical areas. 3. City of Fairhope Erosion and Sediment Control Ordinance (#1398). State and Federal permits shall be on file with the City of Fairhope Building Department, prior to the issuance of City of Fairhope permits. The applicant shall provide as -built profiles of the installed lines, showing the exact depth . The applicant shall provide full size plans (24"X36") for this application and for future applications. Recommendation: To approve with the following conditions: 4 1) The applicant shall follow the general comments related to utility work, as stated above. 2) All mechanical and locator equipment shall be painted Munsell green as applicable. 3) Areas of proposed construction requiring utility location by City of Fairhope Public Utilities shall be marked with white paint prior to requesting a locate ticket from Alabama One Call. a. Applicant shall comply with any utility locate phasing requirements of the Building Official. 4) Applicant and applicant's contractor shall follow the Right of Way Installation Permitting and Work Procedures document provided by the Building Official (attached) including any supplements provided by the Building Official at the time of ROW permit issuance. 5) A minimum clearance around stormwater infrastructure as stated previously . As a condition approval minor edits are required as follows to the construction drawings prior to issuance of a ROW permit: a. Drawing 2 of 11 revise the conduit separation from 26" to 36" b. Drawing 10 of 11 revise the Bloomsbury Avenue detail from 32" to 36" conduit separation c. Drawing 10 of 11 revise the Garrison BLVD detail from 24" to 36" conduit separation UR 18 .03 AT&T -June 2-2018 Summary of Request: Request of Southern Light/Uniti Fibe r for an 11.52 .11 Utility Review and approval of the proposed underground installation of approximately 4,503 linear feet of fiber optic cable along the ALDOT HWY 181 ROW as well as along Quai l Creek Drive terminating near the Quail Creek golf course clubhouse at 19841 Quail Creek Drive. Comments: The proposed utility construction falls within the Corporate limits of the City of Fai rhope. The comments below are typical general comments for City of Fairhope right-of-way projects. Any portions of the project affecting public right-of-way (ROW) maintained by Baldwin County or the Alabama Department ofTransportation (ALDOT) shall require permits through the Baldwin County Highway Department or ALDOT. Southern Light/ Uniti Fiber proposes construction of the project utilizing directional boring. The direction bore will follow the east side of State HWY 181, crossing under the HWY 181/Quail Creek Drive connectors to HWY 181, and continuing east along the south side of Quail Creek Drive terminating as described in the summary. The Right of Way Utility/ Util ity Application references the 2,024 If installation along Quail Creek Drive, however the total proje ct including the HWY 181 portion encompasses 4,503 linear feet as stated in the summary above. A new handhole will be installed along Quail Creek Drive. Two , 1-1/4" HDPE conduits will be insta lled including required locate wires. Bore pits to be excavated prior to initiating the directional bore will be approximately 4' x 4', and 24" deep occurring at each end of the directional bores. GENERAL COMMENTS No open trenches shall be allowed. Directional boring shall be us e d in sensitive areas, such as under roads, in proxim ity to trees, on finished lots, etc. SUPERINTENDENT AND DEPARTMENT HEAD COMMENTS The applicant shall contact Alabama On e Call to locate all existing utilities. Public Works Standard Comments: • Handholes shall not be located within driplines of Heritage Trees (as defined by the Tree Ordinance). o Not expected to occur on this projec t • Any proposed trenching shall not be within the dripline of trees. o No trenching is proposed for this application. • If within a tree drip line, consult with the City of Fairhope Hortic ulturist before proceeding with earth work. o The horticultura/ist was furnished with the project plans and is aware that a directional bore will occur along the south side of Quail Creek Drive, the depth of bore shall be 5 ' as shown on the utility drawings. • Trees shall not be nega tively impacted . o Not expected to occur on this project • The applicant shall provide drawings locating their utilities with other utilities and the sidewalks. Any bo xes/hand holes cannot be placed in sidewalks. The applicant shall review the si dewalk plan to determine if there are any conflicts. The applicant shall coordinate work with Richard D. Johnson, PE, Public Works Dire ctor, to resolve any potential conflicts. o No sidewalks are expected to be impacted by this project • All conduit/cable sha ll be placed at a depth from existing gra de per industry and /or County Standards. A minimum horizon tal and/or vertical clearance (separation) of 36" must be maintained from stormwater and utility infrastructures. No handholes, bo xes, or other above ground infrastructure shall b e installed within drainage easements. Pedestals shall be placed in a manner as to avoid obstructing visibility of motorists a nd to allow vehicles to exit the roadway during an emergency. No grade change sha ll result from the utility installation. o Utility drawings indicate the depth of bore/conduit installation shall be 5 '. 