Loading...
HomeMy WebLinkAbout11-06-1989 Special Meeting1060 NOTICE AND CALL OF SPECIAL MEETING Notice is hereby given of a special meeting of the City Council of the City of Fairhope, Alabama, to be held at the Fairhope Municipal Complex -Mayors Office, on Monday, the 6th of November, 1989, at 4:45 pm, for the purpose of accepting a bid on asphalt to resurface Fairhope Avenue from Bancroft Street to Greeno Road and Fairwood Boulevard,(one side), from Fairhope Avenue to Bayou Avenue. J mes P. Nix, Mayor CONSENT TO HOLDING OF MEETING The undersigned members of the City Council of the City of Fairhope, Alabama, do hereby acknowledge service of the Notice and Call of Special Meeting hereinabove set forth and do hereby consent to the holding of such meeting at such time and in such place and for the "pose et forth therein. �P f 1061 STATE OF ALABAMA X COUNTY OF BALDWIN X The City Council, City of Fairhope, met in special session at 4:45 pm; Fairhope Municipal Complex Mayors Office; 161 North Section Street; Fairhope, Alabama; on Monday, 6 November 1989. The purpose of this meeting was to accept the low bid on resurfacing part of Fairhope Avenue (from Greeno Road to Bancroft Street) and one side of Fairwood Boulevard (from Fairhope Avenue to Bayou Serest). XURNU rr Present were Mayor James P. Nix; Councilmembers Roy C. White, David E. Bishop, Michael A. Ford, and Barney L. Shull; City Attorney Marion E. Wynne and City Clerk Evelyn Phillips. Councilwoman Jeanette Puckett was out of town. There being a quorum present, Mayor Nix called the meeting to order. There were two bids to consider: Timco, Inc., of Bay Minette, at $8.00 per ton; and H.O. Weaver & Son, of Mobile) at $4.40 per ton. Purchasing recommended acceptance of the low bid from Weaver & Son. So moved by Councilman Shull. Seconded by Councilman Bishop, motion passed unanimously. This bid is for placing the asphalt. The material will be purchased from the County (at approximately 7.50 per ton). This resurfacing will be done in connection with the Water & Sewer Extension project now in progress and the resurfacing will replace patching provided for in the W.R. Mitchell contract.... the cost of resurfacing will be paid for by the reduced funds from Mitchell plus Gas Tax funds .... total costs estimated to be $49,000. Meeting was duly adjourned at 4:46 pm. ^- /4PI► ix, Mayor ty c1pr