HomeMy WebLinkAbout12-04-2006 Planning Commission MinutesThe Planning & Zoning Commission of the City of Fairhope met Monday,
December 4, 2006 at 5:00 PM at the Civic Center Complex
Present: Jean Wilson, Chairman; Tim Kant, Bob Clark, Gary Moore,
Dick Charles, Lee Turner, Ed Brinson, Cecil Christenberry. Gregg Mims,
Planner, Jonathan Smith, Nancy Milford, Emily Irby and Betty Rivenbark,
Secretary. Absent: Dan McCrory
The minutes of the November 6, 2006 were duly approved as written on
motion by Dick Charles, 2nd by Ed Brinson and unanimously carried.
SR06-04 Site Plan approval Douglas and Sarah Kennedy mixed-use
building located on the south side of Magnolia Avenue, just west of Section
Street. Jonathan Smith gave the staff report saying that this property is
located in the Central Business District(CBD) and is zoned B2-General
Business. A 3 story professional office/residential building is proposed.
A building now exists on this property on Magnolia St and will be removed.
Four residential dwelling units and eight lease spaces for office/commercial
are proposed. The parking and height requirements have been met and
Jonathan said they met with city horticulturist Jennifer Fidler on site and are
in agreement that the trees located along the south property line will be
preserved through the use of gravel in this parking area rather than
pavement. Staff recommendation was to approve. Ben Coate of HMR was
present on behalf of the Kennedy’s. Mrs. Wilson asked if anyone present
wanted to speak on this, no one did. Tim Kant asked how wide the
sidewalk and was told 5 ft. he remarked that we needed at least 8 ft. and
was told there is some room to work with so that should not be a problem.
Lee Turner moved to accept staff recommendation, Dick Charles 2nd the
motion and it carried with one abstention by Gary Moore.
SR06-05 Site Plan Approval of Founder’s Square located on the west of
Section Street North of Morphy Avenue. Jonathan Smith gave the staff
report saying that this property is zoned B-2 General Business and is
located in the Central Business District. The proposed building is three
stories and will be used for commercial and residential purposes. Twelve
residential units and six commercial units are proposed. Site access is
shown from the city parking lot to the west. The City of Fairhope Parking
Authority leases the parking lot areas from the Single Tax Corporation.
Jonathan further said there are some issues with the parking area and
original staff recommendation was a letter from the City of Fairhope Parking
Authority approving access to the site, and the deletion of 3 public parking
spaces in the parking lot directly west of the subject property. 2. The building
being moved approximately two feet to the west because of encroachment
in the public right of way, and 3. that the sidewalk along Section Street in
front of the subject site shall be eight feet wide but staff recommendation
tonight was to table for 30 days in order for them to work out their problems
and to get this on the December 18 City Council agenda and for them to get
feedback. Mrs. Wilson asked Scott Hutchinson if he agreed to table it for 30
days. He said formally no, that they need a January vote by this body but
Planning & Zoning Commission
December 4, 2006 – Page Two
if they would vote in January he would agree to it being tabled. He was told
access to the site is the issue, that the site plan is in vain if it is not approved
by the Colony and Parking Authority. Scott Hutchinson said that the two feet
encroachment was in error and has been corrected and that the 8 ft
sidewalk is not a problem. Further discussion led to a motion
by Tim Kant to table for 30 days with decision being made at the January
meeting. Ed Brinson 2nd the motion and it carried with one abstention by
Gary Moore.
SD06.53 Preliminary Plat approval of Dogwood Subdivision The
property is located on the northeast corner of Valley Street and Middle
Street. Nancy Milford gave the staff report saying this is a 3.1 acre site and
8 lots are proposed. The property is zoned R-2 and an informal review was
held but the layout has been completely revised from the original submittal.