2 UR 18.04 Southern Light -June 2, 2018 • The material under the sidewalk shall be compacted and the repair work shall be to the satisfaction of the Building Official or his designated representative. The applicant shall contact the Building Department for inspection prior to placing concrete. o No sidewalks are expected to be impacted by this project Code Enforcement Officer's Standard Comments : • The applicant, or subcontractor, shall obtain a ROW permit from the City of Fairhope Building Department prior to beginning work. • Subcontractors shall have a current business license with the City of Fairhope and shall have a copy of the ROW permit available for review at all times, and shall be posted on site or in the window of contractor's vehicles . • Any ROW cuts shall be stabilized (covered) at the end of each day and disturbed areas shall be re-vegetated with sod within ten (10) days of completion of the project. • Mulch/ seed shall only be acceptable as temporary cover. • Sod shall be watered as needed to ensure survival. • Inlets shall be protected. • If site is with i n 100' of a critical area (wetland, etc.), no red soils/clay are allowed as fill material, per the City's Red Clay/Soil Ordinance. Building Official's Standard Comments: • BM P's shall be installed at boring sites and trench locations. • Ground conditions in the ROW's shall be returned to original preconstruction condition(s) or better. • All plans and permits shall be available for review at all times along with the City of Fairhope permit application. • If required , appropriate ALDOT or Baldwin County Highway Department permits shall be obtained prior to the issuance of a right-of-way (ROW) permit. • Contractor is advised to review and comply with the Building Official's best practices flyer . o A copy of the flier is attached. The Building Official may provide supplements to the flier at the time of ROW permit issuance for which the applicant shall comply. Water and Sewer Standard Comments: • All existing utilities must be located, and proper separation shall be maintained between utilities. • All mechanical equipment shall be screened by painting the equipment Munsell Green. o Not expected to occur on this project Natural Gas Standard Comments: • Contractor shall provide proper separation from the gas main and all other utilities. Additional Review Comments: The applicant is advised of the following: • No work shall begin until a ROW permit is issued by the City of Fairhope Building Department or other applicable jurisdiction (permit not valid until paid for and picked up by contractor). • The ROW permit shall be kept with the contractor or subcontractor at all times during site work . The ROW permit shall be posted on the job site or in the window of contractor(s) vehicle. • All contractors/subcontractors are subject to City of Fairhope Business License procedures . This site shall comply with all State, Federal and local requirements, including, but not limited to the following City of Fairhope Ordinances: 3 UR 18 .04 Southern Light -June 2, 2018 1. City of Fairhope Wetland Ordinance (#1370), which regulates activity within 20' of wetlands. 2. City of Fairhope Red Soil & Clay Ordinance (#1423), which prohibits the use of red soil/ clay within 100' of critical areas . 3. City of Fairhope Erosion and Sediment Control Ordinance (#1398). State and Federal permits shall be on file with the City of Fairhope Building Department, prior to the issuance of City of Fairhope permits. The applicant shall provide as-built profiles of the installed lines, showing the exact depth. The applicant shall provide full size plans (24"X36") for this application and for future applications. Recommendation: To approve with the following conditions: 4 1) The applicant shall follow the general comments related to utility work, as stated above. 2) All mechanical and locator equipment shall be painted Munsell green as applicable. 3) Areas of proposed construction requiring utility location by City of Fairhope Public Utilities shall be marked with white paint prior to requesting a locate ticket from Alabama One Call. a. Applicant shall contact the Building Official and comply with any utility locate phasing requirements of the Building Official. 4) Applicant and applicant's contractor shall follow the Right of Way Installation Permitting and Work Procedures document provided by the Building Official (attached) including any supplements provided by the Building Official at the time of ROW permit issuance. UR 18.04 Southern Light -June 2, 2018 Emily Boyett From: Nancy Milford Sent: To: Friday, May 04, 2018 3:09 PM Emily Boyett Subject: FW: Point Clear Village Subdivision Importance: High Please see the information below. Thanks. Nancy From: Scott Hutchinson <sah@hmrengineers.com> Sent: Friday, May 04, 2018 2:31 PM To: Nancy Milford <nancy.milford@cofairhope.com> Cc: Wayne Dyess <wayne.dyess@fairhopeal.gov>; Jeff Barnes <jbarnes@stirlingprop.com> Subject: RE: Point Clear Village Subdivision Nancy, Please accept this email as a new request to be placed on next month's PC agenda for another 180 day Final Plat extension . The County has apparently decided, instead of just signing the plat, to revise t hei r regu lations to remove the 3:1 lot length-to -width requirement. Apparently, this will take a couple of months and we don 't want our Final Plat Approval to expire . Thank you for your consideration . Sincerely, Scott A. Hutch inson , P.E. President -HUTCHINSON, MOORE & RAUCH, LLC E NG INE ERS ♦ SL'll VEYO RS ♦ L IND Pi.A , 1,RS P.O. Box 1127 Daphne. AL 36526 Tel : 251 .626.2626 Fax : 251.626 .6934 Tlw ir!f'or111atio11 co 11 tai11ed i1 1 the ele ctronic message is co,!fide nt ict!. proprietwy. and /mended 011ly/or tire 11se q/'th e ow 11er oftl,e e-mail address li sted as che recipient 1,f tl,i s message. ((yo11 are not th e i11tended recipie 111. or tl,e employee ur agent responsible.for delive rin g this message tu th e rec ipient, you are l1ereby 11 0!/{ted that anv disclos ure, dissemina tion , dis tr ibwio11 . copJ•i11g q('this co 111111u11icmio11 , or unauthorized 11.se is str ictly prohibited and subjec t lo prosecwio11 co 1!,efi1/lest e.rle/'11 of th e 1ml'. DO NOT ACT UPON, FO RW4RD , CO PY OR OT!-I ERWJSE DJSSEMm4T£ /TOR /'I S CON TENTS. From: Scott Hutchinson [mailto:sah@hmrengineers.com] Sent: Tuesday, January 02, 2018 11:46 AM 1