Staff recommendation was to approve conditional upon the submittal of the
street tree plan and the required finished floor elevations and the temporary
turnaround being labeled on the plat. A second opinion on drainage
calculations was sought from Thompson Engineering as property in this
area has had flooding problems before. Scott Hutchinson of HMR spoke for
the project and said the new layout has a detention pond that provides
35, 800 cubic feet of water storage below the 74 contour which
accommodates the existing 32,000 cubic feet of storage on the property plus
the additional 3600 cubic feet of storage required for a 100 year storm
event. Scot said further he had done some work in this area and knows it is
a sensitive area. Jean Wilson asked if anyone wished to speak to the
application, no one did. Scott was asked to provide finished floor elevations
for every lot and he said it would not be a problem. Further discussion led to
a motion by Dick Charles to approve preliminary plat subject to the FFE on
every lot and the temporary turnaround being labeled on the plat. Ed
Brinson 2nd the motion and it carried with one nay vote by Jean Wilson and
one abstention by Gary Moore.
SD06.54 Final Plat approval of Old Battle’s Village Phase One Nancy
Milford read the staff comments and said this property contains 51.44 acres
and 120 lot subdivision that it is located inside the city and is zoned as a
PUD. She said a Letter of Credit has been submitted for the completion of
improvements. Staff recommendation was approval conditional upon a
submittal of utility plan or letter from the Electric utility. Mrs. Wilson asked if
anyone wished to speak on this application and Bo Brodbeck spoke saying
his father and grandfather own the abutting property and citing
encroachment by an appraisal stake on their property. Scott Hutchinson of
HMR spoke on behalf of the applicant and said that will be looked into and
corrected if need be. Mr. Brodbeck asked if any buffers planned and Mr.
Hutchinson remarked that there were none shown on original PUD plan.
Scott said further this was formerly Huntington and that when last discussed
Planning & Zoning Commission
December 4, 2006 – Page Three
the number of lots were significantly reduced and approval given. Lee
Turner asked about the detention pond and Scott explained they were
stabilizing it and planting around it. Further discussion led to a motion by
Dick Charles to accept staff recommendation contingent upon receiving the
utility letter and planting/stabilizing around the detention pond. Ed Brinson
2nd the motion and it carried with one abstention by Gary Moore.
Gregg Mims spoke to the commission on the adoption of the
Comprehensive Plan revisions . He said they have had numerous meetings
and extensive comments and this was the final version. He reminded the
commission that this is a working document and asked for formal adoption.
Dick Charles moved to approve latest 2006 update and recommend same to
the City Council. Lee Turner 2nd the motion and it carried unanimously.
Mayor Kant asked that the changed sections be marked so the council could
compare the old and new document and Gregg said they would be marked.
A Resolution was presented to the Planning Commission and staff was
asking for them to pass it relating to the extension of the present moratorium
through March 26, 2007. Staff was recommending it and Dick Charles
moved to approve the Resolution and pass it on to the City Council, Ed
Brinson 2nd the motion and motion carried unanimously. Tim Kant said he
would still like something that adopted by the commission that will stop any
construction on Hwy 181 until we get a plan from the state. Gregg said he
would be meeting again tomorrow with Gorman Shaffer, the 3rd work
session, and also said that a joint session is planned for the City Council
and Planning Commission on December 20th at 4:00 PM with Gorman
Shaffer who is doing our drainage and traffic study.
Gregg also presented to the commission a court order that he had received
regarding Tuscany Village subdivision where the city was ruled against and
told the commission members what he felt they should do in making future
motions, be specific in voting. He said we could make a form that can be
forwarded to the applicant stating the decision of the Planning & Zoning
Commission and conditions for approval and denial. Bob Clark said he
would like to acknowledge receipt of the court order from Judge James Reid
and go forward. Further discussion led to a motion by Dick Charles, 2nd by
Bob Clark, to pass a resolution authorizing staff to proceed with the Tuscany
Village application and our obligations therein in accordance with the court
order. Motion was passed unanimously.
The calendar for 2007 meetings was duly approved as presented (in P& Z
file)
Meeting was duly adjourned at 6:05 PM
____________________________ ______________________
Jean Wilson, Chairman Betty Rivenbark, Secretary